E 24/240
Register summary
- Holder
- Belres Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 17 Mar 2023
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134409 | 2023 | Gold Road Resources Limited | Black Flag | 56% | Black Flag 2023 Final Surrender Report C67/2016 for the period ending 14/02/2023. E 24/197,P 24/4986,P 24/4987 |
| A136352 | 2023 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Annual Report for the period ending 30/6/2023 |
| A131204 | 2022 | First Au Limited | White Flag | 95% | C119/2020 White Flag Combined Reporting, Annual Report for the period ending 7 February 2022 |
| A130624 | 2022 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Annual Report C67/2016 for the period ending 08/03/2022. |
| A131645 | 2022 | Kesli Chemicals Pty Ltd | White Flag Gold | <1% | Annual technical Report E 24/215 White Flag Gold Project for the period ending 07/02/2022. |
184 more reports
| A131932 | 2022 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period ending 30/06/2022 |
| A132194 | 2022 | Evolution Mining (Mungari) Pty Ltd | Kundana | 67% | Final Surrender Report - E24/206 Kundana Project for the period ending 15/07/2022. |
| A132519 | 2022 | Evolution Mining (Mungari) Pty Ltd | Kundana | 100% | Final Surrender Report - E24/152 Kundana Project for the period ending 17/08/2022. |
| A127008 | 2021 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Annual Report C67/2016 for the period 9 March 2020 to 8 March 2021 |
| A127075 | 2021 | First Au Limited | White Flag | 16% | White Flag Combined Reporting C119/2020 Annual Report for the period 8 February 2020 to 9 February 2021 |
| A126561 | 2021 | First Au Limited | Gimlet | <1% | Report on the Gimlet Project - Cofunded drillhole - 20GDD004 - Round 20 - DAG2020/00111601 |
| A127829 | 2021 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period 1 July 2020 to 30 June 2021. |
| A123684 | 2020 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Annual Report, C67/2016, 9 March 2019 to 8 March 2020 |
| A124960 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | <1% | Kundana E24/153 Final Surrender Report for the period ending 3/9/2020 |
| A122545 | 2020 | First Au Limited | Gimlet | <1% | Gimlet E26/174 Annual Report for the period 7 November 2018 to 6 November 2019 |
| A123271 | 2020 | First Au Limited | White Flag | <1% | 2019 E 24 / 215 Annual Report, White Flag, 8 February 2019 to 9 February 2020 |
| A125459 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project E24/190 Annual Report for the period ending 14/04/2020 |
| A122799 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | 16% | Kundana Annual Report C102/2004 for the period 1 January 2019 to 31 December 2019 |
| A124061 | 2020 | Horizon Minerals | Black Flag | <1% | 2020 Annual Technical Report for Black Flag Project C66/2018 for the period ending 1/4/2020 |
| A124772 | 2020 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Mineral Exploration Report C36/2009 for the period ending 30/06/2020 |
| A118659 | 2019 | First Au Limited | Gimlet | <1% | Gimlet E26/174 Annual Report For the Period 7 November 2017 to 6 November 2018 |
| A120205 | 2019 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Annual Report C67/2016 For the Period 9 March 2018 – 8 March 2019 |
| A120238 | 2019 | Black Mountain Gold Limited | Black Flag | <1% | C66/2018 Black Flag Combined Annual Report for the period 02/04/2018 to 01/04/2019 |
| A120671 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 1 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A121136 | 2019 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report for the period 15 April 2018 to 14 August 2019 |
| A121477 | 2019 | First Au Limited | Gimlet | <1% | Donated Drillcore from First Au Ltd, Drillhole 18GDD001 |
