NextMapsWA TenementsE 25/535

E 25/535

LiveExploration LicenceCity of Kalgoorlie-BoulderBulong District
Area
2,480ha
Expires
May 2028
in 20 months
WAMEX reports
121
WA median is 53
Report drilling
66
of 121 reports
Kalgoorlie-Boulder Explore on the live map

Register summary

Holder
Crown Gold (Wa) Pty Ltd
Local government
City of Kalgoorlie-Boulder
Application received
21 Oct 2015
Commenced
4 May 2016
Expiry
3 May 2028
Term
5 Years (Extended)

Exploration history on this ground

121 historical WAMEX exploration reports intersect E 25/535: 66 report geochemistry or sampling, 79 include a digital data package.
When this ground was worked · 120 of 121 reports dated
71970s
61980s
151990s
262000s
592010s
72020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A137007 2023 Black Cat (Kal East) Pty Ltd Slate Dam <1% Partial Surrender Report for the Slate Dam Project E25/558 For the Period 11 August 2017 to 10 August 2023
A122610 2020 Silver Lake (Integra) Pty Limited Mount Monger Peters Dam JV <1% Final Surrender Report for Mount Monger Peters Dam JV (C135/2007) E26/153 and E26/154 for the period 6 May 20
A124158 2020 Aruma Resources Limited SLATE DAM <1% Annual Report for C112/2017 Slate Dam Project for the period ending 02/04/2020
A122553 2020 Wanaka Exploration Pty Ltd Wanaka <1% Final Surrender Wanaka E25/00570 for the period 5 July 2018 to 3 December 2019
A125576 2020 Silver Lake Resources Limited Mount Monger <1% Surrender Report for E26/146 (Mt Monger) for the period 23 September 2010 to 22 September 2020
116 more reports
A123215 2020 Mining Investments Australia Pty Ltd Majestic <1% Annual Mineral Exploration Report for Combined Reporting Group No. C49/2019, Majestic Project, for the Period
A124734 2020 Resource Holdings Pty Ltd CURTIN 94% Annual Report for C69/2016 "CURTIN" - E25/535 for the period 4 May 2019 to 3 May 2020
A121773 2019 Silver Lake Resources Limited Mount Monger <1% Combined Annual Report on Mt Monger Project - C72/2004 for the period 1 July 2018 to 30 June 2019
A118724 2019 Silver Lake (Integra) Pty Limited Mount Monger Peters Dam <1% Combined Annual Report on Mt Monger Peters Dam Project - C135/2007 for the period 1 November 2017 to 31 Octobe
A120183 2019 Mining Investments Australia Pty Ltd Majestic <1% Annual Mineral Exploration Report for Tenement E25/484 as part of the Majestic Project for the Period 9th Apri
A120476 2019 Aruma Resources Limited Slate Dam <1% Annual Report for C112/2017 "Slate Dam" for the period 3 April 2018 to 2 April 2019, E25/00553, E25/00556, E25
A120651 2019 Resource Holdings Pty Ltd CURTIN 94% ANNUAL REPORT for C69/2016 "CURTIN" - E25/535 For the period 4 May 2018 to 3 May 2019
A121481 2019 Silver Lake (Integra) Pty Limited Peters Dam JV <1% Final Surrender Report for P26/3819, P26/3820 and P26/3821, Peters Dam JV for the period 15 June 2011 to 14 Ju
A116882 2018 Anglogold Ashanti Australia Limited Glandore South <1% Glandore South Project (P26/4238) Annual Report to the Department of Mines, Industry Regulation and Safety for
A117305 2018 Resource Holdings Pty Ltd Curtin 94% Annual Report for C69/2016 Curtin Project E25/535 for the period 04/05/2017 - 03/05/2018
A117326 2018 Aruma Resources Limited Slate Dam <1% Annual Report for C112/2017 Slate Dam Project for the period 3 April 2017 to 2 April 2018, E25/00553, E25/0055
A118055 2018 Silver Lake Resources Limited Mount Monger <1% Combined Annual Report on Mount Monger Project C72/2004 for 1 July 2017 to 30 June 2018
A110667 2017 Rubicon Resources Limited; Silver Lake (Integra) Pty Limited Peters Dam <1% Combined Annual Report on Mount Monger Peters Dam Project – C135/2007 for period 1 November 2015 to 31 October
A111921 2017 Pioneer Resources Limited Dingo West <1% Annual report for the Dingo West Project, E25/523, for the period 5 November 2015 to 4 November 2016
