NextMapsWA TenementsE 47/1329-I

E 47/1329-I

LiveExploration LicenceShire of East PilbaraWest Pilbara M.F. District
Area
19,840ha
Expired
June 2026
2 months ago
WAMEX reports
109
WA median is 53
Report drilling
59
of 109 reports
East Pilbara Explore on the live map

Register summary

Holder
Hamersley Iron Pty. Limited
Local government
Shire of East Pilbara
Application received
3 Nov 2003
Commenced
1 July 2005
Expiry
30 June 2026
Term
5 Years (Extended)

Exploration history on this ground

109 historical WAMEX exploration reports intersect E 47/1329-I: 18 report geochemistry or sampling, 68 include a digital data package.
When this ground was worked · 107 of 109 reports dated
11970s
41980s
161990s
272000s
482010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A153340 2026 Hancock Rdg Pty Ltd Marilana <1% E47/5018 (Lamb) Annual Report for the period ending 12/12/2025
A148533 2025 Ammm Resources Pty Ltd E47/4390 Mining Area C North 1 <1% Annual Report - Hope Downs North 2, E47/4390 for the period ending 08/08/2024.
A150008 2025 Ammm Resources Pty Ltd Mining Area C North 1 <1% Final Surrender - E47/4390 Mining Area C North 1 for the period ending 15/07/2025
A143019 2024 Fortescue Ltd Fig Tree <1% E47/3262 Fig Tree Final Surrender Report for the period 26 April 2018 to 8 April 2024
A136216 2023 Process Minerals International Pty Ltd Lamb Creek <1% Partial Surrender Report E47/3261 Lamb Creek for the period 10/07/2017 to 29/06/2023
104 more reports
A126550 2021 Fortescue Metals Group Ltd Fig Tree <1% E47/3161 Fig Tree Final Surrender Report for the period ending 28/1/2021
A127756 2021 Fmg Pilbara Pty Ltd Fig Tree <1% E47/3263 (Fig Tree) Final Surrender Report for the period 19/12/2017 to 31/05/2021
A122261 2020 Bhp Iron Ore Pty Ltd Tandanya <1% Combined Annual Report for Tandanya - C212/2011 - 1 January 2019 to 31 December 2019
A123704 2020 Bhp Iron Ore Pty Ltd Ministers Bridge 5.3% Annual Report for E47/628 - Ministers Bridge - 4 May 2019 to 2 May 2020
A124436 2020 Hamersley Iron Pty. Limited Leisker 95% Leisker Project Annual Report Exploration Licence 47/1329 (GDSR 7176) for the period ending 30/06/2020
A124823 2020 Process Minerals International Pty Ltd Lamb Creek <1% Annual Report E47/3261 Lamb Creek for the period 10/7/2019 to 9/7/2020
A121091 2019 Fortescue Metals Group Ltd Fig Tree <1% P47/1722 Fig Tree Final Surrender Report for the period 15 October 2014 to 1 August 2019
A118954 2019 Process Minerals International Pty Ltd Lamb Creek <1% M47/1468 Lamb Creek Final Surrender Report for the period 7 July 2017 to 6 December 2018
A121001 2019 Process Minerals International Pty Ltd Lamb Creek <1% E47/3261 Lamb Creek Annual for the period 10/7/2018 to 9/7/20119
A117921 2018 Process Minerals International Wedge - Lamb Creek <1% Annual Mineral Exploration Report for E47/3261 For the Period 10 July 2017 to 9 July 2018
A117934 2018 Process Minerals International Lamb Creek <1% Annual Mineral Exploration Report for M47/1468 Lamb Creek Project for the period 07/07/2017 - 06/07/2018
A110821 2017 Bhp Billiton Iron Ore Pty Ltd North Flank, Packsaddle, Western Ridge <1% Donated Drill Core – GE2403DG, GE2455DG, PSB0454DG, PSD1204DG, PSB0451DG, PSB0453DG, WSR1302RD
A112357 2017 Hamersley Iron Pty Limited Enterprise <1% Enterprise Project Annual Report Exploration Licence 47/1790 (GDSR 6558) for the period 18/02/2016 to 17/02/20
A110287 2016 Fortescue Metals Group Ltd Little Gap 5 <1% P47/1617 (Little Gap 5) Final Surrender Report for the period 29/06/2012 to 28/06/2016
A105216 2015 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Annual Report Ministers North E47/682 Reporting Period 4 May 2014 – 3 May 2015
