E 47/1790-I
Register summary
- Holder
- Hamersley Iron Pty. Limited
- Local government
- Shire of East Pilbara, Shire of Ashburton
- Application received
- 17 Jan 2007
- Commenced
- 18 Feb 2009
- Expiry
- 17 Feb 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154462 | 2026 | Fortescue Ltd | Fig Tree | <1% | E47/3280 Fig Tree Final Surrender Report for the period ending 25/03/2026. (C24/2010) |
| A143019 | 2024 | Fortescue Ltd | Fig Tree | <1% | E47/3262 Fig Tree Final Surrender Report for the period 26 April 2018 to 8 April 2024 |
| A136216 | 2023 | Process Minerals International Pty Ltd | Lamb Creek | <1% | Partial Surrender Report E47/3261 Lamb Creek for the period 10/07/2017 to 29/06/2023 |
| A129578 | 2022 | Bhp Iron Ore Ltd | Tandanya | <1% | Partial Surrender Report for Period 16th November 2015 to 15th November 2021 |
| A129150 | 2021 | Hamersley Iron Pty. Limited | Enterprise North | <1% | Enterprise North Surrender Report Exploration Licence 47/4048 for the period 30 August 2018 to 7 December 2021 |
121 more reports
| A122261 | 2020 | Bhp Iron Ore Pty Ltd | Tandanya | <1% | Combined Annual Report for Tandanya - C212/2011 - 1 January 2019 to 31 December 2019 |
| A124436 | 2020 | Hamersley Iron Pty. Limited | Leisker | <1% | Leisker Project Annual Report Exploration Licence 47/1329 (GDSR 7176) for the period ending 30/06/2020 |
| A124823 | 2020 | Process Minerals International Pty Ltd | Lamb Creek | <1% | Annual Report E47/3261 Lamb Creek for the period 10/7/2019 to 9/7/2020 |
| A118954 | 2019 | Process Minerals International Pty Ltd | Lamb Creek | <1% | M47/1468 Lamb Creek Final Surrender Report for the period 7 July 2017 to 6 December 2018 |
| A121001 | 2019 | Process Minerals International Pty Ltd | Lamb Creek | <1% | E47/3261 Lamb Creek Annual for the period 10/7/2018 to 9/7/20119 |
| A121654 | 2019 | Fmg Pilbara Pty Ltd | Fig Tree | <1% | E47/3280 - C24/2010 Fig Tree Partial Surrender Report for the period 14 January 2016 to 23 October 2019 |
| A117839 | 2018 | Fortescue Metals Group Ltd | Fig Tree | <1% | E 47/01614 Fig Tree Final Surrender Report For the Period 18 January 2008 to 3 July 2018 |
| A117687 | 2018 | Fortescue Metals Group Ltd | Fig Tree | <1% | C24/2010 Fig Tree Partial Surrender, 29 July 2009 - 27 June 2018 |
| A117921 | 2018 | Process Minerals International | Wedge - Lamb Creek | <1% | Annual Mineral Exploration Report for E47/3261 For the Period 10 July 2017 to 9 July 2018 |
| A117934 | 2018 | Process Minerals International | Lamb Creek | <1% | Annual Mineral Exploration Report for M47/1468 Lamb Creek Project for the period 07/07/2017 - 06/07/2018 |
| A112357 | 2017 | Hamersley Iron Pty Limited | Enterprise | 56% | Enterprise Project Annual Report Exploration Licence 47/1790 (GDSR 6558) for the period 18/02/2016 to 17/02/20 |
| A107670 | 2016 | Fortescue Metals Group Ltd | Juna Downs | <1% | E47/1927 (Juna Downs) Partial Surrender Report for the period 29/07/2009 to 28/07/2015 |
| A105867 | 2015 | Polaris Metals Pty Ltd | Central Pilbara | <1% | Central Pilbara Project C4/2013 Annual Report for the Period 1 February 2014 – 31 January 2015, M47/1359-I, M4 |
| A106199 | 2015 | Rio Tinto Iron Ore | Leisker | <1% | Annual Report Exploration Licence 47/1329 Leisker Project for the period 1 July 2014 – 30 June 2015 |
| A104758 | 2015 | Hancock Prospecting Pty Ltd | Juna Downs | <1% | Surrender Report Juna Downs Project Combined Group C77/2012 E47/1819, P47/1539 and P47/1540 for the period 22 |
