E 45/6854
E 45/6854 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Northern Star (Pilbara) Pty Ltd (part of Northern Star Resources Ltd). The application was received on 14 Dec 2023 and is awaiting a decision. The ground is covered by 46 historical WAMEX reports.
Register summary
- Holder
- Northern Star (Pilbara) Pty Ltd
- Part of
- Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 14 Dec 2023
The full record on E 45/6854
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares, and the one change of holder on record
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (3 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147685 | 2025 | Sayona Mining Limited | Red Rock Gold and Lithium | 5% | Annual Technical Report Red Rock Gold and Lithium Project, E45/4716 for the period ending 29/10/2024. |
| A138615 | 2024 | Sayona Mining Limited | Red Rock Gold and Lithium | 5% | Partial Surrender Technical Report Red Rock Gold and Lithium Project, E45/4716 for the period ending 20/11/202 |
| A138593 | 2024 | Sayona Mining Limited | Red Rock Gold and Lithium | 5% | Annual Technical Report Red Rock Gold and Lithium Project, E45/4716 for the period ending 29/10/2023. |
| A134096 | 2023 | Sayona Mining Limited | Red Rock Gold and Lithium | 5% | Annual Technical Report Red Rock Gold and Lithium Project, E45/4716 the period ending 29/10/2022. |
| A136938 | 2023 | Western Lithium Pty Ltd | Tabba Tabba | <1% | Partial Surrender Report E45/04637 Tabba Tabba Lithium Project for the period ending 11/05/2023 |
41 more reports
| A129914 | 2022 | Sayona Mining Limited | Red Rock | 5% | Annual Technical Report Red Rock Gold and Lithium Project, E45/4716 for the period ending 29/10/2021. |
| A126288 | 2021 | Sayona Mining Limited | Red Rock | 2.3% | Annual Report, Red Rock Project, E45/4716 and E45/4775 [C137/2018] for the period ending 29/10/2020 |
| A123735 | 2020 | Lithium Power Wa Holdings Pty Ltd | Tabba Tabba | <1% | Annual Report Tabba Tabba Lithium Project Tenement E45/4637 for the period 12th May 2019 to 11th May 2020 |
| A122571 | 2020 | Sayona Mining Limited | Red Rock | 2.3% | Annual Report, Red Rock Lithium Project E45/4716 and E45/4775 for the period 30 October 2018 to 29 October 201 |
| A120546 | 2019 | Lithium Power International Limited | Tabba Tabba | <1% | Annual Report Tabba Tabba Lithium Project Tenement E45/4637 for the period 12th May 2018 to 11th May 2019 |
| A119260 | 2019 | Sayona Mining Limited | Red Rock | 2.3% | Red Rock Project C137/2018 Combined Annual Technical Report for the period 30 October 2017 to 29 October 2018, |
| A116373 | 2018 | Fortescue Metals Group Ltd | Hedland | <1% | C325/2011 Hedland Annual Report for the period 01/01/2017 - 31/12/2017, E45/03473, E45/03545, E45/03659, E45/0 |
| A116944 | 2018 | Fortescue Metals Group Ltd | Strelley | 5.3% | E45/03659 (Strelley) Partial Surrender Report for the period 03/04/2012 - 02/04/2018 |
| A117184 | 2018 | Lithium Power International Limited | Tabba Tabba | <1% | Annual Report Tabba Tabba Lithium Project Tenement E45/4637 For the Period 12 May 2017 to 11 May 2018 |
| A118141 | 2018 | Strike Australian Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 Annual Technical Report |
| A108018 | 2016 | Haoma Mining Nl | Tabba Tabba - Strelley | 4.3% | FINAL SURRENDER REPORT For the Period 17 October 2013 to 9 December 2015 TABBA TABBA / STRELLEY PROJECT E45/40 |
| A108084 | 2016 | Fortescue Metals Group Ltd | Hedland | <1% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 C325/2011 HEDLAND (E 45/03473, E 45/03545, E 4 |
| A105066 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Combined Annual Report for the Period 1 December 2013 to 30 November 2014, C120/2008, Glacier Valley Project E |
| A105306 | 2015 | Fmg Pilbara Pty Ltd | Glacier Valley | <1% | Glacier Valley Project, Partial Surrender Report for the period 02/10/2012 to 19/12/2014, E45/2857. |
