E 52/4397
Register summary
- Holder
- Catalyst (Plutonic) Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 1 Oct 2024
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147710 | 2025 | Ausgold Exploration Pty Ltd | Doolgunna | <1% | Final Surrender Report for Doolgunna E52/3031 for the Period 4 February 2014 to 30 January 2025 |
| A150701 | 2025 | Auris Minerals Limited | Doolgunna | <1% | Final Surrender Report for Cow Hole Bore (Doolgunna) Project Tenement, E52/2438, for period 1 January 2019 to |
| A138230 | 2024 | Sandfire Resources Limited | Doolgunna | 1% | P 52/1528 Doolgunna Final Surrender Report for the period ending 28/11/2023. |
| A143088 | 2024 | Aic Mines Limited; Venus Metals Corporation Limited | Curara Well | <1% | Final Surrender Report for Tenement E52/3486 for the period 15/05/2018 to 05/04/2024 |
| A138725 | 2024 | Ausgold Exploration Pty Ltd | Doolgunna | <1% | Annual Report for E52/3031: Doolgunna Project for the period 4 February 2023 to 3 February 2024 |
193 more reports
| A139499 | 2024 | Auris Minerals Limited | Doolgunna | <1% | Combined Annual Report for the Doolgunna Project, E52/2438, for the period 11 February 2023 to 10 February 202 |
| A135131 | 2023 | Aic Mines Limited; Ausgold Exploration Pty Ltd | Doolgunna | <1% | Annual Report for E52/3031: Doolgunna Project for the period 4 February 2022 to 3 February 2023 |
| A135926 | 2023 | Aic Mines Limited | Curara Well | <1% | Curara Well JV E52/3486 Annual Technical Report for the period ending 14/5/2023 |
| A136211 | 2023 | Aic Mines Limited | Bryah | <1% | C50/2017 Bryah Annual Technical Report for the period ending 12/05/2023. E 52/3265,E 52/3455,E 52/3623,E 52/36 |
| A137017 | 2023 | Sandfire Resources Limited | Doolgunna | <1% | E 52/2275 Doolgunna Project Final Surrender Report for the period ending 04/09/2023 |
| A137076 | 2023 | Aic Mines Limited | Bryah | <1% | E52/3455 – Partial Surrender Report Bryah Project for the period ending 15/08/2023. |
| A137909 | 2023 | Sandfire Resources Limited | Doolgunna | <1% | E52/2208, E52/2209, E52/2358 and E 52/2401 Doolgunna Project Final Surrender Report 2023 |
| A131387 | 2022 | Aic Mines Limited | Bryah | <1% | C50/2017 - Bryah - Annual Technical Report for the period ending 12/05/2022. |
| A130334 | 2022 | Aic Mines Limited | Doolgunna | <1% | E 52/03031 - Doolgunna Annual Report for the period ending 04/02/2022. |
| A131384 | 2022 | Aic Mines Limited | Bryah | <1% | E52/3265 – Bryah – Compulsory Partial Surrender for the period ending 12/05/2022. |
| A131429 | 2022 | Aic Mines Limited | Curara | <1% | Curara E52/3486 - Annual Technical Report for the period ending 14/05/2022 |
| A133170 | 2022 | Aic Mines Limited | Bryah - E52/3455 | <1% | Bryah - E52/3455 Partial Surrender Report for the period ending 15/08/2022. |
| A126681 | 2021 | Aic Mines Limited | Doolgunna | <1% | Doolgunna E52/3031 Annual Report for the period ending 03/02/2021 |
| A127695 | 2021 | Aic Mines Limited | Curara Well South | <1% | Curara Well South E52/3486 Annual Technical Report for the3 period ending 14/05/2021 |
| A127796 | 2021 | Aic Mines Limited | Bryah | <1% | Bryah - C50/2017 - Annual Technical Report for the period 13 May 2020 to 12 May 2021 |
| A123147 | 2020 | Sandfire Resources Limited | Doolgunna | 38% | Doolgunna C261/2011 Combined Annual Mineral Exploration Report 2019 |
| A124258 | 2020 | Venus Metals Corporation Limited | Curara Well South | <1% | Curara Well South E52/03486 Annual Report for the period ending 15/5/2020 |
| A122226 | 2020 | Ora Gold Limited; William Richmond | Red Bore | 100% | Annual technical report for the Red Bore Project (M52/597), Peak Hill Mineral Field, Western Australia, for th |
| A122726 | 2020 | Sandfire Resources Nl | Springfield | <1% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2018 to 24 November 2019, E52/0 |
| A123282 | 2020 | Aic Mines Limited | Doolgunna | <1% | E52/3031 - Doolgunna Annual Technical Report - 4 February 2019 to 3 February 2020 |
| A123283 | 2020 | Aic Mines Limited | Doolgunna | <1% | E52/3031 - Partial Surrender Report - Doolgunna AusGold JV - 4 February 2014 to 3 February 2020 |
