Register summary
- Holder
- Gullewa Gold Project Pty Ltd
- Local government
- Shire of Yalgoo
- Application received
- 10 Feb 2006
- Commenced
- 5 Aug 2007
- Expiry
- 4 Aug 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A140743 | 2024 | Silver Lake Resources Limited | Blueberry Grove (Brandy Hill) | 30% | DAG2023/00891240 – Defining the stratigraphy of Blueberry Grove (Brandy Hill) - R27 |
| A135928 | 2023 | Minrex Resources Limited | Deflector Extended | <1% | Annual Report for Deflector Extended E59/1657 for the period ending 11/7/2023 |
| A131901 | 2022 | Minrex Resources Limited | Deflector Extended | <1% | 2022 Annual Report on the Deflector Extended E59/1657, East Pilbara, WA. for the period ending 11/07/2022. |
| A128463 | 2021 | Silver Lake Resources Pty Ltd | Deflector Group 1 | 30% | Partial Surrender Report for E59/1241 Deflector Project Group 1 for the period ending 04/08/2021 |
| A128480 | 2021 | Silver Lake Resources Limited | Deflector Project Group 2 | <1% | Partial Surrender Report for E59/1242 Deflector Project Group 2 for the period 10 July 2007 to 7 July 2021 |
147 more reports
| A126263 | 2021 | Coventry Enterprises Pty Ltd | Gullewa | <1% | Annual Technical Report E59/2096 Gullewa Project for the period ending 06/01/2021 |
| A128488 | 2021 | Silverlake Resources Ltd | Deflector Group 1 | <1% | Partial Surrender Report for E59/1240 Deflector Project Group 1 for the period 10 July 2007 to 5 July 2021 |
| A128017 | 2021 | Minrex Resources Limited | Deflector Extended | <1% | Annual Report for E59/1657 Deflector Extended Project for the period ending 11/07/2021 |
| A122828 | 2020 | Coventry Enterprises Pty Ltd | Gullewa | <1% | Annual Technical Report, Gullewa E59/2096, For the Period 6 January 2019 to 5 January 2020 |
| A122958 | 2020 | Silver Lake Resources Limited | Deflector Group 1 | 12% | Annual Technical Report for the Period 1st January 2019 to 31st December 2019 - Deflector Project Group 1 Comb |
| A123249 | 2020 | Silver Lake Resources Limited | Deflector | <1% | Annual Technical Report ending 31st December 2019 - Gullewa Project Group 2 Combined Report, C170/2017 |
| A124565 | 2020 | Minrex Resources Limited | Deflector Extended | <1% | Annual Report for E59/1657 Deflector Extended project for the period 12 July 2019 to 11 July 2020 |
| A124394 | 2020 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo C4/2020, E 59/01350, E 59/02349 Annual Report for the period ending 9 July 2020 |
| A119196 | 2019 | Doray Minerals Limited | Deflector Group 1 | 12% | Annual Technical Report for the Period 1st January 2018 to 31st December 2018 - Deflector Project Group 1 Comb |
| A119517 | 2019 | Doray Minerals Limited | Deflector | <1% | Annual Technical Report ending 31st December 2018 – Gullewa Project Group 2 Combined Report for the period 1 J |
| A120896 | 2019 | Minrex Resources Limited | Deflector Extended | <1% | 2019 Annual Report on the Deflector Extended Project E59/01657 for the period 12 July 2018 to 11 July 2019 |
| A119278 | 2019 | Coventry Enterprises Pty Ltd | Gullewa | <1% | Annual Technical Report E59/2096 Gullewa Project for the period 6 January 2018 to 5 January 2019 |
| A120677 | 2019 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual report E59/1350 Buddadoo Project for the period 10 July 2018 to 9 July 2019 |
| A120692 | 2019 | Silver Lake Resources Limited | Deflector | 27% | DAG2018/01278658 Deflector North (R#17) |
