E 25/657
Register summary
- Holder
- Ardea Exploration Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 12 Sept 2024
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149142 | 2025 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Final Surrender for the Slate Dam Project E25/553 for the period ending 28/04/2025 |
| A133838 | 2023 | Platina Resources Limited | Brimstone | <1% | Partial Surrender Report Brimstone Project E27/568 for period ending 4 November 2022 |
| A135225 | 2023 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Partial Surrender Report for the Slate Dam Project E25/553 for the period ending 02/04/2023 |
| A137528 | 2023 | Black Cat (Kal East) Pty Ltd | Yarri East | <1% | Partial Surrender for the Yarri East Gold Project E27/431 for the period ending 10/10/2023. |
| A131600 | 2022 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 47% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2021 to May 3rd 2022.E 27/552,E 27/554,E 27/555 |
180 more reports
| A131651 | 2022 | Lycaon Resources Ltd | Rocky Dam | <1% | Annual Report for C16/2022 "ROCKY DAM" for the period ending 25/04/2022. |
| A127484 | 2021 | Dreadnought Resources Ltd | Rocky Dam | <1% | E25/533 Rocky Dam Project Annual Report for the period 36/04/2020 to 25/04 2021 |
| A127639 | 2021 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 47% | Bulong Project (C75/2016) Annual Report for the Period 4th May 2020 to 3rd May 2021 |
| A122644 | 2020 | Brimstone Resources Ltd | Mount McLeay | <1% | Mt McLeay Project C43/2010 Annual Report for the period 15 November 2018 to 14 November 2019 |
| A123494 | 2020 | Ardea Resources Limited | Bulong | <1% | Annual Report Bulong Project C224/1995, 1 January 2019 to 31 December 2019 |
| A124158 | 2020 | Aruma Resources Limited | SLATE DAM | <1% | Annual Report for C112/2017 Slate Dam Project for the period ending 02/04/2020 |
| A124735 | 2020 | Hurricane Prospecting Pty Ltd | Bulong Nickel | <1% | E25/552 Annual Report Bulong Nickel project for the period 24 April 2019 to 23 April 2020 |
| A123427 | 2020 | Dreadnought (Yilgarn) Pty Ltd | Rocky Dam | <1% | Rocky Dam E25/00533 Annual Report for the period 26 April 2019 to 25 April 2020 |
| A124136 | 2020 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 42% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2019 to May 3rd 2020 |
| A122836 | 2020 | Black Cat (Bulong) Pty Ltd | Bulong | <1% | Annual Report for the Bulong Gold Project C314/1992 for the period ending 31/12/2019 |
| A123876 | 2020 | Hurricane Prospecting Pty Ltd | Bulong | <1% | Bulong Nickel E25/552 Annual Report for the period 23/4/2020 |
| A123984 | 2020 | Wingstar Investments Pty Ltd | Avalon | 12% | Avalon C156/2006 Annual Technical Report for the period ending 27/03/2020 |
| A125648 | 2020 | Black Cat (Bulong) Pty Ltd | Yarri East | <1% | C24/2018 Annual Report E27/431 & E27/449 Yarri East Project for the period ending 11/09/2020 |
| A118881 | 2019 | Ardea Resources Limited | Little Bulong | 5.2% | Little Bulong Project C55/2012 Annual Report For the Period 29 September 2017 to 28 September 2018, M25/00151, |
| A119240 | 2019 | Black Cat (Bulong) Pty Ltd | Bulong | <1% | Annual Report for the Bulong Gold Poject C314/1992 for the period 01/01/2018 - 31/12/2018 |
| A119310 | 2019 | Brimstone Resources Ltd | Mount McLeay | <1% | Mt McLeay Project Combined Annual Report for the period 15 November 2017 to 14 November 2018, E25/00545, E25/0 |
| A119605 | 2019 | Ardea Resources Limited | Bulong | <1% | Bulong Project C224/1995 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120132 | 2019 | Wingstar Investments Pty Ltd | Avalon | 12% | C156/2006 Avalon Annual Technical Report for the period 28 March 2018 to 27 March 2019, M25/00075, M25/00076, |