A114450 2017 Pioneer Resources Limited Juglah Dome 24% Annual Report for the Juglah Dome Project, E25/381, for the period 21 May 2016 to 20 May 2017
A114613 2017 Resource Holdings Pty Ltd Majestic East 94% Majestic East E25/00535 Annual Report for the year ended 3rd May 2017
A114883 2017 Silver Lake Resources Limited Mount Monger <1% Combined Annual Report on Mt Monger Project C72/2004 for the period 1 July 2016 to 30 June 2017
A115389 2017 Silver Lake Resources Limited Mount Monger Peters Dam <1% Combined Annual Report on Mt Monger Peters Dam Project - C135/2007 for the period 1 November 2016 to 31 Octobe
A107879 2016 Silver Lake (Integra) Pty Limited Peters Dam <1% Combined Annual Report on Mt Monger Peters Dam JV Project – C135/2007 for period 1 November 2014 to 31 October
A109400 2016 Pioneer Resources Limited Juglah Dome 24% Annual Report for the Juglah Dome Project E25/381 for the period 21 May 2015 to 20 May 2016
A109816 2016 Silver Lake Resources Limited Mount Monger <1% Mount Monger Project Combined Annual Report on Mt Monger Project C72/2004 for 1 July 2015 to 30 June 2016
A110590 2016 Silver Lake Resources Limited Mount Monger <1% Surrender Report for Mt Monger Tenements P 26/3426, P 26/3427, P 26/3428, P 26/3429, P 26/3430, P 26/3432, P 2
A104632 2015 Silver Lake Resources Limited Mount Monger - Peters Dam <1% Combined Annual Report on Mt Monger Peters Dam Project – C135/2007 for period 1 November 2013 to 31 October 20
A106108 2015 Pioneer Resources Limited Juglah Dome 19% Annual report for the Juglah Dome Project, C27/2012 (E25/381 & E25/496), East Coolgardie Mineral Field, for th
A106365 2015 Pioneer Resources Limited Juglah Dome 24% Partial Surrender Report for the Juglah Dome Project, E25/381, East Coolgardie Mineral Field, for the period 2
A107152 2015 Silver Lake Resources Limited Mt Monger <1% ANNUAL REPORT For the Period 1 July 2014 to 30 June 2015 MT MONGER Combined Annual Report on Mt Monger Project
A107196 2015 Macphersons Resources Ltd Trojan West <1% Trojan West Exploration Licence 25/504 Final Surrender Report for the Period 10 July 2014 to 07 July 2015
A105860 2015 Silver Lake (Integra) Pty Limited Mount Monger 23% Surrender Report on E25/208 for period 1 August 2006 to 7 April 2015
A103698 2014 Silverlake Resources Ltd Mount Monger <1% Combined Annual Report on Mt Monger Project – C72/2004 for period 1 July 2013 to 30 June 2014
A102911 2014 Silver Lake Resources Limited Mount Monger South <1% Mount Monger South Project, Annual Report for the period 01/05/2013 to 30/04/2014, E25/332; M25/117; M26/148..
A102932 2014 Silver Lake Resources Limited Greater Monger 9.7% Greater Monger Project, Annual Report for the period 01/05/2013 to 30/04/2014, E25/208; M25/350; P25/1897-1905
A103117 2014 Pioneer Resources Ltd Juglah Dome 24% Annual report for the Juglah Dome Project, C27/2012 (E25/381), East Coolgardie Mineral Field, for the period 2
A96422 2013 Integra Mining Ltd Mount Monger Peters Dam <1% Combined Annual Report on Mt Monger Peters Dam Project – C135/2007 for period 1 November 2011 to 31 October 20
A97157 2013 Pioneer Resources Ltd Juglah Dome <1% Final Surrender Report for the Juglah Dome Project, E25/452, East Coolgardie Mineral Field, for the period 3 M
A98315 2013 Silver Lake Resources Ltd Mount Monger South <1% Mount Monger South Project, Annual Report for the period 1st May 2012 to 30th April 2013, E25/332; M25/117; M2
A98746 2013 Silver Lake Resources Ltd Greater Monger 9.7% Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2012 to 30 April 2013, E25/208..
A98944 2013 Pioneer Resources Ltd Juglah Dome 7.6% Annual report for the Juglah Dome Project, C27/2012 (E25/381 & E25/452), East Coolgardie Mineral Field, for th
A99363 2013 Monteray Mining Group Ltd Triple 3 33% Triple 3 Project, Annual Report for the period 21/06/2012 to 20/06/2013, E25/333.
