E 40/393
Register summary
- Holder
- Azure Minerals Pty Ltd
- Local government
- Shire of Menzies, Shire of Leonora
- Application received
- 27 May 2020
- Commenced
- 1 July 2021
- Expiry
- 30 June 2026
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137741 | 2023 | Saturn Metals Limited | Competition | <1% | Apollo Hill Project Partial Surrender Report for Exploration License E31/1259 Competition Project from 28/07/2 |
| A126959 | 2021 | Saturn Metals Limited | 40G | <1% | Partial Surrender Report (40G Project) for the period 9 May 2015 to 8 March 2021 |
| A123927 | 2020 | Apollo Hill | <1% | C317-2015 Apollo Hill Gold Project Annual Report for the period ending 30/3/2020 | |
| A124633 | 2020 | Paris Enterprises (W.A.) Pty Ltd | Orient Well | 25% | Orient Well Project E40/289 Annual Report for the period ending 30/06/2020 |
| A122450 | 2020 | Saturn Metals Limited | Apollo Hill | <1% | Apollo Hill E40/0337 Annual Report for the period 3 December 2018 to 2 December 2019 |
227 more reports
| A122775 | 2020 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | Annual Technical Report, C130/2009 North kookynie project for the period 1 January 2019 to 31 December 2019 |
| A124444 | 2020 | Genesis Minerals Limited | Leonora South | <1% | Annual Report for Leonora South C274/2011 for the period ending 03/05/2020 |
| A125219 | 2020 | Genesis Minerals Limited | South Kookynie | <1% | Annual Technical Report, C131/2009 South Kookynie for the period ending 30/06/2020 |
| A122164 | 2019 | Saturn Metals Limited | Apollo Hill | <1% | Apollo Hill E40/0373 Annual Report for the period 16 November 2018 to 15 November 2019 |
| A118852 | 2019 | Saturn Metals Limited | The Gap | <1% | Annual Report E40/00337 The Gap Project for the period 3 December 2017 to 2 December 2018 |
| A118853 | 2019 | Saturn Metals Limited | The Gap | <1% | Partial Surrender E 40/00337 The Gap Project for the period 3 December 2014 to 2 December 2019 |
| A119204 | 2019 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | Annual Technical Report C130/2009 North Kookynie Project for the period 1 January 2018 to 31 December 2018 |
| A120319 | 2019 | Saturn Metals Limited | Apollo Hill | <1% | Apollo Hill Gold Project C137/2015 Combined Annual Report for the period 31/03/2018 to 30/03/2019, E31/01063, |
| A120625 | 2019 | A & C Mining Investment Pty Ltd | South Kookynie | <1% | Annual Technical Report South Kookynie project, (C131/2009) for the period 1 July 2018 to 30 June 2019 |
| A120876 | 2019 | Paris Enterprises (W.A.) Pty Ltd | Orient Well | 25% | Orient Well Project E40/289 Annual Report for the period 1 July 2018 to 30 June 2019 |
| A120635 | 2019 | Genesis Minerals Limited | Leonora South | <1% | Annual Report for Leonora South project C274/2011 for the period 4 May 2018 to 3 May 2019,E 40/00295,E 40/0031 |
| A117525 | 2018 | Paris Enterprises (W.A.) Pty Ltd | Orient Well | 25% | Paris Enterprises (WA) Pty Ltd, Annual Technical Report, E40/289, Orient Well, 01 July 2017 - 30 June 2018 |
| A117572 | 2018 | A & C Mining Investment Pty Ltd | South Kookynie | <1% | Annual Technical Report C131/2009, South Kookynie Project for the period 01 July 2017 - 30 June 2018 |
| A115719 | 2018 | Saturn Metals Limited; Apollo Mining Pty Ltd | The Gap | <1% | The Gap E40/337 Third Annual Report for the period 3 December 2016 to 2 December 2017 |
| A115823 | 2018 | Ulysses Mining Pty Ltd | Leonora South | <1% | Leonora South Project Partial Surrender For E40/295 for the period 14 October 2011 to 11 October 2017 |
| A115988 | 2018 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project C130/2009 - Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A116877 | 2018 | Saturn Metals Limited | Apollo Hill | <1% | Apollo Hill Gold Project C137/2015 Combined Annual Report for the period 31 March 2018 to 30 March 2018, E31/0 |
| A117324 | 2018 | Ulysses Mining Pty Ltd | Leonora South | <1% | Annual Report for Leonora South C274/2011 For the Period 4 May 2017 to 3 May 2018, E40/00295, E40/00312, M40/0 |
| A114399 | 2017 | Genesis Minerals Limited | Leonora South | <1% | Annual Report for Leonora South C274/2011, M40/00166, E40/00312, E40/00295 for the period 4 May 2016 to 3 May |
| A110594 | 2017 | A & C Mining Investment Pty Ltd | Puzzle West | <1% | A&C Mining Investments P/L - Annual Technical Report - E40/347 |
| A114124 | 2017 | Apollo Mining Pty Ltd | Apollo Hill | <1% | Apollo Hill Gold Project Combined Annual Report For the Period 31 March 2016 to 30 March 2017, E31/01063, M39/ |
| A114541 | 2017 | Paris Enterprises (W.A.) Pty Ltd | Orient Well | 25% | Annual Technical Report, E40/289 Orient Well for the period 1 July 2016 to 30 June 2017 |