| A124538 | 2020 | Aic Mines Limited | Bryah | <1% | C50/2017 - Bryah Annual Report for the period 13 May 2019 to 12 May 2020. E 52/03265,E 52/03455,E 52/03190,E 5 |
| A125205 | 2020 | Sandfire Resources Limited | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period ending 09/09/2020 |
| A125710 | 2020 | Sandfire Resources Limited | Doolgunna Red Bore | 100% | Doolgunna Red Bore Project M52/597 Annual Mineral Exploration Report for the period 6 November 2019 to 5 Novem |
| A121641 | 2019 | Sandfire Resources Nl | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period 10 September 2018 to 9 September 2019 |
| A119132 | 2019 | Sandfire Resources Nl | Springfield | <1% | Springfield Project C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2017 to 24 |
| A119488 | 2019 | Ausgold Exploration Pty Ltd | Doolgunna | <1% | Co-Funded Drilling Program Final Report (R#16) E52/03031 Doolgunna Project for the period 5 September 2018 to |
| A120432 | 2019 | Venus Metals Corporation Limited | Curara Well South | <1% | Curara Well South E52/03486 Annual Report for the period 15 May 2018 to 14 May 2019 |
| A118664 | 2019 | Thundelarra Limited | Red Bore | 100% | Annual Technical report for the Red Bore Project (M52/597), Peak Hill Mineral Field, Western Australia, for th |
| A119580 | 2019 | Sandfire Resources Nl | Doolgunna | 38% | Doolgunna C261/2011 Annual Report for the period 1 January 2018 to 31 December 2018, E52/01698, E52/01699, E52 |
| A120116 | 2019 | Ausgold Exploration Pty Ltd; Intrepid Mines Limited | Doolgunna | <1% | Annual Report for the Doolgunna Project E52/3031 for the period 4 February 2018 to 3 February 2019 |
| A120430 | 2019 | Aic Resources Limited | Bryah | <1% | Annual Report Bryah Project C50/2017 for the period 13 May 2018 to 12 May 2019 |
| A122156 | 2019 | Ora Gold Limited | Curara Well | <1% | Surrender Report on E52/2402 (Curara Well Project) for the period 11 June 2010 to 15 November 2019 |
| A115538 | 2018 | Thundelarra Limited | Red Bore | 100% | Annual Technical Report for the Red Bore Project (M52/597), Peak Hill Mineral Field, Western Australia, for th |
| A115945 | 2018 | Sandfire Resources Nl; Talisman Mining Ltd | Springfield | <1% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2016 to 24 November 2017, E52/0 |
| A116351 | 2018 | Sandfire Resources Nl | Doolgunna | 38% | Doolgunna C261/2011 Combined Annual Mineral Exploration Report for the period 1 January 2017 to 31 December 20 |
| A116397 | 2018 | Ausgold Exploration Pty Ltd | Doolgunna | <1% | Annual Report E52/3031 Doolgunna Project for the period 04/02/2017 - 03/02/2018 |
| A116430 | 2018 | Auris Minerals Limited | Cow Hole Bore - Doolgunna | <1% | Annual Report for the Cow Hole Bore Project E52/2438 for the period 11 February 2017 to 10 February 2018 |
| A118149 | 2018 | Sandfire Resources Nl | Doolgunna EFI | <1% | Annual Report for the Doolgunna EFI Project C213/2008 For the Period 10 September 2017 to 9 September 2018 |
| A117246 | 2018 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 Curara Well Project for the period 11 June 2017 to 10 June 2018, Peak Hil |
| A117464 | 2018 | Aic Resources Limited | Bryah | <1% | Bryah Project C50/2017 Annual Report for the period 13 May 2017 to 12 May 2018, E 52/03455, E 52/03190, E 52/0 |
| A112046 | 2017 | Sandfire Resources Nl | Springfield | <1% | Springfield C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2015 to 24 November |
| A112454 | 2017 | Sandfire Resources Nl | Doolgunna | 38% | Doolgunna Project C261/2011 Combined Annual Mineral Exploration Report 2016, E51/01582, E51/01583, E52/01698, |
| A112657 | 2017 | Rni Nl | Doolgunna | <1% | Doolgunna E52/2438 Annual Technical Report For the Period 11 February 2016 to 10 February 2017 |
| A112706 | 2017 | Ausgold Exploration Pty Ltd | Doolgunna | <1% | Doolgunna Project E52/3031 Annual Report for the period 7 January 2016 to 6 January 2017 |
| A114238 | 2017 | Aic Resources Limited | Bryah | <1% | C50/2015 Bryah Project Annual Combined Exploration Report for the period 13 May 2016 to 12 May 2017, E52/03265 |