| A116004 | 2018 | Doray Minerals Limited | Deflector | 12% | Deflector Project Area C169/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E59/01240, E |
| A116348 | 2018 | Doray Minerals Limited | Gullewa | <1% | Annual Technical Report ending 31st December 2017 – Gullewa Project Group 2 Combined Report - C170/2017, E59/0 |
| A117180 | 2018 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | E59/1350 Buddadoo Project Annual Report for the period 01/08/2017 - 09/07/2018 |
| A117468 | 2018 | Minrex Resources Limited | Deflector Extended | <1% | 2018 Annual Report on Deflector Extended Project - E59/1657, 12 July 2017 - 11 July 2018 |
| A116263 | 2018 | Coventry Enterprises Pty Ltd | Gullewa | <1% | Annual Technical Report E59/2096 Gullewa Project for the period 06/01/2017 - 05/01/2018 |
| A114482 | 2017 | Doray Minerals Limited | Gullewa | 30% | DAG2016/00827515 (Round 13) - EIS Gearless Well Drill Program - Deflector Project |
| A111929 | 2017 | Deflector Mining Limited | Gullewa | 9% | Gullewa Project Combined Report C15/1997 Annual Technical Report For the Period 1 January 2016 to 31 December |
| A114377 | 2017 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo Project E59/01350 Annual Report for the period 6 July 2016 to 31 July 2017 |
| A114510 | 2017 | Minrex Resources Limited | Deflector Extended | <1% | 2017 Annual Report on Deflector Extended Project - E59/1657 For the Period 12 July 2016 to 11 July 2017 |
| A108133 | 2016 | Doray Minerals Ltd | Gullewa | 9% | Gullewa Project Combined Annual Report - C15/1997, 1st January 2015 to 31st December 2015, E59/1240, E59/1241, |
| A109296 | 2016 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report For the Period 10 July 2015 to 9 July 2016 BUDDADOO PROJECT E59/01350 |
| A109677 | 2016 | Minrex Resources Limited | Deflector Extended | <1% | Annual Report on the Deflector Extended Project E59/01657 for the period 12 July 2015 to 11 July 2016 |
| A104719 | 2015 | Mutiny Gold Ltd | Gullewa | 9% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2014, E59/1134.....P59/1737 |
| A105968 | 2015 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Buddadoo Project E59/1350 Annual Report for the period 10 July 2014 to 9 July 2015 |
| A106438 | 2015 | Doray Minerals Ltd | Gullewa | <1% | Surrender Report E59/1134 Gullewa Project for the period 11/01/2006 to 08/01/2015 |
| A106605 | 2015 | Minrex Resources Nl | Deflector Extended | <1% | Annual Report on the Deflector Extended Project E59/1657 for the period 1 July 2014 – 30 June 2015 |
| A102607 | 2014 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Partial Surrender Report for Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2008 to 014/0 |
| A102735 | 2014 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | BUDDADOO PROJECT ANNUAL REPORT For EXPLORATION LEASE E59/1350 Gullewa Region, WA 10th July 2013 – 9th July 201 |
| A104089 | 2014 | Minrex Resources Nl | Deflector Extended | <1% | 2014 Annual Report on the Deflector Extended Project E59/1657 for the period 1 July 2013 – 30 June 2014 |
| A99925 | 2013 | Brandy Hill Iron Pty Ltd | Brandy Hill | <1% | Partial Surrender Report for Tenement E59/1240 (Gullewa) for the period ended 9 July 2013 |
| A99927 | 2013 | Gullewa Gold Project Pty Ltd | Gullewa | <1% | Partial Surrender Report for E59/1242 (Gullewa) for the period ended 9 July 2013 |
| A100683 | 2013 | Enterprise Uranium Ltd | Yalgoo | <1% | Yalgoo Project C13/2011 – 2013 Combined Surrender Report E59/1632, E59/1633, E59/1645, E59/1651, E59/1787, P59 |
