E 37/1635
Register summary
- Holder
- Northern Goldfields Resources Pty Ltd
- Local government
- Shire of Leonora
- Application received
- 14 May 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149542 | 2025 | Giard Pty Ltd | Weebo | <1% | Partial Surrender Report for E37/1345 Weebo Project for the period ending 2/7/2025 |
| A144750 | 2024 | Darlot Mining Company Pty Ltd | Yandal South | 26% | Final Surrender Report Yandal South C5/2017 for the period ending 31/07/2024 |
| A135094 | 2023 | Fortescue Metals Group Ltd | E36/1014 | <1% | E36/1014 Final Surrender Report for the period ending 27/03/2023. |
| A135160 | 2023 | Fmg Resources Pty Ltd | E37/1364 | <1% | E37/1364 Final Surrender Report for the period ending 27/03/2023. |
| A134123 | 2023 | Fmg Resources Pty Ltd | E36/1014 | <1% | E36/1014 Annual Mineral Exploration Report for the period ending 13/01/2023 |
95 more reports
| A131052 | 2022 | Fortescue Metals Group Ltd | E37/1364 | <1% | E37/1364 Annual Report for the period ending 15/04/2022. |
| A127402 | 2021 | Xplore Resources Pty Ltd | Weebo | 18% | Annual Combined Report C63/2017 for Exploration Activity- Weebo Project Period Ending 31 March 2021 |
| A127340 | 2021 | Tyranna Resources Limited | Weebo | <1% | Final Surrender Report For Exploration Activity E36/880, P36/1881, & P36/1882 For the Period 20 March 2017 to |
| A127438 | 2021 | Fortescue Metals Group Ltd | E37/1364 | <1% | E37/1364 Annual Report for the period ending 16/04/2021 |
| A128842 | 2021 | Round Oak Minerals Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (Jaguar) Project E37/1162 Partial Surrender Report for the period 8 July 2015 to 7 July 2021 |
| A122957 | 2020 | Saracen Metals Pty Limited | Warrida Well | <1% | Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2019 to 9 January 2020 |
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | <1% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A124119 | 2020 | Tyranna Resources Limited | Weebo | 20% | Combined Annual Technical Report C63/2017 (Weebo) for the period ending 31/03/2020 |
| A123965 | 2020 | Fmg Resources Pty Ltd | Wilsons | <1% | Wilsons Annual Mineral Exploration Report E37/1364 fo the period ending 15/4/2020 |
| A124706 | 2020 | Bellevue Gold Limited | Leinster East | <1% | Annual Report E37/1345 Leinster East Project for the period ending 2 July 2020 |
| A125015 | 2020 | Tyranna Resources Limited | Weebo | 60% | Final Annual Technical Report E37/1328 |
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | <1% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A119854 | 2019 | Tyranna Resources Ltd | Weebo | 20% | C63/2017 Combined Annual Technical Report For the Period 1 April 2018 to 31 March 2019, E36/00880, E37/01275, |
| A118874 | 2019 | Saracen Metals Pty Limited | Warrida Well | <1% | Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2018 to 9 January 2019, E36/00624, E3 |
| A119862 | 2019 | Saracen Metals Pty Limited | Warrida Well | <1% | Exploration Licence 36/624 Warrida Well Final Surrender Report for the Period 30 January 2009 to 2 April 2019 |
| A116070 | 2018 | Saracen Metals Pty Limited | Warrida Well | <1% | Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2017 to 9 January 2018, E36/00624, E3 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A116949 | 2018 | Tyranna Resources Ltd | Weebo | <1% | Combined Annual Report Weebo Project C63/2017 for the period 1 April 2017 to 31 March 2018, E36/00880, E37/012 |
| A114065 | 2017 | Great Sandy Pty Ltd | Weebo | 15% | Weebo Project E37/1149 Annual Report for the period ending 17/04/2017 |
| A115090 | 2017 | Central Iron Ore Limited | South Darlot | <1% | Annual Technical Report - South Darlot Gold Project E37/01106 for the period 21/06/2016 - 20/07/2017 |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A112523 | 2017 | Agnew Gold Mining Company Pty Ltd | Warrida Well | <1% | Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2016 to 9 January 2017, E36/00624, E3 |
