E 25/671
Register summary
- Holder
- Ore Resource Co Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 15 Oct 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146167 | 2025 | Strickland Metals Limited | Kurnalpi | <1% | Kurnalpi Project Combined Annual Report C201/2020 for the period ending 04/10/2024 |
| A148595 | 2025 | Resource Development Corporation Pty Ltd | Watermill | 14% | Final Surrender - Watermill Exploration Project E25/00598 for the period 26 February 2021 to 20 February 2025 |
| A149126 | 2025 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Final Surrender for the Slate Dam Project E25/556 for the period ending 28/04/2025 |
| A139123 | 2024 | Riversgold (Australia) Pty Ltd | Hampton | 100% | E25/0608 Hampton Final Surrender Report for the period ending 29/09/2023. |
| A139129 | 2024 | Riverina Gold Nl | Hampton | <1% | E28/3060 Hampton Final Surrender Report for the period ending 15/02/2024 |
245 more reports with detail
| A139133 | 2024 | Riversgold (Australia) Pty Ltd | Hampton | <1% | E28/3102 Hampton Final Surrender Report for the period ending 15/02/2024. |
| A142821 | 2024 | Riversgold (Australia) Pty Ltd | Queen La Page | 66% | E25/0538 Queen La Page Final Surrender Report for the period ending 18/03/2024 |
| A142825 | 2024 | Riverina Resources Pty Ltd | Queen La Page | 52% | E28/2580 Queen La Page Final Surrender Report for the period ending 18 March 2024 |
| A142856 | 2024 | Riversgold Ltd | Alloy | <1% | C201/2020 Annual Technical Report-Alloy JV for the period 5 October 2022 to 4 October 2023 |
| A143260 | 2024 | Resource Development Company Pty Ltd | Watermill | 14% | Annual Report - Watermill E25/00598 for the period ending 25/02/2024 |
| A135768 | 2023 | Riversgold Ltd | Kurnalpi | 52% | Annual Report for C202/2020 Kurnalpi for the period ending 20/09/2022. E 25/0538,E 25/0540,E 28/2580 |
| A135921 | 2023 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Partial Surrender Report for the Slate Dam Project E25/556 for the period ending 10/7/2023 |
| A136933 | 2023 | Riversgold (Australia) Pty Ltd | Kurnalpi | <1% | Kurnalpi E28/2665 Partial Surrender Report for the period ending 09/09/2023 |
| A133838 | 2023 | Platina Resources Limited | Brimstone | <1% | Partial Surrender Report Brimstone Project E27/568 for period ending 4 November 2022 |
| A135619 | 2023 | Resource Development Corporation Pty Ltd | Watermill | 14% | Watermill Annual Report E25/598 for the period ending 25/02/2023. |
| A137800 | 2023 | Riversgold Ltd | Kurnalpi | <1% | Kurnalpi E28/3060 Annual Report for the period ending 15/09/2023 |
| A130892 | 2022 | Brimstone Resources Ltd | Mount McLeay | <1% | Mount McLeay E25/547 Final Surrender Report for the period 16/11/2016 to 4/3/2022 |
| A131651 | 2022 | Lycaon Resources Ltd | Rocky Dam | 9.1% | Annual Report for C16/2022 "ROCKY DAM" for the period ending 25/04/2022. |
| A133183 | 2022 | Riversgold (Australia) Pty Ltd | Kurnalpi | 66% | E 25/538 Kurnalpi Partial surrender report for the period ending 20/09/2022. |
| A133187 | 2022 | Riversgold (Australia) Pty Ltd | Kurnalpi | 52% | E 28/2580 Kurnalpi Project Partial surrender report for the period ending 20/09/2022. |
| A133334 | 2022 | Riversgold (Australia) Pty Ltd | Alloy | <1% | Annual Report for 201/2020 Alloy Join Venture Project for the period ending 04/10/2022 |
| A129190 | 2022 | Riversgold Ltd | Kurnalpi | <1% | Annual Report for C201/2020 Kurnalpi Project for the period 5 October 2020 to 4 October 2021. E 28/02599,E 28/ |
| A130480 | 2022 | Resource Development Corporation Pty Ltd | Watermill | 14% | Annual report - Watermill Project E25/598 for the period ending 25/02/2022. |
| A128938 | 2021 | Riversgold Ltd | Kurnalpi | 52% | Annual Report for C202/2020 Kurnalpi Project for the period ending 20/09/2021 |
| A126680 | 2021 | Northern Star Resources Ltd | Acra | <1% | Acra E28/2483 Partial Surrender Report for the period 23 February 2015 to 22 February 2021 |
| A127484 | 2021 | Dreadnought Resources Ltd | Rocky Dam | <1% | E25/533 Rocky Dam Project Annual Report for the period 36/04/2020 to 25/04 2021 |
| A122644 | 2020 | Brimstone Resources Ltd | Mount McLeay | 4.2% | Mt McLeay Project C43/2010 Annual Report for the period 15 November 2018 to 14 November 2019 |
| A122278 | 2020 | Riversgold (Australia) Pty Ltd | Kurnalpi | 52% | E28/2580 Annual Report, Kurnalpi Project, 21 September 2018 to 20 September 2019 |
| A122547 | 2020 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra project C74/2014 for the period 9 December 2018 to 8 December 2019 E 27/00278,E 27/00438,E 27/00491,E 27/ |
| A124158 | 2020 | Aruma Resources Limited | SLATE DAM | <1% | Annual Report for C112/2017 Slate Dam Project for the period ending 02/04/2020 |
| A125599 | 2020 | Riversgold (Australia) Pty Ltd | Kurnalpi | 52% | Annual Report for Kurnalpi E28/2580 for the period ending 20/9/2020 |
| A124866 | 2020 | Alliance (Sa) Pty Ltd | Gundockerta South | <1% | Combined Surrender Technical Report for the Gundockerta South Project E25/459 & E28/2572 for the Period 1 July |
| A125595 | 2020 | Riversgold (Australia) Pty Ltd | Kurnalpi | 66% | Annual Report for Kurnalpi E25/538 for the period ending 20/9/2020 |