| A119241 | 2019 | Northern Star (Kanowna) Pty Limited | Kundana | 16% | Kundana C102/2004 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A120672 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 2 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A121660 | 2019 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project E 24/190 Annual Report for the period 15 April 2017 to 14 April 2018 |
| A115581 | 2018 | Drillabit Pty Ltd | Gimlet | <1% | Gimlet E26/174 Annual Report for the period ending 06/11/2017 |
| A116231 | 2018 | Evolution Mining (Mungari) Pty Ltd | White Flag | 7.6% | Annual Report White Flag Project C4/2017 for the period 1 January 2017 to 31 December 2017 |
| A116471 | 2018 | Evolution Mining (Mungari) Pty Ltd | Binduli | <1% | Final Surrender Report E24/183 Binduli Project for the period 15/02/2013 - 14/02/2018 |
| A116961 | 2018 | Black Mountain Gold Ltd | Black Flag | <1% | Annual Technical Report for C66/2018 for the period 2 April 2017 to 1 April 2018, P24/05143, P24/05144, P24/05 |
| A117105 | 2018 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Project C67/2016 Annual Report for the period 9 March 2016 – 8 March 2017, E24/197, P24/4986, P24/4 |
| A117392 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 for the period 1 July 2017 to 30 June 201 |
| A117404 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 2 of 2 for the period 1 July 2017 to 30 June 201 |
| A117425 | 2018 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report For the Period 15 April 2017 to 14 April 2018 |
| A116058 | 2018 | Northern Star (Kanowna) Pty Limited | Kundana | 16% | Kundana C102/2004 Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A112406 | 2017 | Black Mountain Gold Limited; Intermin Resources Ltd | White Flag | 7.6% | Annual Report on the White Flag Project C04/2017 For the Period 1 January 2016 to 31 December 2016, E24/00183. |
| A112823 | 2017 | Yandan Gold Mines Pty Ltd | Black Flag | 56% | Black Flag Project C67/2016 Annual Report For the Period 9 March 2016 to 8 March 2017, P 24/04986, E24/00197, |
| A114230 | 2017 | Torian Resources Limited | Kundana North | <1% | KUNDANA NORTH PROJECT E24/190 Annual Report for the period 15 April 2016 to 14 April 2017 |
| A114535 | 2017 | Paddington Gold Pty Limited | Paddington | <1% | Annual Mineral Exploration Report Paddington Project C36/2009 for the period 1 July 2016 to 30 June 2017 |
| A112160 | 2017 | Northern Star (Kanowna) Pty Limited | Kundana | 14% | Kundana Project C102/2004 Annual Technical Report for the period 1 January 2016 to 31 December 2016, E24/00152 |
| A108144 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | 14% | Kundana Annual Technical Report for the Period 1 January 2015 to 31 December 2015 C102/2004 |
| A109100 | 2016 | Torian Resources Limited | Kundana North | <1% | Kundana North Project E24/190 Annual Report for the period 15/04/2015 to 14/04/2016 |
| A109539 | 2016 | Paddington Gold Pty Limited | Paddington | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 PADDINGTON PROJECT C36/2009 |
| A109574 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | 53% | P24/4237 Surrender Report for the period 11/06/2008 to 10/06/2016 |
| A109980 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana - White Flag | 10% | Kundana - White Flag Project C102/2004 Final Surrender Report for the period 18 August 2008 to 3 September 201 |
| A110053 | 2016 | Evolution Mining Limited | White Flag | 32% | Annual Report for the period 1st July 2015 to 30th June 2016, White Flag Project, P24/4252 and P24/4770-4783 ( |
| A109024 | 2016 | Evolution Mining Pty Ltd | Horans Dam - Binduli | <1% | Annual Report Horans Dam Prospect E24/183 for the period 15 February 2015 – 14 February 2016 |