| A114554 | 2017 | A & C Mining Investment Pty Ltd | South Kookynie | <1% | Annual Technical Report, C131/2009 South Kookynie Project for the period 1 July 2016 to 30 June 2017, E40/0028 |
| A110710 | 2017 | Apollo Mining Pty Ltd | 27 Well | <1% | E40/296 '27 Well' Final Surrender Report 1 July 2011 to 3 November 2016 |
| A110751 | 2017 | Apollo Mining Pty Ltd | Apollo Hill | <1% | APOLLO MINING PTY LTD ANNUAL REPORT For the Period 3 December 2015 to 2 December 2016 E40/337 'The Gap' Secon |
| A112067 | 2017 | A & C Mining Investment Pty Ltd | Kookynie South | <1% | P40/1302 (Kookynie South) Annual Technical Report for the period 27 December 2015 to 26 December 2016 |
| A112097 | 2017 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project Annual Technical Report C130/2009 for the period 1 January 2016 to 31 December 2016, E4 |
| A108090 | 2016 | Apollo Mining Pty Ltd | Apollo Hill | <1% | COMBINED ANNUAL REPORT C360/1996 Apollo Hill Gold Project E39/1236, E40/0296, E40/0303, P39/4592, P39/4677, P3 |
| A108113 | 2016 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 NORTH KOOKYNIE [C130/2009 (E 40/00229.....P 40 |
| A108065 | 2016 | A & C Mining Investment Pty Ltd | Kookynie | <1% | ANNUAL REPORT For the Period 27 December 2014 to 26 December 2015 KOOKYNIE P40/1302 |
| A107855 | 2016 | Apollo Mining Pty Ltd | Apollo Hill - The Gap | <1% | First Annual Report Apollo Hill Gold Project E40/0337 'The Gap' for the period 03/12/2014 to 02/12/2015 |
| A109204 | 2016 | Apollo Mining Pty Ltd | Apollo Hill | <1% | Apollo Hill Gold Project C137/2015, E39/1198, E31/1063, M31/486, M39/296, P39/4588, P39/4589, P39/4590, P39/45 |
| A109584 | 2016 | Ulysses Mining Pty Ltd | Leonora South | <1% | Annual Report for Leonora South |
| A109683 | 2016 | Paris Enterprises (W.A.) Pty Ltd | Orient Well | 25% | Annual Technical Report 2016 Orient Well Project for the period 1 July 2015 to 30 June 2016 |
| A109732 | 2016 | A & C Mining Investment Pty Ltd | South Kookynie | <1% | Annual Technical Report C131/2009 SOUTH KOOKYNIE PROJECT for the period 01/07/2015 to 30/062016 |
| A104837 | 2015 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project, Annual Report for the period 01/01/2014 to 31/12/2014, C130/2009, E40/229......P 40/12 |
| A106691 | 2015 | Genesis Minerals Limited | South Leonora | <1% | South Leonora Project C274/2011, E40/295, E40/312 Annual Report for the period 1 June, 2014 to 31 May, 2015 |
| A104835 | 2015 | A & C Mining Investment Pty Ltd | Kookynie South | <1% | Kookynie South Project, Annual Report for the period 27/12/2013 to 26/12/2014, P40/1302. |
| A105985 | 2015 | A & C Mining Investment Pty Ltd | South Kookynie | <1% | South Kookynie Project C131/2009 Annual Technical Report for the period 1 July 2014 to 30 June 2015, E40/00281 |
| A106494 | 2015 | Paris Investments Pty Ltd | Orient Well | 25% | Annual Report for the period 1 July 2014 to 30 June 2015 Orient Well [E40/289] |
| A104972 | 2015 | Apollo Mining Pty Ltd | Apollo Hill | <1% | Combined Annual Report C360/1996 Apollo Hill Gold Project for the period 01/01/2014 to 31/12/2014, E31/800, E3 |
| A101709 | 2014 | Nex Metals Explorations Limited | Kookynie North | <1% | Annual Technical Report Kookynie North Project C130/2009 for the period 01 January – 31 December 2013, E40/229 |
| A100921 | 2014 | Cazador Resources Pty Ltd | Kookynie | 60% | Kookynie Project, Annual Report for the period 31/10/2012 to 01/11/2013, E40/284 & 288. [C173/2012] |
| A101912 | 2014 | White Cliff Minerals Limited | Mount Remarkable | <1% | C87_2010 Final Surrender Report For the Period 1st January 2012 to 31st December 2012 Mount Remarkable Project |
| A100923 | 2014 | Apollo Mining Pty Ltd | Apollo Hill | <1% | Apollo Hill Project, Annual Report for the period 01/01/2013 to 31/12/2013, E31/800 ; E39/1198, 1236, & 1644; |
| A101210 | 2014 | Nex Metals Explorations Limited | Kookynie South | <1% | Annual Technical Report P40/1302 (Kookynie South) for the period 27/12/2012 to 26/12/2013 |
| A102909 | 2014 | A & C Mining Investment Pty Ltd; Nex Metals Exploration Ltd | Kookynie South | <1% | South Kookynie Project Annual Technical Report For the Period 01 July 2013 – 30 June 2014 Combined Reporting N |
| A103093 | 2014 | Paris Enterprises (Wa) Pty Ltd | Orient Well | 25% | Orient Well Project E40/289 Annual Technical Report (01/07/2013 – 30/06/2014) |
| A103714 | 2014 | Resource Assets Pty Ltd | South Leonora | <1% | SOUTH LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 4 MAY, 2013 to 3 MAY, 2014 E40/295, E40/312 Combined Report |
| A103826 | 2014 | Rubianna Resources Ltd | Kookynie | 35% | ANNUAL COMBINED REPORT C161/2011 KOOKYNIE for the period 4th August 2013 to 3rd August 2014 |