| A122275 | 2020 | Riversgold (Australia) Pty Ltd; Serendipity Pty Ltd | Kurnalpi | 66% | Annual Report E25/00538, Kurnalpi, 20 September 2018 to 21 September 2019 |
| A123427 | 2020 | Dreadnought (Yilgarn) Pty Ltd | Rocky Dam | <1% | Rocky Dam E25/00533 Annual Report for the period 26 April 2019 to 25 April 2020 |
| A125592 | 2020 | Riversgold (Australia) Pty Ltd | Kurnalpi | <1% | Annual Report for E28/2665 Kurnalpi Project for the period ending 7/9/2020 |
| A121789 | 2019 | Pcb Holdings Pty Ltd | LONE PINE DAM - HAMPTON PLAINS | 14% | PCB HOLDINGS PTY LTD - LONE PINE DAM E 25/521-I Annual report for the period 22 September 2018 to 21 September |
| A118926 | 2019 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project C74/2004 Annual Report for the period 9 December 2017 to 8 December 2018, E27/00278, E27/00438, E |
| A119310 | 2019 | Brimstone Resources Ltd | Mount McLeay | 3.9% | Mt McLeay Project Combined Annual Report for the period 15 November 2017 to 14 November 2018, E25/00545, E25/0 |
| A120476 | 2019 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 "Slate Dam" for the period 3 April 2018 to 2 April 2019, E25/00553, E25/00556, E25 |
| A120634 | 2019 | Dreadnought Resources Ltd | Rocky Dam | <1% | Rocky Dam Project Annual Report E25/533 for the period 26 April 2018 to 25 April 2019 |
| A120836 | 2019 | Alliance (Sa) Pty Ltd | Gundockerta South | <1% | C111/2018 Combined Annual Technical Report for the Gundockerta South Project E25/569 & E28/2572 for the Period |
| A115763 | 2018 | Brimstone Resources Ltd | Mount McLeay | 3.9% | C43/2010 Mt McLeay Project 2017 Combined Annual Report for the period 15 November 2016 to 14 November 2017, P2 |
| A117031 | 2018 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 25/04/2017 - 25/04/2018 |
| A117326 | 2018 | Aruma Resources Limited | Slate Dam | <1% | Annual Report for C112/2017 Slate Dam Project for the period 3 April 2017 to 2 April 2018, E25/00553, E25/0055 |
| A118251 | 2018 | Riversgold (Australia) Pty Ltd | Kurnalpi | 52% | Annual Report for E28/2580 Kurnalpi Project for the period 21 September 2017 to 20 September 2018 |
| A118253 | 2018 | Riversgold (Australia) Pty Ltd | Kurnalpi | 66% | Annual Report for E25/538 Kurnalpi Project for the period 21/09/2017 - 20/09/2018 |
| A118268 | 2018 | Pcb Holdings Pty Ltd | Lone Pine Dam | 14% | Lone Pine Dam E25/521-I Annual Mineral Exploration Report for the period 22/09/2017 to 21/09/2018 |
| A110674 | 2017 | Pcb Holdings Pty Ltd | Lone Pine Dam | 14% | PCB HOLDINGS PTY LTD ANNUAL REPORT LONE PINE DAM E 25/521-I ANNUAL MINERAL EXPLORATION REPORT for the period 2 |
| A111961 | 2017 | Rubicon Resources Limited; G & D Mine Services Pty Ltd | Yindargooda | 17% | Yindargooda Project E25/326 Mineral Exploration Report for the period 01/11/2015 - 31/10/2016 |
| A112095 | 2017 | Pioneer Resources Limited | Acra | <1% | Combined Annual Report for the Acra Project C74/2004 (E27/278, E27/438, E27/491, E27/520, E27/548, E28/1746 & |
| A114101 | 2017 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 26 April 2016 to 26 April 2017 |
| A115196 | 2017 | Riversgold Ltd | Kurnalpi | 66% | Annual Technical Report for E25/538-I for the period 21 September 2016 to 20 September 2017 |
| A115198 | 2017 | Riversgold Ltd | Kurnalpi | 52% | Annual Technical Report for: E28/2580-I Kurnalpi Project for the period 21 September 2016 to 20 September 2017 |
| A115507 | 2017 | Northern Star (Kanowna) Pty Limited | Acra | <1% | Acra Project Annual Technical Report, C74/2004 for the period 09/12/2016-08/12/2017, E27/00278, E28/01746, E27 |
| A115516 | 2017 | Pcb Holdings Pty Ltd | Gundockerta | 14% | Annual Report Gundockerta Project E25/521 for the period 22/09/2016-21/09/2017 |
| A115555 | 2017 | G & D Mine Services Pty Ltd | QE1 | 17% | QE1 PROJECT E25/326 - ANNUAL MINERAL EXPLORATION REPORT For the Period 1st November 2016 to 1st November 2017 |
| A108182 | 2016 | Silver Lake Resources Pty Ltd | Queen Lapage | 8.7% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2014 to 31 October 2015, E25/ |
| A108511 | 2016 | Pioneer Resources Limited | Jubilee South | <1% | Annual Report for the Jubilee South Project E28/2483 for the period 23 February 2015 to 22 February 2016 |
| A104633 | 2015 | Silverlake Resources Ltd | Queen Lapage | 8.7% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2013 to 31 October 2014, E25/ |
| A105094 | 2015 | Paddick Investments Pty Ltd | Reef Dam | 89% | Reef Dam Project (E25/411) Final Surrender Report for the period 18 February 2010 to 17 February 2015 |
| A106214 | 2015 | Silver Lake Resources Ltd | Queen Lapage | 9.1% | Partial Surrender Report on E25/273 (Queen Lapage Project) for the period 23 March 2006 to 20 March 2015 |
| A106275 | 2015 | Fireant Resources Pty Ltd | Yindarlgooda | 100% | Final Surrender Report for the period 16/04/2013 to 20/04/2015, Yindarlgooda Gold Project, E25/486 |
| A100447 | 2014 | Silver Lake Resources Ltd | Wattle Dam | 3.3% | Combined Annual Report on Wattle Dam Project – C132/2007 for period 1 October 2012 to 30 September 2013, E25/3 |