| A104917 | 2015 | Northern Star Resources Ltd | Kundana | 14% | Kundana Project C102/2004 Annual Report for the period 1 January 2014 – 31 December 2014, E24/152....P26/3574 |
| A104571 | 2015 | Intermin Resources Ltd | White Flag | 100% | Annual Report WHITE FLAG PROJECT P24/4252 For the Period 14th July 2013—13th July 2014 |
| A105740 | 2015 | Intermin Resources Ltd | Horans Dam | <1% | E24/183 Horans Dam Project Annual Report for the period 15/02/2014 - 14/02/2015 |
| A106287 | 2015 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report for the period 01 July 2014 to 30 June 2015, M24/16.... |
| A106741 | 2015 | Evolution Mining Pty Ltd | White Flag | 32% | Annual Report for the period 1st July 2014 to 30th June 2015, White Flag Project, P24/4252 and P24/4770-4783 |
| A102015 | 2014 | Intermin Resources Ltd | Horans Dam - Binduli | <1% | Annual Report 15 February 2013 – 14 February 2014 Horans Dam Prospect E24/183 |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | 5.8% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A101284 | 2014 | Barrick (Australia Pacific) Ltd | Kundana | 16% | Project 8100 Kundana Project 8101 Kundana Project 8103 East Kundana Project 8104 West Kundana Annual Report P |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | 5.8% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A99992 | 2013 | Barrick (Australia Pacific) Ltd | White Flag | 31% | E24/154, P24/4252, P24/4251 White Flag Joint Venture Surrender Report Period 1 January 2013 – 31 December 2013 |
| A96158 | 2013 | Intermin Resources Ltd | Binduli | <1% | Binduli Project, Annual Report for the period 1st January 2012 to 31st December 2012, M26/346, 499, 549 & 621; |
| A96888 | 2013 | Barrick (Australia Pacific) Ltd | Kundana | 16% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA Annual Report P |
| A98341 | 2013 | Pandell Pty Ltd | Gimlet | <1% | Gimlet Project, E26/120, Annual Report for the period 4 May 2012 to 3 May 2013. |
| A93042 | 2012 | Barrick Gold Of Australia Ltd | Kundana | 16% | ANNUAL REPORT Period 1 January 2011 – 31 December 2011 C102/2004 |
| A92563 | 2012 | Intermin Resources Ltd | Binduli | <1% | Binduli Project Combined Annual Report 1 January 2011 to 31 December 2011, C66/2009, M26/346, 499, 621, 549, P |
| A94115 | 2012 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project, E26/120 , Annual Report For the Period 4 May 2011 to 3 May 2012. |
| A94404 | 2012 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project E26/120 Western Australia Partial Surrender Report for the period 4 May 2007 to 3 May 2012 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | 5.7% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A89516 | 2011 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report, 1 January 2010 to 31 December 2010, Binduli Project M26/346, M26/499, M26/621, M26/54 |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | 5.4% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A90782 | 2011 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project E26/120, Annual Report for the period 4 May 2010 to 3 May 2011. |
| A85893 | 2010 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report 1 January 2009 to 31 December 2009 Binduli Project M26/346, M26/499, M26/621, M26/549 P |
| A85972 | 2010 | Barrick Gold Of Australia Ltd | Kundana | 15% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA E15/256, E15/634 |
| A87371 | 2010 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project (E26/120) Annual Report 4 May 2009 to 3 May 2010 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | 5.5% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A81372 | 2009 | Barrick Gold Of Australia Ltd | KUNDANA | 17% | ANNUAL REPORT Period 1 January 2008 – 31 December 2008 C102/2004, PROJECT 8100 KUNDANA, PROJECT 8101 KUNDANA, |