A105867 2015 Polaris Metals Pty Ltd Central Pilbara <1% Central Pilbara Project C4/2013 Annual Report for the Period 1 February 2014 – 31 January 2015, M47/1359-I, M4
A106199 2015 Rio Tinto Iron Ore Leisker 95% Annual Report Exploration Licence 47/1329 Leisker Project for the period 1 July 2014 – 30 June 2015
A104791 2015 Bhp Billiton Iron Ore Tandanya - Area C West <1% Tandanya (Area C West) Project, Annual Report for the period 01/01/2014 to 31/12/2014, E47/1429, 1870, 1872, 1
A104862 2015 Rio Tinto Iron Ore Enterprise <1% Partial Surrender Report for E47/1790 (Enterprise) for the period 18 February 2009 – 21 January 2015
A105083 2015 Rio Tinto Iron Ore Enterprise <1% Enterprise Project Annual Report Exploration Licence 47/1790 for the period 18 February 2014 to 17 February 20
A105162 2015 Polaris Metals Pty Ltd Central Pilbara - Wedge <1% Central Pilbara Project E47/2366-I (Wedge Prospect) Final Surrender Report for the Period 6 February 2012 – 13
A105828 2015 Polaris Metals Pty Ltd Lamb Creek <1% Lamb Creek Project E47/1238-I Surrender Report for the period 17 Feb 2004 - 13 Feb 2015
A101741 2014 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Annual Report Ministers North E47/628 Reporting Period 4 May 2013 – 3 May 2014
A102255 2014 Polaris Metals Pty Ltd Central Pilbara <1% Combined – C004/2013 Annual Report for the period 1 February 2013 – 31 January 2014, E47/1236-I, E47/1238-I, E
A102763 2014 Atlas Iron Ltd Packsaddle <1% Packsaddle Project, Final Surrender Report for the period 17/12/2010 to 18/07/2014, E47/2113. [C38/2006]
A104683 2014 Fortescue Metals Group Ltd Fig Tree <1% Combined Mineral Exploration Report: Fig Tree Project, C24/2010 for the period 30 November 2013 to 29 November
A100614 2014 Bhp Billiton Iron Ore Tandanya - Area C West <1% ANNUAL REPORT COMBINED REPORTING #212/2011 Tandanya (Area C West) E47/1429, E47/1870, E47/1872, E47/1873, E47/
A101404 2014 Rio Tinto Iron Ore Enterprise <1% Enterprise Project E47/1790 Annual Report for 18 February 2013 to 17 February 2014
A102916 2014 Rio Tinto Iron Ore Leisker 95% Leisker Project, Annual Report for the period 01/07/2013 to 30/06/2014, E47/1329.
A96603 2013 Bhp Billiton Iron Ore Pty Ltd Tandanya - Area C West <1% ANNUAL REPORT COMBINED REPORTING #212/2011 Tandanya (Area C West) E47/1429 E47/1870 E47/1872 E47/1873 E47/1874
A100753 2013 Fortescue Metals Group Ltd Fig Tree <1% Annual Mineral Exploration Report: Fig Tree Project, C24/2010 for the period 30 November 2012 to 29 November 2
A97385 2013 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Annual Report Ministers North E47/628 Reporting period 4 May 2012 - 3 May 2013
A98330 2013 Process Minerals International Central Pilbara <1% Central Pilbara Project, Annual Report for the period 01/02/2012 to 31/01/2013, E47/1236, 1238 & 2366; M47/135
A98720 2013 Rio Tinto Iron Ore Leisker 95% Leisker Project E47/1329 Annual Report for the Period 1 July 2012 to 30 June 2013
A100523 2013 Atlas Iron Ltd Packsaddle <1% Packsaddle Project E47/2113 Annual Technical Report to the DMP 16 Dec 2013
A92557 2012 Bhp Billiton Iron Ore Pty Ltd Tandanya - Area C West <1% Combined Annual Report Tandanya (Area C West), Period 01 Jan 2011 – 31 Dec 2011, E47/1429, E47/1870, E47/1871,
A93070 2012 Rio Tinto Iron Ore Enterprise <1% Enterprise E47/1790, Annual Technical Report for Period 18/2/2011 to 17/2/2012
A93553 2012 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2011 to 16 February 2012
A93947 2012 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Annual Report Minister’s North E 47/628 Reporting period 4 May 2011 - 3 May 2012.