| A115159 | 2017 | Sandfire Resources Nl | Doolgunna - EFI | <1% | Doolgunna - EFI C213/2008 Combined Annual Mineral Exploration Report for the period 10 September 2016 to 9 Sep |
| A114237 | 2017 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2016 to 10 June 2017, Peak Hi |
| A107735 | 2016 | Sandfire Resources Nl | Springfield | <1% | Springfield E52/2282 Partial Surrender Report for the period 25 November 2009 to 20 November 2015 |
| A108242 | 2016 | Sandfire Resources Nl | Doolgunna | 98% | Doolgunna Project Co-Funded Government – Industry Drilling Program DAG2014/003266645 Final Report (round 8) |
| A108459 | 2016 | Sandfire Resources Nl | Doolgunna | 38% | Doolgunna Project C261/2011 Combined Mineral Exploration Annual Report 01/01/2015 to 31/12/2015, E51/1582, E51 |
| A108595 | 2016 | Rni Nl | Doolgunna | <1% | Annual Technical Report for the period ending 10 February 2016 Doolgunna Project Tenement Number E52/2438 |
| A108725 | 2016 | Sandfire Resources Nl | Halloween | 1% | P52/1241 Halloween Project Final Surrender Report 2016 Report Period 18/03/2008 to 15/03/2016 |
| A108849 | 2016 | Ausgold Limited | Doolgunna | <1% | Doolgunna E52/3031 Annual Report to the Department of Mines and Petroleum for the period 04/02/15 to 03/02/16 |
| A108910 | 2016 | Thundelarra Limited | Curara Well | <1% | PARTIAL SURRENDER REPORT For the Period 11 June 2009 to 10 June 2016 CURARA WELL Partial Surrender Report on E |
| A109483 | 2016 | Faultline Resources Pty Ltd | Three Rivers | <1% | Three Rivers Project E52/3110 Surrender Report for the period 19/09/2015 to 2/6/2016 |
| A109553 | 2016 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2015 to 10 June 2016, Peak Hil |
| A110237 | 2016 | Enterprise Metals Limited | Doolgunna | <1% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report for |
| A110502 | 2016 | Thundelarra Limited | Red Bore | 100% | Annual Technical Report M52/597 Red Bore Project For the Period 6 November 2015 to 5 November 2016 |
| A107736 | 2016 | Sandfire Resources Nl | Springfield | <1% | Springfield E52/2313 Partial Surrender Report for the period 25 November 2009 to 20 November 2015 |
| A107989 | 2016 | Sandfire Resources Nl | Springfield | <1% | Springfield C97/2010, E52/2313, E52/2466, E52/2282 Combined Annual Mineral Exploration Report for the period 2 |
| A104797 | 2015 | Sandfire Resources Nl | Springfield | <1% | Springfield Project (C97/2010) E52/2313, E52/2466, E52/2282 Annual Mineral Exploration Report for the period 2 |
| A105141 | 2015 | Sandfire Resources Nl | Doolgunna | 38% | Doolgunna Project 2014 Mineral Exploration Annual Report Combined Report Group C261/2011 for the period 01/01/ |
| A105295 | 2015 | Ausgold Limited | Doolgunna | <1% | Doolgunna E52/3031 Annual Report to the Department of Mines and Petroleum for the period 04/02/14 to 03/02/15 |
| A105384 | 2015 | Rni Nl | Salmon | <1% | Annual Technical Report for the period ending 10 February 2015 Doolgunna Project (Salmon Prospect) E52/2438 |
| A105932 | 2015 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Surrender Report C166/2012 for the period 10th June 2010 to 9th |
| A107219 | 2015 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report C213 |
| A107298 | 2015 | Faultline Resources Pty Ltd | Three Rivers | <1% | ANNUAL REPORT For the Period 19 September 2014 to 18 September 2015 THREE RIVERS 2015 Annual Technical Report |
| A107368 | 2015 | Thundelarra Limited | Red Bore | 100% | Annual Technical Report, M52/597 (Red Bore Project), for the period 6 November 2014 to 5 November 2015, Peak H |
| A106182 | 2015 | Thundelarra Limited | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2014 to 10 June 2015, Peak Hil |
| A101119 | 2014 | Talisman Mining Ltd | Springfield | <1% | Springfield Project, Annual Report for the period 25/11/2012 to 24/11/2013, E52/2282, 2313, 2466. [C97/2010] |
| A101509 | 2014 | Sandfire Resources Nl | Doolgunna | 39% | Doolgunna Project 2013 Mineral Exploration Annual Report Combined Report Group for the period 01/01/2013 to 3 |