| A104791 | 2015 | Bhp Billiton Iron Ore | Tandanya - Area C West | <1% | Tandanya (Area C West) Project, Annual Report for the period 01/01/2014 to 31/12/2014, E47/1429, 1870, 1872, 1 |
| A104803 | 2015 | Rio Tinto Iron Ore | Mount Windell | <1% | Mount Windell Project Area Combined Annual Report Exploration Licences 47/641 & 47/1243 (C34/2007) for the per |
| A104862 | 2015 | Rio Tinto Iron Ore | Enterprise | 56% | Partial Surrender Report for E47/1790 (Enterprise) for the period 18 February 2009 – 21 January 2015 |
| A105083 | 2015 | Rio Tinto Iron Ore | Enterprise | 56% | Enterprise Project Annual Report Exploration Licence 47/1790 for the period 18 February 2014 to 17 February 20 |
| A105828 | 2015 | Polaris Metals Pty Ltd | Lamb Creek | <1% | Lamb Creek Project E47/1238-I Surrender Report for the period 17 Feb 2004 - 13 Feb 2015 |
| A102255 | 2014 | Polaris Metals Pty Ltd | Central Pilbara | <1% | Combined – C004/2013 Annual Report for the period 1 February 2013 – 31 January 2014, E47/1236-I, E47/1238-I, E |
| A104683 | 2014 | Fortescue Metals Group Ltd | Fig Tree | <1% | Combined Mineral Exploration Report: Fig Tree Project, C24/2010 for the period 30 November 2013 to 29 November |
| A100614 | 2014 | Bhp Billiton Iron Ore | Tandanya - Area C West | <1% | ANNUAL REPORT COMBINED REPORTING #212/2011 Tandanya (Area C West) E47/1429, E47/1870, E47/1872, E47/1873, E47/ |
| A101140 | 2014 | Hancock Prospecting Pty Ltd | Juna Downs | <1% | Juna Downs Project, Annual Report for the period 22/12/2012 to 21/12/2013, E47/1819; P47/1539 & 1540. [C77/201 |
| A101404 | 2014 | Rio Tinto Iron Ore | Enterprise | 56% | Enterprise Project E47/1790 Annual Report for 18 February 2013 to 17 February 2014 |
| A102916 | 2014 | Rio Tinto Iron Ore | Leisker | <1% | Leisker Project, Annual Report for the period 01/07/2013 to 30/06/2014, E47/1329. |
| A96603 | 2013 | Bhp Billiton Iron Ore Pty Ltd | Tandanya - Area C West | <1% | ANNUAL REPORT COMBINED REPORTING #212/2011 Tandanya (Area C West) E47/1429 E47/1870 E47/1872 E47/1873 E47/1874 |
| A100753 | 2013 | Fortescue Metals Group Ltd | Fig Tree | <1% | Annual Mineral Exploration Report: Fig Tree Project, C24/2010 for the period 30 November 2012 to 29 November 2 |
| A97116 | 2013 | Hancock Prospecting Pty Ltd | Juna Downs | <1% | Juna Downs Project Combined Annual Report Combined Reporting Group C77/2012 Juna Downs For the Year Ending 21 |
| A97393 | 2013 | Fortescue Metals Group Ltd | Perishing | <1% | Annual Report for the period 18th January 2012 to 17th January 2013, Perishing Project C16/2009, E47/1613, E47 |
| A98330 | 2013 | Process Minerals International | Central Pilbara | <1% | Central Pilbara Project, Annual Report for the period 01/02/2012 to 31/01/2013, E47/1236, 1238 & 2366; M47/135 |
| A98720 | 2013 | Rio Tinto Iron Ore | Leisker | <1% | Leisker Project E47/1329 Annual Report for the Period 1 July 2012 to 30 June 2013 |
| A92557 | 2012 | Bhp Billiton Iron Ore Pty Ltd | Tandanya - Area C West | <1% | Combined Annual Report Tandanya (Area C West), Period 01 Jan 2011 – 31 Dec 2011, E47/1429, E47/1870, E47/1871, |
| A92573 | 2012 | Hancock Prospecting Pty Ltd | Juna Downs | <1% | E47/1819 Juna Downs Project 2010 Annual Report For the Year Ending 21 December 2011 |
| A92590 | 2012 | Royal Resources Ltd | Enterprise | <1% | Enterprise Project, Annual Report for the period 18th January 2011 to 17th January 2012, E47/1613-1614 & 1927. |
| A92806 | 2012 | Rio Tinto Iron Ore | Mount Windell | <1% | Mount Windell Project Area E47/641, E47/1243 (C34/2007). Annual Technical Report for the Period 22/1/2011 to 2 |