| A120323 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 42% | Annual Report for Bulong Project C75/2016 for the period 4 May 2018 to 3 May 2019, E27/00551, E27/00552, E27/0 |
| A120476 | 2019 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 "Slate Dam" for the period 3 April 2018 to 2 April 2019, E25/00553, E25/00556, E25 |
| A120634 | 2019 | Dreadnought Resources Ltd | Rocky Dam | <1% | Rocky Dam Project Annual Report E25/533 for the period 26 April 2018 to 25 April 2019 |
| A121114 | 2019 | Hurricane Prospecting Pty. Ltd. | Kanowna | <1% | Kanowna Project E25/552 Annual Report for the period 24 April 2018 to 23 April 2019 |
| A122075 | 2019 | Newmont Goldcorp Exploration Pty Ltd | Yarri East | <1% | Combined Annual Report for C 24/2018 (Yarri East project) for the period 12th September 2018 to 11th September |
| A115684 | 2018 | Ardea Resources Limited | Little Bulong | 5.2% | C55/2012 Little Bulong Annual Report For the Period 29 September 2016 to 28 January 2017, M25/00151, M25/00187 |
| A115763 | 2018 | Brimstone Resources Ltd | Mount McLeay | <1% | C43/2010 Mt McLeay Project 2017 Combined Annual Report for the period 15 November 2016 to 14 November 2017, P2 |
| A116898 | 2018 | Wingstar Investments Pty Ltd | Avalon | 12% | Avalon Project C156/2006 Annual Technical Report for the period 28 March 2017 to 27 March 2018, M25/00075, M25 |
| A117031 | 2018 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 25/04/2017 - 25/04/2018 |
| A117074 | 2018 | Hurricane Prospecting Pty Ltd | Bulong | <1% | Bulong Project E25/552 Annual Report for the period 24/04/2017 - 23/04/2018 |
| A117189 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 42% | Annual Report for Bulong Project C75/2016 for the period 04/05/2017 - 03/05/2018, E27/00551, E27/00552, E27/00 |
| A117326 | 2018 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 Slate Dam Project for the period 3 April 2017 to 2 April 2018, E25/00553, E25/0055 |
| A118412 | 2018 | Newmont Exploration Pty Ltd | Yarri East | <1% | Combined Annual Report C24/2018 (Yarri East Project) for the period 12th September 2017 to 11th September 2018 |
| A113911 | 2017 | Wingstar Investments Pty Ltd | Avalon | 12% | Avalon Project C156/2006 Combined Annual Report For the Period 28 March 2016 to 27 March 2017, M25/00075, M25/ |
| A113952 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 42% | Bulong Project C75/2016 Annual Report for the period May 2016 to May 2017, E27/00551, E27/00552, E27/00554, E2 |
| A114101 | 2017 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 26 April 2016 to 26 April 2017 |
| A115168 | 2017 | Newmont Exploration Pty Ltd | Yarri East | <1% | Annual Report for E 27/449 (Yarri East Project) for the period 12th September 2016 to 11th September 2017 |
| A108182 | 2016 | Silver Lake Resources Pty Ltd | Queen Lapage | 19% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2014 to 31 October 2015, E25/ |
| A109098 | 2016 | Wingstar Investments Pty Ltd | Avalon | 12% | Avalon Project C156/2006 Combined Annual Report M 25/00075, M 25/00076, M 25/00077, M 25/00078, M 27/00189 for |
| A110550 | 2016 | Rbr Group Limited | Yindarlgooda | <1% | Yindarlgooda Project Annual Report E27/00449 for the period 1 November 2015 to 31 October 2016 |
| A104633 | 2015 | Silverlake Resources Ltd | Queen Lapage | 19% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2013 to 31 October 2014, E25/ |
| A105853 | 2015 | Wingstar Investments Pty Ltd | Bulong | 12% | Bulong Project C156/2006 Combined Annual Report for the period 28/03/2014 to 27/03/2015, M25/75, 76, 77, 78, M |
| A106214 | 2015 | Silver Lake Resources Ltd | Queen Lapage | 23% | Partial Surrender Report on E25/273 (Queen Lapage Project) for the period 23 March 2006 to 20 March 2015 |
