E 15/1620
Register summary
- Holder
- Corona Minerals Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 21 Aug 2017
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147702 | 2025 | Maximus Resources Limited | Lefroy Lithium Project | 20% | CO-FUNDED DRILLING REPORT KANDUI LITHIUM (R28) |
| A152841 | 2025 | Essential Metals Pty Ltd | Horse Rocks | <1% | Partial Surrender for the Horse Rocks Project E15/1710 for the period ending 28/01/2025. |
| A138155 | 2024 | Equinox Resources Limited | Auxesia | <1% | Auxesia Project E15/1903 Annual Mineral Exploration Report for the period ending 15/11/2023 |
| A135077 | 2023 | Maximus Resources Limited | Hilditch West EIS | 29% | Hilditch West EIS (R24) |
| A128396 | 2021 | St Ives Gold Mining Company Pty Limited | Kambalda West | <1% | Partial Surrender Report for E15/1457 Kambalda West project for the period 11 August 2015 to 10 August 2021 |
214 more reports
| A123203 | 2020 | St Ives Gold Mining Company Pty Limited | Kambalda West | <1% | Kambalda West Project C115/2013 - Combined Annual Technical Report for the period 1 January 2019 to 31 Decembe |
| A124682 | 2020 | Maximus Resources Limited | Wattle Dam | 17% | Wattle Dam C242/1996 Annual Report For the Period 1 May 2019 to 30 April 2020 |
| A123048 | 2020 | Corona Minerals Pty Ltd | Spargos Reward | 73% | Spargos Reward Project C13/2020 Annual Report for the period ending 31/12/2019 |
| A122914 | 2020 | Yilmia Andalusite Pty Ltd | Yilmia | 67% | Yilmia Project E15/1460 Annual Report for the Period 25 August 2018 to 24 August 2019 |
| A119452 | 2019 | St Ives Gold Mining Company Pty Limited | Kambalda West | <1% | Kambalda West Project C115/2013 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120349 | 2019 | Maximus Resources Limited | Wattle Dam | 17% | Wattle Dam Tenement Group M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1474, M15/1769-1776. Combined |
| A121925 | 2019 | Corona Minerals Pty Ltd | Spargos Reward | 71% | Spargos Reward Annual Technical Report C57/2013 for the period 1 October 2018 to 30 September 2019, P15/05791, |
| A118960 | 2019 | Reed Industrial Minerals Pty Ltd | Mount Marion | 10% | Final Surrender E15/1504 Mt Marion for the period 7 September 2016 to 1 November 2018 |
| A118202 | 2018 | Reed Industrial Minerals Pty Ltd | Mount Marion | 4.6% | Combined Annual Report (C110/2011) for the period 21 August 2017 to 20 August 2018. Mt Marion Project, M15/717 |
| A116332 | 2018 | St Ives Gold Mine | Kambalda West | <1% | Kambalda West Project C115/2013 Combined Annual Technical Report for the period 1 January 2017 to 31 December |
| A116102 | 2018 | Corona Minerals Limited | Lady Allison | 86% | Year 1 Lady Allison Project C72/2016 Annual Technical Report for the period 16 March 2017 to 15 March 2018, Mi |
| A116954 | 2018 | Maximus Resources Limited; Lepidico Ltd | Wattle Dam | 17% | Wattledam Tenement Group C242/1996, M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1474, M15/1769-1776. |
| A117522 | 2018 | Maximus Resources Limited | Kambalda West | 22% | Kambalda West Tenement Group Combined Annual Technical Report No. C443/1996, 11 August 2017 - 10 August 2018 |
| A118307 | 2018 | Corona Minerals Limited | Spargos Reward | 71% | Year 6 Combined Annual Report for the Spargos Reward Project C57/2013 For the Period 1 October 2017 to 30 Sept |
| A118479 | 2018 | Strategic Resource Management Pty Ltd | Yilmia | 67% | Annual Technical Report E15/1460 Yilmia Project for the period 25 August 2017 to 24 August 2018 |
| A112801 | 2017 | Corona Minerals Limited | Lady Allison | 45% | Year 1 Combined Annual Report - Lady Allison Project for the period 16/03/2016 to 15/03/2017, M15/01806, P15/0 |
| A115206 | 2017 | Strategic Resources Management Pty Ltd | Yilmia | 67% | Annual Technical Report E15/1460 Yilmia Project for the period 25 August 2016 to 24 August 2017 |
| A112047 | 2017 | Strategic Resource Management Pty Ltd | Yilmia | 67% | Yilmia Project E15/1460 Annual Report for the Period 25 August 2015 to 24 August 2016 |
| A112252 | 2017 | St Ives Gold Mining Company Pty Limited | Kambalda West | <1% | Kambalda West Project C115/2013 Annual Report for the period 1 January 2016 to 31 December 2016, E15/00972.... |
| A114056 | 2017 | Maximus Resources Limited | Wattle Dam | 17% | WATTLE DAM TENEMENT GROUP M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1474, M15/1769-1776 COMBINED T |
| A114128 | 2017 | Maximus Resources Limited | Kambalda West | 21% | Kambalda West Tenement Group Combined Annual Technical Report No. C443/1996 for the period 11 August 2016 to 1 |
