E 31/1467
Register summary
- Holder
- Yerilla Nickel Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 23 Apr 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153917 | 2026 | Kalgoorlie Gold Mining Limited | Kirgella Project | <1% | Final Report on Diamond Drilling at the Kirgella Gift & Providence Gold Deposits (R30) |
| A143202 | 2024 | Hawthorn Resources Limited | Pinjin | <1% | Final Surrender Report for Pinjin E31/783 for the period 9 September 2008 to 6 February 2024 |
| A143220 | 2024 | Hawthorn Resources Limited | Pinjin East | 100% | Final Surrender Report E31/781 Pinjin East for the period ending 06/02/2024. |
| A145840 | 2024 | Hawthorn Resources Limited | Pinjin East E31/782 | <1% | Partial Surrender Report for Pinjin East E31/782 for the period ending 6/9/2024 |
| A135920 | 2023 | Solstice Minerals Limited | Pinjin | 100% | Final Surrender Report for Pinjin E31/1242 period ending 30/05/2023 |
152 more reports
| A131153 | 2022 | Solstice Minerals Ltd | Pinjin | 100% | Annual Technical Report E31/1242 Pinjin Project for the period ending 22/04/2022. |
| A124160 | 2020 | Hawthorn Resources Limited | Pinjin East | 23% | Combined Annual Technical Report for Pinjin East C122/2013 for the period ending 05/04/2020 |
| A123527 | 2020 | Hawthorn Resources Limited | Pinjin | 50% | Surrender Report for Pinjin tenements E31/760, E31/882 & E31/1049 (C122/2013) 19 September 2008 to 27 March 20 |
| A124586 | 2020 | St Barbara Limited | Pinjin North | <1% | E31/1082 Partial Surrender Report for the Period 2 February 2015 to 24 June 2020, Pinjin North project |
| A124589 | 2020 | St Barbara Limited | Pinjin East | <1% | E31/0999 - Partial Surrender Report for the Period 18 September 2012 to 24 June 2020, Pinjin East project |
| A124630 | 2020 | Hawthorn Resources Limited | Pinjin | 3% | Combined Annual Technical Report for Pinjin C10/2000 for the period 12 June 2019 to 11 June 2020. G 31/00004,M |
| A124695 | 2020 | St Barbara Limited | Pinjin North | <1% | Pinjin North Project Combined Reporting Group C122/2015 - Annual Report for the Period 1 July 2019 to 30 June |
| A124698 | 2020 | St Barbara Limited | Pinjin East | <1% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2019 to 30 June 2 |
| A122000 | 2019 | Hawthorn Resources Limited | Pinjin East | 35% | Combined Annual Technical Report for Pinjin East C122/2013 for the period 6 April 2018 to 5 April 2019 |
| A122001 | 2019 | Hawthorn Resources Limited | Pinjin | 3% | Combined Annual Technical Report for Pinjin C10/2000 For the Period 12 June 2018 to 11 June 2019 |
| A120892 | 2019 | St Barbara Limited | Pinjin East | <1% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2018 to 30 June 2 |
| A120893 | 2019 | St Barbara Limited | Pinjin North | <1% | Pinjin North Project Combined Reporting Group C122/2015 - Annual Report for the Period 1 July 2018 to 30 June |
| A117351 | 2018 | Hawthorn Resources Limited | Pinjin East | 35% | Pinjin East C122/2013 Annual Report For the Period 6 April 2017 to 5 April 2018, E31/00882, E31/00783, E31/007 |
| A117520 | 2018 | Hawthorn Resources Limited; Gel Resources Pty Ltd | Trouser Legs Joint Venture | 3.2% | Trouser Legs Joint Venture 2018 Annual Report, C10/2000, 12 June 2017 - 11 June 2018 |
| A117531 | 2018 | St Barbara Limited | Pinjin North | <1% | Pinjin North Project Combined Reporting Group C122/2015 - Annual Report for the Period 1 July 2017 to 30 June |