| A82616 | 2009 | Pandell Pty Ltd | GIMLET | <1% | GIMLET PROJECT, E26/120 WESTERN AUSTRALIA, ANNUAL REPORT FOR THE PERIOD 4 MAY 2008 to 3 MAY 2009 |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | 5.5% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A77536 | 2008 | Barrick Gold Of Australia Ltd | Kundana | 17% | ANNUAL REPORT Period 1 January 2007 - 31 December 2007 KUNDANA PROJECT C102/2004 TECHNICAL REPORT No. 1253 |
| A78105 | 2008 | Intermin Resources Ltd | Abattoir South | <1% | Annual Report 2 March 2007 to 1 March 2008 Abattoir South Project M26/346, P26/1952, P26/2360, P26/2550, P24/3 |
| A78409 | 2008 | Paddington Gold Pty Ltd | ABATTOIR NORTH | 14% | ABATTOIR NORTH PROJECT Annual Report C107/2004 Reporting Period: 1 April 2007 - 31 March 2008 Tenements: E24/5 |
| A78766 | 2008 | Paddington Gold Pty Ltd | Mount Pleasant | <1% | MT PLEASANT PROJECT Mineral Exploration Report C106/2004 Reporting Period: 1 April 2007 - 31 March 2008 Paddin |
| A78909 | 2008 | Pandell Pty Ltd | Gimlet | <1% | GIMLET PROJECT E26/120 WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 4 May 2007 to 3 May 2008 |
| A74408 | 2007 | Barrick Gold Of Australia Ltd | Abbottoir South | <1% | Abattoir South Project C100/2004 Annual Report for the Period 01/01/2006 to 31/12/2006 Report No.1215 (Kalgoor |
| A75242 | 2007 | Barrick Gold Of Australia Ltd | Abattoir North | 19% | Abattoir North Project, (C107/2004) Annual Report for the period 1st April 2006 to 31st March 2007, E24/, 103, |
| A72021 | 2006 | Placer Dome Asia Pacific Ltd | Abattoir South | <1% | Abattoir South Project, Annual Report, 01/01/2005-31/12/2005 (C100/2004), E26/45, E26/53, E26/85, M26/115..... |
| A72446 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | 19% | Abattoir North Project, Annual Report, 1 April 2005 to 31 March 2006, C107/2004, E24/57.................M24/22 |
| A72737 | 2006 | Mr Guj Al | North Kundana | 5.3% | Annual Exploration Report, E24/85, North Kundana Project, Broad Arrow and Coolgardie Mineral Fields, WA, GSWA |
| A73326 | 2006 | De Grey Mining Ltd | Horan's Dam | 1.9% | Annual Technical Report, Exploration licence E26/58 Horans Dam Project, 12 Months Ended 24 June 2006, (Kalgoor |
| A70920 | 2005 | Mr Guj Al | North Kundana | 5.3% | Annual exploration report E24/85, North Kundana Project, Broad Arrow and Coolgardie Mineral Fields, Western Au |
| A70545 | 2005 | Placer Dome Asia Pacific Ltd | Abbattoir North | 19% | Abattoir North Project, Annual Report, 1 April 2004 to 31 March 2005, C107/2004,E24/57, ...........,M24/101, M |
| A82885 | 2005 | Placer (Granny Smith) Pty Ltd | Binduli | <1% | Preliminary notes on results of Binduli North IP Surveys, Jan - Feb 2005 |
| A70006 | 2005 | Placer Dome Asia Pacific Ltd | Abbatoir South | <1% | Annual report for the period 01/01/04 - 31/12/04 Abbatoir South Project 8504, C100/2004, E26/45, E26/53, E26/8 |
| A70007 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual report for the period 01/01/04 - 31/12/04 Binduli North Joint Venture Project 8504, C202/1995, E26/53, |
| A70213 | 2005 | Basegrove Holdings Pty Ltd | East Kundana | <1% | Annual exploration report for the period 02/12/03 - 01/12/04 White Flag Dam Prospect, E24/64, Broad arrow and |
| A71337 | 2005 | De Grey Mining Ltd | Horan's Dam Project | 1.9% | Annual exploration report, Horan's Dam Project, Exploration licence 26/58 For the period 25th June 2004 to 24t |
| A69250 | 2004 | Mr Guj Al | North Kundana | 5.3% | Annual exploration report, E24/85,' North Kundana Project', Broad Arrow and Coolgardie Mineral Fields, WA, GSW |
| A68230 | 2004 | Placer Dome Asia Pacific Ltd | White Flag | 31% | Annual Report for the period 16/12/2002-15/12/2003 White Flag JV Project E24/76 |
| A68414 | 2004 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Binduli North JV Pproject, Annual Report 01/01/2003- 31/12/2003 (C202/1995), P24/3296, P26/1949-52, P24/2136, |