| A96545 | 2013 | Mutiny Gold Ltd | Gullewa | 8.3% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2012, E59/1134.......P59/1737 |
| A98568 | 2013 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2012 to 09/07/2013 |
| A99518 | 2013 | Minrex Resources Nl | Deflector Extended | <1% | 2013 Annual Report on the Deflector Extended Project E59/1657 for the period 1 July 2012 – 30 June 2013 |
| A99926 | 2013 | Gullewa Gold Project Pty Ltd | Gullewa | 30% | Partial Surrender Report for Tenement E59/1241 (Gullewa) for the period ended 4 August 2013 |
| A100262 | 2013 | Enterprise Metals Ltd; Enterprise Uranium Ltd | Yalgoo | <1% | Yalgoo Project C13/2011 – 2013 Combined Annual Report for the period 25 September 2012 to 24 September 2013 E5 |
| A101029 | 2013 | Mutiny Gold Ltd | Gullewa | 8.3% | Gullewa Project, Annual Report for the period 01/01/2013 to 31/12/2013, E59/1134, 1240-1242 & 1274; M59/49, 68 |
| A92777 | 2012 | Mutiny Gold Ltd | Gullewa | 8.3% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2011 |
| A94896 | 2012 | Minrex Resources Nl | Gullewa | <1% | Gullewa Project Annual Exploration Report E59/1657. 12/07/2011 – 11/07/2012 |
| A95119 | 2012 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2011 to 09/07/2012. |
| A96147 | 2012 | Enterprise Metals Ltd | Yalgoo | <1% | Yalgoo Project, Annual Report for the period 25th September 2011 to 24th September 2012, E59/1437, 1632, 1633, |
| A89392 | 2011 | Mutiny Gold Ltd | Gullewa | 8.3% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2010 |
| A91428 | 2011 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report E59/1350 Buddadoo Project For the period 10th July 2010 – 9th July 2011 |
| A92243 | 2011 | Enterprise Metals Ltd | Yalgoo | <1% | Yalgoo Project Combined Annual Report 25 September 2010 to 24 September 2011, E59/1437, 1632, 1633, 1645, 1651 |
| A86867 | 2010 | Atw Gold Corp Pty Ltd | Gullewa | <1% | Gullewa Partial Surrender Report for E59/1134 for the Period 11/01/6 to 10/01/10 |
| A84241 | 2009 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report E59/1350 Buddadoo Project, For the period 10/07/08 –09/07/2009 |
| A81712 | 2009 | Atw Gold Corp Pty Ltd | GULLEWA | <1% | Partial Relinquishment Report for E59/1134, Gullewa Project, Report Period: 10 January 2007 – 10 January 2009 |
| A85441 | 2009 | Atw Gold Corp Pty Ltd | Gullewa | 8.3% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2009, M59/132, M59/133, M59/224, |
| A80757 | 2008 | Atw Gold Corp Pty Ltd | GULLEWA | 8.3% | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2008 |
| A77005 | 2007 | Batavia Mining Limited | Gullewa | 8.3% | Gullewa Project C15/1997. Annual Technical Report for the year ending 31 December 2007. |
| A74115 | 2007 | Batavia Mining Ltd | Gullewa | 16% | Gullewa Project (C15/1997), E59/877, E59/960....,M59/49, M59/68....,M59/1640...,P59/1671 to P59/1674, Annual R |
| A74776 | 2007 | Batavia Mining Ltd | Gullewa | <1% | Gullewa Project. Exploration Licence E59/1134. Annual Technical Report for the year ending 10 January 2007. |
| A71846 | 2006 | Batavia Mining Ltd | Gullewa | 19% | Gullewa Gold Project, E59/877, E59/960..., M59/49.., P59/1671 to P59/1674, Annual Technical Report for the per |
| A72428 | 2006 | Batavia Mining Ltd | Gullewa Gold | <1% | Gullewa Gold Project E59/1129, Final Surrender Report 3 February 2006, (Yalgoo). |
| A70325 | 2005 | Batavia Mining Ltd | Gullewa | 18% | Gullewa Gold Project,(C15/1997),E59/877, E59/988...,M59/49, ....,M59/132...,P59/1640, P59/1641 and P59/1659 to |