| A117530 | 2018 | St Barbara Limited | Pinjin East | <1% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2017 to 30 June 2 |
| A118051 | 2018 | St Barbara Limited | Pinjin East | <1% | E31/0999 – Partial Surrender Report for the Period 18 September 2012 to 17 September 2018 |
| A114511 | 2017 | Hawthorn Resources Limited | Trouser Legs | 3.2% | Trouser Legs Joint Venture C10/2000 Annual Report For the Period 12 June 2016 to 11 June 2017, G31/00004, M31/ |
| A114576 | 2017 | St Barbara Limited | Pinjin North | <1% | Pinjin North Project Combined Reporting Group C122/2015 - Annual Report for the Period 1 July 2016 to 30 June |
| A114405 | 2017 | Hawthorn Resources Limited | Pinjin East | 35% | C122/2013 Annual Report For the Period 6 April 2016 to 5 April 2017, E31/00882, E31/00783, E31/00781, E31/0078 |
| A114574 | 2017 | St Barbara Limited | Pinjin East | <1% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2016 to 30 June 2 |
| A107941 | 2016 | Hawthorn Resources Limited | Salmon Dam - Pinjin East | 100% | EL 31/760 – Salmon Dam, Pinjin East Project Annual Report for the period 19 September 2014 - 18 September 2015 |
| A109706 | 2016 | St Barbara Limited | Pinjin East | <1% | Pinjin East Project Combined Reporting Group C123/2015 Annual Report for the Period 1 July 2015 to 30 June 201 |
| A109799 | 2016 | Hawthorn Resources Limited | Trouser Legs - Pinjin | 1.6% | Annual Report For the Period 12 June 2015 to 11 June 2016 TROUSER LEGS JOINT VENTURE - PINJIN C10/2000, G 31/0 |
| A109700 | 2016 | St Barbara Limited | Pinjin North | <1% | Pinjin North Project Combined Reporting Group C122/2015 - Annual Report for the Period 1 July 2015 to 30 June |
| A109748 | 2016 | Hawthorn Resources Limited | Pinjin East | 35% | Annual Report Pinjin East Project Combined Report C122/2013 for the period 6 April 2015 to 5 April 2016, E31/0 |
| A105140 | 2015 | Hawthorn Resources Limited | Pinjin East - Newland Dam | 27% | Pinjin East Project E31/888 – Newland Dam Annual Report for the period 13 December 2013 - 12 December 2014 |
| A105978 | 2015 | St Barbara Limited | Pinjin | <1% | Annual Mineral Exploration Report - Combined Reporting Group C138/2012 (Pinjin) for the period 28 June 2014 to |
| A106501 | 2015 | Hawthorn Resources Limited | Pinjin East | 23% | ANNUAL REPORT For the Period 6 April 2014 to 5 April 2015 PINJIN EAST C122/2013, [E31/781, E31/782, E31/783, E |
| A106663 | 2015 | Hawthorn Resources Limited | Pinjin | 3.2% | C10/2000 Pinjin Project Annual Report for the period 12 June 2014 to 11 June 2015, G 31/00004, M 31/00078, M 3 |
| A102946 | 2014 | Hawthorn Resources Limited | Pinjin North West | <1% | E31/882 – Pinjin North West ANNUAL REPORT FOR THE PERIOD 6 April 2013 TO 5 April 2014 |
| A103472 | 2014 | Hawthorn Resources Limited | Pinjin | 2.4% | Pinjin Joint Annual Report for the period 12 June 2013 - 11 June 2014 General Purpose Licence 31/4, Miscellane |
| A104324 | 2014 | Hawthorn Resources Limited | Pinjin East | <1% | PINJIN EAST PROJECT E31/782 – Pinjin North ANNUAL REPORT FOR THE PERIOD 9 September 2013 TO 8 September 2014 |
| A104327 | 2014 | Hawthorn Resources Limited | Pinjin East | <1% | PINJIN EAST PROJECT E31/783 – Pinjin ANNUAL REPORT FOR THE PERIOD 9 September 2013 TO 8 September 2014 |
| A100955 | 2014 | Hawthorn Resources Limited | Pinjin East | <1% | Pinjin East Project, Annual Report for the period 09/09/2012 to 08/09/2013, E31/782. |