| A97063 | 2013 | Nex Metals Explorations Limited | Jungle Well | 17% | Jungle Well Project, Final Surrender report E31/712, |
| A97744 | 2013 | White Cliff Minerals Limited | Mount Remarkable | <1% | C87_2010 Combined Annual Report For the Period 1st January 2012 to 31st December 2012 Mt Remarkable Project E3 |
| A97421 | 2013 | Nex Metals Explorations Limited | North Kookynie | <1% | North Kookynie Project, Annual Report for the period 01/01/2012 to 31/12/2012, E40/229, 263, 291 & 306; M40/3. |
| A97423 | 2013 | Peel Mining Ltd | Apollo Hill | <1% | Apollo Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E31/800; E39/1198, 1 |
| A99788 | 2013 | Rubianna Resources Ltd | Kookynie | 35% | Kookynie Combined Project (C215/2010) E40/260, P40/1255 and P40/1256, Annual Report for the period 4th August |
| A99067 | 2013 | Midas Resources Ltd | South Leonora | <1% | South Leonora C274/2011 (E40/294, E40/295, P40/1282) Annual Report to the Department of Mines and Petroleum fo |
| A99408 | 2013 | Nex Metals Explorations Limited | Kookynie South | <1% | Annual Technical Report Kookynie South Project C131/2009 for the period 01 July 2012 – 30 June 2013, E 40/233. |
| A99455 | 2013 | Paris Enterprises Pty Ltd | Kookynie | 25% | Annual Technical Report Kookynie Project For the period 01/07/2012 to 30/06/2013 Tenement: E 40/289 |
| A100310 | 2013 | Rubianna Resources Ltd | Kookynie | 36% | Kookynie Copper Project E40/260 for the period 1st July 2013 to 31rd November 2013 DAG2013/00265533 (round 7) |
| A93299 | 2012 | White Cliff Minerals Limited | Mount Remarkable | <1% | Mt Remarkable Project, Annual Report for the period 1st January 2011 to 31st December 2011, E31/865, 874, 885, |
| A94374 | 2012 | Midas Resources Ltd | South Leonora | <1% | South Leonora Project Annual Report To the Department of Mines and Petroleum For the period 04/05/2011 – 03/0 |
| A95057 | 2012 | Nex Metals Explorations Limited | Kookynie South | 4.2% | Annual Technical Report Kookynie South Project C131/2009 E 31/712; E40/233, 281, 292, M40/2, 8, 22, 26, 27, 56 |
| A95085 | 2012 | Midas Resources Ltd | Midas Resources | 60% | Kookynie Project E40/284, E40/288 Quarterly Activities Report to the Cazador Resources for the period 12/04/12 |
| A95240 | 2012 | Laconia Resources Ltd; Pandell Pty Ltd | Kookynie | 35% | KOOKYNIE PROJECT, E40/260, P40/1255, P40/1256 COMBINED REPORTING GROUP C161/2011, WESTERN AUSTRALIA ANNUAL R |
| A95358 | 2012 | Nex Metals Explorations Limited | Jungle Well | 17% | Annual report for the period 28 November 2011 to 27 November 2012. Jungle Well, E31/712 |
| A95359 | 2012 | Paris Enterprises Pty Ltd | Kookynie | 25% | Annual report for the period 01 July 2011 to 30 June 2012. Kookynie, E40/289 |
| A94180 | 2012 | Hawthorn Resources Limited | Melita | 3.6% | C4/2000 Melita Project annual report for the period 1 April 2011 to 31 March 2012, Exploration Licences: E40/1 |
| A95323 | 2012 | Peel Mining Ltd | 27 Well | <1% | Annual Report E40/296, 27 Well Gold Prospect for the period 1 July 2011 to 30 June 2012 |
| A90631 | 2011 | Hawthorn Resources Limited | Melita | 6.4% | Exploration Licence E40/185 Melita Partial Surrender Report for the period 11 June 2001 to 12 June 2011 |
| A90841 | 2011 | Hawthorn Resources Limited | Melita | 7% | C 4/2000 MELITA ANNUAL REPORT FOR THE PERIOD 1 APRIL 2010 TO 31 MARCH 2011 |
| A89202 | 2011 | Hawthorn Resources Limited | Melita | 50% | Exploration Licence E40/218 MELITA PARTIAL SURRENDER REPORT FOR THE PERIOD 7 NOVEMBER 2006 TO 6 NOVEMBER 2010 |
| A89618 | 2011 | Nex Metals Exploration Ltd | Jungle Well | 17% | Annual Technical Report Jungle Well, Tenement: E 31/712 |
| A89786 | 2011 | White Cliff Nickel Ltd | Mount Remarkable | <1% | C87_2010, COMBINED ANNUAL REPORT For the Period 1st January 2010 to 31st December 2010 MT REMARKABLE PROJECT, |
| A90010 | 2011 | Crucible Resources Pty Ltd | Kookynie | <1% | Annual Report, Kookynie Project, Mining Lease 40/111,129, 135; Prospecting Licence 40/1156-1157,1165-1167,1170 |
| A91419 | 2011 | Laconia Resources Ltd | Kookynie | 35% | Kookynie Project C161/2011 E40/260, P40/1255, P40/1256 Annual Report for the period 4 August 2010 to 3 August |
| A91986 | 2011 | Hawthorn Resources Limited | Melita | 50% | Exploration Licence E40/218 Melita, Final Surrender Report for the period 7 November 2006 to 22 August 2011 |
| A90321 | 2011 | Hawthorn Resources Limited | Melita | <1% | Melita Project, Final Surrender Report for the period 24th October 2006 to 23rd February 2011, E40/216. (C4/20 |
| A91360 | 2011 | Hawthorn Resources Limited | Melita | 43% | Exploration Licence E40/217 Melita Final Surrender report for the period 7 November 2006 to 22 August 2011 |