| A93070 | 2012 | Rio Tinto Iron Ore | Enterprise | 56% | Enterprise E47/1790, Annual Technical Report for Period 18/2/2011 to 17/2/2012 |
| A93553 | 2012 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2011 to 16 February 2012 |
| A96844 | 2012 | Rio Tinto Iron Ore | Mount Windell | <1% | MOUNT WINDELL PROJECT AREA COMBINED ANNUAL TECHNICAL REPORT C34/2007 EXPLORATION LICENCELICENCES 47/641, 47/12 |
| A94453 | 2012 | Rio Tinto Iron Ore | Leisker | <1% | Annual Technical Report for Leisker Project E47/1329 for the period 1 July 2011 – 30 June 2012 |
| A89005 | 2011 | Hancock Prospecting Pty Ltd | Juna Downs | <1% | Juna Downs Project, Annual Report for the year ending 21st December 2010, E47/1819. |
| A89313 | 2011 | Rio Tinto Iron Ore | Mount Windell | <1% | Mount Windell Project Area E47/641, E47/1243 (C034/2007). Annual Technical Report for the Period 22/1/2010 to |
| A89628 | 2011 | Royal Resources Ltd | Marillana Bridge, Perishing and Yarrintr | <1% | Annual Combined Report, Marillana Bridge, Perishing and Yarrintree Project E47/1613, E47/1614, E47/1927 (C16/2 |
| A89630 | 2011 | Rio Tinto Iron Ore | Enterprise | 56% | Enterprise E47/1790, Annual Technical Report for the Period 18/2/2010 to 17/1/2011 |
| A89688 | 2011 | Bhp Billiton Iron Ore Pty Ltd | E47/1429 | <1% | Annual report for the period 29 Jan 2010 to 28 Jan 2011, E47/1429 |
| A89881 | 2011 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | Annual Report, C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2010 to Fe |
| A91538 | 2011 | Royal Resources Ltd | Yarintree | <1% | Drilling Collaborative Final Report Yarintree Project: E47/1927 Western Australia (Round 2) |
| A90807 | 2011 | Rio Tinto Iron Ore | Leisker | <1% | Leisker Project Area, Exploration Licence E47/1329. Annual Report for the Period 01/07/2010 to 30/06/2011 |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | Mesa J - Yandi Junction - Mesa A - Bunga | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me |
| A87379 | 2010 | Rio Tinto Exploration Pty Ltd | Leisker | <1% | Combined Annual Report (C5/2007 Leisker) for the Period 1 July 2009 to 30 June 2010, E47/1329 Leisker and E47/ |
| A86209 | 2010 | Rio Tinto Iron Ore | Enterprise | 56% | ENTERPRISE E47/1790 - Annual Technical Report for the Period 18 February 2009 to 17 February 2010 |
| A86725 | 2010 | Iron Ore Holdings Ltd | Marillana - Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2009 to February 2010, E4 |
| A85628 | 2010 | Royal Resources Ltd | Marillana Bridge - Perishing - Yarrintre | <1% | Annual Combined Report, Marillana Bridge, Perishing and Yarrintree Projects, E47/1613, E47/1614, E47/1927 (C16 |
| A85844 | 2010 | United Iron Pty Ltd | Mount Wildflower | <1% | Mount Wildflower Project , Annual Report for the period 29/01/2009 to 29/01/2010, E47/1429. |
| A85910 | 2010 | Rio Tinto Iron Ore | Mount Windell | <1% | Mount Windell Project Area (Combined) Annual Technical Report E47/641, E47/1243 and P47/1294 (C34/2007) West P |
| A81106 | 2009 | Rio Tinto Iron Ore | MOUNT WINDELL | <1% | MOUNT WINDELL PROJECT AREA (COMBINED) ANNUAL TECHNICAL REPORT EXPLORATION & PROSPECTING LICENCES E47/641, E47/ |
| A82190 | 2009 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2008 to February 2009. |
| A81064 | 2009 | Royal Resources Ltd | Marillana Bridge/ Perishing | <1% | ANNUAL COMBINED REPORT Marillana Bridge and Perishing Project E47/1613, E47/1614 (C16/2009) |
| A81584 | 2009 | United Iron Pty Ltd | MT WILDFLOWER | <1% | Mt WILDFLOWER PROJECT EXPLORATION LICENCE: E47/1429, ANNUAL GEOLOGICAL REPORT FOR THE PERIOD 29/01/2008 T0 29/ |