A94453 2012 Rio Tinto Iron Ore Leisker 95% Annual Technical Report for Leisker Project E47/1329 for the period 1 July 2011 – 30 June 2012
A96290 2012 Atlas Iron Ltd Packsaddle <1% Packsaddle Project Annual Report for E47/2113 for the period ending 16 December 2012.
A89630 2011 Rio Tinto Iron Ore Enterprise <1% Enterprise E47/1790, Annual Technical Report for the Period 18/2/2010 to 17/1/2011
A89688 2011 Bhp Billiton Iron Ore Pty Ltd E47/1429 <1% Annual report for the period 29 Jan 2010 to 28 Jan 2011, E47/1429
A89881 2011 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% Annual Report, C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2010 to Fe
A90807 2011 Rio Tinto Iron Ore Leisker 95% Leisker Project Area, Exploration Licence E47/1329. Annual Report for the Period 01/07/2010 to 30/06/2011
A90397 2011 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Ministers North Project, Annual Report for the period 4th May 2010 to 3rd May 2011, E47/628.
A92185 2011 Atlas Iron Ltd Packsaddle <1% Packsaddle Project E47/2113 Annual Technical Report to DMP Period Ending 16 December 2011
A87343 2010 Rio Tinto Exploration Pty Ltd Leisker East <1% Partial Surrender Report for the Period Ending 16 June 2010, E47/1330 Leisker East
A87379 2010 Rio Tinto Exploration Pty Ltd Leisker 57% Combined Annual Report (C5/2007 Leisker) for the Period 1 July 2009 to 30 June 2010, E47/1329 Leisker and E47/
A86209 2010 Rio Tinto Iron Ore Enterprise <1% ENTERPRISE E47/1790 - Annual Technical Report for the Period 18 February 2009 to 17 February 2010
A86725 2010 Iron Ore Holdings Ltd Marillana - Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2009 to February 2010, E4
A89003 2010 Bhp Billiton Iron Ore Pty Ltd Tandanya (Area C West) <1% Annual Report Tandanya (Area C West) E47/1873, Reporting period 20 November 2009 - 19 Novemeber 2010
A85844 2010 United Iron Pty Ltd Mount Wildflower <1% Mount Wildflower Project , Annual Report for the period 29/01/2009 to 29/01/2010, E47/1429.
A87013 2010 Bhp Billiton Iron Ore Pty Ltd Minister's North 5.3% Annual Report Minister's North E47/0628, Reporting period 4 May 2009 – 3 May 2010
A82525 2009 Bhp Billiton Iron Ore Pty Ltd MINISTER'S NORTH 5.3% ANNUAL REPORT MINISTER'S NORTH E 47/0628, Reporting period 4 May 2008 - 3 May 2009
A82190 2009 Iron Ore Holdings Ltd Marillana – Yandicoogina <1% C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2008 to February 2009.