| A101170 | 2014 | Silver Lake Resources Limited | Queen Lapage | 8.7% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2012 to 31 October 2013 |
| A101376 | 2014 | Fairstar Resources Ltd | Hampton Hill | <1% | Annual Report for the period 19.01.2013 to 18.01.2014 Hampton Hill Prospect, E25/393 |
| A101956 | 2014 | Paddick Investments Pty Ltd | Reef Dam | 89% | Annual Technical Report 2014 Reef Dam Project Tenement E 25/411; Annual Report for the period 18/02/2013 – 17/ |
| A102382 | 2014 | Fireant Resources Pty Ltd | Yindarlgooda | 100% | Annual Report for year ending 15 April 2014, Yindarlgooda Gold Project, E25/486 |
| A102657 | 2014 | Rubicon Resources Ltd | Reef Dam - Yindarlgooda | 77% | Reef Dam, Yindarlgooda E25/456 Final Surrender Report for the period 8 June 2011 – 9 June 2014 |
| A104010 | 2014 | Silver Lake Resources Limited | Queen Lapage | <1% | Surrender Report on E27/426 (Queen Lapage Project) for the period 8 September 2010 to 25 September 2014 |
| A104011 | 2014 | Silver Lake Resources Limited | Wattle Dam | 11% | Surrender Report on E25/488, 489, 490 & E25/475 Wattle Dam Project for the period 1 November 2012 to 25 Septem |
| A96891 | 2013 | Integra Mining Ltd | Wattle Dam | 4.2% | Surrender Report on E25/319 Wattle Dam for period 21 February 2006 to 18 December 2012 |
| A99744 | 2013 | Paddick Investments Pty Ltd | Reef Dam | 89% | Annual Technical Report 2013 Reef Dam Project Tenement E 25/411 [for the period 18/02/2012 – 17/02/2013] |
| A99756 | 2013 | Raven Resources | Reef Dam | 5.6% | Annual Mineral Exploration Report Reef Dam Project E 25/436 For the Period 14th September 2012 to 13th Septemb |
| A99960 | 2013 | Raven Resources | Reef Dam | 5.6% | Partial Surrender Mineral Exploration Report Reef Dam Project E 25/436 For the Period 14th September 2010 to 6 |
| A100409 | 2013 | Rubicon Resources Ltd | Yindarlgooda | 20% | Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, |
| A96582 | 2013 | Integra Mining Ltd | Queen Lapage | 8.7% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2011 to 31 October 2012, E25/ |
| A97057 | 2013 | Fairstar Resources Ltd | Hampton Hill | <1% | Hampton Hill Project, Annual Report for the period 19/01/2012 to 18/01/2013, E25/393. |
| A98392 | 2013 | Nex Metals Explorations Limited | Pipeclay Peaks | <1% | Final Surrender Report, Pipeclay Peaks Projects, E28/1770. |
| A98822 | 2013 | Integra Mining Ltd | Randalls | <1% | Integra Mining Magnetotelluric Survey 30/11/2012 |
| A92700 | 2012 | Integra Mining Ltd | Queen Lapage | 8.7% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2010 to 31 October 2011, E25/ |
| A92708 | 2012 | Pioneer Resources Ltd | Lady of the Lake | 14% | Annual report for the Lady of the Lake Project, E28/1783, North East Coolgardie Mineral Field, for the period |
| A93472 | 2012 | Fairstar Resources Ltd | Hampton Hill | <1% | Annual Report for the period 19.01.2011 to 18.01.2012 Hampton Hill Prospect, E25/393 |
| A95360 | 2012 | Nex Metals Explorations Limited | Pipeclay Peaks | 100% | Annual report for the period 20 July 2011 to 19 July 2012. Pipeclay Peaks, E25/339 |
| A95636 | 2012 | Raven Resources | Reef Dam | 5.6% | Annual Mineral Exploration Report Reef Dam Project E25/436 For the Period 14th September 2011 to 13th Septembe |
| A93877 | 2012 | Paddick Investments Pty Ltd | Reef Dam | 89% | Annual report for the period for 18/02/2011 – 17/02/2012, Reef Dam Project, E25/411. |
| A94164 | 2012 | Nex Metals Explorations Limited | Pipeclay Peaks | <1% | Annual Technical Report Pipeclay Peaks Project E 28/1770 For the period 28/03/2011 to 27/03/2012 |
| A94564 | 2012 | Inca Minerals Ltd | Gundocketa Hill | 75% | Gundocketa Hill Project Final Surrender Exploration Report E25/292 for the period 15th June 2007 – 14th June 2 |
| A95994 | 2012 | Integra Mining Ltd | Wattle Dam | 3.6% | Wattle Dam Project, Annual Report for the period 1st October 2011 to 30th September 2012, E25/319 & 379. [C132 |
| A96114 | 2012 | Rubicon Resources Ltd | Yindarlgooda | 21% | Yindarlgooda Project, Annual Report for the period 1st November 2011 to 31st October 2012, E25/355, 392, 422, |
| A88948 | 2011 | Pioneer Resources Ltd | Lady of the Lake | 14% | Annual Technical Report E28/1783 Lady of the Lake Project For the Period 3/12/2009 to 2/12/2010 |
| A88967 | 2011 | St Barbara Ltd | Yindarlgooda - Rocky Dam | 16% | Yindarlgooda (Rocky Dam) Project, Annual Report for the Period 1 November 2009 to 31 October 2010,C210/2007 Te |
| A89146 | 2011 | St Barbara Mines Ltd | Yindarlgooda - Rocky Dam | 17% | Yindarlgooda (Rocky Dam), Partial Surrender of E25/326 - Block D 2256 |
| A90838 | 2011 | Paddick Investments Pty Ltd | Reef Dam | 89% | Annual Technical Report Reef Dam Project Tenement: E 25/411 for the period for 18/02/2010 – 17/02/2011 |
| A91574 | 2011 | Condor Metals Ltd | Gundocketa | 75% | Gundocketa Project Annual Mineral Exploration Report E25/292 for the period 15th June 2010 – 14th June 2011 |
| A91773 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 25% | Yindarlgooda Project E25/316 Kanowna Mineral Field KURNALPI (SH 51-10) 1:250,000 Sheet KANOWNA (3236) 1:100,00 |