| A83024 | 2009 | Rio Tinto Exploration Pty Ltd | Leisker | <1% | Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the Period 1 July 2008 to |
| A77331 | 2008 | Hamersley Iron Pty Ltd | Mount Windell | <1% | Mount Windell Project Area EXPLORATION LICENCES E47/641 and E47/1243 COMBINED ANNUAL REPORT FOR THE YEAR ENDIN |
| A77539 | 2008 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report - E47/1236-1239 Marillana- Yandicoogina Project - For the Period 17 February 2007 to 16 February |
| A79274 | 2008 | Rio Tinto Exploration Pty Ltd | Pilbara Iron Ore | <1% | Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the period 1 July 2007 |
| A77715 | 2008 | United Iron Pty Ltd | Mount Wildflower | <1% | Mount Wildflower Project Exploration Licence: E47/1429 Annual Geological Report for the period 29/01/2007 to 2 |
| A79442 | 2008 | Rio Tinto Exploration Pty Ltd | Enterprise | 50% | Combined Annual Report (C116/2004 Enterprise) For the Period 15 August 2007 to14 August 2008 E47/1158 Enterpri |
| A74319 | 2007 | Hamersley Iron Pty Ltd | Windell East | <1% | Third Annual Report for the Period Ending 21 January 2007, E47/1243 Windell East, (GDSR No. 4853, Roy Hill). |
| A75963 | 2007 | Rio Tinto Exploration Pty Ltd | Enterprise North, Enterprise South | 50% | Combined Annual Report (C116/2004 Enterprise) For the Period 15 August 2006 to 14 August 2007, E47/1158 Enterp |
| A76701 | 2007 | Hamersley Iron Pty Ltd | Mount Windell East | <1% | Exploration licence E47/1243, Mt. Windell East, (Reporting group C34/2007) Partial Surrender Report - November |
| A74794 | 2007 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report for Exploration Licences E47/1336 - 1239 Yandicoogina Project, for the Period 17 February 2006 t |
| A75818 | 2007 | Rio Tinto Exploration Pty Ltd | Leisker East | <1% | Annual Report (Combined Report C5/2007) E47/1329 Leisker, E47/1330 Leisker East 1 July 2006 to 30 June 2007 Pi |
| A72197 | 2006 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report for Exploration licences E47/1236-1239, 17 February 2005 - 16 February 2006, (Yandicoogina Proje |
| A71865 | 2006 | Hamersley Exp Pty Ltd | Mount Windell | <1% | Mt Windell East, Exploration Licence E47/1243, West Pilbara Mineral Field, Western Australia, Annual report fo |
| A73183 | 2006 | Rio Tinto Exploration Pty Ltd | Enterprise North, Enterprise South | 50% | Combined Third Annual Report C116/2004 for the Period Ending 14 August 2006, E47/1158 and E47/1159, Enterprise |
| A73654 | 2006 | Hallmark Minerals Nl | Yandicoogina | <1% | (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, Western Australia, Annual report for the |
| A73121 | 2006 | Rio Tinto Exploration Pty Ltd | Leisker | <1% | Leisker Project, [1st] Annual Report for the period ending 30th June 2006, E47/1329. |
| A70246 | 2005 | Iron Ore Holdings Ltd | Yandi | <1% | Annual report for the period 17 February 2004 to 17 February 2005, E47/1236, E47/1237, E47/1238 and E47/1239, |
| A70281 | 2005 | Rio Tinto Exploration Pty Ltd | Mount Windell iron ore exploration | <1% | First annual report for the period ending 21 March 2004, E47/1243, Mount Windell East, Iron Ore Programme, Ro |
| A71160 | 2005 | Rio Tinto Exploration Pty Ltd | Enterprise | 50% | Second Annual Report for the Period Ending 14 August 2005 E47/1158 and E47/1159, Enterprise North and South, I |
| A69409 | 2004 | Rio Tinto Exploration Pty Ltd | Enterprise North and South | 50% | First annual report, for the period ending 14 August, 2004, E47/1158, E47/1159, Enterprise North and South Pr |