| A107604 | 2015 | Rubicon Resources Ltd | Yindarlgooda | 38% | Yindarlgooda Project C210/2007 Combined Annual Report for the period 1 November 2014 – 31 October 2015, E25/35 |
| A106060 | 2015 | Rubicon Resources Ltd | Bulong | 60% | Bulong, Yindarlgooda E25/422 Final Report for the period 24 May 2015 – 23 May 2015 |
| A101170 | 2014 | Silver Lake Resources Limited | Queen Lapage | 19% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2012 to 31 October 2013 |
| A101496 | 2014 | Norilsk Nickel Australia Ltd | Avalon | 12% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2013 to 27 March 2014 Avalon Pr |
| A103375 | 2014 | Brimstone Resources Ltd | Penny’s Lake West | 25% | Penny’s Lake West Project Western Australia Final Surrender Report for the period 18 August 2013 – 17 August 2 |
| A104148 | 2014 | Heron Resources Ltd | Little Bulong | 74% | Little Bulong Project C55/2012, Annual Report for the period 29/09/2013 to 28/09/2014, M25/151,187 & 476. |
| A104174 | 2014 | Rubicon Resources Ltd | Yindarlgooda | 33% | Yindarlgooda C210/2007 Combined Annual Report E25/355, 392, 422, E27/425, 430, 443, 449 P27/1949 for the perio |
| A104404 | 2014 | Rubicon Resources Ltd | Bulong - Yindarlgooda | 75% | Bulong / Yindarlgooda E25/355 Final Report for the period 10 November 2009 – 9 November 2014 |
| A96527 | 2013 | Bulong Mining Pty Ltd | Bulong | <1% | Bulong Project (C314/1992) Annual Report for the period 01/01/2012 to 31/12/2012 |
| A97318 | 2013 | Norilsk Nickel Avalon Pty Limited | Avalon | 12% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2012 to 27 March 2013 Avalon Pr |
| A100169 | 2013 | Brimstone Resources Ltd | Penny’s Lake West | 25% | Penny’s Lake West Project E27/452 Annual Report for the period 18 August 2012 – 17 August 2013 |
| A100409 | 2013 | Rubicon Resources Ltd | Yindarlgooda | 25% | Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, |
| A100909 | 2013 | Heron Resources Ltd | Little Bulong | 74% | Little Bulong Project, Annual Report for the period 29/09/2012 to 28/09/2013, M25/151 & 187; E25/476. [C55/201 |
| A96582 | 2013 | Integra Mining Ltd | Queen Lapage | 19% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2011 to 31 October 2012, E25/ |
| A97785 | 2013 | Heron Resources Ltd | North Dam | <1% | North Dam Project, Final Surrender Report for the period 9th February 2009 to 12th June 2012, E27/330. |
| A98714 | 2013 | Aruma Resources Ltd | Lake Penny | <1% | E27/472 Lake Penny Project WA Surrender Report for the period ended 24th April 2013 |
| A92700 | 2012 | Integra Mining Ltd | Queen Lapage | 19% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2010 to 31 October 2011, E25/ |
| A93609 | 2012 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 12% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2011 to 27 March 2012 Avalon Pr |
| A93853 | 2012 | Heron Resources Ltd | South West Taurus | 5.9% | Annual report for the period 18 March 2011 to 17 March 2012, South West Taurus Dam Project, M25/151 |
| A95322 | 2012 | Brimstone Resources Ltd | Penny's Lake West | 25% | Penny's Lake West Project Western Australia 2012 Annual Report E27/452 Period ending 17th August 2012 |
| A95706 | 2012 | Heron Resources Ltd | Little Bulong | 5.2% | Annual report for the period 29 September 2011 to 28 September 2012, Little Bulong Project C55/2012, M25/151, |
| A96114 | 2012 | Rubicon Resources Ltd | Yindarlgooda | 26% | Yindarlgooda Project, Annual Report for the period 1st November 2011 to 31st October 2012, E25/355, 392, 422, |
| A88967 | 2011 | St Barbara Ltd | Yindarlgooda - Rocky Dam | 18% | Yindarlgooda (Rocky Dam) Project, Annual Report for the Period 1 November 2009 to 31 October 2010,C210/2007 Te |
| A88987 | 2011 | Bulong Mining Pty Ltd | New Bulong | <1% | Annual Report for the period 1 January 2010 to 31st December 2010, New Bulong Project C314/1992 |