| A115086 | 2017 | Reed Industrial Minerals Pty Ltd | Mount Marion | 7.8% | Combined Annual Report (C110/2011) for the period 21 August 2016 to 20 August 2017 Mt Marion Project M15/717, |
| A115275 | 2017 | Corona Minerals Limited | Spargos Reward | 71% | Spargos Reward C57/2013 Year 5 Combined Annual Report for the period 1 October 2016 to 30 September 2017, P15/ |
| A108405 | 2016 | St Ives Gold Mining Company Pty Limited | Kambalda West | <1% | Kambalda West COmbined Annual Technical Report (C115/2013) for the period 01 January 2015 - 31 December 2015 |
| A109457 | 2016 | Maximus Resources Ltd | Wattle Dam | 17% | Wattle Dam Tenement Group Combined Technical Report the period 1st May 2015 to 30th June 2016, M15/1101, M15/1 |
| A110145 | 2016 | Maximus Resources Limited | Kambalda West | 19% | Kambalda West Tenement Group Combined Annual Technical Report No. C443/1996 For the Period 11 August 2015 to 1 |
| A110395 | 2016 | Corona Minerals Limited | Spargos Reward | 71% | Year 4 Combined Annual Report For the Period 11 August 2015 to 10 August 2016, P15/04876, E15/01423, P15/04877 |
| A110417 | 2016 | Reed Resources Ltd | Mount Marion | 7.8% | Combined Annual Report for the Period 21 August 2015 to 20 August 2016. Mt Marion Project C110/2011, M15/1000, |
| A104710 | 2015 | Dale G R | Breakaway | 40% | Annual Combined Report E15/1202 and E15/1293 Breakaway Andalusite Project C27/2013 (10 Dec 2012 to 9 Dec 2014 |
| A104829 | 2015 | Mithril Resources Ltd | Spargoville | 28% | Annual report for the period 30 December 2013 to 29 December 2014, C100/2011, Spargoville, E15/1174; M15/1806 |
| A105189 | 2015 | St Ives Gold Mining Co Pty Ltd | Kambalda West | <1% | Kambalda West Project Combined Annual Technical Report C115/2013 for the period 01/01/2014 - 31/12/2014, M15/3 |
| A106292 | 2015 | Tychean Resources Ltd | Wattle Dam | 17% | Wattle Dam Tenement Group M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1474, M15/1769‐1776 Combined T |
| A106294 | 2015 | Tychean Resources Ltd | Kambalda West | 18% | KAMBALDA WEST TENEMENT GROUP E15/967‐968, M15/395, M15/703, P15/4884‐4885, P15/4963, P15/5860 COMBINED TECHNIC |
| A107346 | 2015 | Corona Minerals Limited | Spargos Reward | 69% | Year 3 Combined Annual Report |
| A104092 | 2014 | Yilmia Andalusite Pty Ltd | Yilmia | 32% | YILMIA PROJECT E15/1311, P15/5630 and P15/5631 GROUP REPORT C161/2012 For the Period 31 July 2013 to 30 July 2 |
| A104116 | 2014 | St Ives Gold Mining Co Pty Ltd | Kambalda West | <1% | Kambalda West Project, Partial Surrender Report for the period 03/10/2008 to 02/10/2014, E15/975. [C115/2013] |
| A100473 | 2014 | Dale G R | Breakaway | 40% | Annual Combined Mineral Exploration Report E15/1202 and E15/1293 Breakaway Andalustite Project C27/2013 for th |
| A101202 | 2014 | Mithril Resources Ltd | Spargoville | 28% | Spargoville Project, Annual Report for the period 30/12/2012 to 29/12/2013, E15/1174; M15/1806; P15/4801-4802, |
| A101561 | 2014 | St Ives Gold Mining Co Pty Ltd | Kambalda West | <1% | KAMBALDA WEST PROJECT COMBINED ANNUAL TECHNICAL REPORT (C115/2013) FOR THE PERIOD 01 JANUARY 2013 – 31 DECEMBE |
| A102330 | 2014 | Yilmia Andalusite Pty Ltd | Yilmia | 32% | Yilmia Project E15/1311, P15/5630 and P15/5631 (C161/2012) For the Period 31 July 2012 to 30 July 2013 |
| A102491 | 2014 | Tychean Resources Ltd | Wattle Dam | 17% | Annual Technical Report Wattle Dam Group M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1474, M15/1769 |
| A103383 | 2014 | Creasy M G | Spargo | 100% | Annual Report P15/5259 Spargo Project For the period 16th July 2013 – 15th July 2014 |
| A103774 | 2014 | Mithril Resources Ltd | Spargos Reward | 89% | Year 2 combined annual report for the period 11 August 2013 to 10 August 2014, C57/2013, Spargos Reward |
| A103795 | 2014 | Tychean Resources Ltd | Kambalda West | 19% | Kambalda West Project, Annual Report for the period 11/08/2013 to 10/08/2014, E15/967-968; M15/395, 703;P15/48 |
| A97073 | 2013 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Kambalda West Project, Annual Report for the period 1st January 2012 to 31st December 2012, E15/972-974, 983-9 |
| A96871 | 2013 | Kalnorth Gold Mines Ltd | Spargoville | 28% | Spargoville Project, Annual Report for the period 30th December 2011 to 29th December 2012, (Lady Alli |
| A96963 | 2013 | Dale G R | Breakaway | 40% | Annual Mineral Exploration Report Exploration Licence E15/1202 and E15/1293 YILMIA ANDALUSITE PROJECT December |
| A99460 | 2013 | Creasy M G | Spargo | 100% | Annual Report P15/5259 Spargo Project, For the period 16th July 2012 – 15th July 2013. |
| A99611 | 2013 | Bhp Billiton Nickel West Pty Ltd | Pilbailey | <1% | Pilbailey JV Annual Mineral Exploration Report - DMP Combined Reporting Group C238/2008 Reporting Period 3rd O |