| A69556 | 2004 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | Annual exploration report for the period 02/12/02 - 01/12/03 White Flag Dam Prospect, E24/64, Broad Arrow, Coo |
| A68696 | 2004 | Placer Dome Asia Pacific Ltd | Border Gidji | 3% | Border Gidji JV Project, Annual Report, 01/04/2003 - 31/03/2004 (C115/2002), E24/57, M24/444 to M24/447, P24/3 |
| A68756 | 2004 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 13% | Mt Pleasant Project ,Annual Report 01/04/2003 to 31/03/2004 C330/1997 E24/68, E24/103, M16/211...P24/3581 |
| A68806 | 2004 | De Grey Mining Ltd | Horan's Dam | 1.9% | Annual technical report, Exploration licence E26/58, Horan's Dam Project, 12 months ended 24 June 2004, Kalgoo |
| A66343 | 2003 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | Annual Exploration Report period 2 December 2001 to 1 December 2002 White Flag Dam Prospect E24/64 Broad Arrow |
| A67142 | 2003 | Placer Dome Asia Pacific Ltd | Border Gidgi | 3% | Border Gidgi Project, Annual Report for the period 01/04/2002 to 31/03/2003 C115/2002: E24/57, M24/444-47, P24 |
| A67325 | 2003 | De Grey Mining Ltd | Horan's Dam | 1.9% | Annual Report for 12 months ended 24 June 2003 E26/58 Horans Dam Project Kalgoorlie |
| A67339 | 2003 | Placer Dome Asia Pacific Ltd | Mount Pleasant | 13% | Mount Pleasant project, Annual Report for the period 01/04/2002 to 31/03/2003 C330/1997: E24/68,103 M16/211 M2 |
| A82883 | 2003 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Placer gravity Survey, December 2003, Survey Report |
| A66058 | 2003 | Placer Dome Asia Pacific Ltd | White Flag | 31% | White Flag Project, Annual Report 16/12/2001 - 15/12/2002, E24/76. |
| A66499 | 2003 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual Report 01/01/2002-31/12/2002 Binduli North Project C202/1995: P26/1949-52, 2136, 2212-13, 2241-43, 2248 |
| A65210 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | 12% | Mt Pleasant Project Annual Report 01/04/2000 - 30/04/2002 C330/1997 Tenement/s E24/57, 68, M24/16, 60, 79-82, |
| A65376 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | 3% | Mt Pleasant Project Annual Report 01/04/2000 – 30/04/2002 P24/3351,P26/2296-2297, E24/57, M24/444-447 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | 4.6% | Kalgoorlie High Resolution Gravity Surveys. |
| A64179 | 2002 | Delta Gold Ltd | White Flag | 31% | White Flag Project, Annual Report for the period 16/12/2000 to 15/12/2001, E24/76. [C102/2004] |
| A64185 | 2002 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | Annual Exploration Report E24/64 'White Flag Dam Prospect' period: 2 December 2000 to 1 December 2001, Broad A |
| A64408 | 2002 | Delta Gold Ltd | Binduli North | 1.8% | Annual Report 03/12/2000 To 02/12/2001. Binduli North Joint Venture P24/3270. Tenement/s P24/3270 Mineral Fiel |
| A65041 | 2002 | Mr Guj Al | North Kundana | 5.3% | Annual Exploration Report E24/85 'North Kundana Project' Broad Arrow And Coolgardie Mineral Fields Western Aus |
| A65514 | 2002 | Domain Mining Nl | Horan's Small Dam | 1.9% | Annual Report Of Activities 12 Months Ended 24th June 2002 Exploration Licence 26/58 Horan's Small Dam |
| A62765 | 2001 | Mr Guj Al | North Kundana | 5.3% | Annual Exploration Report E24/85 'North Kundana Project' Broad Arrow And Coolgardie Mineral Fields Western Aus |
| A82890 | 2001 | Placer (Granny Smith) Pty Ltd | Kalgoorlie/ Teal | <1% | Sub-audio magnetics surveys, logistics and data processing report |
| A61955 | 2001 | Delta Gold Ltd | White Flag | 31% | White Flag Joint Venture E24/76 Annual Report 16 December 1999 to 15 December 2000 Goldfields Mineral Field, K |