| A69132 | 2004 | Batavia Mining Ltd | Gullewa | 19% | Gullewa Gold Project, Annual technical report for the period 1 January 2003 to 31 December 2003, C15/1997, M59 |
| A68211 | 2004 | Te Johnston And Associates Pty Ltd | Gullewa | 8.5% | Annual report for the period 05/12/2002-04/12/2003 Gullewa Project E59/960 |
| A66195 | 2003 | King Solomon Mines Ltd | Gullewa | 15% | Annual Report for the period 1 January 2002 - 31 December 2002 Gullewa Gold Project C15/1997: M59/49, 68, 132, |
| A64235 | 2002 | King Solomon Mines Pty Ltd | Gullewa | 18% | Annual Report on exploration activities for exploration licence 59/877 the period up to 14/12/2001. |
| A64726 | 2002 | King Solomon Mines Ltd | Murchison / Gullewa | 19% | Murchison Copper Gold Project (previously known as Gullewa Project) (M59/49, 68, 132, 294, 335, 336, 356, 391, |
| A61606 | 2001 | King Solomon Mines Pty Ltd | Gullewa | 12% | Gullewa Project M59/49,68,132,294,335,336,356,391,392,442, 507, E59/295,575,877. Annual Report for the Period |
| A60809 | 2000 | Gullewa Ltd | Gullewa 2 | 5.8% | Gullewa 2 Project, Non-statutory Report (CD format), July 2000,E59/360, 419, 438, 457, 459, 483 etc ( Multiple |
| A61529 | 2000 | Centaur Mining & Exploration Ltd | The Buddadoo | <1% | Exploration Licences, E59/889,891-892, Prospecting Licences P59/1499-1500, C81/1999-Buddadoo, Joint Annual Rep |
| A58397 | 1999 | Gullewa Gold Nl | Widgullia | 9.5% | Partial Surrender Report E59/575 for the period 20/01/1995 to 20/05/1999 (Widgullia Project). |
| A59830 | 1999 | Gullewa Gold Nl | Gullewa | 19% | Annual Report for the Gullewa Project, E59/360,575, P59/1300 -1302, 1060, M59/49,68,356,371,442,507 for the Pe |
| A59831 | 1999 | Gullewa Gold Nl | Acacia | 7.8% | Annual Report for the Acacia Joint Venture, E59/295,355,621, 568,132,294,335,336,391,392,397,296,348 for the P |
| A73371 | 1999 | Gullewa Gold Nl | White Cliffs | 13% | White Cliffs Kaolin Deposit E59/575,877,M59/531, Preliminary Geological Investigation, (Period 02/99, Yalgoo) |
| A56997 | 1999 | Acacia Resources Ltd | Gullewa | 7.8% | 1998 Annual Report Gullewa JV E59/295,E59/355,E59/621E59/568 M59/132,M59/394,M59/335,M59/336,M59/391,M59/392,M |
| A57796 | 1999 | Julia Mines Nl | Gullewa | 9.5% | Exploration Licence E 59/575, Gullewa JointVenture Annual Report for Year ending 19th January1999. |
| A58396 | 1999 | Gullewa Gold Nl | Gullewa | 10% | Gullewa Project, Final Surrender Report for the period ending 27th May 1999, M59/371; P59/1300-1302. |
| A58617 | 1999 | Acacia Resources Ltd | Gullewa | 4.6% | Gullewa (JV) Project, Partial Surrender Report, E59/295, Report for the period ending 09/06/1999. |
| A54306 | 1998 | Gullewa Gold Nl | Widgullia | 9.5% | Partial Surrender Report for Exploration Licence E59/575 (Widgullia Project) for the period 20/01/1995 to 19/0 |
| A54307 | 1998 | Gullewa Gold Nl | Olivers Well | 16% | Partial Surrender Report for Exploration Licence E59/568 for the period 20/01/1995 to 23/12/1997. |
| A55860 | 1998 | Gullewa Gold Nl | Buddadoo | <1% | Surrender Report for Exploration Licence E59/483 (Buddadoo Project) for the period 26th November 1992 to 30th |
| A57348 | 1998 | Acacia Resources Ltd | Gullewa | 15% | Annual Report for the Gullewa Project for the period 01/01/1998 to 31/12/1998 for E59/360,E59/483,E59/575, GML |
| A55101 | 1998 | Gullewa Gold Nl | Gullewa | 12% | Annual Report for the Gullewa Project for the period 01/01/1997 to 31/12/1997 E59/355,360,568,621,295,483,585, |