| A86910 | 2010 | Rubicon Resources Ltd | Melita | 30% | Melita Project, E40/209, Partial Surrender Report, 3rd April 2006 – 6th April 2010 (C138/2007) |
| A87904 | 2010 | Hawthorn Resources Limited | Mount Melita | 6.4% | Exploration Licence E40/185 Mt Melita Partial Surrender Report for the period 13 June 2006 to 12 June 2010 |
| A85779 | 2010 | Hawthorn Resources Limited | Melita | 43% | Exploration Licence E40/217 MELITA PARTIAL SURRENDER REPORT FOR THE PERIOD 7 NOVEMBER 2006 TO 6 NOVEMBER 2009 |
| A85896 | 2010 | Rubicon Resources Ltd | Apollo | <1% | Apollo Project E31/720 Final Report 2009 |
| A87158 | 2010 | Hawthorn Resources Limited | Melita | 6.9% | Melita Annual Report for the period 1 April 2009 to 31 March 2010, C4/2000, Exploration Licences: E37/528, 543 |
| A88209 | 2010 | Nex Metals Explorations Ltd | Kookynie South | <1% | Annual Technical Report Kookynie South Project Combined Reporting Number C131/2009 Comprising tenements: E 40/ |
| A91603 | 2010 | Nex Metals Explorations Ltd | Kookynie South | <1% | Annual Technical Report Kookynie South Project, Combined Reporting Number C131/2009, 1 July 2010 – 30 June 201 |
| A85012 | 2009 | Rubicon Resources Ltd | Melita | 8.1% | Annual Combined Report, Melita Project, C138/2007, 1 September 2007 to 31 August 2008 |
| A84111 | 2009 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Annual Report, Period: 1 July, 2008 to 30 June, 2009, C48/2001, M40/8, M40/61, M40/117, M40 |
| A84482 | 2009 | Crucible Resources Pty Ltd | Kookynie | <1% | ANNUAL REPORT Kookynie Project MINING LEASE 40/111, 129, 135 PROSPECTING LICENCE 40/1156, 1157, 1165, 1166, 11 |
| A82176 | 2009 | Crucible Resources Pty Ltd | Kookynie | <1% | Annual Report for the period 31 October 2007 to 30 October 2008, Kookynie Project, E40/203 |
| A84483 | 2009 | Crucible Resources Pty Ltd | Kookynie | <1% | Final Surrender Report, Kookynie Project, E40/203 |
| A85011 | 2009 | Rubicon Resources Ltd | Apollo | <1% | Annual report 1 August 2008 to 31 July 2009 |
| A80174 | 2008 | Regis Resources Ltd | Melita | 50% | Annual Report on Exploration for the period 7/11/2007 to 6/11/2008: Melita E40/218 |
| A78391 | 2008 | Regis Resources Ltd | Melita | 7.3% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 01/04/2007 to 31/03/2008 MELITA. Reference: C4-2000 A08.p |
| A79041 | 2008 | Regis Resources Ltd | Melita | 6.4% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 13/06/2007 TO 12/06/2008 Melita E40/185 |
| A80172 | 2008 | Regis Resources Ltd | MELITA | <1% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 24/10/2007 TO 23/10/2008 MELITA E40/216 |
| A80261 | 2008 | Rubicon Resources Ltd | MELITA | 8.3% | MELITA PROJECT COMBINED REPORT, C138/2007, E37/790, E40/202, E40/204, E40/206, E40/209, E40/211, ANNUAL REPORT |
| A80111 | 2008 | Crucible Resources Pty Ltd | Kookynie | <1% | ANNUAL REPORT Kookynie Project MINING LEASE 40/8, 61, 111, 117, 129, 135, 136, 163, 164, EXPLORATION LEASE 40/ |
| A77975 | 2008 | Norilsk Nickel Australia Ltd | Kookynie | <1% | SURRENDER REPORT ON THE KOOKYNIE TENEMENT FOR THE PERIOD 10 OCTOBER 2006 TO 28 NOVEMBER 2007 Exploration Licen |
| A78870 | 2008 | Norilsk Nickel Australia Ltd | Kookynie | 100% | ANNUAL REPORT ON THE KOOKYNIE TENEMENT FOR THE PERIOD 31 MARCH 2007 TO 30 MARCH 2008 NORTH COOLGARDIE MINERAL |
| A79737 | 2008 | Rubicon Resources Ltd | Apollo | <1% | APOLLO PROJECT COMBINED REPORT C139/2007 E31/720, E31/725, E39/1101, E39/1146, & E39/1147 ANNUAL REPORT, APOLL |
| A79860 | 2008 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Annual Report GSWA C48/2001, Reporting period: 1 July, 2007 - 30 June, 2008 |
| A80173 | 2008 | Regis Resources Ltd | MELITA | 43% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 7/11/2007 TO 6/11/2008 MELITA E40/217 |
| A80895 | 2008 | Nex Metals Exploration Ltd | JUNGLE WELL | 17% | Preliminary Report on Reconnaissance Mapping and Sampling Jungle Well E31/712 |
| A75747 | 2007 | Regis Resources Nl | Melita | 6.4% | Annual Report on Exploration for the Period 13/6/2006 to 12/6/2007 Melita E40/185 Volume 1 of 1 |
| A76140 | 2007 | Norilsk Nickel Australia Ltd | Kookynie-Melita | <1% | Surrender Report E40/46 for the period to 17 August 2007 (Kookynie - Melita Project) |
| A76644 | 2007 | Regis Resources Nl | Melita | <1% | Annual Report on Exploration for the period 24/10/2006 to 24 /10/2007: Melita E40/216 |
| A76865 | 2007 | Regis Resources Nl | Melita | 43% | Annual Report on Exploration for the period 7/11/2006 to 6/1 1/2007: Melita E40/217 |
| A76866 | 2007 | Regis Resources Nl | Melita | 50% | Annual Report on Exploration for the period 7/11/2006 to 6/1 1/2007: Melita E40/218 |