| A102869 | 2014 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11 June 2013 to 10 June 2014, Peak Hi |
| A103095 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report C166/2012 for the period 1st July 2013 to 30th Jun |
| A103176 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Final Report Royalties For Regions Co-Funded Government-Industry Drilling Program 2013/14 Doolgunna Drilling P |
| A103726 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, E52/2049 Partial Surrender Report for the period 27th October 2008 to 28th September 2014 |
| A103929 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | DOOLGUNNA PROJECT E51/1079, E51/1168, E51/1301, E51/1303-1304, E52/2049 & P51/2624–2627 COMBINED ANNUAL REPORT |
| A104315 | 2014 | Thundelarra Limited | Red Bore | 100% | ANNUAL TECHNICAL REPORT M52/597 (RED BORE PROJECT) FOR THE PERIOD 6 November 2013 to 5 November 2014 |
| A101132 | 2014 | Ausgold Limited | Doolgunna Station | <1% | Doolgunna Station Project, Final Surrender Report for the period 07/01/2009 to 30/12/2013, E52/2162. |
| A101593 | 2014 | Talisman Mining Ltd | Halloween West | <1% | Halloween West Joint Venture Project - Annual Exploration Report for the period 9 February 2013 to 8 February |
| A101729 | 2014 | Talisman Mining Ltd | Halloween | 1% | Halloween P52/1241 Annual Exploration Report for the period 18 March 2013 to 17 March 2014 |
| A102786 | 2014 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Western Tenement | <1% | Peak Hill-Doolgunna-Western Tenements Project, Final Surrender Report for the period 12th August 2013 to 29 Ma |
| A104100 | 2014 | Lodestar Minerals Ltd | Peak Hill - Doolgunna | <1% | Peak Hill - Doolgunna Project E52/2512 Annual Report for the period 12th August 2013 to 11th August 2014 |
| A96999 | 2013 | Thundelarra Exploration Ltd | Doolgunna | 3.7% | Doolgunna (JV) Project, Annual Report for the period 6th November 2011 to 5th November 2012, E52/2402 ; M52/59 |
| A97283 | 2013 | Talisman Mining Ltd | Halloween West | <1% | Halloween West Joint Venture Project - Annual Exploration Report for the period 9 February 2012 to 8 February |
| A97896 | 2013 | Talisman Mining Ltd | Halloween | 1% | Halloween Project, Annual Report for the period 18th March 2012 to 17th March 2013, P52/1241. |
| A98732 | 2013 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report (C166/2012) for the period 10th June 2012 to 9th J |
| A98809 | 2013 | Thundelarra Exploration Ltd | Curara Well | <1% | Annual Technical Report on E52/2402 (Curara Well Project) for the period 11June 2012 to 10 June 2013, Peak Hil |
| A99923 | 2013 | Lodestar Minerals Ltd | Peak Hill - Doolgunna | <1% | Peak Hill - Doolgunna E52/2403, E52/2512 (C138/2010) Annual Report for the period 12th August 2012 to 11th Aug |
| A100360 | 2013 | Thundelarra Exploration Ltd | Red Bore | 100% | Annual Technical Report on M52/597 (Red Bore Project) for the period 6 November 2012 to 5 November 2013, Peak |
| A97521 | 2013 | Sandfire Resources Nl | Doolgunna | 40% | Doolgunna Project 2012 Mineral Exploration Annual Report Combined Report Group C261/2011 E52/1698, E52/1699, |
| A99937 | 2013 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049, P51/2516-2517, P51/2624-242 |
| A92542 | 2012 | Thunderlarra Exploration Ltd | Doolgunna | 3.7% | Doolgunna Project, Annual Report for the period 6th November 2010 to 5th November 2011, M52/597; E52/2402. ( |
| A92617 | 2012 | Ausgold Limited | Doolgunna | <1% | Doolgunna Project, Annual Report for the period 07/01/2011 to 06/01/2012, E52/2162. |
| A92783 | 2012 | Talisman Mining Ltd | Springfield | <1% | Annual Exploration Report for the period 25 November 2010 to 24 November 2011, Springfield Combined Reporting |
| A93251 | 2012 | Sandfire Resources Ltd | Doolgunna | 40% | Doolgunna Project, Annual Report for the period 01/04/2011 to 31/12/2011, E52/1698-1699, 1715, 2208-2209, 2358 |
| A93282 | 2012 | Ascidian Prospecting Pty Ltd; Resource And Investment Nl | Cow Hole Bore (Doolgunna) | <1% | Cow Hole Bore (Doolgunna) Project, Annual Report for the period 11th February 2011 to 10th February 2012, E52/ |