| A89960 | 2011 | Heron Resources Ltd | Bulong | 18% | Combined annual report for the period 1 January 2010 to 31 December 2010, Bulong Project, C224/1995 |
| A89962 | 2011 | Heron Resources Ltd | Bulong | 100% | Surrender report for the period 22 January 2008 to 14 February 2011, Bulong Project, E27/356, P27/1759- 1761 |
| A90201 | 2011 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 12% | Avalon Project, Annual Report for the period 28th March 2010 to 27th March 2011, M25/75-78, & M27/189. (C156/2 |
| A91838 | 2011 | Heron Resources Ltd | Taurus Dam | 67% | Surrender report for the period 13 April 2006 to 13 July 2011, Taurus Dam Project, M25/127 |
| A91920 | 2011 | Heron Resources Ltd | Taurus Dam | 80% | Surrender report for the period 13 April 2006 to 13 July 2011, Taurus Dam Project, M25/128 |
| A92275 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 23% | Yindarlgooda C210/2007 Combined Annual Report 1 November 2010 – 31 October 2011 |
| A90718 | 2011 | Rubicon Resources Ltd | White Gate Dam | 60% | Annual Report for the period 24th May 2010- 23rd May 2011, White Gate Dam Project, E25/422 |
| A85597 | 2010 | Heron Resources Ltd | Lake Penny | 24% | Surrender report for the period 30 September 1992 to 26 November 2009, Lake Penny Project, E27/94 |
| A87518 | 2010 | Heron Resources Ltd | Bulong | 56% | Surrender report for the period 23 January 2008 to 18 May 2010, Bulong Project, P25/1966–7 and P27/1754-8 |
| A86572 | 2010 | Heron Resources Ltd | Bulong | 15% | Annual report for the period 1 January 2009 to 31 December 2009, Bulong Project, C224/1995, E25/250, M25/59, M |
| A82323 | 2009 | Norilsk Nickel Australia Ltd | AVALON | 12% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2008 TO 27 MARCH 2009, MT MARGARET MINERAL FIELD, |
| A84968 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 18% | Annual Report for the Period 1 November 2008 to 31 October 2009 C210/2007, Tenement Numbers E25/273, E25/316, |
| A76906 | 2008 | Rubicon Resources Ltd | Yindarlgooda | 15% | YINDARLGOODA PROJECTCOMBINED REPORT C210/2007 ANNUAL REPORT 1st November 2006 to 31st October 2007 |
| A77925 | 2008 | Yilgarn Gold Ltd | New Bulong | <1% | Annual report for the period 1 January 2007 to 31 December 2 007, New Bulong Project E25/90 & 218, M25/24, 83, |
| A78871 | 2008 | Norilsk Nickel Australia Ltd | Avalon | 12% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2007 TO27 MARCH 2008 MT MARGARET MINERAL FIELD, WA |
| A80490 | 2008 | Rubicon Resources Ltd | YINDARLGOODA | 17% | YINDARLGOODA PROJECT COMBINED REPORT, C210/2007, E25/273, E25/316, E25/326, E25/335, E27/291, E27/337, E28/15 |
| A77762 | 2008 | Inco Resources (Australia) Pty Ltd | Bulong | 15% | BULONG PROJECT C224/1995, E25/250....M25/59...P27/1754 to P27/1761, Combined Annual Report C224/1995, |
| A79633 | 2008 | Gladiator Resources Ltd | Gindalbie South | <1% | Gindalbie South Project, Final Report for Tenements E27/293 and E27/302, For the period 12/08/2004 to 08/08/20 |
| A81471 | 2008 | Vale Inco Australia Limited Partnership | Bulong | 14% | BULONG PROJECT C224/1995 FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008 |
| A74679 | 2007 | Inco Australia Ltd | Bulong | 14% | Bulong Project C224/1995 Comb Annual Report for the Period 1 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A74727 | 2007 | Heron Resources Ltd | Our Swamp | <1% | Our Swamp Project, Annual Report for the period 5th February 2005 to 4th February 2006 , P27/1576. |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | 20% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A74953 | 2007 | Heron Resources Ltd | Our Swamp | <1% | Our Swamp Project, Annual Report for the period 5th February 2005 to 4th February 2006, P27/1575. |