| A52779 | 1997 | Gullewa Gold Nl | Buddadoo | <1% | Buddadoo Project, Partial Surrender Report for the period 26th November 1992 to 7th July 1997, E59/483. |
| A53404 | 1997 | Gullewa Gold Nl | Alpine | 4.6% | Partial Surrender Report - Exploration Licence: E59/295 10/06/90 - 16/10/97 (Alpine Project) |
| A50269 | 1997 | Gullewa Gold Nl | Gullewa | 8.3% | Gullewa Project, Annual Report for the period 01/01/1996 to 31/12/1996 Report No. 1996/32. |
| A48122 | 1996 | Gullewa Gold Nl | Gullewa 1 | 5.4% | Annual report 1994 to 1995 Gullewa 1 Project period 01/11/94 to 31/10/95 |
| A48562 | 1996 | National Resources Exp Ltd | Gullewa 2 | 5.5% | Annual Report 1994 to 1995 Gullewa 2 Project Period 01/01/1995 to 31/12/1995 Yalgoo 1:250,000 Sheet SH50-2 NRE |
| A49694 | 1996 | National Resources Exp Ltd | Golden Stream | 4.1% | Annual report for M59/68 Golden Stream for the period 9th December 1993 to 8th December 1996 Report No 1996/25 |
| A50681 | 1996 | Gullewa Gold Nl | Pillia Well/ Pillia East | <1% | Pillia Well/ Pillia East Project, Partial Surrender Report E59/483 for the period 26th November 1992 to 25 Nov |
| A43346 | 1995 | National Resources Exp Ltd | Gullewa 1 | 5.3% | Annual Report for Gullewa 1 Project to 31 October 1994 E59/189,294,295,331,457,M59/132,258,294,296,333,334,348 |
| A43992 | 1995 | National Resources Exp Ltd | Gullewa 2 | 5.1% | Annual Report for Gullewa 2 Project to 31 December 1994 Tenements:E59/355,360,361,378,419,438,480,454,459,483 |
| A44470 | 1995 | National Resources Exp Ltd | Gullewa | 20% | Gullewa Annual report on exploration activities Tenements P59/1300-1302 March 3rd 1994 to March 2nd 1995 |
| A45275 | 1995 | National Resources Exp Ltd | Old Broad Dam/ Gullewa | 42% | Old Broad Dam/ Gullewa Project, Annual Report P59/1195-1199 for period 21st June 1994 to 20th June 1995. |
| A40186 | 1994 | National Resources Exp Ltd | Golden Stream | 4.1% | Annual Report for the period 09/12/92-08/12/93 Golden Stream Project M59/68 |
| A40661 | 1994 | Sons Of Gwalia Ltd | Gullewa 2 | 4.8% | Annual Report for the period 01/01/93-31/12/93 Gullewa 2 Project E59/360,361,378,419,438,454,459,480,483 P59/1 |
| A41706 | 1994 | National Resources Exp Ltd | Gullewa 1 | 28% | Gullewa 1 Project, Partial Surrender Report for the period ending 10/02/1994, E59/294. |
| A41747 | 1994 | Sons Of Gwalia Ltd | Gullewa 2 | 50% | Gullewa 2 Project, Partial Surrender Report for the period 26/03/1991 to 25/03/1994, E59/360. |
| A42007 | 1994 | National Resources Exp Ltd | Old Broad Well | 42% | Old Broad Well Project, Annual Report for the period ending 21st June 1994, P59/1195 -1199. |
| A42070 | 1994 | Sons Of Gwalia Ltd | Gullewa 3 | 13% | Gullewa 3 Project, Partial Surrender Report for the period ending 12/01/1994, E59/355. |
| A42563 | 1994 | National Resources Exp Ltd | Gullewa - Barnong Station | <1% | Gullewa -Barnong Station Project, Annual report on Exploration Acitivties Tenements P59/993 August 27, 1993 to |
| A42645 | 1994 | National Resources Exp Ltd | Golden Stream | 4.1% | Period 09/12/93 to 08/12/94 Yalgoo Mineral Field M59/68 Golden Stream Gold Prospect |
| A37800 | 1993 | Sons Of Gwalia Nl | Gullewa 1 | 5.5% | Gullewa 1 (JV) Project, Annual Report for the period 01/11/1991 to 31/10/1992, M59/132 M59/145 M59/146 M59/243 |
| A38806 | 1993 | Sons Of Gwalia Ltd | Gullewa 2 | 4.8% | Gullewa 2 Project, Annual Report for the year ending 31/12/1992, E59/360-361, 378, 419, 438, 454, 459, 480 & |
