E 45/7154
Register summary
- Holder
- Muccanabout Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 25 July 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134261 | 2023 | Brian Richardson | Spinifex Ridge Extended | <1% | Spinifex Ridge Extended E45/5841 Annual Report for the period ending 15/12/2022. |
| A135303 | 2023 | Czr Resources Ltd | Yarrie | <1% | E45/3728 Partial Surrender Report Yarrie for the period ending 02/12/2022.(C142/2013) |
| A128718 | 2021 | Czr Resources Ltd | Yarrie | <1% | E45/3728_2021PS Yarrie Project for the period ending 2 November 2021. |
| A125800 | 2021 | First Au Limited | Talga | <1% | Annual Mineral Exploration Report for Combined Reporting Group C92/2015 — Talga Project for the period ending |
| A124112 | 2020 | Muccan Minerals Pty Ltd | Yarrie | 27% | Annual Mineral Exploration Report for M45/1163 — Yarrie Project for the period ending 14/05/2020 |
110 more reports
| A123030 | 2020 | Bamboozler Pty Ltd; Whim Creek Mining Pty Ltd | Bamboo | 14% | Annual Mineral Exploration Report for Combined Reporting Group C1/2014: M45/202, E45/3724 and E45/4921 — Bambo |
| A119052 | 2019 | First Au Limited | Talga | <1% | Talga E45/4136 Final Surrender for the period 16/09/2013 to 07/01/2019 |
| A122141 | 2019 | First Au Limited | Talga | <1% | Talga C92/2015 Annual Report for the period ending 15/09/2019, E45/03679, E45/03857, E45/04137, E45/04615 |
| A119530 | 2019 | Whim Creek Mining Pty Ltd; Bamboozler Pty Ltd | Bamboo | 14% | Combined Annual Report Bamboo Project For the Period 1 February 2018 to 31 January 2019, E45/03724, M45/00202, |
| A122016 | 2019 | Coziron Resources Limited | Yarrie | <1% | Yarrie Project C142/2013 Annual Report for the period 1 December 2018 to 30 November 2019, E45/03725, E45/0372 |
| A120483 | 2019 | Muccan Minerals Pty Ltd | Yarrie | 27% | Annual Report - Yarrie Project M45/1163 for the period 15 May 2018 to 14 May 2019 |
| A116362 | 2018 | Whim Creek Mining Pty Ltd | Bamboo | 34% | Combined Annual Report - Bamboo Project C1/2014 For the Period 1 February 2017 to 31 January 2018, E45/03724, |
| A115592 | 2018 | Whim Creek Mining Pty Ltd | Yarrie | 34% | Partial Surrender Report - Yarrie E45/3724 for the period 15 November 2011 to 10 November 2017 |
| A117365 | 2018 | Great Sandy Pty Ltd; First Au Limited | Talga | <1% | Talga E45/3679 Partial Surrender Report for the period 12/06/2012 to 06/6/2018 |
| A118549 | 2018 | First Au Limited | Talga | <1% | Talga Project C92/2015 Annual Report for the period ending 15/09/2018, E45/03679, E45/04615, E45/03857, E45/04 |
| A118423 | 2018 | Coziron Resources Ltd | Yarrie | <1% | Yarrie Project C142/2013 Annual Report for the period 1 December 2017 to 30 November 2018, E45/03725, E45/0372 |
| A112403 | 2017 | Whim Creek Mining Pty Ltd | Bamboo | 34% | Combined Annual Exploration Report-Bamboo Project C01/2014 for the period 1 February 2016 to 31 January 2017, |
| A115379 | 2017 | Coziron Resources Ltd | Yarrie | <1% | Yarrie Project C142/2013, E45/03725, E45/03728, E45/04065, E45/04433 Annual Report for the period 1 December 2 |
| A115511 | 2017 | Great Sandy Pty Ltd | Talga | <1% | Talga C92/2015 Combined Annual Report for the period ending 15/09/2017, E45/03679, E45/03857, E45/04136, E45/0 |