| A101413 | 2014 | Hawthorn Resources Limited | Salmon Dam - Pinjin East | 100% | EL 31/760 – Salmon Dam, Pinjin East Project Annual Report for the period 19 September 2012 -18 September 2013 |
| A102093 | 2014 | Hawthorn Resources Limited | Pinjin East - Newland Dam | 27% | Pinjin East Project E31/888 – Newland Dam Annual Report for the period 13 December 2012 TO 12 December 2013 |
| A102819 | 2014 | St Barbara Ltd | Pinjin | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C138/2012 Pinjin Reporting Period: 28 June 2 |
| A102945 | 2014 | Hawthorn Resources Limited | Pinjin East | 100% | PINJIN EAST PROJECT E31/781 – Pinjin North ANNUAL REPORT FOR THE PERIOD 6 April 2013 TO 5 April 2014 |
| A104323 | 2014 | Hawthorn Resources Limited | Pinjin East | 100% | EL 31/760 – Salmon Dam, Pinjin East Project ANNUAL REPORT FOR THE PERIOD 19 September 2013 TO 18 September 201 |
| A96822 | 2013 | Hawthorn Resources Limited | Pinjin East | <1% | Pinjin East Project E31/783 – Pinjin Annual Report for the period 9 September 2011 to 8 September 2012 |
| A96823 | 2013 | Hawthorn Resources Limited | Pinjin East - Pinjin North | <1% | Pinjin East Project E31/782 - Pinjin North Annual report for the period 9 September 2011 to 8 September 2012 |
| A97083 | 2013 | Hawthorn Resources Limited | Pinjin East - Newland dam | 27% | PINJIN EAST PROJECT E31/888 – Newland Dam Annual Report for the period 13 December 2011 to 12 December 2012 |
| A97150 | 2013 | Hawthorn Resources Limited | Salmon Dam - Pinjin East | 100% | EL 31/760 – Salmon Dam , Pinjin East Project Annual Report for the period 19 September 2011 TO 18 September 20 |
| A98583 | 2013 | St Barbara Mines Ltd | Pinjin | <1% | Annual Mineral Exploration Report- DMP, Combined Reporting Group: C138/2012 Pinjin, Reporting Period: 28 June |
| A99387 | 2013 | Hawthorn Resources Limited | Pinjin | 3.2% | C 10/2000 – PINJIN JOINT ANNUAL REPORT FOR THE PERIOD 12 June 2012 TO 11 June 2013 General Purpose Licence 31/ |
| A100222 | 2013 | Legacy Iron Ore Ltd | South Laverton | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/912 For the Period 7th Septe |
| A100954 | 2013 | Hawthorn Resources Limited | Pinjin East | <1% | Pinjin East Project, Annual Report for the period 09/09/2012 to 08/09/2013, E31/783. |
| A93112 | 2012 | Hawthorn Resources Limited | Salmon Dam - Pinjin East | 100% | EL 31/760 – Salmon Dam , Pinjin East Project, annual report for the period 19 September 2010 to 18 September 2 |
| A93277 | 2012 | Hawthorn Resources Limited | Pinjin East | 27% | Pinjin East Project, Annual Report for the period 13th December 2010 to 12th December 2011, E31/888. |
| A94449 | 2012 | Gel Resources Pty Ltd | Pinjin | <1% | Pinjin Gold Project C47/2010 Combined Annual Report for Year Ended 30th April 2012, E 31/754, P31/1776, 1778, |
| A94454 | 2012 | Hawthorn Resources Limited | Pinjin East - Pinjin North | 100% | Pinjin East Project E31/781 – Pinjin North annual report for the period 6 April 2011 to 5 April 2012 |
| A94455 | 2012 | Hawthorn Resources Limited | Pinjin North West | <1% | E31/882 – Pinjin North West Annual Report for the period 6 April 2011 to 5 April 2012 |
| A95089 | 2012 | Legacy Iron Ore Ltd | South Laverton - Stophanis Well | <1% | Final Surrender Mineral Exploration Report – South Laverton Area, Stophanis Well Project E 31/658 |