| A39076 | 1993 | Sons Of Gwalia Ltd | Gullewa 3 | 12% | Annual Report. Gullewa 3 Project, E59/355 and P59/993. For the period 7 May 1992 to 6 May 1993.SOG Ltd. |
| A40350 | 1993 | Sons Of Gwalia Ltd | Gullewa | 5.3% | Annual Report for the Period 01/11/92 - 31/10/93 Gullewa Project |
| A38648 | 1993 | Sons Of Gwalia Ltd | Gullewa 1 | 28% | E59/294, Gullewa 1. Partial surrender report for portions relinquished 10/2/93 |
| A36952 | 1992 | Sons Of Gwalia Ltd | Gullewa 3 - Barnong Station | 12% | Annual Report for the Period 07/05/91 - 06/05/92, Gullewa 3- Barnong Station Project E59/355; P59/993 |
| A36837 | 1992 | Sons Of Gwalia Nl | Gullewa 2 | 18% | Gullewa 2 Project, Annual Report for the period 01/01/199 to 31/12/1991, E59/360-361,378 & 419; P59/1060 |
| A34885 | 1991 | Sons Of Gwalia Nl | Gullewa 1 | 5.9% | Gullewa 1 Project, Annual Report for the period to 2nd September 1991, M59/132,145,146,197; E59/294,295,189,3 |
| A35496 | 1991 | Mr Haren Rj | Barnong Station | <1% | Annual report Prospecting Licence P59/993 25/09/90-24/09/91 (Barnong Station, Yalgoo). |
| A36865 | 1991 | Ivernia West Plc | Buddadoo | 5.8% | Non-statutory Report: Geological Report on the Buddadoo Project, E59/303, July 1991. |
| A36879 | 1991 | Ivernia West Plc | Buddadoo | 5.8% | Summary report. Buddadoo Vanadium-Titanium Project, WA. |
| A33460 | 1991 | Sons Of Gwalia Nl | Gullewa | 6.2% | Gullewa Project, Annual Report for the period 01/03/1990 to 01/03/1991, E59/294 & 331. |
| A31419 | 1990 | Ivernia West Plc | Buddadoo | 5.8% | Non-statutory Report: Davis Tube Testing on drillcore of Diamond DrillHole DDH1. Buddadoo Vanadium - Titanium |
| A31420 | 1990 | Ivernia West Plc | Buddadoo | 5.8% | Non-statutory Report: Buddadoo Vanadium-Titanium. Initial RAB drilling reserves. October-November 1989. E59/30 |
| A31421 | 1990 | Ivernia West Plc | Buddadoo | 5.8% | Buddadoo Project, Non-statutory Report: Diamond Drilling Survey, October - November 1989, E59/303. |
| A34047 | 1990 | Ivernia West Plc | Buddadoo | 5.8% | Non-statutory Report ; Magnetite/ Ilmenite, Laboratory Separation Testing, Buddadoo Vanadlum - Titanium Projec |
| A28361 | 1989 | Hunter Resources Ltd | Buddadoo Range- White Well | 12% | Buddadoo Range - White Well Project, Annual [Surrender] Report for the period ending 30/11/1988, E59/95 & 124. |
| A29727 | 1989 | Golden Plateau Nl | Golden Stream | 9.1% | Golden Stream Project, Annual Report for the period ending 08/12/1989, E59/63; M59/68. |
| A28992 | 1989 | Golden Plateau Nl | Golden Stream | 9.1% | Annual Report Golden Stream Project (E59/63 and M89/68) Gullewa Yalgoo Mineral Field W.A. (12/1989) |
| A31422 | 1989 | Ivernia West Plc | Buddadoo | 5.8% | Non-statutory Report :First assessment of Buddadoo Titanium-Vanadium Project, September 1989. |
| A24578 | 1988 | National Resources Exp Ltd | Cagacaroon | 71% | Cagacaroon Project, Annual report for period 19 June 1987 to 18 June 1988, E59/137 |
| A25027 | 1988 | Golden Plateau Nl | Golden Stream | 9.1% | Annual report on Golden Stream Project, Gullewa W.A. 10 August 1987 to 9 August 1988. Report 010/1/88 E59/63 |
| A25144 | 1988 | Goldwyn Resources Nl | Gullewa | 5.3% | E59/26 (Annual report for the period 09/1987 to 19/1988, Gullewa Project, Yalgoo). |
| A27273 | 1988 | Duke Group Ltd | Edamurta | <1% | Edamurta Project, Annual Report for the period 4th October 1987 to 3rd October 1988, E59/173. |
| A21234 | 1987 | National Resources Exp Ltd | Cagacaroon | 71% | Cagacaroon Project, Annual Report for the period ending 18/06/1987, E59/137. |