| A93411 | 2012 | Chrysalis Resources Limited | Doolgunna West | <1% | Exploration completed in the Doolgunna West Project E52/2275 for the period 9th Feb 2011 to 8 Feb 2012 |
| A93667 | 2012 | Talisman Mining Ltd | Halloween | 1% | Halloween P52/1241 Annual Exploration Report for the period 18 March 2011 to 17 March 2012 |
| A95425 | 2012 | Lodestar Minerals Ltd | Peak Hill - Doolgunna | <1% | PEAK HILL-DOOLGUNNA PROJECT – WESTERN TENEMENTS E52/2403, E52/2418, E52/2430, E52/2431, E52/2512 ANNUAL TECHNI |
| A95573 | 2012 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, Combined Annual Report C213/2008, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52 |
| A96770 | 2012 | Talisman Mining Ltd | Springfield | <1% | Springfield Project, Annual Report for the period 25th November 2011 to 24th November 2012, E52/2313, E52/2466 |
| A97558 | 2012 | Resource And Investment Nl | Doolgunna - Cow Hole Bore | <1% | Annual Report for Exploration License E52/2438 for the Period 11 February 2012 to 10 February 2013 [Doolgunna |
| A94824 | 2012 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404 Annual Report For the Period 10th June 2011 to 9th June 2012 |
| A89042 | 2011 | Ausgold Exploration Pty Ltd | Doolgunna (Three Rivers) | <1% | Annual report for the period 7 January 2010 to 6 January 2011, Doolgunna Project, E52/2162 |
| A89066 | 2011 | Thunderlarra Exploration Ltd | Doolgunna | 3.7% | Annual Technical Report, Doolgunna Project, Combined Annual Report C102/2010, M52/597 & E52/2402, For the peri |
| A89154 | 2011 | Talisman Mining Ltd | Springfield | <1% | Springfield, Annual Exploration Report for the period 25 November 2009 to 24 November 2010 (C97/2010) |
| A89909 | 2011 | Ascidian Prospecting Pty Ltd; Resource And Investment Nl | Doolgunna | <1% | Annual Report for Exploration Licence E52/2438, 11 February 2010 to 10 February 2011 |
| A90180 | 2011 | Talisman Mining Ltd | Halloween | 1% | Halloween Project, Annual Report for the period 18th March 2010 to 17th March 2011, P52/1241. |
| A90310 | 2011 | Chrysalis Resources Limited | Doolgunna West | <1% | Doolgunna West Project, Annual Report for the period 09/02/2010 to 08/02/2011, E52/2275. |
| A90315 | 2011 | Sandfire Resources Nl | Doolgunna | 40% | Doolgunna Project, Annual Report for the period 31/03/2010 to 30/03/2011, E52/1698-1699, 1715, 2208-2209, 2358 |
| A90896 | 2011 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E52/2404 Annual Report for the period 10th June 2010 to 9th June 2011 |
| A91741 | 2011 | Lodestar Minerals Ltd | PEAK HILL - DOOLGUNNA | <1% | PEAK HILL-DOOLGUNNA PROJECT – WESTERN TENEMENTS E52/2403, E52/2418, E52/2430, E52/2431, E52/2512 ANNUAL TECHNI |
| A91803 | 2011 | Enterprise Metals Ltd | Revere | <1% | Revere Project , E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049 M51/818, P51/2516-2517, P51/2 |
| A85846 | 2010 | Ausgold Exploration Pty Ltd | Peak Hill East | <1% | Annual report for the period 7 January 2009 to 6 January 2010, Peak Hill East Project, E52/2162 |
| A86515 | 2010 | Chrysalis Resources Limited | Doolgunna West | <1% | Annual Report Doolgunna West Project Exploration Licence 52/2275, for the period 09/02/2009 TO 08/02/2010 |
| A87302 | 2010 | Talisman Mining Ltd | Halloween | 1% | P52/1241, Halloween Project, Annual Exploration Report for the period 18 March 2009 to 17 March 2010 |
| A87341 | 2010 | Sandfire Resources Nl | Doolgunna | 40% | Combined Annual Mineral Exploration Report Doolgunna Project C164/2005 2010A, Report Period 31 March 2009 to 3 |
| A88349 | 2010 | Lodestar Minerals Ltd | Peak Hill - Doolgunna | <1% | PEAK HILL-DOOLGUNNA PROJECT C138/2010– WESTERN TENEMENTS E52/2403, E52/2418, E52/2430, E52/2430 ANNUAL TECHNIC |
| A88652 | 2010 | Enterprise Metals Ltd | Revere | <1% | Revere Project E52/2049 Annual Report for the period 27 October 2009 to 26 October 2010 |
| A81452 | 2009 | Peak Resources Ltd | DOOLGUNNA | <1% | Doolgunna Project Surrender Report on Exploration 29th October 2004 to 24th October 2008 E52/1650, E52/1661 & |