| A65066 | 2002 | Robe River Mining Co Pty Ltd | Marillana | <1% | Surrender Report for Tenements E47/796 E47/801, E47/802 Marillana Project Area Our Ref: 1751 DOMPR Ref: C266/1 |
| A62958 | 2001 | Robe River Mining Co Pty Ltd | Marillana | <1% | Marillana Project M10197/1 Annual Report for E47/796, E47/801 and E47/802 For the Period 10/6/2000 - 9/6/2001. |
| A60400 | 2000 | Csr Ltd | Yandicoogina | <1% | The Yandicoogina Project Exploration History and Geological Review 1971 to 1981 EMR72/82 (TR70/5259 TR70/6501 |
| A60715 | 2000 | Csr Ltd | Yandicoogina | <1% | Yandicoogina Iron Ore Project Summary (1983, E47/4 to E47/12 TR70/5201 TR70/5259 TR70/5603 to TR70/5604 TR70/6 |
| A60638 | 2000 | Csr Ltd | Yandicoogina | <1% | CSR Ltd. Yandicoogina Prospect. |
| A60901 | 2000 | Robe River Mining Co Pty Ltd | Marillana | <1% | Marillana Proejct Annual Reprot for E47/796 E45/801 and E47/ 802 for the period 10/06/1999 - 9/6/2000. |
| A59397 | 1999 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, WA, Annual Report for the Period 14/10/1 |
| A58754 | 1999 | Robe River Mining Co Pty Ltd | Marillana | <1% | Marillana Project Annual Report for E47/796, E47/801 and E47/802. 10 June 1998 - 9 June 1999. Ref: 1416. |
| A54758 | 1998 | Hamersley Iron Pty Ltd | Mingah Yard | 32% | Mingah Yard, Exploration Licence E47/620 Surrender Report, May 1998. |
| A55419 | 1998 | Robe River Mining Co Pty Ltd | Marillana | <1% | Marillana Project Annual Report for E47/796, E47/801 and E47/802. 10 June 1997 - 9 June 1998. Ref: 1312. |
| A56742 | 1998 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | (HIY) Yandicoogina, Mining Lease ML 274SA West Pilbara Mineral Field W.A. Annual Report 14/10/97 - 13/10/98 |
| A51875 | 1997 | Robe River Mining Co Pty Ltd | Marillana | <1% | Marillana Project Annual Report for E47/796, E47/801 and E47/802. 10 June 1996 - 9 June 1997. Ref: 1181. |
| A51121 | 1997 | Hamersley Iron Pty Ltd | Mingah Yard | 32% | Mingah Yard Project, Annual Report Exploration Licence E47/620 for the period 01/04/1996 to 31/03/1997. |
| A53188 | 1997 | Hamersley Iron Pty Ltd | Yandicoogina Project | <1% | Annual Report (Combined Mineral Exploration Report), Yandicoogina Project Area - Exploration Licence: 47/4 - |
| A47988 | 1996 | Hamersley Iron Pty Ltd | Mingah Yard | 32% | Mingah Yard Project, Annual Report for the period 02/04/1995 to 01/04/1996, E47/620. |
| A44612 | 1995 | Hamersley Iron Pty Ltd | Mingah Yard | 32% | Mingah Yard Project, Annual Report Exploration Licence E47/620, April 1995. |
| A40865 | 1994 | Hamersley Iron Pty Ltd | Rhodes Ridge- Mingah Yard | 32% | Rhodes Ridge - Mingah Yard Project, Annual Report for the period 1st April 1993 to 31st March 1994, E47/620. |
| A43088 | 1994 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Yandicoolgina Project , Annual Report for the period 8th June 1993 to 7th June 1994, E47/4-12. |
| A38853 | 1993 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report for the period 08/06/92-07/06/93 Yandicoogina Project E47/4-12 |
| A35543 | 1992 | Bhp Iron Ore Pty Ltd | Mining Area C and Mudlark Well iron ore | <1% | Exploration status report Mining Area 'C' TR3156H (TR70/3156) May 1992 BHP Iron Ore |
| A33354 | 1991 | Bhp Iron Ore Pty Ltd | Mount Goldsworthy | <1% | Exploration status report. Mining area 'C' 04/91 TR3156H (TR70/3156) BHP Iron Ore |
| A20508 | 1987 | Goldsworthy Mining Ltd | Nimingarra | <1% | Nimingarra Project, Non-statutory Report[s]: Quarterly Reports covering the period 01/01/1987 to 31/03/1987,TR |