| A108348 | 2016 | Saracen Metals Pty Limited | Warrida Well | <1% | Warrida Well Project (C204/1998) Annual Report for the Period 10 January 2015 to 9 January 2016 |
| A110046 | 2016 | Central Iron Ore Limited | South Darlot | <1% | Annual Technical Report for E37/106 SOUTH DARLOT GOLD PROJECT For the Period 21 June 2015 to 20 July 2016 |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A109106 | 2016 | Great Sandy Pty Ltd | Weebo | 15% | Weebo E37/1149 Annual Report for the period 18/04/2015 to 17/04/2016 |
| A105598 | 2015 | Saracen Metals Pty Limited | Warrida Well | <1% | Warrida Well Regional Project Annual Report 10/01/2014 to 09/01/2015. [C204/1998 E36/435.....P36/1653] |
| A106069 | 2015 | Great Sandy Pty Ltd | Weebo | 15% | Weebo Project E37/1149 Annual Report for the period 18/04/2014 to 17/04/2015 |
| A106421 | 2015 | Saracen Gold Mines Pty Ltd | Warrida Well | <1% | Warrida Well Exploration Licences 36/0624 and 36/0628 Partial Surrender Report for the Period 30 January 2009 |
| A107237 | 2015 | Central Iron Ore Limited | South Darlot | <1% | Annual Technical Report for the period 22 June 2014 to 21 June 2015 E37/1106 South Darlot |
| A100852 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Teutonic Bore Project, Final Surrender Report for the period 21/08/2008 to 12/08/2013, E37/900. |
| A100674 | 2014 | Norilsk Nickel Wildara Pty Ltd | Warrida Well | <1% | Annual Report To the Department of Mines and Petroleum For the period 10th January 2013 to 9th January 2014 Wa |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A102452 | 2014 | Great Sandy Pty Ltd | Weebo | 15% | WEEBO PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the Period 18/04/2013 to 17/04/2014 T |
| A103425 | 2014 | Central Iron Ore Ltd | South Darlot | <1% | Annual Technical Report for the period 22 June 2013 to 21 June 2014 E37/1106 South Darlot |
| A96424 | 2013 | Norilsk Nickel Wildara Pty Ltd | Warrida Well | 57% | Final Report on Warrida Well P37/7360 for the period 30 Jan 2009 to 12 Decemeber 2012 |
| A96858 | 2013 | Norilsk Nickel Wildara Pty Ltd | Warrida Well | <1% | Warrida Well Project, Annual Report for the period 10th January 2012 to 9th January 2013, M36/177; E36/434-435 |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A99289 | 2013 | Central Iron Ore Ltd | South Darlot | <1% | Annual Technical Report for the period 22 June 2012 to 21 June 2013 E37/1106 South Darlot |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A92967 | 2012 | Norilsk Nickel Wildara Pty Ltd | Warrida Well | <1% | Annual Report To the Department of Mines and Petroleum For the period 10th January 2011 to 9th January 2012 W |
| A89619 | 2011 | Norilsk Nickel Wildara Nl | Warrida Well Joint Venture | <1% | ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE, FOR THE PERIOD 10 JANUARY 2010 TO 9 JANUARY 2011, Combined Re |
| A89792 | 2011 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010 |
| A86443 | 2010 | Norilsk Nickel Australia Ltd | Warrida Well Joint Venture | 3.7% | ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE FOR THE PERIOD 10 JANUARY 2009 TO 9 JANUARY 2010 EAST MURCHISO |
| A86577 | 2010 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009, |
| A86756 | 2010 | Montezuma Mining Company Ltd | Weebo | 100% | Final Surrender Report on E37/833, Weebo Project, For the Period 12 November 2007 to 03 February 2010 |
| A81243 | 2009 | Jabiru Metals Ltd | TEUTONIC BORE | <1% | TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008 |
| A81674 | 2009 | Norilsk Nickel Australia Ltd | WARRIDA WELL | 3.7% | ANNUAL REPORT ON THE WARRIDA WELL JOINT VENTURE FOR THE PERIOD 10 JANUARY 2008 TO 9 JANUARY 2009, EAST MURCHIS |