| A100238 | 2013 | Mithril Resources Ltd | Spargos Reward - West Kambalda | 91% | Year 1 Combined Annual Report for the period 1 October 2012 to 30 September 2013, C57/2013, Spargos Reward |
| A92914 | 2012 | Carrick Gold Ltd | Spargoville | 29% | Annual report for the period 30 December 2010 to 29 December 2011, Spargoville Project, C100/2011, P15/4801, 4 |
| A93234 | 2012 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group C96/2008 Reporting Period: 1 January 2011 – 3 |
| A94266 | 2012 | Ramelius Resources Ltd | Wattle Dam | 17% | WATTLE DAM TENEMENT GROUP M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M15/1769-1776. COMBINED TECHNICAL |
| A95640 | 2012 | Breakaway Resources Ltd | Kambalda West | 36% | Annual Report, KAMBALDA WEST PROJECT C443/1996, 11 August 2011 to 10 August 2012, E15/967, E15/968, M15/395, M |
| A92792 | 2012 | Dale G R | Yilmia | 50% | ANNUAL MINERAL EXPLORATION REPORT EXPLORATION LICENCE E15/1202 YILMIA ANDALUSITE PROJECT 10 December 2010 to 9 |
| A95679 | 2012 | Bhp Billiton Nickel West Pty Ltd | Pilbailey | <1% | Pilbailey JV Combined Annual Mineral Exploration Report E15/975, P15/4972·4977 C238/2008 for th e period 3rd O |
| A89070 | 2011 | Bhp Billiton Ltd | Kambalda West | <1% | C115/2013 Kambalda West (Pilbailey JV) Annual Mineral Exploration Report, 3 October 2009 – 2nd October 2010 |
| A90789 | 2011 | Ramelius Resources Ltd | Wattle Dam | 27% | Annual Technical Report – Combined Technical Report No. C242/1996, 1 May 20010 to 30 April 2011 |
| A91680 | 2011 | Bhp Billiton Nickel West Pty Ltd | Pilbailey - Kambalda West | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group C238/2008 Reporting Period 3rd October 2010- |
| A91817 | 2011 | Heron Resources Ltd | Spargoville | 56% | Annual report for the period 26 July 2010 to 25 July 2011, Spargoville Project, E15/1163 |
| A89069 | 2011 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Kambalda West Annual Mineral Exploration Report, C96/2008, 1 January 2010 – 31 December 2010 |
| A90555 | 2011 | Carrick Gold Ltd | Spargoville | 100% | Spargoville Project Annual Mineral Exploration Report (P15/4888) for the period 10th March 2010 - 9th March 2 |
| A91604 | 2011 | Breakaway Resources Ltd | Kambalda West | 36% | Annual Report, KAMBALDA WEST PROJECT C443/1996, 11 August 2010 to 10 August 2011 |
| A86802 | 2010 | Ramelius Resources Ltd | Prime | 100% | Final Surrender Report, Prime Tenement – P15/4444, Final Surrender Technical Report, Coolgardie Mineral Field |
| A87017 | 2010 | Ramelius Resources Ltd | Logans / Larkinville | <1% | Annual Report for the period 28 March 2009 to 27 March 2010, Logans / Larkinville Project, E15/689, E15/742, E |
| A85917 | 2010 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Kambalda West Annual Mineral Exploration Report C96/2009 Tenement Numbers: E15/1069, E15/972, E15/973, E15/974 |
| A86290 | 2010 | Heron Resources Ltd | Logans Find | <1% | Surrender report for the period 13 August 2009 to 17 March 2010, Logans Find Project, E15/1118 |
| A86801 | 2010 | Ramelius Resources Ltd | Logans Larkinville | <1% | Final Surrender Report – Exploration Licences 15/689, E15/1062 and Prospecting Licence 15/4790, Part of Larkin |
| A87331 | 2010 | Ramelius Resources Ltd | Wattle Dam | 27% | Annual Technical Report Wattle Dam Tenement Group E15/718, M15/1101, M15/1263, M15/1264, M15/1338, M15/1769-17 |
| A87941 | 2010 | Pindan Exploration Company Pty Ltd | LOGAN’S FIND | 15% | LOGAN’S FIND PROJECT Partial Surrender Report for the period 3 Aug 2006 to 2 Aug 2010 E15/849 |
| A87942 | 2010 | Pindan Exploration Company Pty Ltd | LOGAN’S FIND | 15% | LOGAN’S FIND PROJECT Annual Report for the period 3 Aug 2009 to 2 Aug 2010 E15/849 |
| A88150 | 2010 | Breakaway Resources Ltd | Kambalda West | 36% | Annual Report, Kambalda West Project C443/1996, 11 August 2009 to 10 August 2010 |
| A82299 | 2009 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Kambalda West Annual Mineral Exploration Report, Period: 1 January 2008 – 31 December 2008, C96/2008, E15/223, |
| A82723 | 2009 | Ramelius Resources Ltd | LARKINVILLE/LOGANS | <1% | PARTIAL SURRENDER REPORT, EXPLORATION LICENCE 15/689 PART OF LARKINVILLE/LOGANS PROJECT, REPORTING PERIOD 10/0 |
| A84418 | 2009 | Panoramic Resources Ltd | LOGAN’S FIND | 15% | LOGAN’S FIND PROJECT Annual Report for the period 3 Aug 2008 to 2 Aug 2009, E15/849 |
| A84739 | 2009 | Breakaway Resources Ltd | Kambalda West | 37% | Annual Report Kambalda West Project C443/1996 11 August 2008 to 10 August 2009, E15/967, E15/968, M15/395, M15 |