| A108797 | 2016 | Creasy Group | Bamboo | 8.5% | Combined Annual Mineral Exploration Report Bamboo Project For C01/2014 During the period 01/02/2015 to 31/01/2 |
| A110535 | 2016 | Great Sandy Pty Ltd | Talga | <1% | Talga C92/2015 Combined Annual Report for the period ending 15/09/2016, E45/03679, E45/03857, E45/04136, E45/0 |
| A107832 | 2016 | Great Sandy Pty Ltd | Talga | <1% | Talga Project C92/2015 Combined Annual Report to the Department of Mines and Petroleum for the Period 16/09/20 |
| A107864 | 2016 | Coziron Resources Ltd | Yarrie | <1% | Yarrie Project C142/2013 Annual Report for the period 1 December 2014 to 30 November 2015, E45/03725, E45/0372 |
| A109284 | 2016 | Coziron Resources Ltd | Yarrie | <1% | Yarrie Project E45/03728 Partial Surrender 15 November 2011 to 22 June 2016 |
| A110545 | 2016 | Coziron Resources Ltd | Yarrie | <1% | Yarrie Project C142/2013, E45/03725, E45/03728, E45/04065 Annual Report for the period 1 December 2015 to 30 N |
| A105364 | 2015 | Nullagine Gold Pty Ltd | Bamboo | 8.5% | Combined Annual Mineral Exploration Report Bamboo Project C01/2014 for the period 01/02/1014 to 31/01/2015, E4 |
| A106380 | 2015 | Great Sandy Pty Ltd | Talga Peak | <1% | Talga Peak Project E45/3679 Annual Report for the period 12/06/2014 to 11/06/2015 |
| A106959 | 2015 | Tianda Resources Pty Ltd | Yarrie | <1% | Yarrie Project E45/2397 Annual Report for the period 07/08/2014 to 06/08/2015 |
| A103817 | 2014 | Xfe Pty Ltd | Yarrie | <1% | Yarrie Project, Annual Report for the period 01/12/2013 to 30/11/2014, E45/465, 3725 & 3728 . [C142/2013] |
| A103821 | 2014 | Conglomerate Gold Exploration Pty Ltd | East Pilbara | 1.6% | East Pilbara Project Annual Report for the period 01/07/2013 to 30/06/2014, E45/3000, E45/3001, E45/3332, E45/ |
| A103938 | 2014 | Richardson B | Talga Peak | <1% | Talga Peak Project E45/4136 Annual Report for the period 16 September 2013 15 September 2014 |
| A101221 | 2014 | Xfe Pty Ltd | Yarrie | <1% | Yarrie Project – C142/2013 (E45/3725-I, E45/3728-I & E45/4065-I) 2013 Combined Annual Report For the Reporting |
| A103008 | 2014 | Great Sandy Pty Ltd | Talga Peak | <1% | TALGA PEAK PROJECT E45/3679WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 12 JUNE 2013 to 11 JUNE 2014 |
| A102489 | 2014 | Moly Metals Australia Pty Ltd | Spinifex Ridge | 70% | Annual report for the period 15th March 2013 to 14th March 20134, Spinifex Ridge Project, M45/1095, M45/1096, |
| A101053 | 2013 | Tianda Resources Pty Ltd | Yarrie | <1% | Yarrie Project, Final Surrender Report for the period 07/08/2007 to 20/02/2014, E45/2397. |
| A96607 | 2013 | Whim Creek Mining Pty Ltd | Yarrie | 34% | Yarrie Project (E45/3724) Annual Report For the Reporting Period 15th November 2011 to 14th November 2012 |
| A96608 | 2013 | Xfe Pty Ltd | Yarrie | <1% | Yarrie Project (E45/3728) Annual Report for the period 15/11/11 to 14/11/12 |
| A100598 | 2013 | Whim Creek Mining Pty Ltd | Yarrie | 34% | Yarrie Project (E45/3724) Annual Report For the Reporting Period 15th November 2012 to 14th November 2013 |