| A75023 | 2007 | Heron Resources Ltd | Hampton Hil | 5.9% | Hampton Hill Project, Annual Report for the period 1st January 2006 to 31st December 2006, P25/1004,1005 & 100 |
| A75110 | 2007 | Heron Resources Ltd | Our Swamp Dam | <1% | Our Swamp Dam Project, Annual Report for the period 5th February 2006 to 4th February 2007, P27/1575. |
| A75112 | 2007 | Heron Resources Ltd | Our Swamp Dam | <1% | Our Swamp Dam Project , Annual Report for the period 5th February 2006 to 4th February 2007, P27/1576. |
| A75205 | 2007 | Yilgarn Gold Ltd | New Bulong | <1% | New Bulong Project E25/90 & 218, M25/24, 83, 91 & 129, P25/ 1125-1136, 1191 & 1788 and P25/1312, Combined Annu |
| A75354 | 2007 | Rubicon Resources Ltd | Bulong North | <1% | Bulong North Project, Annual Report for the period 28th April 2006 to 27th April 2007, E27/291. |
| A75476 | 2007 | Lionore Australia (Avalon) Pty Ltd | Avalon | 12% | Annual Report on the Avalon Project For the period 28 March 2006 TO 27 March 2007 Mount Margaret Field,Western |
| A75891 | 2007 | Gladiator Resources Ltd | Gindalbie South Project | <1% | Gindalbie South Project Annual Report for Tenements E27/293 and E27/302 For the period 12/08/2006 to 11/08/200 |
| A76109 | 2007 | Gladiator Resources Ltd | Gindalbie South Project | <1% | Gindalbie South Project Partial Surrender Report for Tenements E27/293 and E27/302 For the period 12/08/2004 t |
| A71827 | 2006 | Heron Resources Ltd | Taurus Project | 5.9% | Taurus Project Combined Report C378/1997, East Coolgardie (Bulong) Mineral Field, Annual Report, 14 September |
| A72025 | 2006 | Yilgarn Gold Ltd | New Bulong | <1% | Annual Report for the period 01/01/05 to 31/12/05, New Bulong Project, E25/90,218, M25/24,83,91,129, P25/1125- |
| A73311 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 14% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A73312 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 14% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73317 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/77, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73318 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/77, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A73319 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 46% | Annual Report on the Avalon Nickel Project M27/189, For the Period 16 December 2003 to 15 December 2004, (Kurn |
| A73320 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 46% | Annual Report on the Avalon Nickel Project M27/189, For the Period 16 December 2004 to 15 December 2005, (Kurn |
| A73544 | 2006 | Gladiator Resources Ltd | Gindalbie South | <1% | Gindalbie South Project E27/293,302, Annual Report for the Period 12/08/2005 to 11/08/2006, Combined Reporting |
| A72377 | 2006 | Heron Resources Ltd | Bulong | 18% | Bulong Project Combined Report C224/1995, Annual Report, 1 January 2004 to 31 December 2005, (Kurnalpi). |
| A69928 | 2005 | Supersorb Minerals Nl | Taurus | 5.9% | Taurus Project ,Annual Report, 14th September 2003 to 13th September: 2004, P25/1004,P25/1005, P25/1006. |
| A71137 | 2005 | Gladiator Resources Ltd | Gindalbie South | <1% | Gindalbie South Project, Annual report for tenements E27/293 & E27/302, For the period 12/08/2004 to 11/08/200 |
| A70093 | 2005 | Yilgarn Gold Ltd | New Bulong | <1% | Annual report for the period 01/01/04 - 31/12/04 New Bulong Project, C314/1992, E25/90, E25/218, M25/24, M25/8 |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | 19% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A68051 | 2004 | Bulong Operations Pty Ltd | Kurnalpi gold / Taurus | 5.9% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2002 to 13th September: 20 |