| A74848 | 2007 | Diamond Rose Nl | Kookynie | 1.8% | Kookynie Project, Annual Report for the year ending 17th December 2006, E40/197 &198. |
| A75657 | 2007 | Dalrymple Resources Nl | Kookynie | 79% | Kookynie Project, Annual Report for the period 31st March 2006 to 30th March 2007, E40/179. |
| A75659 | 2007 | Dalrymple Resources Nl | Kookynie | 100% | Kookynie Project, Annual Report for the period 31st March 2006 to 30th March 2007, E40/173. |
| A76125 | 2007 | Norilsk Nickel Australia Ltd | KOOKYNIE - SOVEREIGN | 13% | Surrender Report on the Kookynie - Sovereign Project For the period to 7 August 2007 P40/1089 and P40/1090 (C4 |
| A76273 | 2007 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project Annual Report GSWA C48/2001 Reporting period: 1 July, 2006 to 30 June, 2007 |
| A76341 | 2007 | Rubicon Resources Ltd | Melita | 8.3% | Melita Project Combined Report C138/2007 E37/790, E40/202, E40/204, E40/206, E40/209, E40/211 Annual Report 1s |
| A76350 | 2007 | Rubicon Resources Ltd | Apollo | <1% | Apollo Project Combined Report C139/2007 E31/720, E31/725, E39/1101, E39/1146, & E39/1147 Annual Report Apollo |
| A76642 | 2007 | Dalrymple Resources Nl | Melita | <1% | Extension of Term Report for Melita E40/46 Menzies SH51-5, WA Year 8 - 1999 |
| A73708 | 2006 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Annual Report, Combined Reporting No. C48/2001, Period 1 July 2005 to 30 June 2006, (Menzies |
| A73854 | 2006 | Dalrymple Resources Nl | Kookynie - Sovereign | 13% | Annual Report on the Kookynie - Sovereign Project for the pe and P40/1090 riod 17 November 2005 to 16 November |
| A70486 | 2005 | Dalrymple Resources Nl | Kookynie - Melita | <1% | Annual report on the Kookynie - Melita project for the period 6 May 2004 to 5 May 2005, E40/46, East Murchison |
| A71420 | 2005 | Kookynie Resources Nl | Kookynie | <1% | Kookynie project, Annual report GSWA C048/2001, Reporting period: 1 July 2004 to 30 June 2005, (Menzies). |
| A71456 | 2005 | Ms O'Reilly Kt | Kookynie | 5.2% | Report on M40/171 and M40/172(P40/966 and P40/968), Niagara District North Coolgardie Goldfield, (Kookynie pro |
| A71538 | 2005 | Dalrymple Resources Nl | Kookynie - Soveriegn | 13% | Annual report on the Kookynie - Sovereign Project for the period 17 November 2004 to 16 November 2005. North C |
| A68481 | 2004 | Johnsons Well Mining Nl | Malcolm gold exploration | 43% | Partial Surrender report for the period 16/04/1999-23/12/03 Melita Project E40/155, E40/160, E40/163 |
| A69550 | 2004 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Annual report, GSWA C48/2001, Reporting period 01 July 2003 - 30 June 2004, E40/51, E40/87, |
| A68065 | 2004 | Johnsons Well Mining Nl | Malcolm | 73% | E40/163, Annual Report for the period 08/06/2002- 07/06/2003 (Melita Project) |
| A68781 | 2004 | Dalrymple Resources Nl | Niagra-George Bore | <1% | Annual report on the Niagara - George Bore Project for the period 6th May 2003 to 5th May 2004, E40/0046 |
| A69524 | 2004 | Dalrymple Resources Nl | Niagara/Sovereign | 13% | Annual Report on the Niagara - Sovereign Project for the per iod 17th November 2003 to 16th November 2004 C44/ |
| A66504 | 2003 | Barminco Pty Ltd | Kookynie | <1% | Kookynie Project, Surrender Report (Part of GSWA C048/2001) for the period 1 January 1993 to 2 December 2002,E |
| A67514 | 2003 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Annual Report for the period 1st July 2002 to 30th June 2003,:E40/51,87; M40/8,61,111, 117, |
| A67034 | 2003 | Dalrymple Resources Nl | Melita | <1% | Annual Report 2003, Melita Project, E40/46 ,for the period 6 May 2002 to 5 May 2003. |
| A68161 | 2003 | Dalrymple Resources Nl | Niagara-Sovereign | 13% | Annual Report on the Niagara - Sovereign Project for the per iod 17th November 2002 to 16th November 2003 |
| A63931 | 2002 | Solbec Pharmaceuticals Ltd | Kookynie | 1.4% | Combined Report for period 30 November 2000 to 29 November 2001 Kookynie Project exploration licence E40/52, M |
| A64037 | 2002 | Sons Of Gwalia Ltd | Melita | <1% | Annual Report for the period 5 Nov 2000 - 4 Nov 2001 Melita JV tenements E40/046, E40/065, E40/066, E40/111, E |
| A64611 | 2002 | Kookynie Resources Nl | Treacy | 29% | Treacy Project E40/60 Annual Report for the Period 11/02/2001 to 10/02/2002. |
| A65275 | 2002 | Kookynie Resources Nl | Kookynie | <1% | Kookynie Project, Reporting Period: 14 July 2001 to 30 June 2002*. Tenements: E40/51, E40/63, E40/77, E40/87, |
| A61871 | 2001 | Dalrymple Resources Nl | Niagara | 13% | Annual Report 1999 - 2000 Niagara Project Sovereign P40/1089 P40/1090 Western Australia. Menzies SH51-1, Meli |
| A62292 | 2001 | Kookynie Resources Nl | Puzzle | 2.9% | Annual Report GSWA Report C364/1996 reporting period: 31 January 2000 to 30 January 2001 Puzzle Project combin |