| A91935 | 2011 | Raven Resources | Reef Dam | 5.6% | Annual Mineral Exploration Report Reef Dam Project E25/436 For the Period 14th September 2010 to 13th Septembe |
| A91990 | 2011 | Nex Metals Explorations Ltd | Pipeclay Peaks | 100% | Annual report for the period 19 July 2010 to 18 July 2011, Pipeclay Peaks Project, E25/339 |
| A92242 | 2011 | Integra Mining Ltd | Wattle Dam | 2.8% | Combined Annual Report on Wattle Dam Project – C132/2007 for period 1 October 2010 to 30 September 2011 |
| A92275 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 25% | Yindarlgooda C210/2007 Combined Annual Report 1 November 2010 – 31 October 2011 |
| A90027 | 2011 | Fairstar Resources Ltd | Hampton Hill | <1% | Hampton Hill Project, Annual Report for the period 19/01/2010 top 18/01/2010, E25/393. |
| A90836 | 2011 | Nex Metals Exploration Ltd | Pipeclay Peaks | <1% | Annual report for the period for 28/03/2010 – 27/03/2011 |
| A85437 | 2010 | Pioneer Resources Ltd | Lady of the Lake | 14% | Annual Technical Report E28/1783, Lady of the Lake Project for the period 3/12/2008 to 2/12/2009 |
| A85634 | 2010 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 17% | Yindarlgooda (Rocky Dam), Partial Surrender Report for the Period 1 November 2006 to 30 October 2009 |
| A86741 | 2010 | Integra Mining Ltd | Wattle Dam | 4.2% | Partial Surrender Report on Wattle Dam Tenement E25/319 for period 21 February 2006 to 20 February 2010 |
| A87895 | 2010 | Condor Nickel Ltd | Gundockerta Hill | 75% | Gundockerta Hill, E25/292: Annual Report for period 16 June 2009 to 15 June 2010 |
| A88496 | 2010 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 25% | Yindarlgooda (Rocky Dam), Partial Surrender Report for the Period 8 August July 2006 to 7 August 2010 |
| A88628 | 2010 | Integra Mining Ltd | Wattle Dam | 1.9% | Combined Annual Report on Wattle Dam Project – C132/2007 for period 1 October 2009 to 30 September 2010 |
| A87254 | 2010 | Rubicon Resources Ltd | Wattle Dam | 13% | Final report for the period 21st June 2005 to 21st April 2010, Yindarlgooda Project, Wattle Dam sub-project E2 |
| A87703 | 2010 | Integra Mining Ltd | Wattle Dam | 1.5% | Surrender Report on E25/298 for period 10 August 2005 to 9 August 2010 |
| A81432 | 2009 | Rubicon Resources Ltd | WATTLE DAM | 4.2% | Partial surrender report on E25/319 for the period 21st February 2006 to 20th February 2009, Wattle Dam Projec |
| A81662 | 2009 | Rubicon Resources Ltd | Wattle Dam | 100% | Surrender report for the period 4th February 2004 to 3rd February 2009, Wattle Dam Project, E25/271 |
| A82933 | 2009 | International Exploration Ltd | EAST BULONG | 8% | Final Surrender Report East Bulong Project E25/0296 For reporting period 24th August 2005 to 9th April 2009 |
| A84317 | 2009 | Rubicon Resources Ltd | Wattle Dam | 1.5% | Partial Surrender report for the period 10th August 2005 to 6th August 2009, Wattle Dam Project E25/298 (C132/ |
| A84572 | 2009 | Carrick Gold Ltd | Gundockerta Hill | 75% | Gundockerta Hill Project E25/292 Annual Report for the period 16 June 2008 to 15 June 2009 |
| A85250 | 2009 | Integra Mining Ltd | Wattle Dam | 2% | Combined Annual Report on Wattle Dam Project – C132/2007, Tenement Numbers: E25/298, E25/303, E25/319, C132/20 |
| A88174 | 2009 | Nex Metals Exploration Ltd | Lake Yindarlgooda | 100% | Review of E25/339 - Lake Yindarlgooda |
| A84316 | 2009 | Rubicon Resources Ltd | Wattle Dam | 13% | Partial Surrender report for the period 21st June 2005 to 20th June 2009, Yindarlgooda Project, E25/305 |
| A84588 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 25% | Yindarlgooda (Rocky Dam) C210/2007, E25/316, Partial Surrender Report for the Period 8 August July 2006 to 7 |
| A84968 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 16% | Annual Report for the Period 1 November 2008 to 31 October 2009 C210/2007, Tenement Numbers E25/273, E25/316, |
| A86449 | 2009 | Rubicon Resources Ltd | Wattle Dam | 13% | Wattle Dam, E25/305, East Coolgardie Mineral Field, Wattle Dam Annual Report, 21st June 2008 to 20th June 2009 |
| A76906 | 2008 | Rubicon Resources Ltd | Yindarlgooda | 16% | YINDARLGOODA PROJECTCOMBINED REPORT C210/2007 ANNUAL REPORT 1st November 2006 to 31st October 2007 |
| A77104 | 2008 | Rubicon Resources Ltd | Yindarlgooda gold/ nickel exploration | 100% | Partial surrender report for the period 4th February 2004 to 15th November 2007, Wattle Dam Project, E25/271 |
| A79713 | 2008 | Carrick Gold Ltd | Kurnalpi | 75% | KURNALPI PROJECT, E25/292, ANNUAL REPORT FOR PERIOD ENDING 29th June 2008 |
| A80224 | 2008 | Australasian Resources Pty Ltd | EAST BULONG | 8% | ANNUAL EXPLORATION REPORT EAST BULONG PROJECT E25/296, For reporting period 24th August 2007 to 23rd August 20 |
| A80489 | 2008 | Rubicon Resources Ltd | WATTLE DAM | 5.8% | Annual report for the period 1st October 2007 to 30th September 2008, Wattle Dam Project, C132/2007 |
| A80490 | 2008 | Rubicon Resources Ltd | YINDARLGOODA | 16% | YINDARLGOODA PROJECT COMBINED REPORT, C210/2007, E25/273, E25/316, E25/326, E25/335, E27/291, E27/337, E28/15 |
