NextMaps›WA Tenements›E 45/7286

E 45/7286

PendingExploration LicenceShire of East PilbaraMarble Bar District

E 45/7286 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Aventine Resources Pty Ltd. The application was received on 13 Apr 2026 and is awaiting a decision. The ground is covered by 53 historical WAMEX reports.

Area
5,425.107ha
Applied
Apr 2026
6 months ago
WAMEX reports
53
WA median is 53
Report drilling
23
of 53 reports
Free Tenure Pack for E 45/7286
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 45/7286 that covers 53 WAMEX reports · 22 open-file drillholes (1,078 m drilled) · 20 earlier titles on the ground since 1958 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
East Pilbara Explore on the live map

Register summary

Holder
Aventine Resources Pty Ltd
Local government
Shire of East Pilbara
Application received
13 Apr 2026

The full record on E 45/7286

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Every register dealing (1 on record), with mortgages, caveats and transfers flagged
See Premium

Exploration history on this ground

53 historical WAMEX exploration reports intersect E 45/7286: 15 report geochemistry or sampling, 29 include a digital data package.
Work on record: Aerial magnetic surveys 11 · RC drilling 11 · Rotary drilling 11 · Rock chip sampling 9 · Aerial EM surveys 8 · Geophysical interpretation 7. Resource declared in A123532 (2020).
Rather than open these one by one on the DMPE site, have them read into one cited report on E 45/7286, free for new accounts.
When this ground was worked · 51 of 53 reports dated
11970s
41980s
121990s
102000s
172010s
72020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154561 2026 Antipa Minerals Ltd. Paterson East 22% E45/5313 - Partial Surrender Report Paterson East for the period ending 12/03/2026. (C73/2025)
A145089 2024 Newmont Nol Pty Limited Juri <1% E 45/4928 Paterson Range East, Juri Project, Partial Surrender Report for the Period 27 September 2018 to 26 S
A137807 2023 Greatland Paterson South Pty Ltd Paterson South <1% Partial Surrender Report for Budjidowns E45/4815 for the period 13/10/2017 to 11/10/2023
A129329 2022 Antipa Minerals Ltd. Wilki <1% E45/4514-I Partial Surrender Report Wilki project for the period 24 November 2015 to 23 November 2021
A123532 2020 Antipa Minerals Ltd. Paterson 3.5% Paterson Project C108/2015 Annual Technical Report 1 April 2019 to 31 March 2020 for Exploration Licences E45/
48 more reports
A125380 2020 Rio Tinto Exploration Pty Limited Paterson South <1% Mineral Exploration Annual Report 31488 for CR112/2019 – Paterson South for the period ending 19/08/2020
A125443 2020 Greatland Pty Ltd Paterson Range East <1% Annual Report for Paterson Range East Project EL45/4928 for the period from 27 September 2019 to 26 September
A120216 2019 Antipa Minerals Ltd. Paterson 8.6% Paterson Project E45/2528 voluntary partial surrender for the period 1 April 2015 to 31 March 2019
A121802 2019 Rio Tinto Exploration Pty Limited Paterson South <1% Mineral Exploration Annual Report 31306 for CR112/2019 – Paterson South for the period 20 August 2018 to 19 Au
A120215 2019 Antipa Minerals Ltd. Paterson 16% Paterson Project E45/2527 voluntary partial surrender for the Period 1 March 2014 to 31 March 2019
A120583 2019 Antipa Minerals Ltd. Paterson 3.5% Paterson Project - 2018 Annual Report (C108/2015) for the period 01/04/2018-31/03/2019
A121824 2019 Greatland Pty Ltd Paterson Range East <1% Annual Report for Paterson Range East Project EL45/4928 for the period from 27 September 2018 to 26 September
A116999 2018 Antipa Minerals Ltd. Paterson 3.6% Paterson Project C108/2015 Annual Report for the period 01/04/2017 - 31/03/2018, E45/02524, E45/02525, E45/025
A118518 2018 Rio Tinto Exploration Pty Ltd Paterson <1% Mineral Exploration Annual Report for E45/4815 Paterson Project for the period 13 October 2017 to 12 October 2
A117008 2018 Antipa Minerals Ltd. Paterson 4% Paterson Project - C108/2015 - Partial Surrender Report For the Period 15 April 2015 to 11 April 2018, E45/025
A114183 2017 Antipa Minerals Ltd. Paterson 3.6% Paterson Project C108/2015 Annual Report For the Period 1 April 2016 to 31 March 2017, E45/02524, E45/02525, E
A109118 2016 Antipa Minerals Ltd. Paterson 4% Paterson Project - Annual Report C108/2015, E45/2524-2529 for the period 01 April 2015 to 31 March 2016
A104953 2015 Newcrest Mining Ltd Black Hills <1% Black Hills Project, Final Surrender Report for the period 19/01/2009 to 14/01/2015, E45/2963.
A101401 2014 Newcrest Mining Ltd Black Hills <1% Black Hills Project Annual Technical Report for Period Ending 18 January 2014
A101805 2014 Ming Gold Ltd Black Hills East <1% Annual Technical Report For the Period 26 February 2013 to 25 February 2014, Black Hills East Project, Explora
A102637 2014 Newcrest Mining Ltd Black Hills <1% Black Hills E45/2963, Partial Surrender Report to the WA Department of Mines and Petroleum, period ending 14th
A93129 2012 Newcrest Mining Ltd Blackhills <1% Blackhills E45/2963 Annual Technical Report for Period Ending 31st December 2011