| A62015 | 2001 | Delta Gold Ltd | Binduli North Joint Venture | 1.8% | Binduli North Joint Venture P24/3270 Annual Report 3 December 1999 to 2 December 2000, Goldfields Mineral Fiel |
| A63323 | 2001 | De Grey Mining Nl | Horan's Small Dam | 1.9% | Annual Report Of Activities 12 Months ended 24th June 2001 Exploration Licence 26/58 Horan's Small Dam. |
| A59916 | 2000 | Delta Gold Ltd | Horan's Small Dam | 1.8% | Prospecting Licence P24/3270, Annual Report, 03/12/1998 to 02/12/1999. Horans Small Dam Project. |
| A59956 | 2000 | Delta Gold Ltd | White Flag | 31% | White Flag Joint Venture Project, E24/76, Annual Report 16/12/1998 to 15/12/1999. |
| A60016 | 2000 | Delta Gold Ltd | Peters Farm Dam | 14% | P24/3296 Annual Report 07/01/1999 to 06/01/2000 Report No. WA00.013 Project No. 3067.018 |
| A60183 | 2000 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | Annual Exploration Report E24/64 White Flag Dam Prospect Broad Arrow and Coolgardie Mineral Fields Western Aus |
| A61193 | 2000 | De Grey Mining Nl | Horan's Small Dam | 1.9% | Annual Report of Activities, 12 months ended 24th June 2000, Exploration Licence E26/58 Horan's Small Dam situ |
| A61373 | 2000 | Centaur Mining & Exploration Ltd | Mount Pleasant | 10% | Mount Pleasant Project, Annual Report for the period 1st April 1999 to 31st March, Combined Reporting Group: C |
| A62086 | 2000 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | Annual Exploration Report E26/64 White Flag Dam Prospect' Broad Arrow and Coolgardie Mineral Fields, Western A |
| A58935 | 1999 | Yamarna Goldfields Nl | Horan's Small Dam | 1.9% | Annual report of activities 12 months ended 24 June 1999, Exploration licence E26/58 Horans Small Dam. |
| A57465 | 1999 | Eyre Resources Nl | White Flag Dam | <1% | Annual Exploration Report E24/64 White Flag Dam Prospect. 02/12/97-01/12/98. |
| A57990 | 1999 | Croesus Mining Nl | Centre Dam | 2.6% | Centre Dam Project, Partial Surrender Report for the period 28/06/1994 to 27/06/1998, E24/80. |
| A59091 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | 10% | Mt Pleasant Project, (Joint) Annual Report for the period 01/04/1998 to 31/03/1999, C330/1997-Mt Pleasant. |
| A59413 | 1999 | Croesus Mining Nl | Centre Dam | 2.6% | Final Surrender Report on E42/80, Centre Dam, for the Period 28th June, 1994 to 27th June, 1999 |
| A61943 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Non-statutory Report: Resources Report June 1999. |
| A53256 | 1998 | Basegrove Holdings Pty Ltd | White Flag Dam | <1% | White Flag Dam Prospect E24/64, Annual Exploration Report Broad Arrow and Coolgardie Mineral Fields W.A. 02/12 |
| A55746 | 1998 | Centaur Mining & Exploration Ltd | Mount Pleasant | 10% | C330/1997 - Mt. Pleasant Joint Annual Report 01/04/97 - 31/03/98 Exploration Licence: E24/57, 68, Gold Lease: |
| A53970 | 1998 | Intermin Resource Corp Ltd | White Dam North | 14% | White Dam North Project, Annual Report for the period 07/01/1997 - 06/01/1998, P24/3296. |
| A54065 | 1998 | Intermin Resource Corp Ltd | Binduli North | 31% | Exploration Licence 24/76 Annual report for the period 16/12/96-15/12/97 (Binduli North Project) |
| A56547 | 1998 | Yamarna Goldfields Nl | Horan's Small Dam | 1.9% | Horan's Small Dam - Kalgoorlie W.A. 12 Months ended 24/07/1998 Exploration Licence: 26/58 |
| A49894 | 1997 | Intermin Resource Corp Ltd | Horan's Small Dam | 1.8% | P24/3270 Horans Small Dam Kalgoorlie Region Western Australia Annual Technical Report for period ending 2 Dece |
| A50353 | 1997 | Pegasus Gold Australia Pty Ltd | White Dam | 14% | Intermin Resource Corporation P24/3296 White Dam North Kalgoorlie Region Western Australia Annual Technical re |
| A50750 | 1997 | Eyre Resources Nl | White Flag Dam | <1% | Annual Exploration Report E24/64 'White Flag Dam Prospect' Broad Arrow and Coolgardie Mineral Fields Western A |
