E 52/4142
Register summary
- Holder
- Dreadnought Exploration Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 25 Aug 2022
- Commenced
- 28 Oct 2022
- Expiry
- 27 Oct 2027
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149152 | 2025 | Dreadnought Resources Ltd | Bresnahan | <1% | Bresnahan E52/4228 Final Surrender Report for the period ending 02/05/2025 |
| A139248 | 2024 | Dreadnought Resources Ltd | E52/4142 Bresnahan | 79% | E52/4142 Partial Surrender Report Bresnahan Project for the period ending 29/01/2024. |
| A144803 | 2024 | Dreadnought Resources Ltd | Bresnahan E52/4228 | <1% | E52/4228 Partial Surrender Report Bresnahan Project for the period ending 01/08/2024. |
| A134158 | 2023 | Rio Tinto Exploration Pty Limited | Glen Ross | <1% | E52/04005_Glen Ross_Surrender Report for the period ending 11/01/2023. |
| A135257 | 2023 | Moore River Metals Pty Ltd | Pingandy | <1% | Annual and Final Report for the Pingandy Project C260/2021 for the period ending 20/04/2023 |
91 more reports
| A131862 | 2022 | Aruma Exploration Pty Ltd | Saltwater | 45% | Final Surrender Report for E52/3816, E52/3825, E52/3830, E52/3852, E52/3854 part of C108/2020, Saltwater Proje |
| A132230 | 2022 | Moore River Metals Pty Ltd | Pingandy | <1% | Pingandy Project Combined C260/2021 Annual Technical Report fort the period ending 28/07/2022 |
| A124707 | 2020 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | E52/2637 Tunnel Creek Final Surrender Report for the period ending 30/06/2020 |
| A122189 | 2019 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | Tunnel Creek Annual Report, C180/2007, 1 October 2018 to 30 September 2019 |
| A115613 | 2018 | Fortescue Metals Group Ltd | Tunnel Creek | 23% | C180/2007 Tunnel Creek Annual Report For the Period 1 October 2016 to 30 September 2017, E52/02555, E 52/02620 |
| A117775 | 2018 | Fortescue Metals Group Ltd | Tunnel Creek | 38% | C180/2007 Tunnel Creek Combined Full Surrender Report For the Period 6 September 2011 to 27 July 2018, E52/029 |
| A118235 | 2018 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | C180/2007 Tunnel Creek Annual Report For the Period 1 October 2017 to 30 September 2018, E52/02555, E52/02637 |
| A111898 | 2017 | Fortescue Metals Group Ltd | Yindibiddy Pool | <1% | E52/2637 (Yindibiddy Pool) Partial Surrender Report 16 December 2010 to 15 December 2016 |
| A108193 | 2016 | Fortescue Metals Group Ltd | Angelo | <1% | C115/2011 Angelo Final Surrender Report For the Period 6 October 2010 to 26 January 2015, E52/02470, E52/02621 |
| A108202 | 2016 | Fortescue Metals Group Ltd | Turee Creek | <1% | E52/2924 (Turee Creek) Final Surrender Report For the Period 28 August 2013 to 22 December 2015 |
| A108414 | 2016 | Fortescue Metals Group Ltd | Glen Camel | 16% | C158/2013 Glen Camel Final Surrender Report, 14 September 2013 to 19 February 2016 |
| A108877 | 2016 | Fortescue Metals Group Ltd | Mount Vernon North | 17% | E52/2856 (Mt Vernon North) Final Surrender Report for the period 07/05/2013 to 15/03/2016 |
| A109355 | 2016 | Fortescue Metals Group Ltd | Yilbrinna Pool | 100% | E52/2857 (Yilbrinna Pool) Final Surrender Report for the period 17/04/2013 to 29/04/2016 |
| A110581 | 2016 | Fortescue Metals Group Ltd | Tunnel Creek | 23% | C180/2007 Tunnel Creek Project Annual Report for the period 01/10/2015 to 30/09/2016 |