| A21407 | 1987 | Golden Plateau Nl | Golden Stream | 9.1% | Annual report E59/63 period 10/08/86 to 09/08/87 (Golden Stream Project) |
| A22201 | 1987 | Hunter Resources Ltd | Buddadoo Range | 12% | 1987 Annual report, Buddadoo Range, E59/95 and White Well, E59/124 |
| A18554 | 1986 | Hunter Resources Ltd | Buddadoo Range | 12% | 1985 Annual Report on Buddadoo Range Prospect EL 59/95 |
| A18800 | 1986 | Golden Plateau Nl | Gullewa | 9.1% | Report on Exploration Activities on Exploration Licence E59/63 Gullewa, Yalgoo Mineral Field, Western Australi |
| A19068 | 1986 | Goldfields Exploration Pty Ltd | Gullewa | 5.3% | Gullewa Project EL59/26 Yallabyne Well Progress Report P/10/86 October 1986 |
| A19126 | 1986 | Goldfields Exploration Pty Ltd | Gullewa | 1% | Gullewa Project, E59/35, Progress [non-statutory] report, June 1986 |
| A15362 | 1985 | Goldfields Exploration Pty Ltd | Gullewa | 1% | Gullewa Project, Non-statutory Report: Progress Report, February 1985, E59/35. |
| A16031 | 1985 | Goldfields Exploration Pty Ltd | Gullewa | 5.3% | Gullewa Project EL59/26 Progress Report P/4/85 1985 |
| A16111 | 1985 | Aztec Exploration Ltd | Golden Stream | 9.1% | Annual report Exploration Licence E59/63 (Golden Stream Project, 1985) |
| A13778 | 1984 | Union Oil Development Corp | Gearless Well | 70% | Gearless Well Project, Final Surrender Report for the period 4th March 1983 to 4th March 1984, E59/19. |
| A10678 | 1982 | Esso Exploration Aust Inc | Yallabyne | 12% | Yallabyne Project, Non-statutory Report: Annual Report for the period 01/01/1981 to 31/12/1981, MC59/7598-7625 |
| A7854 | 1978 | Dampier Mining Co Ltd | Gearless Well | 77% | Gearless Well Project, Non-statutory Report: Final Report, February 1978, MC59/6798 -6814. |
| A7971 | 1978 | Samin Ltd | Brandy Hill | 5.9% | Brandy Hill Project, Annual Report for the period 29th June 1977 to 27th June 1978, MC59/5321-5322, 5324-5329, |
| A7271 | 1977 | Samin Ltd | Brandy Hill | 14% | Brandy Hill Project, Annual Report for the period 30th June 1976 to 28th June 1997, MC59/5321-5329, 5351-5367, |
| A7357 | 1977 | Mines Exploration Pty Ltd | Cagacaroon | 58% | Cagacaroon Project, Non-statutory Report: Final Report , November 1977, MC59/510-512. |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | 1.1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A6514 | 1976 | Samin Ltd | Brandy Hill | 15% | Brandy Hill Project, Annual Report for the period 18th June 1975 to 29th June 1976, MC59/5321-5329............ |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A5964 | 1975 | Samin Ltd | Brandy Hill | 15% | Brandy Hill Project, Annual Report for the period 19th June 1974 to 17th June 1975, MC59/5732,5798, 5344-5347, |
| A6027 | 1975 | Samin Ltd | Brandy Hill | 15% | Brandy Hill Project, Annual Report: Plans to accompany Annual Report, Brandy Hill to June 1975. (See A5964 for |
| A6029 | 1974 | Samin Ltd | Brandy Hill | 4.5% | Brandy Hill Project, Annual Report for the period ending 18th June 1974, MC59/5732, 5798, 5344-5347, 5340-5343 |
| A88037 | 1753 | Buddadoo Metals Pty Ltd | Buddadoo | <1% | Annual Report Exploration Licence E59/1350 Buddadoo Project, for the period 10/07/2009 to 09/07/2010. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 11 months · 4 Aug 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/1241-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 59/1241-I? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.