A99585 2013 Ironstone Resources Ltd Juglah Rocks <1% Combined Annual Report on Exploration at Juglah Rocks Tenements, E25/421, E25/435 and E25/453. 18th October, 2
A99783 2013 Silver Lake Resources Pty Ltd Mount Monger <1% Annual Report for Mount Monger Project C72/2004 E26/146.....P26/3874 for the period 1 July 2012 to 30 June 201
A98822 2013 Integra Mining Ltd Randalls <1% Integra Mining Magnetotelluric Survey 30/11/2012
A94670 2012 Monteray Mining Group Ltd Triple 3 33% Partial Surrender Report for the period 21st June 2007 to 20th June 2012 Triple 3 Project, E25/333, Block P254
A94705 2012 Pioneer Resources Ltd Juglah Dome 7.6% Combined Annual report for the Juglah Dome Project, C27/2012 (E25/381 & E25/452), East Coolgardie Mineral Fiel
A93706 2012 Classic Minerals Ltd Juglah (3) <1% Juglah (3) Project E25/453 Annual Report for the period 31 January 2011 - 30 January 2012
A94987 2012 Monteray Mining Group Ltd Triple 3 33% Annual Report for the period 21st June 2011 to 20th June 2012 E25/333, Triple 3 Project
A95421 2012 Classic Minerals Ltd Juglah <1% Juglah 1.2.3. Project, Annual Report for the period 18/10/2011 to 17/10/2012, E25/421, 435 & 453. {C291/2011]
A95757 2012 Silver Lake Resources Pty Ltd Mount Monger <1% Mount Monger Project, Annual Report for the period 1st July 2011 to 30th June 2012, Combined Reporting Group:
A90579 2011 Integra Mining Ltd Greater Monger 9.7% Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2010 to 30 April 2011
A90917 2011 Pioneer Resources Ltd Juglah Dome 24% Juglah Dome E25/381 Annual Technical Report For the Period 21st May 2010 to 20th May 2011
A91421 2011 Monteray Mining Group Ltd Tripple 3 33% Tripple 3 Project E25/333 Annual Report for the period 20 June 2010 to 19 June 2011
A91552 2011 Silver Lake Resources Pty Ltd Mount Monger <1% Mount Monger Project, Annual Report for the period 01/07/2010 to 30/06/2011, C72/2004.
A92264 2011 Integra Mining Ltd Mount Monger <1% Mount Monger Project, Annual Report for period 1st November 2010 to 31st October 2011, E15/869; E25/307, 313,
A94097 2011 Integra Mining Ltd Greater Monger 9.7% Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2011 to 30 April 2012, E25/208,
A87247 2010 Integra Mining Ltd Greater Monger 9.9% Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2009 to 30 April 2010
A87303 2010 Pioneer Resources Ltd Juglah Dome 24% Exploration Licence 25/381 Juglah Dome Annual Technical Report For the Period 21th May 2009 to 20th May 2010
A87892 2010 Silver Lake Resources Pty Ltd Mount Monger <1% Mount Monger Project, Annual Report for the period 01/07/2009 to 20/06/2010 , C72/2004.
A88628 2010 Integra Mining Ltd Wattle Dam <1% Combined Annual Report on Wattle Dam Project – C132/2007 for period 1 October 2009 to 30 September 2010
A88848 2010 Integra Mining Ltd Mount Monger <1% Mt Monger Project, Annual Report for the period 1st November 2009 to 31st October 2010, C135/2007.
A87591 2010 Integra Mining Ltd Greater Monger 23% Partial Surrender Report on E25/208 for period 1 August 2006 to 30 July 2010
A87703 2010 Integra Mining Ltd Wattle Dam <1% Surrender Report on E25/298 for period 10 August 2005 to 9 August 2010
A88343 2010 Integra Mining Ltd Mount Monger <1% Mt Monger Project, Final Surrender Report for the period 7th September 2006 to 6th September 2010, P25/1842-18
A82327 2009 Integra Mining Ltd Greater Monger 9.9% Combined Annual Report on Greater Monger Project – C108/2001 for period 1 May 2008 to 30 April 2009
A84317 2009 Rubicon Resources Ltd Wattle Dam <1% Partial Surrender report for the period 10th August 2005 to 6th August 2009, Wattle Dam Project E25/298 (C132/
A84788 2009 Silver Lake Resources Pty Ltd Mount Monger <1% Mt Monger Project, Annual Report for the period 01/07/2008 to 30/06/2009, C72/2004.