| A78130 | 2008 | Rubicon Resources Ltd | Wattle Dam Project | 100% | Partial surrender report for the period 4th February 2004 to 15th November 2007, Wattle Dam Project, E25/271 |
| A79519 | 2008 | Rubicon Resources Ltd | Wattle Dam | 13% | WATTLE DAM E25/305 East Coolgardie Mineral Field WATTLE DAM PARTIAL SURRENDER REPORT 21st June 2005 to 19th Ju |
| A79540 | 2008 | Rubicon Resources Ltd | Wattle Dam | 1.5% | WATTLE DAM E25/298 East Coolgardie Mineral Field PARTIAL SURRENDER REPORT 10th Aug 2005 to 6 Aug 2008 |
| A80208 | 2008 | Australasian Resources Pty Ltd | East Bulong | 8% | ANNUAL EXPLORATION REPORT For reporting period 24th August 2007 to 23rd August 2008 |
| A74107 | 2007 | Boyer Exploration And Resource Management Pty Ltd | Yindarlgooda (North) | 100% | Surrender Report for the Period Ending 26 May 2006 for the Yindarlgooda (North) Project, E28/1184. (Kurnalpi) |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | 8.1% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A76260 | 2007 | Rubicon Resources Ltd | Yindarlgooda | 25% | Annual report for the period 8th August 2006 to 7th August 2007,Yindarlgooda Project, E25/316 |
| A76393 | 2007 | Australasian Resources Pty Ltd | East Bulong | 8% | Annual Exploration Report East Bulong Project E25/296 For Reporting Period 24th August 2006 to 23rd August 200 |
| A76734 | 2007 | Rubicon Resources Ltd | Wattle Dam | 5.8% | WATTLE DAM E25/222, E25/241, E25/271, ..............P25/1830, P25/1831, East Coolgardie Mineral Field ANNUAL R |
| A72888 | 2006 | Heron Resources Ltd | Lake Yindarlgooda | 100% | Lake Yindarlgooda Project E25/271, Annual Report, 4 February 2005 to 3 February 2006, (Kurnalpi). |
| A73253 | 2006 | Heron Resources Ltd | Reef Dam | 13% | Reef Dam Project E25/205, Annual Report, 21 June 2005 to 21 June 2006, (Kurnalpi). |
| A73541 | 2006 | Australasian Resources Ltd | East Bulong | 8% | Annual Exploration Report, East Bulong Project E25/296, For Period 24 August 2005 to 23 August 2006, (Kurnalpi |
| A73946 | 2006 | Pioneer Nickel Ltd | Lake Yindarlgooda | 33% | Lake Yindarlagooda E28/1186, Annual Technical Report, For the Period 2 August 2005 to 1 August 2006, (Kurnalpi |
| A74296 | 2006 | Heron Resources Ltd | Yindarlgooda | 4.9% | Yindarlgooda Project, Annual Combined Report C69/2006, 01 November 2005 to 31 October 2006, (Kurnalpi). |
| A70280 | 2005 | Pioneer Nickel Ltd | Acra | 2.9% | Acra Project , Annual Report for the period 9th December 2003 to 8th December 2004, E28/1055, 1058, 1059, 122 |
| A69880 | 2005 | Glintan Pty Ltd | Olly Dam | 17% | Annual report on exploration completed, Exploration licence, E25/258 for the period 13 December 2003 - 12 Dece |
| A70884 | 2005 | Heron Resources Ltd | Yindarlgooda | 100% | Yindarlgooda Project-E25/271, East Coolgardie mineral field, Annual report 04 February 2004 to 03 February 200 |
| A71497 | 2005 | Boyer Exploration And Resource Management Pty Ltd | Lake Yindarlgooda | 100% | Lake Yindarlgooda Project Western Australia, Exploration Licence 28/1184, Annual report for the period 15 Dece |
| A68800 | 2004 | Solomon (Australia) Pty Ltd | Greater Randalls | <1% | Annual Report for the period 01/05/2003-30/04/2004 Greater Randalls Project (C109/2001), E25/55, E25/73, E25/8 |
| A68193 | 2004 | Glintan Pty Ltd | Olly Dam | 17% | Annual Report on exploration completed Exploration licence E25/258 for the period 13 December 2002 - 12 Decemb |
| A68758 | 2004 | Newcrest Mining Ltd | Mount Monger | <1% | Mt Monger (JV) Project, Annual Report for the period 01/05/2003 to 30/04/2004 , C108/2001. |
| A65889 | 2003 | South Kal Mines Pty Ltd | Transline | 9.1% | Combined Annual Report for the period 12th June 2001 to 11th June 2002 Transline JV Gold Project C16/2001: E25 |
| A65953 | 2003 | Placer Dome Asia Pacific Ltd | Lake Yindarlgooda | 9.3% | Annual Report 14/11/2001-13/11/2002 Lake Yindarlgooda Project C9/2002 Tenements E25/226, 228 Report No WA02.08 |
| A66940 | 2003 | Placer Dome Asia Pacific Ltd | Greater Randalls | <1% | Greater Randalls Project, Annual Report for the period 01/05/2002 to 30/04/2003, E25/55,73,80,88,100,113,137,1 |
| A65396 | 2002 | Auriongold Exploration Pty Ltd | Greater Randalls | <1% | Greater Randalls Project, Annual Report 01/05/2001-30/04/2002 [C109/2001] P25/1094-1097, 1553; E25/55, 73, 80 |
| A65927 | 2002 | Placer Dome Asia Pacific Ltd | Greater Randalls | 3.6% | Surrender Report 17/11/1997-16/11/2002, Greater Randalls Project, E25/150. |
| A64009 | 2002 | Delta Gold Ltd | Queen Lapage | 37% | Queen Lapage JV Project C16/1998 Annual Report 01/01/2001 to 31/12/2001 tenements E25/111, 117, 120, 122, 200, |
| A62895 | 2001 | Delta Gold Ltd | Queen Lapage | 2% | Queen Lapage Joint Venture E25/123 Annual Technical Report 12 January 2000 - 11 January 2001. Dome Reference: |
| A62896 | 2001 | Delta Gold Ltd | Queen Lapage | 39% | Queen Lapage Joint Venture E25/111, E25/120 Partial and Final Surrender Report. Delta Report Number: WA01.017. |
| A63729 | 2001 | New Hampton Goldfields Nl | Transline | 9.1% | Transline JV Gold Project Combined Annual Report for the period 12 June 2000 to 11 June 2001 on Reporting Grou |