| A98819 | 2013 | Great Sandy Pty Ltd | Talga Peak | <1% | Talga Peak Project E45/3679 Western Australia Annual Report for the period 12 June 2012 to 11 June 2013 |
| A99465 | 2013 | Tianda Resources (Australia) Pty Ltd | Yarrie | <1% | Annual Report for E45/2937 for the period 7th August 2012 - 6th August 2013 |
| A97414 | 2013 | Mining Projects Group | Talga Peak | <1% | Talga Peak Project, Final Surrender Report for the period 23rd December 2005 to 17th December 2012, E45/2650. |
| A95785 | 2012 | Tianda Resources (Australia) Pty Ltd | Yarrie | <1% | Annual Report for E45/2937 Yarrie Iron Project for the period 9th August 2011 - 8th August 2012 |
| A89254 | 2011 | Oakover Gold Ltd | Talga Peak | <1% | TALGA PEAK PROJECT E45/2650-I WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 23 DECEMBER 2009 to 22 DECEMBER 2 |
| A89517 | 2011 | Regency Bay Pty Ltd | Port Hedland | 5.6% | 2011 SURRENDER REPORT EXPLORATION LICENCE 45/2969 PILBARA MINERAL FIELD WESTERN AUSTRALIA |
| A91658 | 2011 | Tianda Resources (Australia) Pty Ltd | Yarrie | <1% | Yarrie Iron Project Annual Report for E45/2937, 9 August 2010 – 8 August 2011 |
| A92752 | 2011 | Mining Projects Group | Talga Peak | <1% | Annual Report Talga Peak Project E45/2650 for the period 23rd December 2010 to 22nd December 2011 |
| A85643 | 2010 | Mining Projects Group | Talga Peak | <1% | PARTIAL SURRENDER TALGA PEAK PROJECT E45/2650 FOR THE FOUR YEAR PERIOD ENDING 17/12/2009 (4th Year Anniversary |
| A87965 | 2010 | Tianda Resources (Australia) Pty Ltd | Yarrie | <1% | Annual Report for exploration tenement E45/2937-I for the period 8 August 2009 to 7 August 2010 |
| A85644 | 2010 | Mining Projects Group | Talga Peak | <1% | ANNUAL REPORT TALGA PEAK PROJECT E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2009 (4th Year Anniversary) |
| A86246 | 2010 | Regency Bay Pty Ltd | Port Hedland Iron Ore(Mount Margaret) | 5.6% | 2010 ANNUAL REPORT EXPLORATION LICENCE 45/2969 PILBARA MINERAL FIELD WESTERN AUSTRALIA |
| A80891 | 2009 | Regency Bay Pty Ltd | PORT HEDLAND | 5.6% | FIRST ANNUAL REPORT ON PORT HEDLAND IRON ORE PROJECT, PILBARA MINERAL FIELD, WESTERN AUSTRALIA, Port Hedland I |
| A81167 | 2009 | Mining Projects Group; Oakover Gold Ltd | TALGA PEAK | <1% | ANNUAL REPORT TALGA PEAK PROJECT E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2008 |
| A81168 | 2009 | Mining Projects Group; Oakover Gold Ltd | TALGA PEAK | <1% | PARTIAL SURRENDER TALGA PEAK PROJECT E45/2650 FOR THE THREE YEAR PERIOD ENDING 22/12/2008 (3rd Year Anniversar |
| A84474 | 2009 | Tianda Resources (Australia) Pty Ltd | YARRIE IRON | <1% | YARRIE IRON PROJECT ANNUAL REPORT FOR TENEMENT E45/2937 7 AUGUST 2008 TO 6 AUGUST 2009 |
| A77775 | 2008 | Oakover Gold Ltd | Talga Peak | <1% | Annual Report Talga Peak Project E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2007 |
| A77951 | 2008 | Mr Creasy Mg | Yarrie | 36% | Project Name: Yarrie C182/2006 Nature of Report: Anuual Period Covered: 16.12.2006 to 15.12.2007 Tenements: ex |
| A79861 | 2008 | Tianda Resources (Australia) Pty Ltd; Trianda Resources (Aus | Yarrie Iron | <1% | Yarrie Iron Project, COMBINED ANNUAL REPORT FOR TENEMENTS E45/2936 AND E45/2937 7 AUGUST 2007 TO 6 AUGUST 2008 |