| A51943 | 1997 | Pandell Pty Ltd | Horan's Small Dam | 1.9% | Annual Mineral Exploration Report Exploration Licence E26/58 for the period 25th June 1996 to 24th June 1997 G |
| A52187 | 1997 | Croesus Mining Nl | Centre Dam | 2.6% | Centre Dam Project, Annual Report for the period 28th June 1996 to 27th June 1997, E24/80. |
| A52201 | 1997 | Croesus Mining Nl | Centre Dam | 2.6% | Partial Relinquishment Report to the Department of Minerals and Energy for the Centre Dam Project E24/80 East |
| A46920 | 1996 | Pandell Pty Ltd | Horan's Small Dam | 1.9% | Annual report of Activities 12 Months ended 24th June 1995 Exploration Licence E26/58 Horan's Small Dam situat |
| A47465 | 1996 | Centaur Mining & Exploration Ltd | Black Flag (Mount Pleasant) | <1% | GML24/2486 GML24/2532 GML24/2764 GML24/3202 MLA16/211 MLA24/79 to MLA24/82 MLA16/102 MLA16/142 MLA16/155 MLA16 |
| A48365 | 1996 | Border Gold Ltd | Gidji | 3% | Annual report to 31st March 1996 Exploration Licence E24/57 Mining Leases M24/444 to M24/447 Prospecting Licen |
| A48606 | 1996 | Croesus Mining Nl | Centre Dam | 2.6% | Centre Dam Project, Annual Report for the period 28th June 1995 to 27th June 1996, E24/80. |
| A47851 | 1996 | Croesus Mining Nl | Centre Dam | 2.6% | Centre Dam Project, Annual Report for the period ending June 28th 1995, E24/80. |
| A49031 | 1996 | Pandell Pty Ltd | Horan's Small Dam | 1.9% | Annual report of Activities 12 months ended 24 June 1996 Exploration Licence E26/58 Horan's Small Dam Geoff Bl |
| A46905 | 1995 | Eyre Resources Nl | White Flag Dam | <1% | White Flag Dam Project, Annual Report for the year ending December 5th 1995, E24/64. |
| A44791 | 1995 | Border Gold Ltd | Gidji | 3% | Annual report to 6th April 1995 Exploration licence E24/57 Minning leases M24/444 to 447 Prospecting licences |
| A44820 | 1995 | Mining Corporation Of Australia Ltd | Black Flag (Mount Pleasant) | <1% | Black Flag Regional gold report. Annual report For the period 1 January 1994 to 31 December 1994. |
| A44821 | 1995 | Mining Corporation Of Australia Ltd | Black Flag | <1% | Black Flag regional gold project. Annual report for the period 1 January 1994 to 31 December 1994 |
| A44822 | 1995 | Mining Corporation Of Australia Ltd | Black Flag | 24% | Black flag regional gold project Annual report for the period 1 January 1994 to the 31 December 1994. |
| A45380 | 1995 | Eyre Resources Nl | White Flag Dam | <1% | Annual mineral exploration report covering the period from The 6/12/93 to 5/12/94 for the White Flag Lake Dam |
| A41335 | 1994 | Border Gold Ltd | Gidji | 3.2% | Annual report for the period 07/04/93 to 06/04/94 Gidji Project E24/57 Border Gold Ltd, Ramsgate Resources |
| A41046 | 1994 | Mining Corporation Of Australia Ltd | Eastern Area | <1% | Annual Report for the Period 1 July 1992 to 31 December 1993 Eastern Area The Report Comprises: M24/165,M24/18 |
| A41047 | 1994 | Mining Corporation Of Australia Ltd | Central Area | <1% | Black Flag Gold Project Annual Report for the Period 01 July 1992 to 31 December 1993 Central Area |
| A41348 | 1994 | Mining Corporation Of Australia Ltd | Black Flag | 95% | Mining Corporation of Australia Ltd Report on Exploration of Exploration Licence E24/68 For the 12 month perio |
| A41526 | 1994 | Eyre Resources Nl | White Flag Dam | <1% | White Flag Dam Prospect, Annual report for period ending 5/12/93, E24/64 |
| A42410 | 1994 | Eyre Resources Nl | White Flag Dam | <1% | Annual mineral exploration report covering the period from 6/12/92 to 5/12/93 for the White Flag Lake Dam pros |
| A42500 | 1994 | Pandell Pty Ltd | Horan's Small Dam | 1.9% | Annual Report for the period 06/93 to 06/94 Horans Small Dam Project E26/58 Denis O'Meara Prospecting |
| A38693 | 1993 | Sierra Gold Pty Ltd | White Flag | <1% | Annual report for the period 02/12/91-01/12/92 White Flag Project E24/64 |