| A17480 | 1986 | North Flinders Mines Ltd | Newman - Turee Creek | <1% | Newman - Turee Creek Project, Exploration Report for Quarterly Period ended 31st March 1986, TR70/3156H. |
| A18058 | 1986 | Csr Ltd | Yandicoogina | <1% | Annual report Exploration Licences E47/4 to E47/12 Yandicoogina Project, Pilbara Region, Western Australia for |
| A14967 | 1985 | Goldsworthy Mining Ltd | Goldsworthy | <1% | Goldsworthy Project, Annual Report for the year ending December 31st 1984, TR703156H & E47/13-17. |
| A17088 | 1985 | Goldsworthy Mining Ltd | Goldsworthy | <1% | Goldsworthy Project, Annual Report for the year ending 31/12/1985, TR70/3156H.[Weeli Wolli Springs] |
| A15302 | 1985 | Csr Ltd | Yandicoogina | <1% | Annual report Exploration Licence E47/4 to E47/12 Yandicoogina Project Pilbara Region Western Australia for th |
| A15303 | 1985 | Csr Ltd | Yandicoogina | <1% | Yandicoogina Project, Non-statutory Report:Paper presented to the Fourth International Iron Ore Symposium, Rom |
| A9300 | 1980 | Dampier Mining Co Ltd | Windell - Marillana Creek | 33% | Windell - Marillana Creek Project, Annual & Final Surrender Report[s], August 1980, TR70/6993H [ Marillana Cr |
| A5557 | 1975 | Pacminex Pty Ltd | Yandicoogina | 6% | Completion Report on Exploration for Iron Ore, Temporary reserve 560H, Yandicoogina Prospect, Hamersley Distri |
| A4570 | 1974 | Pacminex Pty Ltd | Yandicoogina | 6% | Yandicoogina Project, Non-statutory Report: Exploration Report for the period ending 30/04/1974, TR70/5602H. |
| A5212 | 1974 | Pacminex Pty Ltd | Yandicoogina | 6% | Yandicoogina Project, Annual Report for the year ending 31st July 1974, TR70/5602H. |
| A3197 | 1972 | Pacminex Pty Ltd | Roy Hill | 2.1% | Roy Hill Project, Non-statutory Report: Report on Geological Exploration, October 1972, TR70/ 5602-5604H. |
| A2373 | 1972 | Pacmin Tarmoola Operations Pty Ltd | Roy Hill | 2.8% | Roy Hill Project, Annual Report for the period ending 31/12/1971, TR70/5261-5275H. |
| A968 | 1972 | Western Mining Corporation Ltd | Menzies - Comet Vale - Ora Banda | <1% | Menzies - Comet Vale - Ora Banda Project, Non-statutory Report: |
| A1379 | 1970 | Pacminex Pty Ltd | Hamersley | <1% | Temporary Reserves for iron ore West Pilbara and Peak Hill Goldfields. Report for the quarter ended 30th June, |
| A22483 | 1753 | Goldsworthy Mining Ltd | Mining Area C | <1% | Annual Exploration Report for year ending 31/12/87 Temporary Reserve T.R. 3156H Mining area 'C' Iron Ore (Mt G |
| A97133 | 1753 | Rio Tinto Iron Ore | Enterprise | 56% | Enterprise E47/1790, Annual Technical Report for Period 18/02/2012 to 17/02/2013 |
| A101089 | 1753 | Rio Tinto Iron Ore | Mount Windell | <1% | Mount Windell Project, Annual Report for the period 22/01/2013m to 21/01/2014, E47/641 & 1243. [C34/2007] |
| A46438 | 1753 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report Yandicoogina Project Area Exploration Licences E47/4 to E47/12 8 June 1994 to 7 June 1995 Minera |
| A49724 | 1753 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report Yandicoogina Project Area Exploration Licence E47/4 to E47/12 Reporting period 8 June 1995 to 7 |
| A151811 | Hamersley Iron Pty Ltd | Yandi Braid | <1% | Donated hole geology DD15YBBR0002 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 6 months · 17 Feb 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 47/1790-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 47/1790-I? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.