| A82915 | 2009 | Ramelius Resources Ltd | WATTLE DAM | 27% | ANNUAL TECHNICAL REPORT WATTLE DAM TENEMENT GROUP E15/718, M15/1101, M15/1263, M15/1264, M15/1323, M15/1338, M |
| A84417 | 2009 | Pindan Exploration Company Pty Ltd | LOGAN’S FIND | 15% | LOGAN’S FIND PROJECT Partial Surrender Report for the period 3 Aug 2006 to 2 Aug 2009, E15/849 |
| A85245 | 2009 | Bhp Billiton Nickel West Pty Ltd | Pilbailey Joint Venture | <1% | Annual Report Pilbailey Joint Venture C238/2008, E15/975, P15/4972, P15/4973, P15/4974, P15/4975, P15/4976, P1 |
| A77395 | 2008 | Bhp Billiton Nickel West Pty Ltd | New Celebration | <1% | NEW CELEBRATION PROJECT (C225/1994), COMBINED ANNUAL REPORT FOR THE PERIOD JANUARY 1, 2007 TO DECEMBER 31, 200 |
| A78273 | 2008 | Nex Metals Exploration Ltd | Depot Hill Project | <1% | Annual Exploration Report for Exploration Licence 15/881 Depot Hill Project 6/2/07 - 5/2/08 |
| A78652 | 2008 | Ramelius Resources Ltd | LARKINVILLE LOGANS | <1% | PARTIAL SURRENDER REPORT EXPLORATION LICENCE 15/689 PART OF LARKINVILLE/LOGANS PROJECT REPORTING PERIOD 20/04/ |
| A78709 | 2008 | Ramelius Resources Ltd | Logans Larkinville | <1% | ANNUAL REPORT LOGANS/LARKINVILLE PROJECT E15/689, E15/742, P15/4213, P15/4214 FOR THE PERIOD 28/03/07 TO 27/03 |
| A79467 | 2008 | Breakaway Resources Ltd | Kambalda West | 24% | Kambalda West Project, Final Surrender Report for the period ending 19th May 2008, E15/643 & 643. [C443/1996] |
| A79543 | 2008 | Liontown Resources Ltd | Logan's Find | 15% | LOGAN’S FIND PROJECT E15/849 Annual report for the period 3 August 2007 – 2 August 2008 |
| A80060 | 2008 | Breakaway Resources Ltd | Kambalda West | 36% | Annual Technical Report 11 August 2007 to 10 August 2008 |
| A82476 | 2008 | Ramelius Resources Ltd | LOGANS/LARKINVILLE | <1% | ANNUAL REPORT LOGANS/LARKINVILLE PROJECT E15/689, E15/742, E15/1062, P15/4213, P15/4214, P15/4790, COOLGARDIE |
| A78697 | 2008 | Dioro Exploration Nl | Spargoville West | 100% | ANNUAL EXPLORATION REPORT YEAR ENDING JUNE 5TH 2008 |
| A79091 | 2008 | Ramelius Resources Ltd | Wattle Dam | 27% | COMBINED TECHNICAL REPORT WATTLE DAM TENEMENT GROUP E15/718, M15/1101, M15/1263, M15/1264, P15/3767, P15/3873, |
| A79517 | 2008 | Breakaway Resources Ltd | Maincoast Option | 21% | ANNUAL TECHNICAL REPORT MAINCOAST OPTION FOR THE PERIOD 1 JULY 2007 – 30 JUNE 2008 COOLGARDIE MINERAL FIELD, W |
| A79925 | 2008 | Ramelius Resources Ltd | Prime | 100% | Prime Tenement, P15/4444, Annual Technical Report Coolgardie Mineral Field, Western Australia For the Period |
| A80080 | 2008 | Ramelius Resources Ltd | Wattle Dam | 30% | Surrender Technical Report – GSWA Ref No. M 9927/1, E15/718, Coolgardie Mineral Field, Western Australia.FOR T |
| A74857 | 2007 | South Kal Mines Pty Ltd | New Celebration | <1% | New Celebration Project C225/1994 Combined Annual Report for the Period 01/01/06 - 31/12/06 |
| A75576 | 2007 | Ramelius Resources Ltd | Wattle Dam | 27% | Annual Technical Report Wattle Dam Tenement Group E15/718, M15/1101,M15/1263,M15/1264,P15/3767,P15/3873,P15/44 |
| A76048 | 2007 | Breakaway Resources Ltd | Maincoast | 21% | Annual Technical Report Maincoast Option For the period 1 July 2006 - 30 June 2007 Prospecting Licences: P15/4 |
| A76547 | 2007 | Liontown Resources Ltd | Logans Find | 15% | ANNUAL REPORT 3 August 2006 - 2 August 2007 LOGANS FIND PROJECT E15/849 |
| A76590 | 2007 | Breakaway Resources Ltd | Spargoville | 36% | Annual Technical Report 11 August 2006 to 10 August 2007 Kambalda West Project Combined Annual Technical Repor |
| A75421 | 2007 | Ramelius Resources Ltd | Larkinville / Logans | <1% | Combined Technical Report C182/2001 Prospecting Licences 15/4213 & 4214 Exploration Licences 15/689 & 742 Part |
| A75866 | 2007 | South Kal Mines Pty Ltd | Spargoville West | 100% | Spargoville West C40/2004 Project Combined Annual Report for the Period June 6, 2006 to June 5, 2007 Prospecti |
| A71754 | 2006 | Breakaway Resources Ltd | Allen Option | 21% | Annual Technical Report, 1 November 2004 to 31 October 2005, Yilima Project E15/642-643 and P15/4248-4249, Com |
| A72281 | 2006 | South Kal Mines Pty Ltd | New Celebration | <1% | New Celebration C225/1994 Project, Combined Annual Report for the Period 1 January 2005 to 31 December 2005, ( |
| A72453 | 2006 | Ramelius Resources Ltd | Grave Hill | <1% | Combined Technical Report C182/2001, P15/4213,4214 & E15/689,742, Part of Larkinville/Logans Project, Period 2 |
| A72973 | 2006 | Breakaway Resources Ltd | Yilmia/Sinclair | 43% | Annual Technical Report, 28 March 2005 to 27 March 2006, Gilbert Option Project P15/4457, P15/4458, Combined R |