| A62331 | 2001 | Britannia Gold Nl | Kookynie | 1.4% | Combined Report For Period 30 November To November 2000. North Coolgardie Mineral Field Niagara District. Kook |
| A62370 | 2001 | Kookynie Resources Nl | Treacy | 29% | Treacy Project, Annual Report for the period 11/02/2000 to 10/02/2001, E40/60. |
| A62530 | 2001 | Sons Of Gwalia Ltd | Melita | <1% | Melita Project, Annual Report For The Period 1 January 1997 - 4 November 2000 Tenements: E40/46, E40/65-66 E40 |
| A63564 | 2001 | Solbec Pharmaceuticals Ltd | Kookynie | 1.4% | Annual Report for the period 30 November 2000 to 29 November 2001, Kookynie Project, C455/1995, E40/52 , MLA |
| A63706 | 2001 | Anaconda Nickel Ltd | Thirty Well | 93% | Technical Report 1218. E31/460 Thirty Well Project First and Final Technical Report from 28 April 2000 to 14 |
| A62557 | 2001 | Kookynie Resources Nl | Tampa | 2.6% | Tenement E40/154 Annual report. Reporting period: 15 March 2000 to 14 March 2001. |
| A60262 | 2000 | Kookynie Resources Nl | Puzzle | 2.9% | Puzzle Project Annual Report GSWA C364/96 30/03/2000 Reporting Period 31/03/1999 to 30/03/2000 |
| A60355 | 2000 | Britannia Gold Nl | Kookynie | 1.4% | Kookynie Project, Annual Report for the period 30/11/1998 to 29/11/1999 ,E40/52; M40/116. |
| A61049 | 2000 | Kookynie Resources Nl | Kookynie - 12 Mile | 16% | Kookynie -12 Mile Project , E31/162 3rd and 4th year Partial Surrender Report. Reporting period 28/10/1997 and |
| A61127 | 2000 | Kookynie Resources Nl | Kookynie | 11% | Combined Technical Report C75/1999 Money East Project. Tenements E31/162, E40/104. Biennial Report for Reporti |
| A61126 | 2000 | Kookynie Resources Nl | Treacy | 29% | Treacy (JV) Project, Annual Report for the period February 1999 to 0th February 2000, E40/60. |
| A57644 | 1999 | Britannia Gold Nl | Kookynie | 1.4% | Kookynie Project, Combined Annual Report E40/52, M40/116 30/11/1997 - 29/11/1998. |
| A58243 | 1999 | Kookynie Resources Nl | Puzzle | 2.9% | Kookynie Resources NL, Puzzle Project 31/03/98 - 30/03/99 E40/51, M40/8, 61, 111 |
| A57451 | 1999 | Kookynie Resources Nl | Treacy | 29% | Treacy Project, Annual Report for the period 11/02/1998 to10/02/1999, E40/60. |
| A53680 | 1998 | North Ltd | Niagara | 93% | Annual Mineral Exploration Report on E31/274, Niagara, for the period 13 December 1996 to 12 December 1997 ( d |
| A55646 | 1998 | Mr Treacy Ja | Treacy | 29% | Annual Technical Report, 1997-1998 E40/60 ,Treacy Project. |
| A57005 | 1998 | Kookynie Resources Nl | Kookynie - 12 Mile | 16% | Kookynie Resources NL, Kookynie 12 Mile project, E31/162, Annual report for the reporting period 13 October 1 |
| A56707 | 1998 | Dalrymple Resources Nl | Snowy Melita | <1% | Snowy Melita Project, Partial Surrender Report, November 1998,E40/46. |
| A53643 | 1998 | Savage Australian Exploration Pty Ltd | Melita | 76% | Melita Project ,Annual Report, E40/48, for the period 23 December 1996 to 22 December 1997. |
| A54811 | 1998 | North Ltd | Niagara | 93% | Final Mineral Exploration Report on E31/274, Niagara, for the period 13th December 1997 to 9th April 1998. |
| A55840 | 1998 | Consolidated Gold Nl | Puzzle | 2.9% | Annual Technical Report - Puzzle Project E40/51, M40/8, 61, 111, 129, 135-136, 158, 163-164 etc 1997 - 1998 |
| A49874 | 1997 | Britannia Gold Nl | Kookynie | 1.4% | Kookynie Project, Annual Report 30th November 1995 - 29th November 1996, E40/52 & M40/115. |
| A50225 | 1997 | Horizon Mining Nl | Cosmopolitan | <1% | Cosmopolitan Project M40/61 M40/135 and M40/136 P40/1018 and P40/1045 Annual report for period ended 31 Decemb |
| A51019 | 1997 | Savage Australian Exploration Pty Ltd | Melita | 76% | Melita Project Technical Report E40/48 23 December 1996 to 22 December 1997. |
| A52279 | 1997 | Dalrymple Resources Nl | Snowy Melita | <1% | Snowy Melita Project,,E40/46 P40/1014 , M40/166 Annual report 1996-1997 |
| A53206 | 1997 | Britannia Gold Nl | Kookynie | 1.4% | Annual Report, E40/52 & M40/116 30/11/1996 - 29/11/1997 Kookynie |
| A53207 | 1997 | Tulloch Resources Nl | Kookynie gold exploration | 13% | Annual Interim Report M40/149 22/8/96-21/8/97 |
| A53208 | 1997 | Tulloch Resources Nl | Kookynie | 2.3% | Non-statutory Report : Annual Interim Report, P40/1006-1011, for the period 09/06/1996 - 08/06/1997. |
| A46820 | 1996 | Horizon Mining Nl | Red Hill | <1% | Red Hill Project M40/111 Annual report for period ending 14 November 1995 North Coolgardie Mineral Field Geolo |
| A47814 | 1996 | Troy Resources Nl | New Chum North | 29% | New Chum North Project, , Annual Report, 1995/1996 ,E40/60. |
| A47824 | 1996 | Aberfoyle Resources Ltd | Kookynie East | <1% | Kookynie East Project, Final Report, April 1996, E40/53 ( Six Mile) . |