| A105147 | 2015 | Fortescue Metals Group Ltd | Hedland | <1% | Combined Annual Mineral Exploration Report for the Period 1 January 2014 – 31 December 2014, C325/2011, E45/34 |
| A106614 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | <1% | C120/2008 Glacier Valley Final Surrender Report for the period 13/02/2012 to 11/05/2015 |
| A105315 | 2015 | Fmg Pilbara Pty Ltd | Glacier Valley | <1% | Final Surrender Mineral Exploration Report: E45/2852 Turner River 4 Project for the period 13 February 2012 to |
| A104043 | 2014 | Haoma Mining Nl | Tabba Tabba - Strelley | 4.3% | Tabba Tabba - Strelley Project, Annual Report for the period 17/10/2013 to 18/10/2014, E45/4062. |
| A102121 | 2014 | Fortescue Metals Group Ltd | Strelley | 5.3% | Annual Mineral Exploration Report: E45/3659 Strelley for the period 03 April 2013 to 02 April 2014 |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A95295 | 2012 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Donald Well Final Relinquishment Report to 20 October 2012 E45/2534 |
| A92121 | 2011 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Donald Well Project Annual Report for tenement E45/2534 for the period 21/10/2010 to 20/10/2011 |
| A88391 | 2010 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Donald Well E45/2534 Annual Report to 20th October, 2010 |
| A86270 | 2010 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Partial Surrender Report for Tenement E45/2534 For the Period 21/10/2005 to 20/10/2009 |
| A85170 | 2009 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Donald Well Project Annual Report for Tenement E45/2534, Report Period: 21/10/2008 to 20/10/2009. |
| A80485 | 2008 | Shaw River Resources Ltd | Donald Well | <1% | DONALD WELL PROJECT Annual Report for Tenement E45/2534 (21/10/2007 - 20/10/2008) |
| A81070 | 2008 | Shaw River Resources Ltd | Donald Well | <1% | Donald Well E45/2534 Annual Report, 21/10/2007 to 20/10/2008 |
| A81203 | 2008 | Shaw River Resources Ltd | Donald Well | <1% | Partial Surrender Report for Tenement E45/2534 For the Period 21/10/2005 to 20/10/2008 |
| A76815 | 2007 | Sunrise Exploration Pty Ltd | Donald Well | <1% | DONALD WELL PROJECT Annual Report for Tenement E45/2534 For the Period 21/10/06 to 20/10/07 |
| A73735 | 2006 | Sunrise Exploration Pty Ltd | Donald Well | <1% | Donald Well Project E45/2534, Annual Report for Period 21/10/05 to 20/10/06, (Port Hedland). |
| A61721 | 2001 | Stockdale Prospecting Ltd | Pilton | 1% | C102/1999 Final report for exploration licences E45/1980, E45/1982, E45/1983 & E45/1993 January 2001. |
| A61323 | 2000 | Stockdale Prospecting Ltd | Pilton | <1% | C102/1999 Second Annual Report for Exploration Licences E45/1980, E45/1982, E45/1983, E45/1988, E45/1989, E45/ |
| A58756 | 1999 | Stockdale Prospecting Ltd | Exposed Pilbara | <1% | Annual Report Exploration Licence E45/1678 Exposed Pilbara Project July 1999 |
| A59319 | 1999 | Stockdale Prospecting Ltd | Pilton | 1% | First Combined C102/1999 Annual Report for Exploration Licences E45/1980, 1982, 1983, 1993, November 1999 |
| A59509 | 1999 | Stockdale Prospecting Ltd | Exposed Pilbara | <1% | Exploration Licence E45/1678, Final Report, Exposed Pilbara Project, October 1999. |
| A56106 | 1998 | Stockdale Prospecting Ltd | Exposed Pilbara | <1% | Annual Report on E45/1678 (Exposed Pilbara) |
| A51565 | 1997 | Lynas Gold Nl | Tabba Tabba | <1% | Tabba Tabba Project, Annual Report E45/1678 for the period 17th May 1996 to 16th May 1997. |
| A1440 | 1961 | Consolidated Gold Fields Aust Ltd | Port Hedland | <1% | Port Hedland Project, Non-statutory Report: Report for the year ending 31st December 1961, TR70/2059, 2061-207 |
| A121485 | Strike Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 Tabba Tabba Annual Report For The Period Ended 10th August 2019 | |
| A122929 | Strike Operations Pty Ltd | Tabba Tabba | <1% | E45/4800 ‘Tabba Tabba’, Final Report for the period ending 30/01/2020 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 45/6854 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.