| A104714 | 2015 | Supergene Commodities Pty Ltd | Cherrybooka | <1% | Cherrybookas Project, Exploration Licence 52/3033, West Pilbara Mineral Field, Final Surrender Report for E52/ |
| A105442 | 2015 | Fortescue Metals Group Ltd | Tunnel Creek | 11% | Tunnel Creek Project C180/2007 Annual Report for the period 1 October 2013 to 30 September 2014, E52/1759, E52 |
| A105445 | 2015 | Fortescue Metals Group Ltd; Iron Bull Ashburton Pty Ltd | Angelo | <1% | Angelo Project C115/2011 Annual Report for the period 1 December 2013 to 30 November 2014, E52/1984, E52/2034, |
| A107413 | 2015 | Marindi Metals Ltd | Newman | 100% | Annual Report Newman Base Metal Project E52/3118 and E52/3155 (CC22/2015) for the period 1st Sep 2014 to 31st |
| A107508 | 2015 | Fortescue Metals Group Ltd | Glen Camel | 19% | Glen Camel Project C158/2013 Glen Camel Annual Report for the period 1 September 2014 to 31 August 2015, E52/ |
| A105630 | 2015 | Lion One Australia Pty Ltd | Mount Vernon North | 17% | Final surrender report for the period 16 February 2006 to 13 February 2015, Mt Vernon North Project, E52/1917 |
| A101164 | 2014 | Lion One Ltd | Saltwater Pool | 30% | Annual Report for period 5 January 2013 to 4 January 2014, E52/1892 Saltwater Pool JV |
| A104560 | 2014 | Lion One Australia Pty Ltd | Saltwater Pool | 30% | Final Surrender Report 5 January 2009 to 4 January 2015, E52/1892 Saltwater Pool JV E/52/1892 |
| A100768 | 2014 | Fortescue Metals Group Ltd | Angelo | <1% | Annual Report Angelo Project (C115/2011) for the period 1/12/2012 to 30/11/2013. [E52/2470, E52/2621, E52/198 |
| A101163 | 2014 | Lion One Ltd | Saltwater Pool | 56% | Annual Report for period 5 January 2013 to 4 January 2014, E52/1890 Saltwater Pool JV |
| A102319 | 2014 | Lion One Ltd | Ristretto | <1% | Annual report for the period 17 April 2013 to 16 April 2014, Ristretto Project, E52/2767 |
| A102739 | 2014 | Lion One Australia Pty Ltd | Yilbrinna Pool | 100% | Yilbrinna Pool Project, Final Surrender Report for the period 16/02/2006 to 19/06/2014, E52/1916. |
| A103796 | 2014 | Lion One Australia Pty Ltd | Atlantis | 23% | FINAL SURRENDER REPORT FOR PERIOD 20 SEPTEMBER 2005 TO 19 SEPTEMBER 2014 ATLANTIS PROJECT E52/1880 |
| A103926 | 2014 | Lion One Australia Pty Ltd | Saltwater Pool | 56% | E52/1890 Saltwater Pool JV Final Relinquishment for period 5 January 2009 to 27 August 2014 |
| A96470 | 2013 | Avocet Resources Ltd | Saltwater Pool JV | 56% | Annual Report for Period 5 January 2012 to 4 January 2013, E52/1890 Saltwater Pool JV |
| A96471 | 2013 | Avocet Resources Ltd | Saltwater Pool | 30% | Annual Report for period 5 January 2012 to 4 January 2013, Saltwater Pool JV E52/1892 |
| A97976 | 2013 | Avocet Resources Ltd | Yilbrinna Pool | 100% | Yilbrinna Pool Project, Partial Surrender Report for the period 16th February 2012 to 15th February 2013, E52/ |
| A97977 | 2013 | Avocet Resources Ltd | Mount Vernon North | 17% | Mount Vernon North Project, Partial Surrender Report for the period 16th February 2006 to 15th February 2013, |
| A99144 | 2013 | Avocet Resources Ltd | Ristretto | <1% | Partial relinquishment report for the period 17 April 2012 to 10 July 2013, Ristretto Project, E52/2767 |