| A47331 | 1996 | Horizon Mining Nl | Cosmopolitan | <1% | Cosmopolitan Project M40/61 M40/135 and M40/136 Annual report for period ended 31 December 1995 North Coolgard |
| A49282 | 1996 | Aberfoyle Resources Ltd | Kookynie East- Twelve Mile | 16% | Kookynie East Project, E31/162, Twelve Mile, Annual report for period 12 October 1995 to 11 October 1996 |
| A49355 | 1996 | Money Mining Nl | Red Hill | <1% | Red Hill Project, Annual Report for the year ending 7th September 1996, E40/51. |
| A49356 | 1996 | Britannia Gold Nl | Kookynie | 1.4% | Partial Surrender Report 7th September 1995 - 6th September 1996 E40/52 North Coolgardie Mineral FIelds |
| A49395 | 1996 | Tulloch Resources Nl | Kookynie | 2.3% | Annual Report ,Kookynie Project, P40/1006 to P40/1011, for the period 09/06/95 to 08/06/96. |
| A49778 | 1996 | Horizon Mining Nl | Treacy | 100% | Treacy Project P40/1055 Annual report for the period ending 20 December 1996 North Coolgardie Mineral Field Ge |
| A49780 | 1996 | Horizon Mining Nl | Red Hill | 36% | Red Hill Project M40/111 P40/1050 and P40/1052 Annual report for period ending 31 December 1996 |
| A50461 | 1996 | Tibooburra Gold Nl | Sovereign | 13% | Sovereign Project, Annual Report 21 August 1996, Mining Lease 40/149 Kookynie. |
| A43260 | 1995 | Horizon Mining Nl | Cosmospolitan | <1% | Cosmospolitan Project[s] , M40/18 M40/33 M40/61 M40/135 P40/1045 . Annual report for the period ending 31 Dece |
| A43497 | 1995 | Britannia Gold Nl | Kookynie | 1.4% | Kookynie Project, Annual Report M40/116, E40/52 for period 30th November 1993 to 29th November 1994. |
| A44090 | 1995 | Troy Resources Nl | New Chum North | 29% | New Chum NorthProject, Annual Report, 1994/1995 ,E40/60. |
| A44656 | 1995 | Aberfoyle Resources Ltd | Kookynie | 16% | Kookynie Project, Annual Report for the period ending 11th October1994, E31/162. |
| A45772 | 1995 | Aberfoyle Resources Ltd | Kookynie East | 11% | Kookynie East Propject, , E40/53, E31/162, Annual Report on exploration for the period 7 September 1994 to 7 S |
| A46830 | 1995 | North Ltd | Melita | 76% | Melita Project, Annual Report, For the period 22/12/94 to 21/12/95, E40/48. |
| A45400 | 1995 | Dalrymple Resources Nl | Snowy Melita | <1% | Snowy Melita Project, E40/46 Annual report 1994-1995 |
| A43178 | 1995 | Euraust Mineral Development Nl | Red Hill | <1% | Annual report Period from 15 November 1993 to 14 November 1994 Red Hill project Mining Lease Number M40/111. |
| A44106 | 1995 | Money Mining Nl | Kookynie North East | <1% | Kookynie North East Project, Annual Exploration Report E40/069 year ending 24th March 1995. |
| A45866 | 1995 | Money Mining Nl | Red Hill | <1% | Red Hill Project, Annual Report for the year ending 6th September 1995, E40/051. |
| A47565 | 1995 | Tulloch Resources Nl | Kookynie | 2.3% | Kookynie Project, Annual Report P40/1006 to P40/1011, for the period 09/06/94 to 08/06/95 |
| A40382 | 1994 | Money Mining Nl | Kookynie East - Red Hill | <1% | Kookynie East - Red Hill Project, Annual Report for the period ending 6th September 1993, E40/51 & 53. |
| A40651 | 1994 | Geopeko | Melita | 76% | Melita Project, Annual Report for the year ended 21st December 1993, E40/48. |
| A40931 | 1994 | Troy Resources Nl | New Chum North | 29% | New Chum North Project, Annual Report, 1993-1994 Exploration Licences E40/60. |
| A41707 | 1994 | Dalrymple Resources Nl | Melita | <1% | Annual Report for the period 05/93-05/94, Snowy Melita Project, E40/46. |
| A41759 | 1994 | Tulloch Resources Nl | Rubywulf | 2.3% | Annual Report for the period 06/93-06/94, Rubywulf Project, P40/1006-1011. |
| A42707 | 1994 | Tibooburra Gold Nl | Sovereign | 15% | Sovereign Project, Annual Report for the period 26th September 1993 to 25th September 1994, P40/935 & 936. |
| A42798 | 1994 | Money Mining Nl | Red Hill | <1% | Red Hill Project, Annual Report for the year ending 6th September 1994, E40/51. |
| A38827 | 1993 | Dalrymple Resources Nl | Snowy Melita | <1% | Annual Report for the period 06/05/92-05/05/93 Snowy Melita Project E40/46 |
| A39865 | 1993 | Mr French Dv | Kookynie | 1.4% | Kookynie Project Niagara Mining District, WA. Annual Report 07/09/92 - 06/09/93 E40/52 |
| A34896 | 1992 | Golden Valley Mines Nl | Kookynie | 4.4% | Kookynie Project 1990 Annual Report (M40/18 M40/33 M40/61-62 M40/89 M40/105 P40/729 P40/731) |
| A34897 | 1992 | Golden Valley Mines Nl | Kookynie | 4.4% | Kookynie Project 1991 Annual Report (M40/18 M40/33 M40/61-62 M40/89 M40/105 P40/729 P40/731) |
| A37175 | 1992 | Dookut Pty Ltd | Kookynie | 15% | Kookynie Project, Annual Report for the period 26th September 1991 to 25th September 1992, P40/935 & 936. |