| A95448 | 2012 | Hawthorn Resources Limited | Pinjin | 3.2% | Pinjin Project, Annual Report for the period 12th June 2011 to 11th June 2012, G31/4; M31/78-79, 88, 113 & 28 |
| A95502 | 2012 | Legacy Iron Ore Ltd | South Laverton - Stophanis Well | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E31/912 For the Period 7th Septem |
| A93095 | 2012 | Hawthorn Resources Limited | Pinjin East - Pinjin | <1% | Pinjin East Project E31/783 - Pinjin Annual Report for the period 9 September 2010 to 8 September 2011 |
| A93096 | 2012 | Hawthorn Resources Limited | Pinjin East - Pinjin North | <1% | Pinjin East Project E31/782 - Pinjin North Annual Report for the period 9 September 2010 to 8 September 2011 |
| A89168 | 2011 | Hawthorn Resources Limited | Pinjin East | <1% | Pinjin East Project E31/782 – Pinjin North Annual Report for the period 9 September 2009 to 8 September 2010 |
| A89169 | 2011 | Hawthorn Resources Limited | Salmon Dam - Pinjin East | 100% | EL 31/760 – Salmon Dam , Pinjin East Project Annual Report for the period 19 September 2009 to 18 September 20 |
| A89170 | 2011 | Hawthorn Resources Limited | Pinjin | <1% | Pinjin East Project E31/783 – Pinjin Annual Report For the Period 9 September 2009 TO 8 September 2010 |
| A90842 | 2011 | Hawthorn Resources Limited | Pinjin East - Pinjin North | 100% | Pinjin East PRroject E31/781 – Pinjin North, Annual Report for the period 6 April 2010 to 5 April 2011 |
| A91361 | 2011 | Hawthorn Resources Limited | Pinjin | 3.2% | General Purpose Licence 31/4, Mining Leases 31/78, 31/79, 31/88, 31/113, 31/284 C 10/2000 – Pinjin Joint Annua |
| A91510 | 2011 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Annual Mineral Exploration Report – South Laverton Area, Stophanis Well Project E 31/658 For the Period 14th A |
| A91845 | 2011 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Final Mineral Exploration Report – Stophanis Well Project E 31/711 |
| A91860 | 2011 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/912 For the Period 7th Septe |
| A90988 | 2011 | Gel Resources Pty Ltd | Pinjin | <1% | Pinjin Gold Project C47/2010 Combined Annual Report for Year Ended 30th April 2011, E31/754, P31/1776, 1778,17 |
| A87369 | 2010 | Ausgold Exploration Pty Ltd | Pinjin | <1% | Combined technical report C26/2010 Pinjin Project for the period 8/04/2009 to 7/04/2010, Lake Raeside Project, |
| A85716 | 2010 | Hawthorn Resources Limited | Pinjin East - Pinjin North | <1% | PINJIN EAST PROJECT E31/782 – Pinjin North, ANNUAL REPORT FOR THE PERIOD 9 September 2008 - 8 September 2009 |
| A85812 | 2010 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Partial Surrender Report Stophanis Well Project E31/711 For the Period, 30th August 2006 to 29th August 2009 |
| A87476 | 2010 | Gel Resources Pty Ltd | Pinjin | <1% | Pinjin Project C47/2010 E31/754, P31/1776. P31/1778, P31/1780-1787 Report Period: 1 May 2009 to 30 April 2010 |
| A87935 | 2010 | Hawthorn Resources Limited | Pinjin | 3.2% | General Purpose Licence 31/4, Mining Leases 31/78, 31/79, 31/88, 31/113, 31/284 C10/2000 – Pinjin Joint Annual |
| A88112 | 2010 | Legacy Iron Ore Ltd | Stophanis Well - South Laverton | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/711, For the Period 30th Aug |
| A88657 | 2010 | Legacy Iron Ore Ltd | South Laverton Area - Stophanis Well | <1% | Partial Relinquishment Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/658 For the |
