NextMaps›WA Tenements›E 51/2355

E 51/2355

PendingExploration LicenceShire of MeekatharraMeekatharra District

E 51/2355 is a pending exploration licence in the Shire of Meekatharra, Western Australia, applied for by Yerrida Co Pty Ltd. The application was received on 22 July 2026 and is awaiting a decision. The ground is covered by 69 historical WAMEX reports.

Area
7,687.148ha
Applied
July 2026
3 months ago
WAMEX reports
69
WA median is 53
Report drilling
36
of 69 reports
Free Tenure Pack for E 51/2355
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 51/2355 that covers 69 WAMEX reports · 1 open-file drillhole (20 m drilled) · 19 earlier titles on the ground since 1958 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Meekatharra Explore on the live map

Register summary

Holder
Yerrida Co Pty Ltd
Local government
Shire of Meekatharra
Application received
22 July 2026

The full record on E 51/2355

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Dealings, mortgages, caveats and transfer history
See Premium

Exploration history on this ground

69 historical WAMEX exploration reports intersect E 51/2355: 34 report geochemistry or sampling, 55 include a digital data package.
Work on record: Soil sampling 18 · Aircore drilling 16 · RC drilling 15 · Diamond drilling 11 · Rock chip sampling 11 · Aerial magnetic surveys 10. Resource declared in A121382 (2019), A116164 (2018), A115023 (2017), A112435 (2017) and 1 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 51/2355, free for new accounts.
When this ground was worked · 68 of 69 reports dated
81990s
82000s
332010s
192020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A153469 2026 Yerrida Co Pty Ltd Yerrida <1% E51/1920 and E51/1921 Partial Surrender Report for the period ending 15/12/2025
A148295 2025 Yerrida Co Pty Ltd Mirage Extension 26% E51/1897 Partial Surrender Report Mirage Extension for the period ending 07/02/2025.
A142827 2024 Mistletoe Mining Pty Ltd Mistletoe <1% Final Surrender Report Mistletoe Project C100/2020 for the period ending 12/04/2024
A143154 2024 Yerrida Co Pty Ltd Killara <1% E51/2016 Annual Report for the period ending 07/06/2024
A144913 2024 Meeka Metals Ltd Andy Well <1% E51/1596 Final Surrender Report Andy Well Project for the period ending 07/10/2024.
64 more reports
A139128 2024 Mistletoe Mining Pty Ltd Mistletoe <1% Final Surrender Report for E 51/1491 Mistletoe Project for the period ending 06/12/2023. (C100/2020)
A133483 2023 Gold Road Resources Limited Yerrida 10% Annual Report for Tenement E51/2040 Yerrida Project for the period ending 17/10/2022
A135104 2023 Mistletoe Mining Pty Ltd Mistletoe <1% Combined Annual Report (C100/2020) Mistletoe Project for the period ending 31/12/2022. E 51/1491,E 51/1894,E 5
A136175 2023 Gold Road Resources Limited Yerrida <1% Yerrida E51/2016 Annual Report for the period ending 8/6/2023
A137868 2023 Yerrida Co Pty Ltd Yerrida 10% Annual Report for E51/2040 Yerrida Project for the period ending 17/10/2023
A130160 2022 Mistletoe Mining Pty Ltd Mistletoe <1% Combined Annual Report C100/2020 Mistletoe Project for the period ending 31/12/2021
A131649 2022 Yandan Gold Mines Pty Ltd E51/2016 <1% E51/2016 Annual Report for the period ending 07/06/2022.
A126641 2021 Mistletoe Mining Pty Ltd Mistletoe <1% Combined Annual Report C100/2020 Mistletoe Project, 1 January 2020 to 31 December 2020
A122739 2020 Mistletoe Mining Pty Ltd Mistletoe <1% Annual Report for Mistletoe E 51/1491 for the period 16 December 2018 to 15 December 2019
A123303 2020 Yandan Gold Mines Pty Ltd Bocky Bore 26% Bocky Bore 2019 Annual Report, E51/1897, 8 February 2019 to 7 February 2020
A123511 2020 Silver Lake Resources Limited Andy Well <1% Andy Well Combined Annual Report for year ending 31/12/2019, C48/2013
A125298 2020 Silver Lake (Doray) Pty Ltd Gnaweeda 3.1% Gnaweeda Project C46/2005 Annual Technical Report for the period ending 30 July 2020