A85250 2009 Integra Mining Ltd Wattle Dam <1% Combined Annual Report on Wattle Dam Project – C132/2007, Tenement Numbers: E25/298, E25/303, E25/319, C132/20
A85375 2009 Integra Mining Ltd Mount Monger <1% Combined Annual Report on Mt Monger Project – C135/2007 for period 1 November 2008 to 31 October 2009, Report
A84525 2009 Integra Mining Ltd Greater Monger 23% Partial Surrender Report on E25/208 for period 1 August 2006 to 28 July 2009
A78163 2008 Newcrest Mining Ltd Mount Monger 9.9% Mt Monger (JV) Project, Annual Report for the period ending 30 April 2008, C108/2001.
A80032 2008 Silver Lake Resources Pty Ltd Mount Monger <1% Mount Monger Project, Annual Report for the period 01/07/2007 to 30/06/2008, C72/2004.
A80489 2008 Rubicon Resources Ltd WATTLE DAM <1% Annual report for the period 1st October 2007 to 30th September 2008, Wattle Dam Project, C132/2007
A80491 2008 Rubicon Resources Ltd MOUNT MONGER <1% Annual Report for the period 1st November 2007 to 31st October 2008, Mt Monger Project, C135/2007, Tenement Nu
A79540 2008 Rubicon Resources Ltd Wattle Dam <1% WATTLE DAM E25/298 East Coolgardie Mineral Field PARTIAL SURRENDER REPORT 10th Aug 2005 to 6 Aug 2008
A76734 2007 Rubicon Resources Ltd Wattle Dam <1% WATTLE DAM E25/222, E25/241, E25/271, ..............P25/1830, P25/1831, East Coolgardie Mineral Field ANNUAL R
A75185 2007 Newcrest Mining Ltd Mount Monger 3.2% Mt Monger (JV) Project, Annual Report for the period ending 30th April 2004, E25/197,E25/203,E25/208........
A76853 2007 Rubicon Resources Ltd Mount Monger <1% MT MONGER East Coolgardie & Coolgardie Mineral Fields ANNUAL REPORT C135/2007 1st Nov 2006 to 31st Oct 2007
A74296 2006 Heron Resources Ltd Yindarlgooda <1% Yindarlgooda Project, Annual Combined Report C69/2006, 01 November 2005 to 31 October 2006, (Kurnalpi).
A72436 2006 Newcrest Mining Ltd Mount Monger / Jews/ Credo <1% Monger JV Annual Technical Report, Period Ending 30 April 2006, Combined Reporting No. C108/2001, (Newcrest Re
A70694 2005 Alcaston Mining Nl North Monger <1% North Monger Project, P25/1390, P25/1391........P26/2064.........M26/437 and M26/440, Annual Report for the pe
A70671 2005 Newcrest Operations Ltd Mount Monger <1% Monger JV Annual Report to the Dept of Industry and Resources for the period 01/05/2004 to 30/04/2005. DOIR Gr
A68758 2004 Newcrest Mining Ltd Mount Monger 3.2% Mt Monger (JV) Project, Annual Report for the period 01/05/2003 to 30/04/2004 , C108/2001.
A69074 2004 Newcrest Mining Ltd Mount Monger 64% Mt Monger (JV) Project, Partial Surrender Report for the period ending 30/03/2000 to 09/09/2004, E25/202. [C10
A65889 2003 South Kal Mines Pty Ltd Transline <1% Combined Annual Report for the period 12th June 2001 to 11th June 2002 Transline JV Gold Project C16/2001: E25
A66731 2003 Placer Dome Asia Pacific Ltd Greater Monger 64% Greater Monger Project, Partial Surrender Report for the period 30/03/2000 to 24/12/2002, E25/202.
A66939 2003 Placer Dome Asia Pacific Ltd Greater Monger 8.9% Annual Report for the period 01/05/2002 to 30/04/2003 C108/2001: E25/202 M25/117 M26/148,197,248-249,357,364,3
A65401 2002 Auriongold Exploration Pty Ltd Greater Monger 9% Greater Monger Project Annual Report 01/05/2001 - 30/04/2002 C108/2001 Tenement/s P25/1503-1506, 1509/1509, 15
A63729 2001 New Hampton Goldfields Nl Transline <1% Transline JV Gold Project Combined Annual Report for the period 12 June 2000 to 11 June 2001 on Reporting Grou
A62328 2001 Croesus Mining Nl Twin Tanks 6.1% Twin Tanks Project Annual Report For The Period 23 February 2000 to 22 February 2001 On The Tenement E25/199.