| A62925 | 2001 | Delta Gold Ltd | Queen Lapage | 35% | Queen Lapage Joint Venture E25/111, E25/117 E25/120 E25/122 E25/190 E25/200 E27/193 GML25/1586 GML/1587 Annual |
| A60112 | 2000 | Croesus Mining Nl | Queen Lapage | 51% | QUEEN LAPAGE PROJECT ANNUAL TECHNICAL REPORT ON EXPLORATION ACTIVITY FOR THE PERIOD 1/1/99 TO 31/12/99. ON EXP |
| A60736 | 2000 | Resource Mapping Pty Ltd | Gundockerta Hill | <1% | Annual report Period 15/04/1999 to 14/04/2000 Gundockerta Hill Project East Coolgardie Mineral Field Western A |
| A59896 | 2000 | Mining Project Investors Pty Ltd | Pineapple Dam | 33% | Annual Report, E28/568,E28/569,E28/621,M28/80, M28/81,M28/85,P28/823, Pineapple Dam Project , for the year en |
| A60114 | 2000 | Croesus Mining Nl | Queen LaPage | 26% | Queen LaPage Project, Final Report on E25/78 for the period 14 October 1998 to 13 October 1999 |
| A60864 | 2000 | Spinifex Gold Nl | Transline | <1% | Partial Surrender Reprot Period 15/04/1998 to 14/04/1999 Transline Project East coolgardie Mineral Field Weste |
| A60941 | 2000 | Solomon (Australia) Pty Ltd | Venetian | 5.5% | Venetian Project, Annual Report for the year 1st June 1999 to 31st May 2000 , E25/113 E25/137 E25/150 & E25/16 |
| A57274 | 1999 | Heron Resources Ltd | Pineapple Dam | 33% | Pineapple Dam Project, E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 P28/823 , Annual Report for 01/01/98-31/12 |
| A58566 | 1999 | General Gold Resources Nl | Randalls | 1.3% | Report On Exploration Activities In The Randalls Project Area, Annual Report Of the Year 1/05/1998 to 30/03/19 |
| A59374 | 1999 | Mining Project Investors Pty Ltd | Pineapple Dam | 58% | Partial Surrender Report , E28/569, Pineapple Dam Project, for the period 17 October 1994 to 11 May, 1999. |
| A59414 | 1999 | Croesus Mining Nl | Queen Lapage | 91% | Partial Surrender Report for the Period 7 November 1998 to 6 November 1999, Queen Lapage Project, Tenement E25 |
| A59415 | 1999 | Croesus Mining Nl | Queen Lapage | 12% | Final Report, Queen Lapage Project, Tenement E27/115, 17 October 1998 to 16 October 1999 |
| A57323 | 1999 | Croesus Mining Nl | Queen Lapage | 100% | Surrender Report - Queen Lapage Project M25/153 01/1999 |
| A57919 | 1999 | Croesus Mining Nl | Queen Lapage | 29% | Queen Lapage Project ,Annual Technical Report on Exploration Activity for the period 28/02/1998 to27/02/1999 |
| A58169 | 1999 | Croesus Mining Nl | Queen Lapage | 2% | Queen Lapage Project Annual Technical Report on Exploration Activity for the Period 12/1/98 to 11/1/99 on Tene |
| A59370 | 1999 | Wiluna Mines Ltd | Lake Yindarlgooda | <1% | Exploration Licence E25/132, Lake Yindarlgooda, Surrender Report for the Period 5 August 1996 to 29 July 1999, |
| A59373 | 1999 | Mining Project Investors Pty Ltd | Pineapple Dam | 18% | Partial Surrender Report E28/568, Pineapple Dam Project, for the period 23rd January 1995 to 14th July 1999. |
| A59489 | 1999 | Croesus Mining Nl | Queen Lapage | 29% | Partial Surrender Report, Queen Lapage project, Tenement E25/111, 24 April 1998 to 23 April 1999. |
| A57243 | 1998 | Croesus Mining Nl | Queen Lapage | 12% | Partial Surrender Report Queen Lapage Project Tenement E27/115 Fourth Year 17/10/1998 |
| A57244 | 1998 | Croesus Mining Nl | Queen Lapage | 91% | Annual Report for the Period 7 November 1997 to 6 November 1998 Queen Lapage Project Tenement E25/117. |
| A54039 | 1998 | Anvil Mining Nl | Pineapple Dam | 18% | Partial Surrender Report E28/568 Pineapple Dam Project ,Western Australia, for period 23rd January 1995 to 22 |
| A53989 | 1998 | Croesus Mining Nl | Queen Lapage | 12% | Annual Report to the Dept of Minerals & Energy For the Queen Lapage Prospect E27/115 for the Period 18th Octo |
| A53990 | 1998 | Croesus Mining Nl | Queen Lapage | 18% | Annual Report to the Dept of Minerals and Energy for the Queen Lapage Prospect E25/122, Prepared for on behalf |
| A54038 | 1998 | Anvil Mining Nl | Pineapple Dam | 33% | Annual Report , Pineapple Dam Project, for the year ending 31/12/1997, E28/568, 569, 621, M28/80, 81, 85, P28/ |
| A54113 | 1998 | Mt Monger Gold Project Pty Ltd | Randalls | <1% | Randalls Project, Annual Report, 01/05/1996 - 30/04/1997 , E25/55, 73, 80, 88 & 113; P25/1094 -1097; M25/71, |
| A54185 | 1998 | Julia Mines Nl | Lake Yindarlgooda | 100% | Lake Yindarlgooda, Alluvial Gold Project, Annual Report Year Ended: 02/01/1998 |
| A54186 | 1998 | Julia Mines Nl | Lake Yindarlgooda | 91% | Lake Yindarlgooda Alluvial Gold Project Annual Report for Year Ended 7th November 1997. |
| A54187 | 1998 | Julia Mines Nl | Lake Yindarlgooda | 26% | Lake Yindarlgooda Alluvial Gold Project Annual Report for year ended 14 October 1997 E25/78 |
| A56265 | 1998 | Spinifex Gold Nl | Transline West | <1% | Annual report for period 15/04/97-14/04/98 Transline West Project Exploration Licence 25/114 |
| A56424 | 1998 | Mt Monger Gold Project Pty Ltd | Randalls | 1.3% | Randalls Project Area of W.A. 01/05/97 - 30/04/98 E25/113, 137, 150, 55, 73, 80, 88, L25/21, 22, 24, 8 Etc. |
| A49835 | 1997 | North Ltd | Yindar | 100% | Report No. WA97/15S Annual Mineral Exploration Report for the period 2/1/1996 to 1/1/1997 for Mining Lease M25 |