| A73069 | 2006 | Ramelius Resources Ltd | Wattle Dam | 27% | Annual Technical Report, Wattle Dam E15/718,M15/1101,1263, M15/1264,P15/3767,3873,4479,4651-4653, Combined Rep |
| A73339 | 2006 | South Kal Mines Pty Ltd | Spargoville West | 100% | Spargoville West Project P15/4101-4102, Combined Annual Report C40/2004, For the Period 6 June 2005 to 5 June |
| A73423 | 2006 | Breakaway Resources Ltd | Maincoast | 21% | Annual Technical Report, 21 July 2005 to 20 July 2006, Maincoast Project P15/4582-4583,4656, Combined Reportin |
| A73624 | 2006 | Breakaway Resources Ltd | Spargoville | 36% | Annual Technical Report, 11th August 2005 to 10th August 2006, Kambalda West Project. C443/1996. |
| A70161 | 2005 | Breakaway Resources Ltd | Allen Option | 21% | Annual technical report, 1st November 2003 to 31st October 2004, Yilmia Project, C59/2003, E15/642, E15/643, P |
| A70347 | 2005 | South Kal Mines Pty Ltd | New Celebration | <1% | Harmony, New Celebration C225/1994 Project, Combined Annual Report for period 1 January 2004 to 31 December 20 |
| A70481 | 2005 | Breakaway Resources Ltd | Gilbert Option | 43% | Annual technical report, 28th March 2004 to 27th March 2005 Gilbert Option Project, Report C50/2002, P15/4457, |
| A70526 | 2005 | Mr Williams J | Yilmia Andalusite | 46% | Annual report for the period 28/03/04 - 27/03/05 Yilmia Andalusite Project, C80/2001, P15/4201-4204, Kambalda |
| A70878 | 2005 | Ramelius Resources Ltd | Wattle Dam | 27% | Annual technical report, Wattle Dam tenement group, E15/718, M15/1101, M15/1263, M15/1264, P15/3767, P15/3873 |
| A70932 | 2005 | South Kal Mines Pty Ltd | Spargoville West | 100% | Spargoville West C40/2004 Project, Combined annual report for the period June 6, 2004 to June 5, 2005, Prospec |
| A71372 | 2005 | Breakaway Resources Ltd | Spargos Reward Project | 91% | Annual technical report, 11 August 2004 to 10 August 2005, Spargos Reward Project P15/3181-3186,3220,4181, Com |
| A68045 | 2004 | Ramelius Resources Ltd | Wattle Dam | 100% | Annual Report for the Period 13/02/03-12/02/04 Wattle Dam Tenement Group P15/3767 |
| A68346 | 2004 | South Kal Mines Pty Ltd | New Celebration | <1% | Harmony, New Celebration C225/1994 Project, Combined Annual Report for the period 1 January, 2003 to 31 Decemb |
| A68626 | 2004 | Mr Dale Gr | Yilmia Andalusite | 46% | Annual Report for the period 28/03/2003-27/03/2004 Yilmia Andalusite Project (C80/2001), P15/4201 |
| A68738 | 2004 | Ramelius Resources Ltd | Queen Victoria Rocks | 12% | Annual Technical Report for the period 01/05/03-30/04/04 Wattle Dam Project (C242/1996), P15/3632, P15/3637, P |
| A69053 | 2004 | South Kal Mines Pty Ltd | Spargoville West | 46% | Spargoville West C40/2004 Project, Combined Annual report for the period June 6, 2003 to June 5, 2004, Prospec |
| A69335 | 2004 | Breakaway Resources Ltd | Spargos Reward | 91% | Annual technical report, 11th August 2003 to 10th August 2004, Spargos Reward Project, P15/3181, P15/3182, P15 |
| A69504 | 2004 | Agricola Minerals Pty Ltd | Yilmia | 82% | Annual report for the period 12/09/03 - 11/09/04 Yilmia Andalusite Project, P15/4303 |
| A69553 | 2004 | Breakaway Resources Ltd | Spargos Reward | 91% | Annual technical report for the period 11/08/03 - 10/08/04 Spargos Reward Project, C443/1996, P15/3181, P15/31 |
| A67499 | 2003 | Agricola Minerals Pty Ltd | Yilmia Andalusite | 82% | Annual Report for the period 12 September 2002 -11 September 2003 Yilmia Andalusite Project P15/4303 |
| A67626 | 2003 | Breakaway Resources Ltd | Spargos Reward | 100% | Annual Technical Report for the period 11/08/2002-10/8/2003 Spargos Reward Project P15/3181-3186, P15/3220 |
| A67902 | 2003 | Breakaway Resources Ltd | Yilima | 21% | Annual Report for the period 01/11/2002- 31/10/2003 Yilima Project C59/2003, E15/642-643, P15/4248-4249 |
| A65871 | 2003 | South Kal Mines Pty Ltd | New Celebration | <1% | Combined Annual Report for the period January 1, 2001 to December 31, 2001 New Celebration C225/1994 Project R |
| A66629 | 2003 | Agricola Minerals Pty Ltd | Yilmia | 46% | Annual Report for the period 28 March 2002 to 27 March 2003 Yilmia Andalusite Project C80/2001: P15/4201-04 |
| A66786 | 2003 | Ramelius Resources Ltd | Wattle Dam | 12% | Combined Annual Technical Report for the period 01/05/02 to 30/04/03 Wattle Dam Tenement Group C242/1996:P15/3 |
| A67107 | 2003 | South Kal Mines Pty Ltd | New Celebration | <1% | Combined Annual Report for the period January 1 2002 to December 31 2002 New Celebration Project C225/1994: E1 |
| A64365 | 2002 | South Kal Mines Pty Ltd | Ellen Dam | <1% | Annual Report on The New Celebration Combined Reporting Group For The Period Ending 31/12/01. Tenements covere |