| A74310 | 2007 | Mining Projects Group | Talga Peak | <1% | Annual Report, Talga Peak Project E45/2650, For the 12 Month Period Ending 22/12/2006, (Port Hedland). |
| A74614 | 2006 | Muccan Minerals Pty Ltd | Bamboo Creek | 36% | Annual Report for the period 16.12.2005 to 15.12.2006 Yarrie Project (C182/2006) E45/2385, M45/202 |
| A62173 | 2001 | Mr Creasy Mg | Yarrie | 5.5% | Annual Report for the period 01.01.2000 to 31.12.2001 Yarrie Project mining lease M45/202, exploration licence |
| A63518 | 2001 | De Beers Australia Exploration Ltd | Carlindi | 11% | Annual Report for Exploration Licences 45/2195 - 45/2200. |
| A61120 | 2000 | Mr Creasy Mg | Yarrie | 5.5% | Combined Mineral Exploration Report Yarrie (GSWA Ref:C3147/ 1993 and M8292) Exploration Licences 45/1233, 45/1 |
| A57255 | 1999 | Mr Creasy Mg | Yarrie | 15% | Yarrie (M8292/1) Partial Surrender 22/07/92 - 07/11/98 Exploration Licence: 45/1344 |
| A57847 | 1999 | Mr Creasy Mg | Yarrie | 3.4% | Yarrie M8292, C314/1993, 01/01/98 - 31/12/98 Mining Lease: M45/202, Exploration Licence:E45/1233, 1344, 1609, |
| A57034 | 1999 | Sipa Resources Ltd | Panorama / Kittys Gap | 8.9% | 1998 Annual and Final Report on E45/1294 Kittys Gap Panorama Project, Covering the Period 9 November 1992 to 3 |
| A53871 | 1998 | Mr Creasy Mg | Yarrie | 4.8% | Yarrie Project (M8292, C314/1993) Partial Surrender Report E45/1233 covering period 22/07/1992 to 10/10/1997. |
| A55435 | 1998 | Mr Creasy Mg | Yarrie | 8.6% | Yarrie, M8292, C314/1993 Surrender Report, 01/02/96 - 17/06/98 Exploration Licence: E45/1602, 1610, 1611, 1613 |
| A53457 | 1998 | Outokumpu Exp Aust Pty Ltd | Panorama / Kittys Gap | 8.9% | E45/1294 Kittys Gap Annual Report Panorama Project covering the period 1January to 31 December 1997. |
| A54642 | 1998 | Mr Creasy Mg | Yarrie | 6.5% | Yarrie Project, C314/1993, Annual Report 01/01/97 - 31/12/97 Mining Licence: M45/202, Exploration Licence: E4 |
| A50543 | 1997 | Sipa Resources Ltd | Kitty's Gap/ Panorama | 8.9% | Kitty's Gap/ Panorama Project, Annual Report E45/1294 for period 9th November 1995 to 31st December 1996. |
| A50861 | 1997 | Mr Creasy Mg | Yarrie | 6.5% | Report on a reverse circulation drilling, stream sediment, soil and rock sampling programs at Yarrie, East Pil |
| A47462 | 1996 | Mr Creasy Mg | Yarrie | 10% | Anual report period 01/01/95 to 31/12/95 Mark Creasy, Geochemex Australia Rep No 318 Doc No 161 Report on a co |
| A49432 | 1996 | Cra Exploration Pty Ltd | Marble Bar | 7.6% | Final Exploration Report for E45/1598 (Marble Bar 3) Port Headland SF50-04 Western Australia Report No. 22438 |
| A46574 | 1995 | Cra Exploration Pty Ltd | Panorama | 8.9% | Panorama Project, Annual Report for year ending 8th November 1995, E45/1294. |
| A44976 | 1995 | Sipa Resources Ltd | Panorama / Kittys Gap | 8.9% | Panorama / Kittys Gap Project,1994 Annual Report E45/1294 covering period 1st January 1994 to 31st December 19 |
| A44977 | 1995 | Sipa Resources Ltd | Panorama | 8.9% | E45/1294 voluntary partial surrender report. Kitty's Gap, Panorama Project. Covering the period 9/11/92 to 26/ |