| A51330 | 1997 | North Ltd | Rocky Dam | <1% | Report on E25/63,105, 81; M27/168 & M25/147, Rocky Dam, for the period 01/01/1996 to 30/04/1996. |
| A51447 | 1997 | North Ltd | Rocky Dam | 29% | Rocky Dam Project, Annual Report Exploration Licence E25/111for period 1st May 1996 to 30th April 1997. |
| A51633 | 1997 | Resolute Ltd | Cane Grass | 8.1% | Cane Grass Project, Annual Report Exploration Licence E28/406, for period 7th April 1996 to 6th April 1997. |
| A50943 | 1997 | Mining Project Investors Pty Ltd | Pineapple Dam | 33% | Annual Report , E28/568 E28/569 E28/621 M28/80 M28/81 M28/85 & P28/823, Pineapple Dam Project, for the year e |
| A51871 | 1997 | Spinifex Gold Nl | Transline West | <1% | Transline West Project, Annual Report for the period 15th April 1996 to 14th April 1997, E25/114. |
| A52588 | 1997 | Mining Project Investors Pty Ltd | Pineapple Dam | 58% | Partial Surrender Report, Pineapple Dam Project, E28/569, for the period 17/10/94-16/10/97. |
| A46957 | 1996 | North Ltd | Queen Lapage | <1% | Queen Lapage Project, Annual Report For the period 31/12/1994 to 31/12/1995, E25/81, M27/168, 25/147. |
| A48112 | 1996 | Cra Exploration Pty Ltd | Canegrass/ Kurnalpi | 8.1% | Canegrass/ Kurnalpi Project, 1995/1996 Annual Report to 6th April 1996, E28/406. |
| A48285 | 1996 | Cra Exploration Pty Ltd | Gundockerta | 11% | Gundockerta Project, Annual Report to June 16th 1996, E25/71 |
| A48544 | 1996 | Mt Monger Gold Project Pty Ltd | Randalls | <1% | Report on Exploration Activities in the Randalls Area of Western Australia Annual report for the year May 1, 1 |
| A47624 | 1996 | Croesus Mining Nl | Queen Lapage | 12% | Queen Lapage Project, Annual Report for the period ending 17th October 1995, E27/115. |
| A46956 | 1996 | North Ltd | Queen Lapage | <1% | Queen Lapage Project, Partial Surrender Report on E25/81, 18/01/1996. |
| A47039 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 26% | Lake Yindarlgooda - Gundockerta Project,Partial Surrender Report for the period ending 13/10/95 E25/78 |
| A47040 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 26% | Annual Report for E25/78 Gundockerta, Lake Yindarlgooda, WA Fourth Year ending 13 October 1995. |
| A47398 | 1996 | Anvil Mining Nl | Kurnalpi | 33% | Kurnalpi Project, Annual report for the period 01 January 1995 to 31 December 1995,E28/568 E28/569 E28/621; M2 |
| A49022 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 26% | Annual mineral exploration report for E25/78 Gundockerta, Yindarlgooda, WA, for the period ending 13 October 1 |
| A49063 | 1996 | Titan Resources Nl | Juglah Rock | 15% | E25/92 Juglah Rock Annual Report for the Period 18 AUgusr 1995 to 17 Augusr 1996 |
| A46783 | 1995 | Cra Exploration Pty Ltd | Gundockerta | 11% | Partial Surrender Report for the period to 16/06/95 Gundockerta Project E25/71. |
| A43993 | 1995 | Cra Exploration Pty Ltd | Kurnalpi | 1.6% | Annual Report to 19 December 1994 on E28/406, E28/438 & E25/84 Kurnalpi Project, January 1995. |
| A45073 | 1995 | Mt Monger Gold Project Pty Ltd | Mount Monger Gold | <1% | Mt Monger Gold Project Report on Exploration Activities in the Randalls Area of Western Australia Annual repor |
| A45396 | 1995 | Croesus Mining Nl | Queen Lapage | <1% | Queen Lapage Project, Annual Report Exploration E25/81 for the period 19th January 1994 to 20th January 1995. |
| A45627 | 1995 | Titan Resources Nl | Juglah Rock | 15% | Juglah Rock Project, Annual Report Exploration Licence E25/92 for the period 18th August 1994 to 17th August 1 |
| A45827 | 1995 | Kkr Resources Nl | Kurnalpi | 34% | Kurnalpi Project, Non-statutory Report :Exploration Report , July 1995, E28/568-569; M28/80-81 & 85; P28/283. |
| A45974 | 1995 | Cra Exploration Pty Ltd | Canegrass | 8.1% | Canegrass Project, Partial Surrender Report for the period to 06/04/95 [Kurnalpi Project] E28/406. |
| A42952 | 1994 | North Mining Ltd | Gundockerta North | 7.3% | Annual report for the period 27/10/93-27/10/94 Gundockerta North Project M25/116 |
| A40652 | 1994 | Geopeko | Lake Yindarlgooda -Gundockerta | 26% | Annual Report for E25/78, Gundockerta, Lake Yindarlgooda, WA. Second Year ending 13 October 1993. |
| A41318 | 1994 | Newcrest Mining Ltd | Juglah | 15% | Juglah Project, Non-statutory Report: Interin Technical Report for the period 18th August 1993 to 17th Februa |
| A41339 | 1994 | Cra Exploration Pty Ltd | Kurnalpi | 8.1% | Partial Relinquishment Report to 7 April 1994 on E28/406, Kurnalpi Project, Western Australia. |
| A41957 | 1994 | Cra Exploration Pty Ltd | Gundockerta | 11% | Gundockerta Project, Annual Report for the period ending 16th June 1994, E25/71. |
| A41998 | 1994 | Croesus Mining Nl | Queen Lapage | 15% | Queen Lapage Project, Partial Surrender Report covering period(s) to 5th September 1994, E25/56, E25/63 & E27/ |
| A42004 | 1994 | Cra Exploration Pty Ltd | Gundockerta | 11% | Gundockerta Project, Partial Surrender Report for the period ending 16th June 1994, E25/71. |
| A42290 | 1994 | Titan Resources Nl | Juglah Rock | 15% | Juglah Rock Project, Annual Report for the period 18th August 1993 to 17th August 1994, E25/92. |