| A64625 | 2002 | Ramelius Resources Ltd | Spargos South | 23% | Spargos South Tenement Group Prospecting Licences 15/4117 - 4118: 15/4457 - 4458: For The Period 28.03.01 To 2 |
| A64905 | 2002 | Mr Williams J | Yilmia Andalusite | 46% | Annual Report P15/4201, P15/4202, P15/4203, P15/4204 For The Period 28 March 2001 to 27 March 2002 Yilmia Anda |
| A65362 | 2002 | Mr Williams J | Yilmia Andalusite | 82% | Annual Report P15/4303 For The Period 12 September 2001 to 11 September 2002. Yilmia Andalusite Project Wester |
| A65384 | 2002 | Ramelius Resources Ltd | Spargoville | 91% | Combined Annual Report C443/1996 Spargos Reward Tenement Group Prospecting Licences 15/3181 - 3186; 3220: 4181 |
| A62311 | 2001 | Anglogold Australasia Ltd | Yilmia Sinclair | 27% | Final Report for the period 31 March 2000 to 18 January 2001 Yilmia Sinclair Project P15/3981, P15/3982, P15/3 |
| A61873 | 2001 | Newcrest Mining Ltd | New Celebration | <1% | Annual Report on New Celebration combined reporting group 1 January 2000 to 31 December 2000. Tenements cover |
| A62063 | 2001 | St Francis Mining Nl | Spargos Find | 40% | Annual Report for the period 06/11/1999 - 05/11/2000 Spargos Find - E15/482 Coolgardie Mineral Field, Western |
| A63136 | 2001 | Wmc Resources Ltd | Resolute JV | 3.5% | Annual Report (C113/2000) for the Resolute Joint Venture. |
| A63213 | 2001 | Spinifex Gold Nl | Wattle Dam | <1% | Surrender Report Wattle Dam Project. Mining Lease 15/754- Period 9 February 1995 to 6 April 2001 And Explorati |
| A60172 | 2000 | Newcrest Mining Ltd | Mount Marion | <1% | Annual Report for the Mt Marion South Project for the Period 01/01/1999 to 31/12/1999 Tenements covered by thi |
| A60854 | 2000 | Anglogold Australasia Ltd | SINCLAIR YILMIA | 22% | Sinclair Yilmia project, P15/3981-3983; P15/3987; P15/4004; P15/4117-4118 Annual Report for the Period 01/06/1 |
| A59624 | 2000 | Acacia Resources Ltd | Yilmia Hill | 4.2% | Yilmia Hill Project E15/553-554 01/01/1999 - 31/12/1999 |
| A60389 | 2000 | Resolute Ltd | Logan's Find | 12% | Partial Surrender Report Logans FInd Joint Venture E15/380 for the period 02/12/1994 to 09/06/1999. Resolute L |
| A61236 | 2000 | Amalg Resources Nl | Spargoville | 100% | Combined Annual Report Spargos Reward Year Ending 10/08/2000 (P15/3181 to P15/3186 P15/3220) |
| A61407 | 2000 | Anglogold Australasia Ltd | Yilmia Hill | 5.4% | Yilmia Hill P15/4322,4323, Final Report for the Period 29/08/2001. Report No 8.10110 |
| A62470 | 2000 | Mr Williams J | Yilmia | 46% | Yilmia Andalusite Deposit. P15/4201-4204. 28/3/2000- 27/3/2001. |
| A57943 | 1999 | Resolute Ltd | Logans Find | 31% | Annual report Logans Find Joint Venture. E15/297,380. 01/04/98-31/03/99. |
| A57951 | 1999 | Newcrest Mining Ltd | Mount Marion South | <1% | Annual Report For the Mt Marion South Project For the Period 01/01/1998 to 31/12/1998 |
| A58128 | 1999 | Resolute Ltd | Logans Find | 1.4% | Two Year Report, E 15/286 For the Period 01/01/1997 to 31/12/1998. Logans Find. |
| A58783 | 1999 | Amalg Resources Nl | Spargos Reward | 100% | Annual report Spargos Reward Project P15/3181-3186 P15/3220 C443/1996 (11/08/98-10/08/99) |
| A53664 | 1998 | Resolute Ltd | Logans Find | 100% | Surrender Report, Logans Find Joint Venture, P15/3411 for the period 19th April 1994 to 28th August 1997. |
| A53665 | 1998 | Resolute Ltd | Logans Find | 76% | Surrender Report, Logans Find Joint Venture P15/3412 for the period 19th April 1994 to 28th August 1997. |
| A54754 | 1998 | Newcrest Mining Ltd | Mount Marion North | <1% | Mt Marion North Project, Period Ending: 31/12/97 Annual Report E15/222, 216, 275, 343, 721-723, etc. |
| A57947 | 1998 | Resolute Ltd | Logans Find | 24% | Logans Find Joint Venture E15/297, 380, M15/729, 730, 659, 687, 728 01/05/1997 - 30/04/1998 |
| A56108 | 1998 | Resolute Ltd | Bulong | <1% | Combined annual mineral exploration report. Bulong Project. 01/01/97-31/12/97. E15/286. E25/67. E27/94,95. P25 |
| A53416 | 1998 | Resolute Ltd | Logans Find | 12% | Partial Surrender Report Logans Find Joint Venture E15/380 for the period 2nd December 1994 to 28th August 19 |
| A54385 | 1998 | Newcrest Mining Ltd | Mt Marion South | <1% | Mt Marion South Project, Annual Report 01/01/97 - 31/12/97 E15/223, M15/717-720, 841-843, MLA15/934-936 |
| A56024 | 1998 | Amalg Resources Nl | Spargos Reward | 100% | Annual report Spargos Reward Project. P15/3181-3186,3220. 09/98. |
| A56753 | 1998 | Spinifex Gold Nl | Wattle Dam | 1.6% | Wattle Dam Project, Annual Report for the period 01/05/97 - 30/04/98, P15/3873, 3756, 3637, 3638, 3632, ,3335- |