| A88658 | 2010 | Legacy Iron Ore Ltd | South Laverton - Stophanis Well | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/658 For the Period 14th Augu |
| A84766 | 2009 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Stophanis Well – Partial Surrender Report E31/658 Between the Period 14th August 2006 and 13th August 2009 |
| A84846 | 2009 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Stophanis Well Annual Report E31/658, Between the Period 14th August 2008 and 13th August 2009 |
| A84976 | 2009 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Annual Technical Report Stophanis Well Project E31/711 for the period 30th August 2008 to 29th August 2009 |
| A77765 | 2008 | Great Gold Mines Nl | Pinjin | <1% | Exploration Licence 31/636 Pinjin Annual Report for the period 16 January 2007 to 15 January 2008 |
| A79588 | 2008 | Hawthorn Resources Limited | Pinjin | 22% | C 10/2000 – PINJIN JOINT ANNUAL REPORT FOR THE PERIOD 12 June 2007 TO 11 June 2008 |
| A79728 | 2008 | Jackson Minerals Ltd | Stophanis Well | <1% | Stophanis Well – E31/658 2007 - 2008 Annual Report, 14 August 2007 – 13 August 2008 |
| A79729 | 2008 | Jackson Minerals Ltd | Stophanis Well | <1% | Stophanis Well – E31/711 2007 - 2008 Annual Report, Period: 30 August 2007 – 29 August 2008 |
| A76217 | 2007 | Jackson Gold Ltd | Stophanis Well | <1% | Stophanis Well - E31/658 2006 - 2007 Annual Report Report Period: 14 August 2006 - 13 August 2007 |
| A74567 | 2007 | Great Gold Mines Nl | Pinjin | 7.2% | Exploration licence, E31/508, Pinjin, Annual Report for the Period 12th Nov 2005 to 11th Nov 2006. (Kurnalpi) |
| A75466 | 2007 | Great Gold Mines Nl | Linden South | <1% | Linden South Project, Annual Report for the period 18th April 2006 to 17th April 2007, E31/701. |
| A76089 | 2007 | Great Gold Mines Nl | Pinjin | 19% | E31/413, E31/425 GPL31/4, M31/78,.....P31/1546 and P31/1547 C10/2000- PINJIN, Joint Annual Report for the peri |
| A76218 | 2007 | Jackson Gold Ltd | Stophanis Well | <1% | Stophanis Well - E31/711 2006 - 2007 Annual Report Report Period: 30 August 2006 - 29 August 2007 |
| A72914 | 2006 | Great Gold Mines Nl | Pinjin | 90% | E31/533 Pinjin, Annual Report for the Period 8 December 2004 to 7 December 2005, (Edjudina). |
| A72989 | 2006 | Great Gold Mines Nl | Mount Celia | 19% | Pinjin Project, Annual Report for the period 12th June 2004 to 11th June 2005, E31/413, 425, 468; G31/4; M31/7 |
| A70254 | 2005 | Gel Oil Pty Ltd | Pinjin | 5% | Annual technical report for the period 08/11/03 - 07/11/04 Pinjin Project, E31/403, Edjudina |
| A69281 | 2004 | Great Gold Mines Nl | Pinjin | 13% | E31/252 and E31/425, C10/2000 - Pinjin, Joint Partial Surrender Report for period 24 December 1998 to 30 Octob |
| A69282 | 2004 | Gutnick Resources Nl | Pinjin | 9.1% | Exploration licences: E31/252, E31/263, E31/413, E31/425, E31/425, E31/468, E31/469, Mining leases: M31/78, M3 |
| A68343 | 2004 | Gel Oil Pty Ltd | Pinjin | 5% | Pinjin Project, Partial Relinquishment Report for the period 08/11/2000 to 07/11/2003, E31/403. |
| A67508 | 2003 | Gutnick Resources Nl | Pinjin | 8.3% | Exploration Licences:E31/157,195,205,252,263,403,404 413,425,468,469, Mining Leases, M31/78,79,88,13,284, Pros |
| A64390 | 2002 | Gutnick Resources Nl | Trouser Legs | 3.2% | Joint Annual Report For The Period 5 October 2000 To 4 October 2001. Mining Licences: M31/77-78, 88, 113. C 25 |