| A99180 | 2013 | Avocet Resources Ltd | Bromus South | 30% | Partial Relinquishment Report for Period 5 January 2009 to 23 JULY 2013 Saltwater Pool JV E52/1892 |
| A99181 | 2013 | Avocet Resources Ltd | Peak Hill | <1% | Peak Hill E52/1940 Final Relinquishment Report for period 11 September 2008 to 10 July 2013 |
| A99761 | 2013 | Avocet Resources Ltd | Atlantis | 23% | Partial surrender report for the period 20 September 2005 to 5 September 2013, Atlantis Project, E52/1880 |
| A99871 | 2013 | Avocet Resources Ltd | Mount Vernon North | 17% | Partial surrender report for the period 16 February 2006 to 16 September 2013, Mt Vernon North Project, E52/19 |
| A100303 | 2013 | Avocet Resources Ltd | Ashburton | 17% | Ashburton Joint Venture C13/2009 Combined report for period 19 September 2012 to 18 September 2013 E52/1879, 1 |
| A100378 | 2013 | Fortescue Metals Group Ltd | Tunnel Creek | 11% | Tunnel Creek C180/2007 Annual Report for the period 1 October 2012 to 30 September 2013, E52/2414, E52/2415, E |
| A97940 | 2013 | Avocet Resources Ltd | Ristretto | <1% | Ristretto Project, Annual Report for the period 17th April 2012 to 16th April 2013, E52/2767. |
| A99179 | 2013 | Avocet Resources Ltd | Saltwater Pool | 56% | Partial Relinquishment Report for period 5 January 2009 to 23 July 2013, E52/1890 |
| A99249 | 2013 | Avocet Resources Ltd | Monster Ashburton | 23% | Co-funded Drilling 2013 Monster Ashburton Project Final Report Exploration Incentive Scheme (round 6) |
| A99870 | 2013 | Avocet Resources Ltd | Yilbrinna Pool | 100% | Partial surrender report for the period 16 February 2006 to 16 September 2013, Yilbrinna Pool Project, E52/191 |
| A92459 | 2012 | U308 Ltd | Peak Hill | <1% | COMBINED ANNUAL REPORT FOR PERIOD 1 October 2010 to 30 September 2011 C227/2008 U3O8 Limited – Thundelarra Exp |
| A92613 | 2012 | Fortescue Metals Group Ltd | Angelo | <1% | Annual report for the period 01th December 2010 – 30th November 2011 E52/2034 /2035 /2470 / 2594 / 2621, Angel |
| A92614 | 2012 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | Tunnel Creek Project, Annual Report for the period 1st October 2010 to 30th September 2011, E52/1759-1760, 177 |
| A92965 | 2012 | U308 Ltd | Saltwater Pool | 56% | Annual report for period 5 January 2011 to 4 January 2012, Saltwater Pool JV E52/1890 |
| A92966 | 2012 | U308 Ltd | Saltwater Pool | 30% | Annual report for period 5 January 2011 to 4 January 2012, Saltwater Pool JV E52/1892 |
| A93173 | 2012 | Rio Doce Australia Pty Ltd | Kunderong | <1% | Kunderong Project, C146/2006, Tenements E52/1896, E52/1897, E52/1898, E52/1899 and E52/1997, [ Peak Hill Miner |
| A94649 | 2012 | Atlas Iron Ltd | Upper Ashburton | 1.8% | Upper Ashburton Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 30 June |
| A95846 | 2012 | Avocet Resources Ltd | Ashburton | 17% | Ashburton Joint Venture C13/2009 Combined report for period 19 September 2011 to 18 September 2012, E52/1879, |
| A96010 | 2012 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | Tunnel Creek Project, Annual Report for the period 01/10/2011 to 30/09/2012, E52/1759-1760, 1779, 2414-2416, 2 |
| A96409 | 2012 | Fortescue Metals Group Ltd | Angelo | <1% | Angelo C115/2011 Annual report for the period 1st of December 2011 to 30th of November 2012 E52/2034, E52/2035 |