A125709 2020 Andy Well Mining Pty Ltd Andy Well <1% Andy Well E51/1596 Partial Surrender Report for the period 8 October 2014 to 7 October 2020
A122580 2020 Greenrock Gold Pty Ltd East Gnaweeda 17% Final Surrender Report for East Gnaweeda Project E51/01651 For the Period 1 September 2015 to 28 August 2019
A118995 2019 Mistletoe Mining Pty Ltd Mistletoe <1% Annual Report for Mistletoe E51/1491 for the period 6 November 2017 to 15 November 2018
A121382 2019 Silver Lake (Doray) Pty Ltd Gnaweeda 3.1% Gnaweeda Project C46/2005 Annual Techncal Report for the period 31 July 2018 to 30 July 2019, E51/00926, E51/0
A119518 2019 Doray Minerals Limited Andy Well <1% Meekatharra North, Andy Well Project Combined Report C48/2013 For the Period 1 January 2018 to 31 December 201
A115852 2018 Mistletoe Mining Pty Ltd Mistletoe <1% MISTLETOE PROJECT, E51/1491, ANNUAL TECHNICAL REPORT FOR 16/12/2016 TO 15/12/2017
A116131 2018 Mistletoe Mining Pty Ltd Mistletoe <1% Partial Surrender Report for Mistletoe Project E51/01491 for the period 16 December 2011 to 13 December 2017
A118061 2018 Doray Minerals Limited Gnaweeda 3.1% Meekatharra North, Gnaweeda Project C46/2005 Annual Technical Report For the Period 31 July 2017 to 30 July 20
A118468 2018 Greenrock Gold Pty Ltd East Gnaweeda 17% Annual Report for East Gnaweeda Project E51/01651 for the period 01/09/2017 to 31/08/2018
A116164 2018 Doray Minerals Limited Andy Well <1% C48/2013 Meekatharra North Andy Well Project Combined Report For the Period 1 January 2017 to 31 December 2017
A111938 2017 Mistletoe Mining Pty Ltd Mistletoe <1% MISTLETOE PROJECT E51/1491 Annual Technical Report for the period 16/12/2015 to 15/12/2016
A112435 2017 Doray Minerals Limited; Andy Well Mining Pty Ltd Andy Well <1% Meekatharra North, Andy Well Project C48/2013 Combined Report for the period 01/01/2016 to 31/12/2016, E51/012
A115023 2017 Doray Minerals Limited Gnaweeda 3.1% Meekatharra North, Gnaweeda Project Annual Technical Report - C46/2005 For the Period 31 July 2016 to 30 July
A115311 2017 Greenrock Gold Pty Ltd East Gnaweeda 17% Annual Report for East Gnaweeda Project E51/01651 For the Period 1 September 2016 to 31 August 2017
A108017 2016 Mistletoe Mining Pty Ltd Mistletoe <1% ANNUAL REPORT For the Period 16 December 2014 to 15 December 2015 MISTLETOE PROJECT E51/01491
A108458 2016 Doray Minerals Ltd Meekatharra North - Andy Well <1% Meekatharra North Andy Well Project Combined Report (C48/2013) M51/870, E51/1217, E51/1596, E51/1625 & E51/162
A110066 2016 Doray Minerals Limited Gnaweeda 3.1% E51/00926, E51/00927, P51/02652 Gnaweeda Project C46/2005 Annual Technical Report For the Period 31 July 2015
A110099 2016 Greenrock Gold Pty Ltd East Gnaweeda 17% Annual Report for East Gnaweeda Project E51/01651 For the Period 1 September 2015 to 31 August 2016
A104913 2015 Rubianna Resources Ltd Killara 9.6% Final Report for Killara Combined Reporting Group C215/2010 (E51/1345, E51/1347, E51/1348, E51/1349) for the p
A105088 2015 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Gnaweeda Project E51/926, E51/927, E51/1419, E51/1420, and P51/2652 Annual Report for the period 31/07/2013 to
A106105 2015 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Final Report Co-Funding Drilling Programme, Gnaweeda Greenstone Belt, 10th to 30th June, 2013: E51/926 & E51/9
A107503 2015 Doray Minerals Ltd Gnaweeda 3.1% Meekatharra North Gnaweeda Project C46/2005 Annual Technical Report E51/926, E51/927, E51/1419, E51/1420 and P
A104133 2014 Rubianna Resources Ltd Killara 9.6% Killara Project, Annual Report for the period 03/08/2013 to 02/08/2014, E51/1345, 1347, 1348 & 1349. [C215/201
A100917 2014 Velox Mining Services Pty Ltd Mistletoe <1% Mistletoe Project, Annual Report for the period 16/12/2012 to 15/12/2013, E51/1491.
A105296 2014 Velox Mining Services Pty Ltd Mistletoe <1% Mistletoe Project Annual Report for period 16/12/2013 to 15/12/2014, E51/1491