| A68527 | 2004 | Yilgarn Gold Ltd | Bulong | <1% | Annual report for the period 01/01/2003-31/12/2003 New Bulong Project (C314/1992), E25/90, E25/218, M25/24, M2 |
| A66108 | 2003 | Yilgarn Gold Ltd | Bulong | <1% | Annual Report/Technical Review February 2003 New Bulong Project M25/24, 83, 91, 129, P25/1125-36, 1191, 1312, |
| A66149 | 2003 | Bulong Operations Pty Ltd | Bulong | 5.9% | Bulong/Talon Tenure Combined Annual Report, C378/1997 for the period 14th September 2001 to 13th September: 20 |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | 19% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | 21% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A65132 | 2002 | Anglogold Australia Ltd | New Bulong | <1% | Final Report for the Period 22 August 1997 to 13 June 2002 [ C314/92]. New Bulong (JV) Project, E25/85. |
| A63586 | 2002 | Anglogold Australia Ltd | New Bulong | <1% | New Bulong (JV) Project M25/83, E25/85, E25/218, P25/1125-1136, P25/1191 & P27/1312, Annual Report for the per |
| A64009 | 2002 | Delta Gold Ltd | Queen Lapage | 17% | Queen Lapage JV Project C16/1998 Annual Report 01/01/2001 to 31/12/2001 tenements E25/111, 117, 120, 122, 200, |
| A64171 | 2002 | Bulong Operations Pty Ltd | Bulong | 5.9% | Annual Report 14th September 2000 to 13th September 2001 P25/1004, P25/1005, P25/1006 Bulong/Talon tenure, Bul |
| A90338 | 2002 | Mpi Mines Ltd | Black Swan | 8.1% | Black Swan Nickel Mine, Drill Hole SUD 821, October 2002, E27/67; M27/189, 200, 288-289; P27/1433-1434. ( M27/ |
| A62233 | 2001 | Bulong Operations Pty Ltd | Bulong | 61% | Bulong WA Combined Report C224/95 For Year 2000. |
| A62925 | 2001 | Delta Gold Ltd | Queen Lapage | 16% | Queen Lapage Joint Venture E25/111, E25/117 E25/120 E25/122 E25/190 E25/200 E27/193 GML25/1586 GML/1587 Annual |
| A59936 | 2000 | Acacia Resources Ltd | New Bulong | <1% | New Bulong (JV) Project, E25/85, P25/1125-1136,1191 , GML27/1709, P27/1312, M25/83, E26/77, Annual Report for |
| A61983 | 2000 | Anglogold Australasia Ltd | New Bulong | <1% | New Bulong JV Project E25/85, P25/1125-1136, P25/1191, GML27/1709, P27/1312, M25/83 & E25/218 Verification Rep |
| A58802 | 1999 | Preston Resources Nl | Bulong | 5.9% | Bulong Project, Annual report to 31/12/98 for P25/1004 P25/1005 and P25/1006 Taurus Western Australia |
| A54428 | 1998 | Croesus Mining Nl | Queen Lapage | 100% | Surrender Report to the Dept of Minerals & Energy for the Queen Lapage Prospect, M25/147, for the period 1st M |
| A57394 | 1998 | Acacia Resources Ltd | New Bulong | <1% | New Bulong (JV) Project, Annual Report for the period 01/01/98 - 31/12/98, E25/85, P25/1125-1136, 1191 GML27 |
| A53308 | 1998 | Talon Resources Nl | Taurus | 5.9% | Taurus Project, Annual Report P25/1004-1006 Year Ending: 13/09/1995 Kurnalpi, East Coolgardie Mine |
| A53309 | 1998 | Talon Resources Nl | Taurus | 5.9% | Taurus Project, Annual Report Year Ending: 13/09/1996 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field, |
| A53327 | 1998 | Croesus Mining Nl | Queen Lapage | 98% | Surrender Report Queen Lapage Prospect M27/168 for the period 01/05/1995 to 17/11/1997 |
| A54344 | 1998 | Acacia Resources Ltd | Bulong | <1% | New Bulong Joint Venture Project - Annual Report E25/85, MLA25/163-164, MLA27/332, P25/1125-1127, etc. 01/01/1 |
| A56082 | 1998 | Resolute Ltd | Bulong | 28% | Combined Annual Mineral-Exploration Report Bulong Project Tenements Exploration Licences E27/72 Prospecting Li |
| A56108 | 1998 | Resolute Ltd | Bulong | 12% | Combined annual mineral exploration report. Bulong Project. 01/01/97-31/12/97. E15/286. E25/67. E27/94,95. P25 |
| A51330 | 1997 | North Ltd | Rocky Dam | 53% | Report on E25/63,105, 81; M27/168 & M25/147, Rocky Dam, for the period 01/01/1996 to 30/04/1996. |