| A39032 | 1993 | Border Resources Nl | Gidji | 3.2% | Annual report for the period 07/04/92-06/04/93 Gidji Project E24/57 |
| A36422 | 1992 | Black Flag Consolidated Nl | Black Flag | <1% | Annual Report for the period 01/07/91-31/06/92 Black Flag South JV M24/102,142,166,167,172,211,256 GML24/2486, |
| A36654 | 1992 | Gold Dust Holdings Pty Ltd | Oxford | <1% | Gold Dust Holdings Pty Ltd Oxford Project Annual Report for year ending 30 June 1992 M24/281 & 287, P24/2170, |
| A38617 | 1992 | Ramsgate Resources Ltd | Gidji | 3.2% | Annual report for the period 07/04/91-06/04/92 Gidji Project E24/57 |
| A34378 | 1991 | Maitland Mining Nl | Maitland South | <1% | Report for the Period 01/07/90 - 30/06/91 Maitland South Joint Venture Areas ML24/102,142,166,167,172, 211,256 |
| A30614 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | <1% | Kalgoorlie Project. Annual report. December 1989. M16/85, M24/1270139, 210, 286, 305, 312-314, M26/134, 135, 2 |
| A32566 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | 1.8% | Kalgoorlie Project Surrender Report October 1990 |
| A31378 | 1990 | Maitland Mining Nl | Maitland South | <1% | Report for the Period 01/01/89 - 30/06/90 on the Maitland South Joint Venture Areas; M24/102,142,166,167,172, |
| A28591 | 1989 | Ramsgate Resources Ltd | Kalgoorlie | 2.4% | Kalgoorlie Project. Annual report. December 1988. E24/1, 2. P24/1538; 26/1121. M16/85; 24/127-130, 210; 26/13 |
| A24298 | 1988 | Maitland Mining Nl | Black Flag | <1% | Black Flag Joint Venture, Report for the period January 1987 to June 1988, on tenements M24/166, 102, 172, 142 |
| A26386 | 1988 | Ramsgate Resources Ltd | Kalgoorlie | 11% | KALGOORLIE PROJECT ANNUAL REPORT 18 SEP'TEMBER 1987 TO 17 SEPTEMBER 1988 MINING LEASES 24/128, 129, 130 |
| A28731 | 1988 | Maitland Mining Nl | Black Flag South | <1% | Report for the period 01/07/88-30/06/89. Black Flag South Joint Venture Areas, Broad Arrow Mineral Field, WA. |
| A25086 | 1987 | Ramsgate Resources Ltd | Ramsgate | 4.7% | The Ramsgate Gold Prospect, Kalgoorlie, WA. E24/1-2, 127-130. M26/134-135, 1121, M24/1538. Exploration program |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | 1.2% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A50610 | 1753 | Centaur Mining & Exploration Ltd | Black Flag | <1% | 'Black Flag Central' 'C186/1995' Joint Annual report for the period 01 January 1996 to 31 December 1996 |
| A51245 | 1753 | Centaur Mining & Exploration Ltd | Black Flag | 28% | 'Black Flag Eastern' C207/1996 Joint Annual report for the period 01 April 1996 to 31 March 1997 E24/68, GML24 |
| A89376 | 1753 | Barrick Gold Of Australia Ltd | Kundana | 14% | Kundana Project, ANNUAL REPORT, Period 1 January 2010 – 31 December 2010, C102/2004, E15/256, E15/634, E16/113 |
| A55798 | 1753 | Croesus Mining Nl | Binduli | <1% | Binduli Project 01/01/97 - 30/06/98 E24/80, E26/45, L26/197, L26/202-204 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43625 | 1753 | Black Mountain Gold Nl | White Dam | 1.4% | Report on White Dam Project, P26/2546-2551, P24/3296, P26/2360, P26/2136, East Coolgardie Mineral Field for th |
| A47986 | 1753 | Centaur Mining & Exploration Ltd | Black Flag East JV | 33% | C188/1995 'Black Flag East' Joint Venture Annual report for the period 01 April 1995 to 31 March 1996 E24/0006 |
| A53036 | 1753 | Centaur Mining & Exploration Ltd | Oxford | 95% | Exploration Licence E24/68 'Oxford' (part of C207/1996-Black Flag Eastern Project Joint Reporting period 01/04 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 24/240 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 24/240 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 24/240? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.