| A64889 | 2002 | Gutnick Resources Nl | Pinjin | 39% | Annual Report for the period 31 March 2001 to 30 March 2002 Exploration Licence E31/425 |
| A65742 | 2002 | Gutnick Resources Nl | Pinjin | 11% | Exploration Licences: E31/157, E31/205, E31/252, E31/263, E31/403-04, E31/413, E31/425, E31/468, E31/469, M31/ |
| A62875 | 2001 | Gutnick Resources Nl | Trouser Legs | 3.2% | Mining Licences: M31/77-78, 88, 113 'C250/1997 - Trouser Legs' Joint Annual Report For The Period 5 October 19 |
| A63078 | 2001 | Gutnick Resources Nl | Pinjin | <1% | Exploration Licence: E31/252 'Pinjin' Annual Report For The Period 24 December 1999 To 23 December 2000. |
| A64247 | 2001 | Gutnick Resources Nl | Pinjin | 39% | Annual Report for the period 31 March 2000 to 30 March 2001 'Crossbow' exploration licence E31/425. |
| A59608 | 2000 | Capricorn Resources Aust Nl | Stophanis Well | 17% | Stophanis Well JV Project, Annual Report [C92/1995] , E31/90,129,165,202,223, P31/1453-1458 for the Period en |
| A60807 | 2000 | Capricorn Resources Aust Nl | Stophanis Well | 34% | Stophanis Well JV E31/202 Final Surrender Report 14/03/2000 Combined reporting group C92/1995 |
| A57950 | 1999 | Burdekin Resources Nl | Pinjin | 3.2% | Pinjin Project. Combined annual report for the period 05/10/97-04/10/98. M31/78,79,88,113. GML31/1458. |
| A53770 | 1998 | Aberfoyle Resources Ltd | Anglo Saxon | 14% | Anglo Saxon Project, E31/94 Final Report to 18/02/98. |
| A54292 | 1998 | Burdekin Resources Nl | Pinjin Dumps | 34% | Pinjin Dumps Project - E31/205, Eastern Goldfields W.A. Annual Report Period Ended: 11/02/1998 |
| A56682 | 1998 | Capricorn Resources Aust Nl | Stophanis Well | 34% | Stophanis Well Project, Partial Surrender Report EL31/202 10/1998 |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 3.1% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A54144 | 1998 | Burdekin Resources Nl | Pinjin | 3.2% | Pinjin Project. M31/78,79,88,113. GML31/1458. Combined annual report for the period 05/10/96-04/10/97. |
| A55643 | 1998 | Capricorn Resources Aust Nl | Stophanis Well | 34% | Stophanis Well Project ,Annual Report for the period 14/03/97 - 13/03/98, EL 31/202. |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | 3.1% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A49919 | 1997 | Burdekin Resources Nl | Pinjin | 3.2% | Pinjin Project Mining Lease M31/78 M31/79 M31/113 and GML31/1458 Combined Annual report for the period 05/10/9 |
| A51387 | 1997 | Burdekin Resources Nl | Pinjin Dumps | 34% | Pinjin Dumps Project E31/205 Eastern Goldfields Western Australia Annual report for the period ended 11th Febr |
| A51575 | 1997 | Burdekin Resources Nl | Pinjin - Kurrajong | 34% | Pinjin - Kurrajong Project, EL31/202 Annual report for the period ending 14th March 1997. |
| A48158 | 1996 | Burdekin Resources Nl | Pinjin - Kurrajong | 34% | Pinjin - Kurrajong Project, EL31/202 Annual Report for the period ending 14th March 1996. |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | 2.6% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A46072 | 1995 | Aurifex Mining Nl | Pinjin | 3.2% | Pinjin Project M31/78 M31/79 M31/113 and GML31/1458 Annual report for the period 5 October 1994 to 4 October 1 |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 2.4% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 2.8% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 2.4% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A42897 | 1994 | Aurifex Mining Nl | Pinjin | 3.2% | Pinjin Project Mining Leases M31/78 M31/79 M31/113 and Gold Mining Lease M31/1458, Pinjin District, Western Au |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 2.3% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 2.3% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A34980 | 1991 | European Pacific Resources Pty Ltd | Pinjin | 3.3% | R Report for the Period of 1991 Pinjin Project |