A81584 2009 United Iron Pty Ltd MT WILDFLOWER <1% Mt WILDFLOWER PROJECT EXPLORATION LICENCE: E47/1429, ANNUAL GEOLOGICAL REPORT FOR THE PERIOD 29/01/2008 T0 29/
A83023 2009 Rio Tinto Exploration Pty Ltd Leisker East <1% Partial Surrender Report for the Period Ending 11 June 2009, E47/1330 Leisker East, Western Australia
A83024 2009 Rio Tinto Exploration Pty Ltd Leisker 57% Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the Period 1 July 2008 to
A77539 2008 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report - E47/1236-1239 Marillana- Yandicoogina Project - For the Period 17 February 2007 to 16 February
A78653 2008 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% ANNUAL REPORT MINISTER'S NORTH E47/0628 Reporting period 4 May 2007 - 3 May 2008
A79274 2008 Rio Tinto Exploration Pty Ltd Pilbara Iron Ore 57% Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the period 1 July 2007
A77715 2008 United Iron Pty Ltd Mount Wildflower <1% Mount Wildflower Project Exploration Licence: E47/1429 Annual Geological Report for the period 29/01/2007 to 2
A79442 2008 Rio Tinto Exploration Pty Ltd Enterprise <1% Combined Annual Report (C116/2004 Enterprise) For the Period 15 August 2007 to14 August 2008 E47/1158 Enterpri
A75963 2007 Rio Tinto Exploration Pty Ltd Enterprise North, Enterprise South <1% Combined Annual Report (C116/2004 Enterprise) For the Period 15 August 2006 to 14 August 2007, E47/1158 Enterp
A74794 2007 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report for Exploration Licences E47/1336 - 1239 Yandicoogina Project, for the Period 17 February 2006 t
A75818 2007 Rio Tinto Exploration Pty Ltd Leisker East 57% Annual Report (Combined Report C5/2007) E47/1329 Leisker, E47/1330 Leisker East 1 July 2006 to 30 June 2007 Pi
A75371 2007 Bhp Billiton Iron Ore Pty Ltd Minister's North 5.3% Annual Report Minister's North E47/0628 Reporting period 4 May 2006 - 3 May 2007
A72197 2006 Iron Ore Holdings Ltd Yandicoogina <1% Annual Report for Exploration licences E47/1236-1239, 17 February 2005 - 16 February 2006, (Yandicoogina Proje
A73183 2006 Rio Tinto Exploration Pty Ltd Enterprise North, Enterprise South <1% Combined Third Annual Report C116/2004 for the Period Ending 14 August 2006, E47/1158 and E47/1159, Enterprise
A73122 2006 Rio Tinto Exploration Pty Ltd Leisker East <1% First Annual Report for the Period Ending 30 June 2006, E47/1330 Leisker East, Pilbara Iron Ore Programme, Roy
A73121 2006 Rio Tinto Exploration Pty Ltd Leisker 95% Leisker Project, [1st] Annual Report for the period ending 30th June 2006, E47/1329.
A70246 2005 Iron Ore Holdings Ltd Yandi <1% Annual report for the period 17 February 2004 to 17 February 2005, E47/1236, E47/1237, E47/1238 and E47/1239,
A71160 2005 Rio Tinto Exploration Pty Ltd Enterprise <1% Second Annual Report for the Period Ending 14 August 2005 E47/1158 and E47/1159, Enterprise North and South, I
A68551 2004 Bhp Billiton Iron Ore Pty Ltd Minister's North 5.3% Annual report for the period 04/05/2003-03/05/2004 Minister's North Project E47/628
A69409 2004 Rio Tinto Exploration Pty Ltd Enterprise North and South <1% First annual report, for the period ending 14 August, 2004, E47/1158, E47/1159, Enterprise North and South Pr
A66067 2003 Bhp Billiton Iron Ore Pty Ltd Ministers North 5.3% Annual Report for the period 4 May 2002 to 3 May 2003 Minister's North E47/628.
A64679 2002 Bhp Billiton Iron Ore Pty Ltd Mount Goldsworthy 5.3% Annual Report Ministers North E47/628 Period 4 May 2001 To 3 May 2002.
A59664 2000 Bhp Iron Ore Pty Ltd Mac North 80% Annual Report, E47/629, Mac North project, Lamb Creek Period 04/05/1999 to 03/05/2000.
A62228 2000 Bhp Iron Ore Pty Ltd Ministers North 42% Annual Report E47/628 Ministers North, E47/629 Lamb Creek period 4 May 2000 to 3 May 2001.
A62348 2000 Bhp Iron Ore Pty Ltd Lamb Creek 80% Lamb Creek Project, Final Surrender Report for the period 04/05/1993 to 03/05/2001,E47/629.
A57498 1998 Bhp Iron Ore Pty Ltd Mac North 42% Annual Report Mac North Project. E47/628-629. Period 04/05/98-03/05/99.
A54184 1998 Bhp Iron Ore Pty Ltd Ministers North 42% Annual Report, Ministers North E47/628, Lamb Creek E47/629 04/05/97 - 03/05/98
A54758 1998 Hamersley Iron Pty Ltd Mingah Yard 11% Mingah Yard, Exploration Licence E47/620 Surrender Report, May 1998.