| A34583 | 1991 | Dookut Pty Ltd | Sovereign | 15% | Sovereign Project, Non-statutory Report: Annual Report for the period 29th July 1990 to 26th September 1991, P |
| A28787 | 1989 | Charter Mining Nl | Sovereign | 25% | North Coolgardie Mineral Field. M04/65, Menzies SH51-5. Annual report 08/08/88 to 07/08/89 |
| A14803 | 1985 | Western Mining Corporation Ltd | Kookynie | 4.5% | Annual report Kookynie Joint Venture for the period 4 November 1983 to 11 October 1984 GML40/992, MC40/941 to |
| A16245 | 1985 | Mt Edon Gold Mines Aust Ltd | Niagara - Kookynie | 8.4% | Exploration Report for 'N-K' project (P40/43 to P40/49 P40/59 P40/148 to P40/157 P40/201 P40/207 P40/271, 1985 |
| A11941 | 1983 | Cra Exploration Pty Ltd | Kookynie | 4.5% | Annual Report for 1982 On Mineral Claims 40/941-947, 40/990- 992, 40/1088-92, 40/1177-83, Cosmopolitan Kookyni |
| A10243 | 1981 | Minplex Resources Pty Ltd | Eleven Mile Bore | 84% | Eleven Mile Bore Project, Non-statutory Report; Quarterly Report for the period 20th May 1981 to 29th August 1 |
| A7897 | 1978 | Abminco Nl | Dingo Well | 47% | Dingo Well Project, Non-statutory Report: Progress Report for the period ending 19/05/1978, MC40/795-797 & MC4 |
| A16109 | 1978 | Asarco Australia Ltd | Barton | 33% | Report on Exploration- Barton Prospect, Western Australia |
| A8560 | 1975 | Asarco (Australia) Pty Ltd | Kookynie | 6.2% | Kookynie Project, Non-statutory Report: Exploration Report , February 1975, MC40/670-682. |
| A5389 | 1974 | Western Mining Corporation Ltd | East Kookynie | 45% | East Kookynie copper investigation, August 1967 to March 1974, Termination report [non-statutory], MC40/459-47 |
| A5391 | 1974 | Western Mining Corporation Ltd | Kookynie | 45% | Kookynie Project, Non-statutory Report: Percussion & Auger Drilling Data, November 1974, , MC40/459-475, 477- |
| A4279 | 1973 | Western Mining Corporation Limited | Kookynie - Tampa | 27% | Kookynie - Tampa Project, Annual Report for the year ending 30th June 1973, MC40/1-16, 20-25, 28-32, 53-58, 44 |
| A4388 | 1973 | Western Mining Corporation Ltd | Kookynie | 45% | Kookynie Project, Non-statutory Report: Geological Plans, November 1973, MC40/459-475, 477-480 & 486-490. |
| A2907 | 1972 | Western Mining Corporation Limited | Six Mile Well | 2% | Six Mile Well Project, Annual Report for the year ending 30th June 1972, MC40/11-33. |
| A1864 | 1971 | Western Mining Corporation Ltd | Six Mile Well - Kookynie | 2% | Six Mile Well - Kookynie Project, Annual Report for the year ending 30th June 1971, MC40/1-33. |
| A240 | 1970 | Western Mining Corporation Ltd | Kookynie | 2% | Kookynie Project, Annual Report for the year ending 30th June 1970, MC40/1-11, 12-33. |
| A955 | 1967 | Western Mining Corporation Ltd | Kookynie | 5.1% | Kookynie Project, Final Surrender Report, March 1967, TR70/3238-3267H. |
| A43709 | 1753 | Geopeko | Melita | 76% | Melita Project, Annual Report E40/48 for year ended 21st December 1994. |
| A46500 | 1753 | Aberfoyle Resources Ltd | Britannia | 1.4% | Britannia JV E40/52, M40/116 Annual Report on exploration fo r the period 10 November 1994 to 10 November 1995 |
| A84017 | 1753 | Hawthorn Resources Limited | MELITA | 6.9% | MELITA ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 TO 31 MARCH 2009, C 4/2000, Exploration Licences: E37/528, 54 |
| A85681 | 1753 | Nex Metals Exploration Ltd | Jungle Well | 17% | Annual report Jungle Well E31/712 |
| A74798 | 1753 | Heron Resources Ltd | Kookynie | 12% | Kookynie Project C62/2006 Annual Report, 1st February 2006 to 31st January 2007 (Menzies/Leonora) |
| A84526 | 1753 | Hawthorn Resources Limited | Mount Melita | 6.4% | Exploration Licence E40/185, Mt Melita Partial Surender Report for the period 13 June 2006 To 12 June 2009 |
| A85782 | 1753 | Hawthorn Resources Limited | Melita | 50% | Exploration Licence E40/218 MELITA PARTIAL SURRENDER REPORT FOR THE PERIOD 7 NOVEMBER 2006 TO 6 NOVEMBER 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A42424 | 1753 | Nova Resources Nl | Cosmopolitan | 18% | Technical Report M40/61 (Cosmopolitan) - Annual Report, M40/33 (Altona) - Surrender Report, M40/18 (Altona) - |
| A49940 | 1753 | Consolidated Gold Nl | Puzzle | <1% | Puzzle Prospect M40/163 and M40/164 C No.364/96 Annual Geological Report for the period 09/08/95 to 08/08/96 |
| A48223 | 1753 | Dalrymple Resources Nl | Snowy Melita | <1% | Snowy Melita Project, E40/46 P40/1014 Annual report 1995 to 1996. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- Past expiry date · 30 June 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 40/393 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 40/393? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.