| A95765 | 2012 | Avocet Resources Ltd | Peak Hill | <1% | COMBINED ANNUAL REPORT FOR PERIOD 1 October 2011 to 30 September 2012 C227/2008 Peak Hill Project E52/1940 |
| A89293 | 2011 | Thundelarra Exploration | Kunderong – Cullen | 28% | Combined Annual Report C17/2009, Kunderong – Cullen JV Project E52/1890, E52/1891 & E52/1892, for the period 5 |
| A90292 | 2011 | Vale Exploration Pty Ltd | Kunderong | <1% | Kunderong Project, Annual Report for the period 1st April 2010 to 31st March 2011, E52/1896-1899 & E52/1997. |
| A91034 | 2011 | Atlas Iron Ltd | Upper Ashburton | <1% | Upper Ashburton Project E52/2335 Annual Report to DMP Period Ending 20 July 2011 |
| A92103 | 2011 | U308 Ltd | Ashburton | 20% | Ashburton Joint Venture Combined report for period 19 September 2010 to 18 September 2011, C13/2009, |
| A91370 | 2011 | Atlas Iron Ltd | Upper Ashburton | 12% | Upper Ashburton Project E52/2407 Annual Report to DMP Period Ending 19 August 2011 |
| A85932 | 2010 | Thundelarra Exploration | Kunderong - Cullen JV | 28% | Combined Annual Report, Kunderong – Cullen JV Project, E52/1890, E52/1891 & E52/1892, for the period 5 January |
| A86595 | 2010 | Rio Doce Australia Pty Ltd; Vale | Kennedy | <1% | Kennedy Project Tenement E52/1997, Partial Surrender Report for the period 19 March 2007 to 17 November 2009 |
| A86639 | 2010 | Rio Doce Australia Pty Ltd; Vale | Kunderong | <1% | Kunderong Project, Annual Report for the period 1st April 2009 to 31st March 2010, E52/1896,1897, 1898, 1899 |
| A87481 | 2010 | Encounter Resources Ltd | Tchintaby East | <1% | Annual and Final Surrender report for the period 23 June 2009 to 21 July 2010, Tchintaby East Project, E52/238 |
| A88005 | 2010 | U308 Ltd | Ashburton | 9% | EIS Final Report, Application Number DA2009/116 (Round 1) |
| A88229 | 2010 | Thundelarra Exploration Ltd | Kunderong | <1% | Partial Surrender Report, Kunderong Project E52/1940, for the period 1 October 2008 to 10 September 2010, Peak |
| A88232 | 2010 | Thundelarra Exploration Ltd | Kunderong | <1% | Combined Annual Report C227/2008, Kunderong Project E52/1940, for the period 1 October 2009 to 30 September 20 |
| A88669 | 2010 | U308 Ltd | Ashburton | 20% | Ashburton Joint Venture C13/2009, Combined report for period 19 September 2009 to 18 September 2010 |
| A85044 | 2009 | Thundelarra Exploration Ltd | Kunderong | <1% | Combined Annual Report, Kunderong Project E52/1909 & E52/1940, for the period 1 October 2008 to 30 September 2 |
| A85268 | 2009 | U308 Ltd | Ashburton Joint Venture | 20% | Combined report for period to 18 September 2009 E52/1879, E52/1880, E52/1893, E52/1914, E52/1915, E52/1916, E5 |
| A82193 | 2009 | Vale Inco Australia Limited Partnership | KENNEDY | <1% | Kennedy Project, Annual Report for the period 19th March 2008 to 18th March 2009, E52/1997. |
| A77917 | 2008 | Cameco Australia Pty Ltd | Bresnahan | 100% | Annual Report for 16 February 2007 to 15 February 2008, E52/1916 Bresnahan Project - Western Australia |
| A78303 | 2008 | Dioro Exploration Nl | Kennedy Creek | <1% | ANNUAL EXPLORATION REPORT E52/1997, 'KENNEDY CREEK' , FOR YEAR ENDING 18TH MARCH 2008. |