| A40985 | 1994 | Sipa Resources Ltd | Panorama | 8.9% | Panorama Project, Annual Report for the period 9th November 1992 to 31st December 1993, E45/1294 |
| A40394 | 1994 | Mr Creasy Mg | Bamboo | 10% | Annual report for the period 22/07/92-31/12/93 Bamboo Project E45/1233 E45/1344 |
| A43224 | 1994 | Mr Creasy Mg | Bamboo | 10% | Summary of results of a surface geochemical sampling programme Yarrie Prospect Tenement Nos E45/1233, E45/1344 |
| A43240 | 1994 | Mr Creasy Mg | Yarrie | 10% | Yarrie Project, Non-statutory Report: Airborne Geophysical Survey Interpretation, December 1994, E45/1233 & 1 |
| A39502 | 1993 | Poseidon Exploration Ltd | Marble Bar | 4.6% | Marble Bar Project, Final Surrender Report for the period October 1993 to November 1993, E45/1411 & 1412. |
| A26664 | 1989 | City Resources Ltd | Nuggetty Gully | 1.2% | Annual Report Nuggetty Gully EL 45/319 for period 28/11/87 - 27/11/88 |
| A29864 | 1989 | City Resources Ltd | Nuggetty Gully | 1.3% | Annual Report, Nuggetty Gully EL45/319, for the period 28/11/88 - 27/11/89 |
| A24516 | 1988 | Zenith Mining Nl | Bamboo Creek | 18% | Bamboo Creek Alluvial Gold Project, Annual report to March 1988, E45/89 |
| A22762 | 1988 | Mr Loneskie L | Blue Ridge | 24% | Non-statutory Report ; Progress Report Prospecting Licence 45/1204 24/07/86-24/07/87. |
| A21018 | 1987 | Mr Devincentiis Bv | Bamboo Creek | 18% | Bamboo Creek Prospect, Annual report, E45/89, 2/5/1986 to 1/5/1987 |
| A22215 | 1987 | City Resources Ltd | Nuggetty Gully | 1.3% | Annual report for Nuggety Gully Exploration Licence (E45/319, Coppin Gap area), East Pilbara, WA. |
| A19211 | 1986 | Esso Australia Ltd | Nuggetty Gully | 1.3% | Nuggetty Gully (5649) EL 45/319, Annual Report for Period 27th November 1985 to 26 November 1986. |
| A16318 | 1985 | Mr Creasy Mg | Bamboo Creek | 18% | Bamboo Creek Project, Non-statutory Report: Drilling Report, May 1985, E45/89. |
| A16319 | 1985 | Mr Creasy Mg | Bamboo Creek | 18% | Bamboo Creek Project, Non-statutory Report: Reconnaissance Sampling Programme, E45/89. |
| A14736 | 1984 | Esso Australia Ltd | Nuggetty Gully | 1.2% | Nuggetty Gully Annual Report for Period 1 January 1984 - 31 December 1984. ML's 45/518 and 45/519 (now part of |
| A10101 | 1981 | Amax Iron Ore Corporation | Coppins Gap | 3.3% | Copping Gap Project, Non-statutory Report: Final Exploration Report, July 1981, TR7508H & 7509H. |
| A9396 | 1980 | Cra Exploration Pty Ltd | Bamboo Creek | <1% | Bamboo Creek, Non-statutory Report: Final Report for the period endng 4th August 1980, TR70/7137 & 7138H. |
| A8604 | 1979 | Esso Australia Ltd | Nuggetty Gully | 14% | Nuggetty Gully Project, Annual [Final] Report, October 1979, TR70/5948H. |
| A7961 | 1978 | Esso Australia Ltd | Nuggetty Gully | 14% | Nuggetty Gully Project, Annual Report for the period 26/07/1977 to 25/07/1978, TR70/5948H. |
| A7169 | 1977 | Esso Australia Ltd | Nuggetty Gully | 14% | Nuggetty Gully Project, Annual Report for the period July 26th 1976 to July 25th 1977, TR70/5948H. |
| A6526 | 1976 | Esso Australia Ltd | Nuggetty Gully | 14% | Nuggetty Gully Project, Annual Report for the year ending 26/07/1976, TR70/5948H. |
| A5593 | 1975 | Esso Exploration Aust Inc | Murphy Well | 18% | Murphy Well Annual Report for Period Ending March 1975 |