| A51057 | 1997 | Spinifex Gold Nl | Wattle Dam | 7% | Annual Report for the period 1st November 1995 to 31st October 1996, Wattle Dam Project, P15/3762. |
| A51419 | 1997 | Resolute Ltd | Logans Find | 37% | Partial Surrender Report, Logans Find JV, E15/297 for the period 18th March 1993 to 17th March 1997. |
| A51457 | 1997 | Resolute Ltd | Logans Find | 17% | Surrender Report, Logans Find JV, E15/269 for the period 2nd December 1991 to 1st December 1996. |
| A51510 | 1997 | Resolute Ltd | Logans Find/ Eivers Find | 1.4% | Logans Find/ Eivers Find Project, Partial Surrender Report E15/286 for the period 8th June 1994 to 10th June 1 |
| A51916 | 1997 | Resolute Ltd | Logans Find | 16% | Annual report Logans Find Joint Venture C263/1995 E15/297 E15/295 E15/380 E15/199 E15/269 M15/659 M15/687 M15/ |
| A52495 | 1997 | Resolute Ltd | Bulong | 1.4% | Bulong project, Partial Surrender Report E15/286 for the period 8 June 1994 to 10 June 1996. |
| A52569 | 1997 | Resolute Ltd | Bulong | 1.4% | Bulong Project. Annual Report E15/286. Period 01/01/96-31/12/96. |
| A51058 | 1997 | Spinifex Gold Nl | Wattle Dam | 100% | Annual Report for the period 14th February 1996 to 13th February 1997, Wattle Dam Project, P15/3767. |
| A51032 | 1997 | Newcrest Mining Ltd | Mount Marion South | <1% | Report No. W130/382 annual report for the Mt Marion South Project E15/223 M15/717 M15/718 M15/719 M15/720 M15/ |
| A52226 | 1997 | Spinifex Gold Nl | Wattle Dam | 1.6% | Annual Report for the period 01/05/96-31/04/97 Wattle Dam Project, P15/3873,3756,3637,3638,3632,3335-3338,376 |
| A47701 | 1996 | Central Kalgoorlie Gold Mines Nl | Pilbailey | 17% | Pilbailey (JV) Project, Annual Report for period 01/12/1994 to 01/12/1995, Part E15/269. |
| A48294 | 1996 | Gwalia Consolidated Ltd | Yilmia | 39% | Yilmia Project, Annual Report for the period 18/04/1995 to 17/04/1996, E15/321; P15/3415 & 3417. |
| A48489 | 1996 | Resolute Samantha Ltd | Bulong | <1% | Bulong Nickel Cobalt Project Annual report Bulong (water) Tenements Group E15/286 E15/324 E27/94 E27/95 P25/10 |
| A48609 | 1996 | Resolute Samantha Ltd | Logans Find | 100% | Logans Find Project, Surrender Report for the period 6th September 1994 to 5th September 1995, P15/3620. |
| A48665 | 1996 | Border Gold Ltd | Logans Find | 37% | Logans Find Project, Partial Surrender Report for the period 18th March 1993 to 17th March 1996, E15/297. |
| A49090 | 1996 | Amalg Resources Nl | Spargo's Reward | 100% | Spargo's Reward Project, Annual Report for the period 11th August 1995 to 10th August 1996,P15/3181- P15/3186 |
| A48607 | 1996 | Resolute Samantha Ltd | Logans Find | 16% | Annual report Logans Find Joint Venture E15/297 E15/295 E15/199 E15/269 E15/380 M15/659 M15/687 M15/728 M15/72 |
| A49482 | 1996 | Resolute Ltd | Carbine North | 4.4% | Annual report Carbine North Project Mining Leases M16/83 M16/84 M16/187 M24/212 Prospecting Licences P16/1513 |
| A45024 | 1995 | Border Gold Ltd | Logans Find | 16% | Annual Report Logans Find Joint Venture, E15/297, E15/295, E15/199, E15/269, E15/380, M15/659, M15/687, M15/72 |
| A45232 | 1995 | Gwalia Consolidated Ltd | Yilmia | 39% | Yilmia Project, Annual Report E15/321, P15/3415 & P15/3417 for the period 18/04/1994 to 17/04/1995. |
| A43928 | 1995 | Amalg Resources Nl | Spargos Reward | 100% | Spargos Reward Project, Non-statutory Report: Exploration Intiative 1994 (P15/3181 to P15/3186 1994) |
| A44324 | 1995 | Central Kalgoorlie Gold Mines Nl | Pilbailey | 17% | Pilbailey(JV) Project, Annual Report for period 01/12/1993 to 01/12/1994 Part E15/269. |
| A45574 | 1995 | Amalg Resources Nl | Spargos Reward | 100% | Annual Report 1994 to 1995 Spargos Reward project, P15/3181 P15/3182 P15/3183 P15/3184 P15/3185 P15/3186 & P15 |
| A42026 | 1994 | Western Mining Corporation Ltd | Bulong - Kalgoorlie | 1.4% | Annual report for the period 11/06/93-10/06/94 Bulong Project E15/286 |
| A40342 | 1994 | Central Kalgoorlie Gold Mines Nl | Pilbailey | 3.8% | Annual report for the period 01/02/93-31/01/94 Pilbailey JV Project E15/269 E15/288 |
| A41409 | 1994 | Samantha Gold Nl | Logans Find | 18% | Annual report for the period 01/05/93-30/04/94 Logans Find JV Project E15/199 E15/269 E15/297 E15/295 M15/659 |
| A41835 | 1994 | Main Reef Gold Ltd | Spargoville | 100% | Annual Report for the period 06/93-06/94, Spargoville Project, P15/2752,2953 |
| A38126 | 1993 | Border Resources Nl | Logan's | 4.3% | Annual report for the period 04/92-04/93 Logan's Project E15/199 E15/269 E15/295 P15/2636-2637 M15/659 |
| A40551 | 1993 | Border Resources Nl | Twenty Grand | 17% | Twenty Grand Project, Annual Report for period ending 2nd December 1993, E15/269. |