A53443 1998 Titan Resources Nl Horseshoe Dam 19% E25/101 Partial Surrender Report, Reporting Period :8 February 1992 to 13 January 1998 ( Horseshoe Dam Projec
A53594 1998 Titan Resources Nl Horseshoe Dam 19% E25/101 Partial Surrender Report, Reporting Period :8th February 1994 to 7th February 1998
A54262 1998 Amx Resources Nl North Monger <1% Surrender Report on North Monger Tenements P25/1457-59, 1465-66, P26/2708, 2752-53. (Period: From Date of Gran
A55381 1998 Minair Exploration Pty Ltd Majestic <1% Prospecting Licence P25/1333 Majestic Project Annual Report reporting period from 10/06/1997 to 09/06/1998.
A51059 1997 Titan Resources Nl Horseshoe Dam 19% Horseshoe Dam Project : Annual Report ( M9086-All Tenements) Horseshoe Dam E25/101, Horseshoe Infill P25/1307-
A51132 1997 Hampton Hill Mining Nl Mount Monger <1% Mount Monger Project, 1996 Surrender Report P26/2176, 2534-2536, May 1997.
A52456 1997 Amx Resources Nl North Monger <1% Report on North Monger Tenements: M26/59, 278, 437, 440, 01/08/96 - 31/08/96
A47769 1996 Titan Resources Nl Horseshoe Dam 19% Horseshoe Dam Project, Annual Report for reporting period 21st March 1995 to 20th March 1996, E25/101 (Horsesh
A47817 1996 Hampton Hill Mining Nl Easter Gift <1% Combined Annual Technical Report for the period 31/03/95 to 31/03/96 Mt Monger Tenements P26/2176 P26/2324 P26
A43847 1995 Hampton Hill Mining Nl Mount Monger <1% Combined annual technical report for the period 1/1/94 to 31/12/94 Mount Monger tenements P26/2176, 2324, 2534
A44279 1995 Titan Resources Nl Horseshoe Dam 19% Horseshoe Dam Project, E25/101&P25/1307-P25/1310 inclusive, for the period 8th February 1994 to 7th February (
A46502 1995 Westchester Pty Ltd Majestic <1% Majestic Project, Annual Report Prospecting Licences P25/1332 & 1333 for the period 10/06/1994 to 09/06/1995.
A37902 1993 Nugold Hill Mines Nl Mount Monger <1% Mount Monger Project, Annual technical report. PL25/1153 and 1154. for the period 6/3/92 - 5/3/93.
A35001 1992 Mt Kersey Mining Nl Curtin 11% Curtin Project, Annual Report for the period 22nd January 1991 to 21st January 1992, E25/68 & 69.
A33929 1991 Western Mining Corporation Ltd Yindarlgooda Dome <1% Yindarlgooda Dome Project, Final Surrender Report for the period 9th August 1983 to 3rd May 1991, E25/2-5, M25
A21791 1987 Western Mining Corporation Ltd Yindarlgooda Dome <1% Yindarlgooda Dome Project, Annual Report for the period 9th August 1986 to 8th August 1987, E25/2-5.
A18898 1986 Western Mining Corporation Ltd Yindarlgooda Dome <1% Annual report on Yindarlgooda Dome, E25/2, 3, 4, 5, For the period 9 August 1985 to 8 August 1986
A18899 1986 Western Mining Corporation Ltd Yindarlgooda Dome <1% Terminal (partial surrender) report on the relinquished portion of the Yindarlgooda Dome, E25/2-5, To 9 August
A16203 1985 Western Mining Corporation Ltd Yindarlgooda Dome <1% Yindarlgooda Dome Project, Annual Report for the period 9th August 1984 to 8th August 1985, E25/2-5.
A14265 1984 Western Mining Corporation Ltd Yindarlgooda Dome <1% Yindarlgooda Dome Project, Annual Report for the period 9th August 1983 to 8th August 1984, E25/2-5.
A21792 1983 Western Mining Corporation Ltd Yindarlgooda Dome <1% Yindarlgooda Dome gold/copper-zinc exploration
A4697 1974 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill).,
A4492 1972 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972.
A2305 1971 Union Miniere Dev & Mining Corp Ltd Majestic Dyke 5.7% Majestic Dyke Project, Non-statutory Report:Final Report for the period ending 29/10/1971, MC25/405-414.
A4696 1971 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971.
A4698 1971 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971.
A4693 1970 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: No 3 Sill, Drill Holes & Logs, November 1970,
A4695 1970 Great Boulder Mines Ltd Cowarna Rocks <1% Cowarna Rocks Project, Non-statutory Report: Drill Holes & Logs, ( No 2 Sill) for the year ending 31/12/1970.
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
20 months · 3 May 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 25/535 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 25/535? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.