| A82285 | 2009 | Sandfire Resources Nl | DOOLGUNNA | 43% | COMBINED ANNUAL MINERAL EXPLORATION REPORT DOOLGUNNA PROJECT C164/2005, REPORTING PERIOD: 31 MARCH 2008 to 30 |
| A84199 | 2009 | Sandfire Resources Nl | DOOLGUNNA | 25% | Voluntary Partial Surrender Mineral Exploration Report Doolgunna Project E52/1698, Reporting Period: 01 August |
| A85357 | 2009 | Enterprise Metals Ltd | Revere | <1% | Revere Project E52/2049 Annual Report for the period 27 October 2008 to 26 October 2009 |
| A78498 | 2008 | Peak Resources Ltd | Doolgunna | <1% | Doolgunna - Annual Report on Exploration Report Period:1st March 2007 to 28th February 2008 E52/1650, E52/1661 |
| A78846 | 2008 | Sandfire Resources Nl | Doolgunna | 37% | COMBINED ANNUAL MINERAL EXPLORATION REPORT REPORTING PERIOD: 31 MARCH 2007 TO 30 MARCH 2008 DOOLGUNNA PROJECT |
| A79032 | 2008 | Uranium Equities Ltd | Three Rivers | <1% | Final Surrender Report for the Period 26 July 2007 - 12 May 2008, Three Rivers Project, E52/1935 |
| A79938 | 2008 | Sandfire Resources Nl | Doolgunna | 25% | PARTIAL SURRENDER MINERAL EXPLORATION REPORT REPORTING PERIOD: 01 AUGUST 2005 TO 31 JULY 2008 |
| A74149 | 2007 | Peak Resources Ltd | Doolgunna | <1% | Doolgunna Project E52/1661 Annual Report for the Period 27th Oct 2005 to 26th Oct 2007 (Peak Hill) |
| A74865 | 2007 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Pinnacle Bore E52/1500, Surrender Report, Period: 7 June 2002 - 10 January 2007, Technical Report No.1226 |
| A75198 | 2007 | Sandfire Resources Nl | Doolgunna | 37% | Combined Annual Mineral Exploration Report Reporting Period: 31 March 2006 to 30 March 2007 Doolgunna Project |
| A75252 | 2007 | Peak Resources Ltd | Doolgunna | <1% | Annual Report - C6/2007, 1st Anniversary - 28th February 2007, Doolgunna, E52/1650, E52/1661, E52/1838. |
| A72536 | 2006 | Sandfire Resources Nl | Doolgunna | 37% | Combined Annual Mineral Exploration Report, 31 March 2005 to 30 March 2006, Doolgunna Project E52/1697-1699,17 |
| A73277 | 2006 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Pinnacle Bore E52/1500, Annual Report, Period 8 June 2005 to 7 June 2006, (Barrick Report No. 1196, Peak Hill) |
| A73323 | 2006 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Pinnacle Bore E52/1500, Partial Surrender Report, Period 7 June 2002 to 6 June 2006, Combined Reporting No. C9 |
| A70903 | 2005 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Project 6409, Pinnacle Bore, E52/1500, Annual report, Period 8 June 2004 - 7 June 2005, Technical report No. 1 |
| A71013 | 2005 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Project 6409, Pinnacle Bore, E52/1500, Surrender report, Period 7 June 2002 - 6 June 2005, Technical report No |
| A67017 | 2003 | Barrick Gold Of Australia Ltd | Pinnacle Bore | 1% | Project 6409, Pinnacle Bore, E52/1500 Annual Report , Period 8 June 2002 to 7 June 2003, Project C94/1999: Ba |
| A64137 | 2002 | Troy Resources Nl | Red Bore | 18% | Partial Surrender Report for the period 26 March 1997 to 27 October 2001, E52/1130, Red Bore Project. |
| A65050 | 2002 | Troy Resources Nl | Red Bore | 18% | Red Bore Project, Final Surrender Report for the Period 26 March 1997 to 27 March 2002. Tenement E52/1130. |
| A63961 | 2001 | Rio Tinto Exploration Pty Ltd | Kayak | <1% | Fourth Annual Report for the period ending 10th September 2001 E52/1239, Kayak, Diamonds programme. Peak Hill |
| A63820 | 2001 | Rio Tinto Exploration Pty Ltd | Northern Star | 21% | Fourth Annual Report on the North Star JV exploration licence E52/1226 (Sakaldis) for the period ending 27/07/ |
| A61870 | 2000 | Troy Resources Nl | Red Bore | 18% | Red Bore Project, Partial Surrender Report for the period 26th March 1997 to 2nd August 2000, E52/1130. |
| A62000 | 2000 | Bougainvillaea Holdings Pty Ltd | Peak Hill Bore | <1% | Annual Mineral Exploration Report Peak Hill Bore exploration licence 52/1368 for the period 27th October 1999 |
| A60830 | 2000 | Troy Resources Nl | Red Bore | 18% | Red Bore Project, Annual Report, 26/03/1999 to 25/03/2000, E52/1130. |