| A38139 | 1993 | Western Mining Corporation Ltd | Bulong | <1% | Annual report for the period 06/92-03/93 Bulong Project E15/286 E27/94-95 P25/1196-1214 P27/1247 P27/1252 |
| A38666 | 1993 | Western Mining Corporation Ltd | Kalgoorlie Groundwater | <1% | Annual report for the period 06/92-06/93 Kalgoorlie Groundwater Project E15/286 E27/94-95 P25/1193-1194 P25/11 |
| A35167 | 1992 | Kagara Ltd | Spargoville | 100% | Spargoville Project, Annual Report (for the Period 01/01/91 - 01/01/92) M15/559. |
| A28002 | 1989 | Spargos Mining Nl | Spargoville | 54% | Spargoville Project Annual Report on Operations M15/302,303,304 From 22/04/88 - 21/04/89. |
| A21334 | 1987 | Newmont Holdings Pty Ltd | Spargos Reward | 100% | Spargoville Project, Annual Report on Spargos Reward Project, M15/71, for the period 31/05/86 to 30/05/87. |
| A21977 | 1987 | Newmont Holdings Pty Ltd | Spargoville | 11% | W139/32 Spargoville Project Annual report on Exploration Licence E15/16 and associated PL's and ML's for the |
| A18584 | 1986 | Newmont Holdings Pty Ltd | Spargoville | 100% | Spargoville Project, Annual Report on Spargos Reward M15/71 for period 31/05/85 to 30/05/86. |
| A16305 | 1985 | Newmont Holdings Pty Ltd | Spargoville | 100% | Spargoville Project , Non-statutory Report: Report to 31/05/85 on Spargos Reward ML15/71. |
| A13731 | 1984 | Newmont Holdings Pty Ltd | Spargoville | 100% | Spargoville Project, Annual Report for the period ending 21st December 1983, M15/2 & GML15/7037. |
| A12573 | 1983 | Spargos Exploration Nl | Spargoville | 100% | W.A Mines Department Annual Report 1982 Gold Mining Leases- 15/6016, 15/6074, 15/6136, 15/6156, 15/6157, 15/61 |
| A11304 | 1981 | Spargos Exploration Nl | Spargoville | 100% | Report on Exploration at Spargos Reward Gold Mine for the Period 1974-1981 |
| A7960 | 1978 | Australian Selection Pty Ltd | Spargoville | 13% | Spargoville Project, Non-statutory Report: Miscellaneous Data: Reports, Plans & Sections covering the period F |
| A4722 | 1974 | Spargos Exploration Nl | Spargoville | 100% | Spargoville Project, Non-statutory Report: Exploration Report, May 1974, GML15/6074, 6131 & 6169. |
| A5546 | 1974 | Australian Selection Pty Ltd | Spargoville - Yilmia | 13% | Yilmia Area, Final [surrender] report on investigations, December 1966 to December 1973, TR3700H, 4588H, 4589H |
| A3975 | 1973 | Australian Selection Pty Ltd | Spargoville - Yilmia | 13% | Spargoville - Yilmia Project, Annual Report for the period 1st January 1972 to 31st March 1973, MC15/39, 58, 7 |
| A1403 | 1971 | Australian Selection Pty Ltd | Spargoville - Yilmia | 6.3% | Spargoville - Yilmia Project, Annual Report for the period ending 31/12/1970, Tr70/3700 & 4588H, MC15/39,58, 7 |
| A1388 | 1970 | Australian Selection Pty Ltd | Spargoville - Yilmia | 6.2% | Spargoville - Yilmia Project, Annual Report for the period ending 31st December 1969, TR70/3700 & 4588H. |
| A93 | 1970 | International Nickel Aust Ltd | Yilmia | <1% | International Nickel Australia Ltd Annual Report Mineral Claims 1012-1058, 1994 Yilmia Group Coolgardie Goldfi |
| A1382 | 1968 | Australian Selection Pty Ltd | Spargoville | 6.5% | Spargoville Project, Non-statutory Report : Annual & Quarterly Reports for the period ending 31/12/1968, TR70/ |
| A1381 | 1968 | Australian Selection Pty Ltd | Spargoville | 6.2% | Spargoville Project, Annual Report for the period ending 31/12/1967, TR70/3700H. |
| A47049 | 1753 | Newcrest Mining Ltd | Mount Marion South | <1% | Annual Report on The Mt Marion South Project Tenements covered by this report are E15/223 M15/717 to M15/720 M |
| A91931 | 1753 | Pindan Exploration Company Pty Ltd | Logan's Find | 15% | Logan's Find Project Surrender Report For the Period 3rd August 2010 to 29th July 2011 E15/849 |
| A99711 | 1753 | Ramelius Resources Ltd | Kambalda West | 18% | Annual Exploration Report: Kambalda West Project C443/1996 (11/08/2012 – 10/08/2013) E15/967, E15/968, M15/395 |
| A98177 | 1753 | Bhp Billiton Nickel West Pty Ltd | Kambalda West | <1% | Kambalda West Project, Final Surrender Report for the period 26th October 2009 to 7th May 2013, E15/1069. [C96 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43711 | 1753 | Newcrest Mining Ltd | Mount Marion South | <1% | Annual report on project Mount Marion South Tenements covered by this report are: E15/223, M15/717-720 for the |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 15/1620 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 15/1620 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 15/1620? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.