| A77861 | 2008 | Norilsk Nickel Australia Ltd | Warrida Well | 3.8% | Annual Report on the Warrida Well Joint Venture For the period 10 January 2007 to 9 January 2008 Combined Repo |
| A78149 | 2008 | Jabiru Metals Ltd | Teutonic Bore | <1% | COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37 |
| A80228 | 2008 | Montezuma Mining Company Ltd | WEEBO | <1% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008 |
| A74344 | 2007 | Lionore Australia (Wildara) Nl | Warrida Well | 3.8% | Annual Report on the Warrida Well Joint Venture For the Period 10th Jan 2006 to 9th Jan 2007 (C204/1998, Sir S |
| A74695 | 2007 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007 |
| A77253 | 2007 | Montezuma Mining Company Ltd | Weebo | <1% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007 |
| A71757 | 2006 | Lionore Australia (Wildara) Nl | Warrida Well | 3.8% | Annual Report on the Warrida Well Joint Venture, For the period 10 January 2005 to 9 January 2006, East Murchi |
| A69716 | 2005 | Dalrymple Resources Nl | Spider Bore | 100% | Annual report on Spider Bore Project for the period 30 December 2003 to 29 December 2004, (E37/744, Mount Marg |
| A70488 | 2005 | Dalrymple Resources Nl | Spider Bore | 100% | Surrender report on the Spider Bore project for the period 30 December 2003 to 19 May 2005, Exploration licenc |
| A70216 | 2005 | Newmont Australia Ltd | Heather Bore | <1% | Annual report for the period 08/02/04 - 07/02/05 Heather Bore Project, E37/319, Leonora, Report number 31817 |
| A68172 | 2004 | Barrick Gold Of Australia Ltd | Warrida Well | 4.1% | Annual Report for the period 10/01/2003-09/01/2004. Warrida Well Project E36/179, E36/180, E36/193, E36/229, ( |
| A68376 | 2004 | Newmont Yandal Operations Ltd | Heather Bore | <1% | Annual Report for the period 08/02/2003-07/02/2004 Heather Bore Project E37/319 |
| A66213 | 2003 | Barrick Gold Of Australia Ltd | Warrida Well | 4.1% | Combined Annual Report 10 January 2002 - 9 January 2003 Project 6551 Warrida Well E36/179, 180, 193, 229, Proj |
| A66268 | 2003 | Agnew Gold Mining Company Pty Ltd | Mount Von Mueller | 7.8% | Surrender Report for the period 1st January 2002 to 28th February 2003 , Mt Von Mueller Project, E36/83, E37/4 |
| A66101 | 2003 | Newmont Australia Ltd | Heather Bore | <1% | Annual Report for the period 01/01/2002 to 31/12/2002 Heather Bore Project,C72/2001 E37/319, 553, 556. |
| A64350 | 2002 | Homestake Gold Of Australia Ltd | Warrida Well | 4.1% | Verification Listing Report. 10 December 2000 - 9 December 2001. Warrida Well Region Combined Annual Report. P |
| A64410 | 2002 | Newmont Yandal Operations Ltd | Heather Bore | <1% | Annual Report form the period 1/01/2001 To 31/12/2001. Project Heather Bore E37/319 E37/553 E37/556. |
| A64461 | 2002 | Agnew Gold Mining Company Pty Ltd | Mount Von Mueller | 5.6% | Mt Von Mueller Project, Annual Report for the Period 1 January 2001 to 31 December 2001,M36/223, 36/224, 36/22 |
| A65293 | 2002 | Agnew Gold Mining Company Pty Ltd | Mount Von Mueller | 23% | Mt Von Mueller Project, Partial Surrender Report for the period 9/02/1999 to 7/06/2002 ,E37/499 & E37/500. |
| A62102 | 2001 | Homestake Gold Of Australia Ltd | Warrida Well | 4.1% | Warrida Well Project, Annual Report 10 January 2000 - 9 January 2001. Project 6551 Warrida Well E36/179, E36 |
| A62593 | 2001 | Normandy Yandal Operations Ltd | Heather Bore | <1% | Annual Report On Exploration For Period 7/02/2000 To 6/02/2001. Project Heather Bore E37/319. |
| A59996 | 2000 | Homestake Gold Of Australia Ltd | Warrida Well | 3.8% | Project 6551 Warrida Well E36/179,E36/180,E36/193,E36/195, E36/229 Project 6559 Gardiners Well E36/382 Project |
| A60944 | 2000 | Sons Of Gwalia Ltd | Madman Well | <1% | Madman Well Project Annual Report for the Period 3 January 1999 - 2 January 2000 SOG Report No. 0361-04 E37/4 |