| A52660 | 1997 | Talon Resources Nl | Taurus | 5.9% | Taurus Project, Annual Report Year Ending 13/09/1997 P25/1004-1006 Kurnalpi, East Coolgardie Mineral Field |
| A52879 | 1997 | Croesus Mining Nl | Queen Lapage | 71% | Queen Lapage Project, Final Surrender Report for the period 27th July 1990 to 17th November 1997, E25/63. |
| A52971 | 1997 | Croesus Mining Nl | Queen Lapage | 76% | Queen Lapage Project, Final Surrender Report for the period 1st May 1996 to 17th November 1997, E25/105. |
| A53093 | 1997 | Resolute Ltd | Bulong | 18% | Bulong Nickel Cobalt Project. Annual Report 01/01/96 - 31/12/96. Bulong (Water) Tenement Group: E27/94-95, |
| A53417 | 1997 | Resolute Ltd | Bulong | 33% | Bulong Nickel Cobalt Project. Annual report 01/01/96-31/12/96. E25/67. E27/72. M25/75-78,127-128. M27/189-190. |
| A46957 | 1996 | North Ltd | Queen Lapage | 53% | Queen Lapage Project, Annual Report For the period 31/12/1994 to 31/12/1995, E25/81, M27/168, 25/147. |
| A48489 | 1996 | Resolute Samantha Ltd | Bulong | 6.7% | Bulong Nickel Cobalt Project Annual report Bulong (water) Tenements Group E15/286 E15/324 E27/94 E27/95 P25/10 |
| A48757 | 1996 | North Ltd | Gundockerta North | 34% | Gundockerta North Project, Annual Report for the period 02/09/1995 to 01/09/1996, P25/1368-1377. |
| A46956 | 1996 | North Ltd | Queen Lapage | 20% | Queen Lapage Project, Partial Surrender Report on E25/81, 18/01/1996. |
| A48478 | 1996 | Resolute Samantha Ltd | Bulong | 34% | Bulong Nickel Cobalt Project Annual report Bulong (Nickel) Tenement Group M25/75 to M25/78 M25/127 M25/128 M27 |
| A43697 | 1995 | Cyprus Gold Australia Corporation | Bulong | <1% | Bulong (JV) Project , Annual Report for the period March 1,1994 to February 28,1995 E25/85,E25/90,P25/1125 to |
| A45396 | 1995 | Croesus Mining Nl | Queen Lapage | 20% | Queen Lapage Project, Annual Report Exploration E25/81 for the period 19th January 1994 to 20th January 1995. |
| A45677 | 1995 | North Ltd | Gundockerta North | 34% | Gundockerta North Project,(First Year) Annual Report P25,1368-1377 for the period 02/09/1994 to 01/09/1995. |
| A40273 | 1994 | Talon Gold Nl | Taurus | 5.9% | Annual Report for the period 14/09/92-13/09/93 Taurus Project P25/1004-1006 |
| A40973 | 1994 | Cyprus Gold Australia Corporation | Bulong | <1% | Annual report for the period 01/03/93-28/02/94 Bulong JV Project E25/85 P25/1125-1136 P25/1192 |
| A41998 | 1994 | Croesus Mining Nl | Queen Lapage | 16% | Queen Lapage Project, Partial Surrender Report covering period(s) to 5th September 1994, E25/56, E25/63 & E27/ |
| A42953 | 1994 | North Mining Ltd | Gundockerta North | 34% | Gundockerta North Project, (Taurus & Slate), Annual Report for the period 27/10/1993 to 01/09/1994, M25/114 & |
| A43043 | 1994 | Croesus Mining Nl | Queen Lapage | 40% | Queen Lapage Project, Annual Report for the period 01/06/1993 to 30/06/1994, E25/63, 81, & M27/168. |
| A43505 | 1994 | Talon Resources Nl | Taurus | 5.9% | Annual Report on the Taurus Group, P25/1004 to P25/1006 for period 14/09/1993 to 13/09/1994. |
| A37734 | 1993 | Ernmik Exploration | Bulong | <1% | Annual report for the period ending 31/12/1992 Bulong/North Queen Margaret Gold Project E25/85 P25/1125- 1136 |
| A38139 | 1993 | Western Mining Corporation Ltd | Bulong | 7.5% | Annual report for the period 06/92-03/93 Bulong Project E15/286 E27/94-95 P25/1196-1214 P27/1247 P27/1252 |
| A38321 | 1993 | Cra Exploration Pty Ltd | Queen Lapage | 9.7% | Queen Lapage Project, Annual Report for period to 30/04/1993, GML25/1586-1587, P25/1079-1083, P27/1014, M25/10 |
| A38666 | 1993 | Western Mining Corporation Ltd | Kalgoorlie Groundwater | 7.4% | Annual report for the period 06/92-06/93 Kalgoorlie Groundwater Project E15/286 E27/94-95 P25/1193-1194 P25/11 |