| A60985 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | 21% | Partial Relinquishment Report on the North Star JV Exploration Licence E52/1226(Sakaldis) for the Period endin |
| A61219 | 2000 | Rio Tinto Exploration Pty Ltd | Sakaldis | 21% | Third Annual Report on the North Star JV Exploration Licence E52/1226 (Sakaldis) for the Period Ending 27/07/2 |
| A61570 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | <1% | Third Annual report for the period ending 10/09/2000, E52/1239, Kayak, Peak Hill SG50-08, Western Australia, P |
| A58340 | 1999 | Troy Resources Nl | Red Bore | 18% | Red Bore Project , Annual Report March 1998 to May 1999, E52/1130. |
| A59104 | 1999 | Rio Tinto Exploration Pty Ltd | Doolgunna | 21% | Second Annual Report on Exploration for Diamonds on North Star JV Exploration Licence E51/1225 (Sakalidis) for |
| A59231 | 1999 | Astro Mining Nl | Doolgunna | 12% | Joint Annual/Surrender Report, Doolgunna, E51/395, E52/740- 742, for the Period 19 April 1998 to 18 April 1999 |
| A59248 | 1999 | Rio Tinto Exploration Pty Ltd | North Star | <1% | Second Annual Report on Exploration for Diamods on North Star Joint Venture, Exploration Licence E52/1239 (Kay |
| A55923 | 1998 | Astro Mining Nl | Doolgunna | 12% | Exploration Licences E51/395, E52/740-742 'C288/1997 - Doolgunna' Joint Annual Report for the Period 19 April |
| A56259 | 1998 | Troy Resources Nl | Toorndinnian | 16% | Annual Report Toorndinnia Project Exploration Licence 52/1076 Peak Hill District Western Australia 10/09/1997 |
| A54889 | 1998 | Troy Resources Nl | Red Bore | 18% | Red Bore Project, Annual Report for the period March 1997 to May 1998 E52/1130. |
| A54893 | 1998 | Troy Resources Nl | Gale Well | 30% | First Annual Report, Gale Well Project 18/04/97 to 17/04/98 Exploration Licence: E52/1138 Troy Resources NL Re |
| A56279 | 1998 | North Star Resources Nl | Doolgunna | <1% | Doolgunna Project Exploration Licence E52/1239 :Kayak", Peak Hill Mineral Field Western Australia. |
| A56320 | 1998 | North Star Resources Nl | Doolgunna | 21% | North Star Resources N.L., Doolgunna project, Exploration Licence E52/1226, Sakalidis, Peak Hill Mineral Field |
| A55085 | 1997 | Mr O'Meara Dw | Peak Hill Bore | <1% | Surrender Report relating to the Prospectivity of Exploration Licences E52/1124,1213, & 1214 situated at Peak |
| A51987 | 1997 | Mr Harrison Ra | Red Bore - Doolgunna | 18% | Non-statutory Report: Interim Geological Report, E52/1130, Red Bore - Doolgunna Project, January 1997. |
| A53107 | 1997 | Wmc Resources Ltd | Toorndinnia | 16% | First Annual Report for the period 10/09/1996 to 09/09/1997 Toorndinnia Project Exploration Licence 52/1076 1: |
| A48134 | 1996 | Mines & Resources Australia Pty Ltd | Gale Bore | 8.6% | Gale Bore Project, Final Annual & Surrender Report for period 6th May 1995 to 24th May 1996, E52/630. |
| A48755 | 1996 | Great Central Mines Nl | Sorenson Bore | 15% | Exploration Licences E51/395 and E42/741-742 (Inclusive) Sorenson Bore Project Joint Report for the Period 30 |
| A44881 | 1995 | Afmeco Pty Ltd | Gale Bore | 8.6% | Gale Bore Project, Annual Report Exploration Licence E52/630 for period 06/05/1994 to 05/05/1995. |
| A44944 | 1995 | Great Central Mines Nl | Noonyareena Hill | 13% | Exploration Licences E51/395, E52/733 and E52/741-742 (Inclusive) Noonyareena Hill Annual Report for the Perio |
| A45212 | 1995 | Sabminco Nl | Red Bore | 100% | Red Bore Project ,P52/698, Annual Report for the period 13/5/1994 to 12/5/1995 |
| A45882 | 1995 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | <1% | Annual report for the period 09/94-09/95 Ruby Bore - Good Pool Project E51/321 E51/357 E51/367 E57/391 E52/554 |
| A46231 | 1995 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | <1% | Surrender Report for the period 01/10/95-20/11/95 Ruby Bore - Good Pool Project E51/391 E52/554-557 E52/668 E5 |
| A41104 | 1994 | Great Central Mines Nl | Noonyareena Hill | 12% | Exploration Licences E51/395 and E52/740 (inclusive) Noonyareena Hill, Annual Report for the Period 19 March 1 |