A97054 2012 Newcrest Mining Ltd Black Hills <1% Black Hills E45/2963 Annual Technical Report for Period Ending 31st December 2012
A90103 2011 Newcrest Operations Ltd Black Hills <1% E45/2963, ANNUAL TECHNICAL REPORT for PERIOD ENDING 18th JANUARY 2011Black Hills Project.
A72143 2006 Range River Gold Ltd Black Hills <1% Annual Report on Exploration for Period Ended 25 November 2005, E45/2344, Black Hills East Pilbara WA, (Paters
A69849 2005 Range River Gold Ltd Black Hills <1% Annual report on exploration for period ended 25 November 20 04 E45/2344 Black Hills Project East Pilbara, WA
A67945 2003 Range River Gold Ltd Black Hills <1% Annual Report on exploration for period ended 25 November 20 03 E45/2344 Black Hills
A61909 2001 Normandy Gold Exploration Pty Ltd Yeneena <1% Final Surrender Report on exploration for the period 7 August 1998 to 23 January 2001 Yeneena Project - Lamil
A62732 2001 Croesus Mining Nl Minyari 5.6% Combined annual technical and final surrender report for the period 17 May 2000 to 16 May 2001. E45/2085
A62733 2001 Croesus Mining Nl Minyari 7% Combined annual technical and final surrender report for the period 17 May 2000 to 16 May 2001. E45/2086
A62734 2001 Croesus Mining Nl Minyari 11% Combined annual technical and final surrender report for the period 17 May 2000 to 16 May 2001. E45/2087
A60939 2000 Normandy Gold Exploration Pty Ltd Yeneena <1% Partial Surrender Report on Exploration for the Period 7 August 1998 to 14 June 2000.
A61284 2000 Normandy Gold Exploration Pty Ltd Yeneena <1% Annual Report on Exploration for the Period 1 August 1999 to 31 July 2000, Yeneena Project, Lamil Group Combin
A61489 2000 Normandy Gold Exploration Pty Ltd Yeneena <1% Final Surrender Report on Exploration for the Period 7 August 1998 to 8 September 2000. Ghost Castle (E45/2013
A59339 1999 Normandy Gold Ltd Yeneena <1% Annual Report on Exploration for the Period 1 August 1998 to 31 July 1999, Yeneena Project, Lamil Group Combin
A52218 1997 Newcrest Mining Ltd Sand Hills 1.8% Sand Hills Project, Final Surrender Report for the period 27th March 1996 to 26th March 1997, E45/1574.
A47109 1996 Newcrest Mining Ltd Black Hills Dome <1% Annual Technical Report to the Department of Mines period en ding 31st December 1995 Exploration licence 45/97
A47314 1996 Newcrest Mining Ltd Anketell 7.2% Annual Technical Report period ending 31 December 1995 Anketell Group M45/605 Havieron EL45/1029 Punchimup EL4
A50011 1996 Newcrest Mining Ltd Black Hills Dome <1% Annual Technical Report to the Department of Minerals and Energy period ending 31st December, 1996 Black Hills
A47949 1996 Newcrest Mining Ltd Anketell 7.3% Anketell Project, Final Surrender Report for period ending 19th January1996, E45/1029, 1031-1035, 1240-1241, 1
A43537 1995 Newcrest Mining Ltd Anketell 7.2% Annual Technical Report for the period from 1st January- 31st December 1994. Anketell Project, M45/605,E45/102
A44069 1995 Bhp Minerals Pty Ltd Anketell <1% Anketell Project,(Southen Anketell Area), Partial Relinquishment Report for Exploration Licences E45/1320, 132
A40304 1994 Newcrest Mining Ltd Anketell 7.1% Anketell Project, Annual Report for the period ending 18th December 1993, E45/1029, 1031-1035, 1240 & 1241.
A41177 1994 Bhp Minerals Pty Ltd Anketell <1% Anketell Project. Relinquishment report for E45/1319, 1321, 1332, 1334, 1335 and 1336 and partial relinquishme
A41180 1994 Bhp Minerals Pty Ltd Anketell <1% Annual Report for the Period 31/02/93 to 01/03/94 Anketell Project E45/1320, E45/1322, E45/1330, E45/1331 and
A37548 1993 Newcrest Mining Ltd Anketell 6.4% Anketell Project, Annual Report for the period ending 18th December 1992, E45/1029-1035,1240-1241.
A19284 1986 Battle Mountain Australia Inc Trotman Hills <1% Trotman Hills Project, Third progress [annual] report, From January 1 1986 to December 31 1986, E45/328...471
A16605 1985 Duval Mining Australia Ltd Trotman Hills <1% Trotman Hills Project, Annual Report for the period 01/01/1985 to 31/12/1985, E45/328-331, 333-34, 349 ,367, 3
A15374 1985 Duval Mining Australia Ltd Trotman Hills- Carr Boyd <1% Trotman Hills - Carr Boyd (JV) Project [s], Non-statutory Report: First Progress Report for the period ending
A16599 1984 Duval Mining Australia Ltd Trotman Hills <1% Trotman Hills Project, Annual Report for the period ending 31st December 1984, (Field Seasons), E45/328-331, 3
A7263 1977 Geopeko Paterson Range <1% Paterson Range Project, Non-statutory Report: Geology Plans [undated].
A16301 1753 Occidental Minerals Corp M2415/0: Paterson Province uranium/coppe <1% M2415/0: Paterson Province uranium/copper-lead-zinc exploration
A25990 1753 Freeport Of Australia Inc Trotman Hills 1.1% Annual report, Trotman Hills 1987 - 1988, For period 31/10/87 to 30/10/88 (E45/328, 329, 340-342, 344, Paterso

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 45/7286 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 45/7286? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.