| A36924 | 1991 | European Pacific Resources Pty Ltd | Pinjin | 3.4% | Preliminary Feasibility Study Report for the Period of 1991 Pinjin Project M31/78-79 |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | 2% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A29142 | 1988 | Little River Goldfields Nl | Pinjin | 3.4% | Metallurgical Report - Pingin Ores 04/1988 Metskill : Little River Goldfields NL |
| A16958 | 1985 | Little River Resources Pty Ltd | Pinjin | 6.1% | Pinjin Project North Coolgardie Mineral Field Yerilla District, Western Australia Progress Report for the peri |
| A14597 | 1984 | Paget Gold Mining Co Nl | Edjudina | <1% | Edjudina Project, Non-statutory Report: Chairman's Address to the Shareholders, 23/10/1984. |
| A9571 | 1980 | Seltrust Mining Corp Pty Ltd | Foley Well | <1% | Foley Well Project, Final Report for the period ending 01/12/1980, MC 31/1891-1953 & 2122-2129. |
| A5845 | 1975 | Amax Exploration Aust Inc | Foley Well | <1% | Foley Well Project, Non-statutory Report: Final Report , June 1975, MC31/742-749 & 926-931 |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A2513 | 1971 | Le Nickel Aust Exp Pty Ltd | Watson Dam | 6.9% | Watson Dam Project, Annual Report for the period ending 31/12/1971, MC31/1171-1181, 1183-1185, 1187-1189, 1191 |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A82932 | 1753 | Hawthorn Resources Limited | LINDEN SOUTH | <1% | EXPLORATION LICENCE E31/701 LINDEN SOUTH PARTIAL SURRENDER REPORT FOR THE PERIOD 18 APRIL 2006 TO 17 APRIL 200 |
| A84466 | 1753 | Hawthorn Resources Limited | PINJIN | 3.2% | General Purpose Licence 31/4, Mining Leases 31/78, 31/79, 31/88, 31/113, 31/284, C 10/2000 – PINJIN JOINT ANNU |
| A84819 | 1753 | Hawthorn Resources Limited | Pinjin | <1% | Exploration Licence E31/613 PINJIN ANNUAL REPORT FOR THE PERIOD 14 JULY 2008 TO 13 JULY 2009 |
| A88257 | 1753 | Hawthorn Resources Limited | Pinjin – Saxon East | <1% | Exploration Licence 31/613 – Saxon East ANNUAL REPORT FOR THE PERIOD 13 July 2009 TO 12 July 2010 |
| A79783 | 1753 | Hawthorn Resources Limited | Saxon East | <1% | Exploration Licence 31/613 – Saxon East, ANNUAL REPOR, FOR THE PERIOD 13 July 2007 TO 12 July 2008 |
| A81897 | 1753 | Hawthorn Resources Limited | PINJIN | <1% | Exploration Licence E31/636 PINJIN, FINAL SURRENDER REPORT FOR THE PERIOD 16 JANUARY 2006 TO 18 SEPTEMBER 2008 |
| A85678 | 1753 | Hawthorn Resources Limited | Pinjin East | 100% | Annual report for the period 19 September 2008 to 18 September 2009 |
| A85715 | 1753 | Hawthorn Resources Limited | Pinjin East | <1% | PINJIN EAST PROJECT E31/783 – Pinjin ANNUAL REPORT FOR THE PERIOD 9 September 2008 - 8 September 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 31/1467 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 31/1467 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 31/1467? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.