| A6080 | 1975 | Esso Australia Ltd | Nuggetty Gully | 14% | Annual Report for Temporary Reserve No. 5948H Nuggetty Gully |
| A5204 | 1973 | Australian Anglo American Ltd | Coppin Gap | 7% | Pilbara Joint Venture, Coppin Gap, Results of exploration of mineral claims during 1973, [Non-statutory report |
| A3469 | 1973 | Australian Anglo American Ltd | Coppins Gap - Yarrie | <1% | Coppins Gap - Yarrie Project, Annual Report for the year ending 31/12/1972, TR70/4714H. |
| A21861 | 1973 | Australian Anglo American Ltd | Pilbara -Bridget | <1% | Pilbara -Bridget Project, Non-statutory Report: Pilbara- Bridget Project, Plans covering the period 01/01/1968 |
| A3074 | 1972 | Woodsreef Mines Ltd | Coppins Gap - Bamboo Creek | 8.8% | Coppins Gap - Bamboo Creek Project, Non-statutory Report: Report on Final Field Examination TR70/ 4770 & 487 |
| A2635 | 1971 | Australian Anglo American Ltd | Yarrie | 8.8% | Yarrie Project, Annual Report for the period 01/01/1971 to 31/12/1971, TR70/4875H & 4770H. |
| A165 | 1971 | Anglo-American Corporation ( Australia) Limited | Pilbara | <1% | Pilbara (JV) Project, Annual (Geological) Report for the period endng 31/12/1970, TR70/4714H. |
| A530 | 1971 | Woodsreef Mines Ltd | Marble Bar | 21% | Report on Exploration Temporary Reserve 4875H, Marble Bar, W.A. Year Ended Feb 24, 1971 With Proposed Programm |
| A2256 | 1971 | Australian Anglo American Ltd | Coppin Gap - Yarrie | <1% | Coppin Gap - Yarrie Project, Annual Report for the period ending 31/12/1971, TR70/4714 |
| A164 | 1970 | Anglo-American Corporation ( Australia) Limited | Pilbara | <1% | Pilbara (JV) Project, Annual (Geologica) Report for theyear ending 31st December 1969, TR70/4714H, 4725H, 4727 |
| A339 | 1970 | Woodsreef Mines Ltd | Marble Bar | 8.8% | Report on Phase I Exploration Southern Part T.R 4875H and Western Part T.R. 4770H, Marble Bar, Western Austral |
| A2091 | 1970 | Australian Anglo American Ltd | Yarrie | <1% | Yarrie Project, Non-statutory Report:Results of Exploration for the period ending 31/12/1970, TR70/4714H. |
| A1563 | 1969 | Anglo American Corporation ( Australia) Ltd | Coppin Gap- Yarrie | <1% | Coppin Gap - Yarrie Project, Non-statutory Report: Geological Maps & Geochemical Stream Sediment Sampling Valu |
| A1452 | 1963 | Mt Goldsworthy Mining Assoc | Roebourne | 13% | Roebourne Project, Non-statutory Report: Final Examination Report, June 1963, TR70/2064H. (Kitty's Gap & Coppi |
| A1440 | 1961 | Consolidated Gold Fields Aust Ltd | Port Hedland | 2.6% | Port Hedland Project, Non-statutory Report: Report for the year ending 31st December 1961, TR70/2059, 2061-207 |
| A2386 | 1753 | Australian Anglo American Ltd | Coppin Gap | <1% | Coppin Gap |
| A3900 | 1753 | Australian Anglo American Ltd | Coppin Gap | 5.1% | Coppin Gap Project, Non-statutory Report : Induced Polarization Survey 1972, MC45/3568-3573, 5496-5502, 6163-6 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 45/7154 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 45/7154 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 45/7154? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.