| A44020 | 1994 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | <1% | Annual report for the period 09/93-09/94 Ruby Bore-Good Pool Project. |
| A40646 | 1994 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | <1% | Annual report for the period 09/92-09/93 Ruby Bore-Good Pool Project. |
| A41463 | 1994 | Afmeco Pty Ltd | Gale Bore | 8.6% | Gale Bore Project, Annual Report for the period 06805/1993 to 05/05/1994, E52/630. |
| A41651 | 1994 | Gb Barnes And Associates | Red Bore | 100% | Red Bore Project,P52/698,for the period 01/05/1993 -01/05/1994. |
| A38124 | 1993 | Cra Exploration Pty Ltd | Ruby Bore | <1% | Annual report for the period 09/91-09/92 Ruby Bore Project E51/321 E52/220 E52/222 E52/224 E52/226 E52/527 E52 |
| A38727 | 1993 | Afmeco Pty Ltd | Gale Bore | 8.6% | Gale Bore Project, Annual Report for the period 06/05/1992 to 05/05/1993, E52/630. |
| A10592 | 1982 | Chevron Exploration Corp | Noonyereena | 44% | Noonyereena Project, Final Surrender Report for the period ending 22nd January 1982, TR70/7642H. |
| A9872 | 1981 | Chevron Exploration Corp | Noonyereena | 44% | Noonyereena Project, Annual Report, April 1981,TR70/7642H. |
| A9536 | 1980 | Uranex Pty Ltd | Robinson Range | 6.1% | Robinson Range Project, Non-statutory Report: Interim Report, June -July 1980, MC52/3188,3541-3542, 3977,4082- |
| A2876 | 1972 | Western Mining Corporation Ltd | Doolgunna | 17% | Doolgunna Project, Non-statutory Report for the year ending 30th June 1972, MC52/455-462, 472-477 & 780-812. |
| A1747 | 1971 | Western Mining Corporation Ltd | Thaduna | 16% | Thaduna Project, Non-statutory Report: Pecussion Drill Assay & Log Sheets, June 1971, TR70/5439 & 5440H. |
| A1735 | 1971 | Western Mining Corporation Ltd | Thaduna | 19% | Thaduna Project, Non-statutory Report: Vacuum Drill Assay Sheets, File 2, June 1971, TR70/5439H. ( Vol 2) |
| A1744 | 1971 | Western Mining Corporation Ltd | Thaduna | 19% | Thaduna Project, Non-statutory Report: Vacuum Drill Hole Assay Sheets MJV612- MJV646 inc., June 1971, TR70/543 |
| A1734 | 1971 | Western Mining Corporation Ltd | Thaduna | 19% | Thaduna Project, Non-statutory Report: Soil Sampling at Well 8, June 1971, TR70/5439H. |
| A1746 | 1971 | Western Mining Corporation Ltd | Thaduna - Good Pool | 16% | Thaduna - Good Pool Project, Non-statutory Report: Soil Sampling at Good Pool, June 1971, TR70/5439 & 5440H. |
| A1748 | 1971 | Western Mining Corporation Ltd | Thaduna | 16% | Thaduna Project, Non-statutory Report: Geochemical Data Plans, June 1971, TR70/5439 & 5440H. |
| A1749 | 1971 | Western Mining Corporation Ltd | Thaduna - Red Bore | 16% | Thaduna - Red Bore Project, Non-statutory Report: Vacuum Drillilng Traverses,for period ending 01/03/1971, TR7 |
| A1750 | 1971 | Western Mining Corporation Ltd | Thaduna | 16% | Thaduna Project, Non-statutory Report: Final Report for the period 01/02/1969 to 31/01/1970, TR70/5439 & 5440H |
| A9473 | 1971 | Western Mining Corporation Ltd | Thaduna | 14% | Thaduna Project, Non-statutory Report: Terminal Report for the period 21/02/1969 to 30/03/1971, TR70/5439 & 54 |
| A124 | 1971 | Western Mining Corporation Ltd | Thaduna | 16% | Thaduna Report |
| A9097 | 1970 | Western Mining Corporation Ltd | Doolgunna | 85% | Doolgunna Project, Annual Report for the year ending 30th June 1970, MC52/184P. |
| A9504 | 1970 | Western Mining Corporation Ltd | Thaduna | 14% | Thaduna Project, Non-statutory Report:Report on Rock & Ironstone Assays, September 1970, Tr70/5439-5440H; MC5 |
| A51931 | 1753 | Astro Mining Nl | Sorenson Bore | 15% | Exploration Licences: E51/395, E52/741-742 ,C347/1995, Sorenson Bore Project Joint Annual Report for the Perio |
| A131754 | Sandfire Resources Limited | Monty, Doolgunna | 39% | Downhole drilling data for donated drillholes |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 52/4397 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4397 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4397? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.