| A42881 | 1994 | Golden State Resources Nl | Queen Lapage | 31% | Queen Lapage Project, Annual Report for the period ending 8th September 1994,E25/72 & E27/62. |
| A43043 | 1994 | Croesus Mining Nl | Queen Lapage | <1% | Queen Lapage Project, Annual Report for the period 01/06/1993 to 30/06/1994, E25/63, 81, & M27/168. |
| A43248 | 1994 | North Mining Ltd | Lake Yindarlgooda- Gundockerta | 26% | Annulal Report for E25/78 Gundockerta, Lake Yindarlgooda WA, Third Year ending 13 October 1994. |
| A37809 | 1993 | Geopeko | Lake Yindarlgooda -Gundockerta | 26% | Report for E25/78 Gundockerta, Lake Yindarlgooda, WA. First year ending 13 October 1992. |
| A38321 | 1993 | Cra Exploration Pty Ltd | Queen Lapage | 26% | Queen Lapage Project, Annual Report for period to 30/04/1993, GML25/1586-1587, P25/1079-1083, P27/1014, M25/10 |
| A39477 | 1993 | Cra Exploration Pty Ltd | Gundockerta | 11% | Gundockerta Project, Annual Report for period to 16th June 1993, E25/71. |
| A40961 | 1993 | Cra Exploration Pty Ltd | Kurnalpi | 1.6% | Kurnalpi Project, Annual Report for the period ending 19th December 1993, E28/406. |
| A39022 | 1992 | Cra Exploration Pty Ltd | Kurnalpi | 1.6% | Kurnalpi Project, Annual Report for the two year period ending 19th December 1992, E28/406, 438, & E25/84. |
| A36554 | 1992 | Metana Minerals Nl | Gundockerta | 11% | Gundockerta Project, Annual Report for the period to 16th June 1992, E25/71. |
| A36868 | 1992 | Cra Exploration Pty Ltd | Queen Lapage | 17% | Queen Lapage Project, Annual Report for period ending 30th April 1992, GML25/1586-1587, E25/18, 56, 63, 72, 81 |
| A33331 | 1991 | Croesus Mining Nl | Queen Lapage | 15% | Queen Lapage Project, Annual Report for the period ending April 30th 1991, E25/18, 56, 63; E27/62; P27/1014; M |
| A27643 | 1989 | Bp Minerals Aust Pty Ltd | Queen Lapage | 23% | BP Mineral Australia Queen Lapage Project Olly Dam Intermin Joint Venture P25/228-231 Final Report |
| A26118 | 1988 | Bp Minerals Aust Pty Ltd | Queen Lapage | 23% | Annual report for period ending 22nd October 1988 |
| A22652 | 1987 | Bp Minerals Aust Pty Ltd | Queen Lapage | 23% | Queen Lapage Project Olly Dam Intermin Joint Venture P25/228-231 Annual Report for the Period Ending 22nd Octo |
| A19390 | 1986 | Bp Minerals Aust Pty Ltd | Queen Lapage | 23% | Queen Lapage Project P25/228-231 Annual Report for Period Ending 22nd October, 1986. |
| A11660 | 1982 | Western Mining Corporation Ltd | Rocky Dam | 19% | Rocky Dam Project, Annual Report for the period 18th July 1981 to 17th July 1982, TR70/7673H; MC25/1348-1361, |
| A10240 | 1981 | Western Mining Corporation Ltd | Rocky Dam - Lake Yindarlgooda | 19% | Rocky Dam - Lake Yindarlgooda Project, Annual Report for the period 18th July 1980 to 17th July 1981, TR70/767 |
| A8798 | 1980 | Western Mining Corporation Ltd | Lake Yindarlgooda | 5.4% | Lake Yindarlgooda Project, Non-statutory Report: Percussion Drillholes YGP 1-8-Logs, March 1980, [see also A1 |
| A8799 | 1980 | Western Mining Corporation Ltd | Lake Yindarlgooda | 5.4% | Lake Yindarlgooda Project, Non-statutory Report: Soil Geochemistry Results & Geological Plans for the year end |
| A5592 | 1975 | Esso Australia Ltd | Reef Dam | 56% | Reef Dam, Annual report for period ending March 1975, MC25/1072-1086 |
| A5642 | 1975 | Swiss Aluminium Mining Aust Pty Ltd | Gunny Dam | 90% | MC25/1043 - 25/1047, Gunny Dam, Annual report 1974 |
| A5726 | 1975 | Cra Exploration Pty Ltd | Olly Swamp | 85% | 1974 Annual report of MC25/1048-1050 and 28/2263-2267 at Olly Swamp |
| A6291 | 1975 | Cra Exploration Pty Ltd | Olly Swamp | 44% | Olly Swamp Project, Annual Report for the year ending 31/12/1975, MC28/2266-2270 & 2322-2324. |
| A4697 | 1974 | Great Boulder Mines Ltd | Cowarna Rocks | 6.1% | Cowarna Rocks Project, Non-statutory Report: Cowarna I. P. Survey : Lines 158N-164N, 156N-192N ( No 3 Sill)., |
| A2716 | 1972 | Consolidated Gold Fields Aust Ltd | Lake Yindarlgooda | 19% | Lake Yindarlgooda Project, Annual Report 1971-1972, July 1972, MC28/3, 8-10, 23-24, 171-174, 361-378, 1790-179 |
| A4492 | 1972 | Great Boulder Mines Ltd | Cowarna Rocks | 6.1% | Cowarna Rocks Project, Non-statutory Report: Summary Report, December 1972. |
| A2870 | 1972 | Western Mining Corporation Ltd | Lake Yindarlgooda | 11% | Lake Yindarlgooda Project, Non-statutory Report: Brief Exploration Report for the year ending 30th June 1972, |
| A1848 | 1971 | Western Mining Corporation Ltd | Lake Yindarlgooda | 11% | Lake Yindarlgooda Project, Annual Report for the year ending 30th June 1971, MC25/203-206, 211-223, 230-247, 3 |
| A4696 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | 6.1% | Cowarna Rocks Project, Non-statutory Report: ( No 1 Sill), Percussion Logs & Drill Hole Sections, 1970/1971. |
| A4698 | 1971 | Great Boulder Mines Ltd | Cowarna Rocks | 6.1% | Cowarna Rocks Project, Non-statutory Report: I. P. Lines 60N-92N & 128N-174N, to January 1971. |
All 259 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 25/671 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 25/671 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 25/671? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.