| A36868 | 1992 | Cra Exploration Pty Ltd | Queen Lapage | 14% | Queen Lapage Project, Annual Report for period ending 30th April 1992, GML25/1586-1587, E25/18, 56, 63, 72, 81 |
| A34602 | 1991 | Mr Dalla-Costa Mr | Taurus | 5.9% | (Annual Report for the period 01/90-12/91 Taurus Project P25/1004-1006) Taurus, Bulong District |
| A33331 | 1991 | Croesus Mining Nl | Queen Lapage | 15% | Queen Lapage Project, Annual Report for the period ending April 30th 1991, E25/18, 56, 63; E27/62; P27/1014; M |
| A23291 | 1987 | Leader Resources Nl | Bulong | 5.8% | Bulong Project, Initial reconnaissance and proposed further exploration, P25/159-161, P25/269 |
| A16210 | 1985 | Rytech Pty Ltd | Taurus | 5.8% | Taurus Project, Non-statutory Report: Report on Gold Prospects in the Eastern Goldfields of Western Australia, |
| A15676 | 1984 | Consolidated Resources Nl | Bulong | 5.8% | Bulong Project, Non-statutory Report: Final Report, Gold Exploration Activities , Taurus Mine & Environs at Bu |
| A1288 | 1983 | Western Nickel Pty Ltd | Bulong | 100% | Bulong Project, Non-statutory Report: Report on Exploration Data, Drill Holes & Sections, January 1983, MC25/1 |
| A11660 | 1982 | Western Mining Corporation Ltd | Rocky Dam | 25% | Rocky Dam Project, Annual Report for the period 18th July 1981 to 17th July 1982, TR70/7673H; MC25/1348-1361, |
| A11492 | 1982 | Electrolytic Zinc Co | Rocky Dam | 31% | Rocky Dam Project, Final Surrender Report for the period ending 31/07/1978, MC25/1163-1180. |
| A10240 | 1981 | Western Mining Corporation Ltd | Rocky Dam - Lake Yindarlgooda | 25% | Rocky Dam - Lake Yindarlgooda Project, Annual Report for the period 18th July 1980 to 17th July 1981, TR70/767 |
| A7844 | 1978 | Aquitaine Aust Minerals Pty Ltd | Ophir | <1% | Ophir Project, Non-statutory Report: Exploration Report, March 1978, MC25/1042, 1113-1117. |
| A5073 | 1973 | Western Nickel Pty Ltd | Bulong | 17% | Bulong Project, Non-statutory Report: Geological Report for the period 1st January 1972 to 31st March 1973, |
| A1279 | 1970 | Western Nickel Pty Ltd | Bulong | 16% | Bulong Project, Annual Report for the period ending 31/12/1970, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A2177 | 1970 | Union- Homestake- Hanna Syndicate | Anzac | 12% | Anzac Project, Non-statutory Report: (3) Report(s) covering the period (s) 24/04/1968 TO 12/11/1970, MC25/138- |
| A1277 | 1968 | Western Nickel Pty Ltd | Bulong | 16% | Bulong Project, Annual Report for the period ending 31/12/1968, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A47290 | 1753 | Cyprus Gold Australia Corporation | Bulong JV | <1% | Bulong Joint Venture Project Annual report March 1, 1995 to February 28, 1996 E25/85 E25/90 M25/163 M25/164 M2 |
| A82549 | 1753 | St Barbara Ltd | ROCKY DAM | 23% | ROCKY DAM PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD 23 MARCH 2006 – 20 MARCH 2009 |
| A82928 | 1753 | St Barbara Ltd | Rocky Dam | <1% | Rocky Dam Project C210/2007, E27/291, Partial Surrender Report for the Period 28 April 2006 - 27 April 2009 |
| A5072 | 1753 | Western Nickel Pty Ltd | Bulong | 9.7% | Bulong Annual Report, Year Ending 31st March 1974 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A39278 | 1753 | Western Mining Corporation Ltd | Bulong | 35% | Annual Report for the period 18/10/90 to 27/03/93 WMC : Resolute Resources : Energy, Oil and Gas NL Bulong nic |
| A41487 | 1753 | Western Mining Corporation Ltd | Bulong | 35% | Annual report for the period 28/03/93-27/03/94 Bulong Laterite Project E25/67 E27/72 M25/75-78 P25/909 P25/10 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 25/657 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 25/657 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 25/657? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.