| A77484 | 2008 | U308 Ltd | ATLANTIS | 23% | ANNUAL REPORT FOR PERIOD 20 SEPTEMBER 2006 TO 19 SEPTEMBER 2007 ATLANTIS PROJECT E52/1880 |
| A77918 | 2008 | Cameco Australia Pty Ltd | Bresnahan | 17% | Annual Report for 16 February 2007 to 15 February 2008, E52/1917 Bresnahan Project - Western Australia |
| A78564 | 2008 | Baracus Pty Ltd | Pingandy | 13% | Pingandy Project Annual Technical Report E52/1921 27/02/2007 - 26/02/2008 |
| A80842 | 2008 | U308 Ltd | ATLANTIS | 23% | ANNUAL REPORT FOR PERIOD 20 SEPTEMBER 2007 TO 19 SEPTEMBER 2008 ATLANTIS PROJECT, E 52/1880 |
| A75247 | 2007 | Baracus Pty Ltd | PINGANDY | 13% | PINGANDY PROJECT EL52/1921 Annual Technical Report FOR THE PERIOD 27/02/2006 - 26/02/2007 |
| A74395 | 2007 | U308 Ltd | Atlantis | 23% | Annual Report for the Period 20th Sep 2005 to 19th Sep 2006, Atlantis Project E52/1880, (Turee Creek/Newman). |
| A74901 | 2007 | Cameco Australia Pty Ltd | Bresnahan | 34% | Bresnahan Project, Annual Report for the period 16th February 2006 to 15th February 2007, EL52/1914-1917. |
| A70285 | 2005 | Marengo Mining Ltd | Yilbrinna Pool | 76% | Exporation licence E52/1643, Yilbrinna Pool Project, First and final report for the period 2 March 2004 - 17 F |
| A70283 | 2005 | Marengo Mining Ltd | Saltwater Pool North | <1% | Exploration licence E52/1629, Saltwater Pool North Project, First and final report for the period 26 February |
| A70636 | 2005 | Placer Dome Asia Pacific Ltd | Kunderong Range | <1% | Kunderong Range Project, Annual technical report for the period 29/04/04 - 28/04/05 on tenements E52/1741, E52 |
| A49907 | 1997 | Cra Exploration Pty Ltd | Yilbrinna Pool | 61% | Surrender Report for the period 14th August 1996 to 6th December,Yilbrinna Pool, Exploration Licence E52/981. |
| A48863 | 1996 | Cra Exploration Pty Ltd | Yilbrinna Pool | 61% | Yilbrinna Pool Project, Annual Report for the year ended August 1996,E52/981. |
| A46562 | 1995 | Giralia Resources Nl | Saltwater Pool | 8.1% | Saltwater Pool Project, Annual Report E52/881 for period ending September 1995. |
| A10745 | 1982 | Pancontinental Mining Ltd | Turee Creek | 2.4% | Turee Creek Project, Annual Report for the period ending 31/12/1981( 1981 field season), TR70/7109-7112H, 7191 |
| A11692 | 1982 | Pancontinental Mining Ltd | Turee Creek | 2.4% | Turee Creek Project, Annual (& Final) Report, 1982 Field Season, TR70/7109-7112, 7191-7196, & 7440. |
| A9643 | 1981 | Pancontinental Mining Ltd | Turee Creek | 2% | Turee Creek (JV) Project, Annual Report for the period ending 01/11/1980, TR70/7109-7112, 7191-7196. |
| A9302 | 1980 | Pancontinental Mining Ltd | Turee Creek | 1.1% | Turee Creek Project, Annual Report for the period 11/07/1979 to 10/07/1980, TR70/7019-7112H. |
| A1595 | 1966 | Ashburton Exp Pty Ltd | M62/0: Ashburton-Bangemall base metal/as | <1% | TR2924H Ashburton Exploration Summary Report for 1965. Programme 1966. |
| A566 | 1964 | Westfield Minerals Nl | Ashburton-Bangemall | <1% | Ashburton-Bangemall Project, Non-statutory Report: Summary Report for 1963 & Projected Development Programme 1 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 14 months · 27 Oct 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4142 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4142? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.