A99969 2013 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005: Gnaweeda Project, E51/926, E51/927, E51/1419, E51/1420, and P51/2652 for the
A97379 2013 Velox Mining Services Pty Ltd Mistletoe <1% Annual Report E51/1491 Mistletoe for the period 16 December 2011 to 15 December 2012
A99693 2013 Rubianna Resources Ltd Killara 7.1% Killara Combined Project, C215/2010, Surrender Report for the period 4th August 2008 to 15th July 2013, E51/12
A99789 2013 Rubianna Resources Ltd Killara 5.9% Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2012 to 2nd August 2013, E51/1244
A95431 2012 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005: Gnaweeda Project, E51/926, E51/927, E51/1419, E51/1420, and P51/2652
A95203 2012 Rubianna Resources Ltd Killara 5.9% Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2011 to 2nd August 2012, E51/1244
A95346 2012 Proto Resources And Investments Ltd Casey 3.1% ANNUAL TECHNICAL REPORT E51/1457, CASEY PROJECT Period from 22/09/2011 to 21/09/2012
A91683 2011 Rubianna Resources Ltd Killara 6.5% Killara Combined Project, C215/2010, Annual Report 3rd August 2010 to 2nd August 2011, E51/1244, E51/1246, E51
A91806 2011 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005: Gnaweeda Project 31st July 2010 – 30th July 2011
A88900 2010 Teck Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2009 – 30th July 2010
A84726 2009 Archean Star Resources Australia Pty Ltd Gnaweeda 3.1% Annual Combined report for the period 31 July 2008 to 30 July 2009, Gnaweeda Project, E51/926 and E51/927
A78824 2008 Locatore Pty Ltd Mistletoe Well 43% Annual Report for the Period 17 November 2006 to 16 November 2007, Mistletoe Well, EL51/1081
A80148 2008 Teck Cominco Australia Pty Ltd Gnaweeda 3.1% COMBINED ANNUAL REPORT C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2007 – 30th July 2008
A76157 2007 Teck Cominco Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2006 30th July 2007
A73439 2006 Teck Cominco Australia Pty Ltd Gnaweeda 3.1% Combined Annual Report C46/2005, Gnaweeda Project E51/926-927, 31 July 2005 to 30 July 2006, (Glengarry).
A70086 2005 Bullion Minerals Ltd Gnaweeda 3.1% Annual technical report for the period 31/07/03 - 30/07/04 Gnaweeda Project, C46/2005, E51/926, E51/927.
A70982 2005 Bullion Minerals Ltd Gnaweeda 3.1% Gnaweeda Project, Annual technical report on exploration licences 51/926 and 51/927 for the period 31/07/04 to
A67376 2003 Helix Resources Ltd Gnaweeda 3.1% Gnaweeda Project, Annual Technical Report on Exploration Licences E51/926, E51/927 for the period 31/07/02 to
A55361 1998 Mines & Resources Australia Pty Ltd Mistletoe 5.4% Mistletoe Project, Annual Report for the period 3rd July 1997 to 2nd July 1998, E53/313, 427, 476, 523, P51/19
A52292 1997 Mines & Resources Australia Pty Ltd Mistletoe 5.4% Mistletoe Project, Annual Report for the period 3rd July 1996 to 2nd July 1997, E51/313, 427, 476, 523 & P51/1
A48650 1996 Mines & Resources Australia Pty Ltd Mistletoe 5.4% Mistletoe Project, Annual Report for the period 3rd July 1995 to 2nd July 1996, E51/313, 427, 476, 523, & P51/
A49753 1996 Mines & Resources Australia Pty Ltd Mistletoe 11% Mistleoe Project Partial Surrender Report E51/313 PE 96/19
A45418 1995 Mines & Resources Australia Pty Ltd Mistletoe 8.3% Mistletoe Project, Annual Report E51/313, E51/427, P51/1983 for period 03/07/1994 to 02/07/1995.
A42402 1994 Afmeco Pty Ltd Mistletoe 8.3% Mistletoe Project, Annual Report for the period 03/07/1993 to 02/07/1994, E51/313, 427, & P51/1983.
A39405 1993 Afmeco Pty Ltd Mistletoe 11% Mistletoe Project, Annual Report for the period 03/07/1992 to 02/07/1993, E51/313.
A39410 1993 Geopeko Killara 2.8% First and Final report on Exploration Activities
A136573 Meeka Metals Limited Gnaweeda 5.8% pXRF readings FE001 and FE003 drillholes

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 51/2355 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 51/2355? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.