| A59927 | 2000 | Wmc Resources Ltd | Mount Von Mueller | 5.6% | Mt Von Mueller Project, Annual Report for the period 01/01/1999 to 31/12/1999,M36/223, 224,228,236,237; M37/33 |
| A62168 | 2000 | Wmc Resources Ltd | Mount Von Mueller | 5.6% | Mt Von Mueller Project, Annual Report for the period 1 January 2000 to 31 December 2000, M 36/223, 36/224, 36 |
| A62780 | 2000 | Sons Of Gwalia Ltd | Madman Well | <1% | Madman Well Project, Partial Surrender Report for the period 3rd January 1996 to 31st July 2000, E37/402-403. |
| A57577 | 1999 | Homestake Gold Of Australia Ltd | Try Again Bore / Warrida Well | 3.8% | Project 6551 - Warrida Well - E36/382 Project 6579 - Three-O-One - E37/301 Warrida Well Region Combined Annual |
| A58159 | 1999 | Sons Of Gwalia Ltd | Madman Well | <1% | Madman Well Project , Partial Surrender Report for the period 03/01/1996 to 02/01/1999 E37/402 & E37/403. |
| A55538 | 1998 | Homestake Gold Of Australia Ltd | Three-O-One | 12% | Three-O-One Project, Joint Venture Project E37/301, Annual Report, 14/06/97 - 13/06/98. |
| A54141 | 1998 | Great Central Mines Ltd | Clilfford Bore - Heather Bore | <1% | Exploration Licence E37/319 'Clifford Bore' (Heather Bore Project) Annual report for the period 07/02/97-06/02 |
| A54365 | 1998 | Sons Of Gwalia Ltd | Madman Well | <1% | Madman Well Project, Annual Report 03/01/97 - 02/01/98 E37/402, 403 |
| A50918 | 1997 | Sons Of Gwalia Ltd | Madman Well | <1% | Leonora Region Madman Well Project Annual report for the period 03 January 1996 to 02 January 1997 (Tenements |
| A50997 | 1997 | Plutonic Operations Ltd | 301 | 12% | 301(JV) Project, Partial Relinquishment Report E37/301 for period 14/06/1993 to 04/10/1996. |
| A51693 | 1997 | Plutonic Operations Ltd | 301 Joint Venture | 12% | Project 579 301 Joint Venture Project E37/301 Annual report period 14/06/96 to 13/06/97 Technical Report No. 6 |
| A48550 | 1996 | Plutonic Operations Ltd | 301 | 12% | Project 579 301 Joint Venture Project E37/301 Annual report period 13/06/95 to 12/06/96 Technical Report No. 4 |
| A43626 | 1995 | Black Mountain Gold Nl | Lehman's South | <1% | Final report Lehman's South Project. E37/330,337 for period ending 10/02/95. |
| A40360 | 1993 | Black Mountain Gold Nl | Lehmans Wel | 4.1% | Annual report for the period 01/01/93-31/12/93 Lehmanns Well Project E36/185 E36/247-248 GML36/1407 M36/35 P36 |
| A14489 | 1984 | Esso Exploration Aust Inc | Goanna Patch | <1% | Goanna Patch Project, Final Surrender Report for the period ending 16/03/1976, MC36/3626- 3670. |
| A8236 | 1979 | Australian Selection Pty Ltd | Spider Well | <1% | Spider Well Project, Non-statutory Report:Progress Report for the period 1st October 1977 to 31st December 197 |
| A9981 | 1978 | Australian Selection Pty Ltd | Spider Well | <1% | Spider Well Project, Non-statutory Report: Progress Report, RAB Analytical Results, April 1978, MC36/3774-3778 |
| A7295 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4 |
| A2643 | 1971 | Amad Nl | Rainbow Well | 12% | Rainbow Well Project, Non-statutory Report:Progress Report for the period March 1970 to December 1970 MC/37/10 |
| A44687 | 1753 | Black Mountain Gold Nl | Weebo | 12% | Report on Weebo Joint Venture E37/301 Murchison Mineral Field 1994 |
| A80232 | 1753 | Montezuma Mining Company Ltd | WEEBO | 100% | Annual Report on E37/833, WEEBO PROJECT, For the Period 12 November 2007 to 11 November 2008 |
| A10417 | 1753 | Australian Selection Pty Ltd | M2440/0: Joy Well copper-zinc-silver-nic | <1% | Seltrust Mining Corporation Pty Ltd Joy Well Claims Final Report 1980 MC36/3774 to MC3778, MC36/3780 to MC36/3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 37/1635 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 37/1635 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 37/1635? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.