A50758 1997 Hamersley Iron Pty Ltd Lamb Creek 20% Lamb Creek Project, Surrender Report, Exploration Licence E47/724, March 1997.
A51121 1997 Hamersley Iron Pty Ltd Mingah Yard 11% Mingah Yard Project, Annual Report Exploration Licence E47/620 for the period 01/04/1996 to 31/03/1997.
A51676 1997 Bhp Iron Ore Pty Ltd Ministers North / Lamb Creek 42% Second Compulsory Surrender Report, Ministers North E47/628, Lamb CreekE47/629 for the period 4th May 1993 to
A51677 1997 Bhp Iron Ore Pty Ltd Ministers North 42% Annual report Period 4 May 1996 to 3 May 1997 Ministers North E47/629 Lamb Creek E47/629 BHP Iron Ore Pty Ltd
A47744 1996 Bhp Iron Ore Pty Ltd Mount Goldsworthy Area C and Mudlark Wel 42% Annual report Period 4 May 1995 to 3 May 1996 Ministers North E47/628 Lamb Creek E47/629 BHP Iron Ore Pty Ltd
A47988 1996 Hamersley Iron Pty Ltd Mingah Yard 11% Mingah Yard Project, Annual Report for the period 02/04/1995 to 01/04/1996, E47/620.
A48110 1996 Bhp Iron Ore Pty Ltd Ministers North / Lamb Creek 42% Ministers North / Lamb Creek Project, Partial Surrender Report for the period 4th May 1993 to 3rd May 1996, E4
A44612 1995 Hamersley Iron Pty Ltd Mingah Yard 11% Mingah Yard Project, Annual Report Exploration Licence E47/620, April 1995.
A40865 1994 Hamersley Iron Pty Ltd Rhodes Ridge- Mingah Yard 11% Rhodes Ridge - Mingah Yard Project, Annual Report for the period 1st April 1993 to 31st March 1994, E47/620.
A41062 1994 Bhp Iron Ore Pty Ltd Area C North 42% Annual Report for the Period 04/05/93 to 03/05/94 Ministers North / Lamb Creek E47/628, E47/629 BHP Iron Ore P
A43947 1994 Bhp Iron Ore Pty Ltd Ministers North 42% Annual report period 4 May 1994 to 3 May 1995 Ministers North E47/628 Lamb Creek E47/629
A35543 1992 Bhp Iron Ore Pty Ltd Mining Area C and Mudlark Well iron ore 11% Exploration status report Mining Area 'C' TR3156H (TR70/3156) May 1992 BHP Iron Ore
A33354 1991 Bhp Iron Ore Pty Ltd Mount Goldsworthy 11% Exploration status report. Mining area 'C' 04/91 TR3156H (TR70/3156) BHP Iron Ore
A20508 1987 Goldsworthy Mining Ltd Nimingarra 10% Nimingarra Project, Non-statutory Report[s]: Quarterly Reports covering the period 01/01/1987 to 31/03/1987,TR
A17480 1986 North Flinders Mines Ltd Newman - Turee Creek 11% Newman - Turee Creek Project, Exploration Report for Quarterly Period ended 31st March 1986, TR70/3156H.
A14967 1985 Goldsworthy Mining Ltd Goldsworthy 8.2% Goldsworthy Project, Annual Report for the year ending December 31st 1984, TR703156H & E47/13-17.
A17088 1985 Goldsworthy Mining Ltd Goldsworthy 11% Goldsworthy Project, Annual Report for the year ending 31/12/1985, TR70/3156H.[Weeli Wolli Springs]
A968 1972 Western Mining Corporation Ltd Menzies - Comet Vale - Ora Banda <1% Menzies - Comet Vale - Ora Banda Project, Non-statutory Report:
A22483 1753 Goldsworthy Mining Ltd Mining Area C 11% Annual Exploration Report for year ending 31/12/87 Temporary Reserve T.R. 3156H Mining area 'C' Iron Ore (Mt G
A97133 1753 Rio Tinto Iron Ore Enterprise <1% Enterprise E47/1790, Annual Technical Report for Period 18/02/2012 to 17/02/2013
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
Past expiry date · 30 June 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 47/1329-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 47/1329-I? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.