E 59/2183
Register summary
- Holder
- Silver Lake (Rothsay) Pty Ltd
- Local government
- Shire of Perenjori
- Application received
- 30 May 2016
- Commenced
- 24 Feb 2017
- Expiry
- 23 Feb 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147523 | 2025 | Cundeelee Pty Ltd | Rothsay | <1% | Rothsay Project Final Surrender Report E59/02808 For the Period 21 February 2024 to 16 October 2024 |
| A147525 | 2025 | Cundeelee Pty Ltd | Murray Bore | <1% | Murray Bore Project Final Surrender Report E59/02810 For the Period 21 December 2023 to 16 October 2024 |
| A138300 | 2024 | Yalgoo Exploration Pty Ltd | Enchanted | <1% | E59/2230 Final Surrender Enchanted for the period ending 12/10/2023. |
| A140636 | 2024 | Firefly Resources Limited | E59/2468 Rothsay | <1% | E59/2468 Surrender Report Rothsay Project for the period ending 16/10/2023 |
| A134129 | 2023 | Gascoyne Resources (Wa) Ltd | Rothsay | <1% | Annual Mineral Exploration Report for E59/2468 – Rothsay Project, for the Period 12th January 2022 to 11th Jan |
128 more reports
| A134128 | 2023 | Gascoyne Resources (Wa) Ltd | Enchanted | <1% | Annual Mineral Exploration Report for E59/2230 – Enchanted Project, for the Period 19th January 2022 to 18th J |
| A135292 | 2023 | Silver Lake (Rothsay) Pty Ltd | Rothsay | 40% | Rothsay E59/2183 Partial Surrender Report for the period ending 23/02/2023 |
| A130609 | 2022 | Gascoyne Resources (Wa) Pty Ltd | Enchanted | <1% | Enchanted E59/2230 Annual Report for the period ending 18/01/2022 |
| A127255 | 2021 | Firefly Resources Limited | Yalgoo - Enchanted | <1% | Yalgoo Gold Project Annual Technical Report for E59/02230 (Enchanted) for the period 19th January 2020 to 18th |
| A128205 | 2021 | Minjar Gold Pty Ltd | Minjar South | <1% | Minjar South Project (C232/2007) E59/1331-I Final Surrender Report for the period 9 April 2008 to 22 September |
| A122502 | 2020 | Egan Street Rothsay Pty Ltd | Rothsay | 33% | Rothsay Project C166/1995Annual Technical Report for the period 27 November 2018 to 26 November 2019 |
| A123471 | 2020 | Silver Lake Resources Limited | Rothsay | <1% | Final Surrender Report for E59/1234, Rothsay Gold Project, 29 January 2017 to 28 January 2020 |
| A123987 | 2020 | Minjar Gold Pty Ltd | Minjar South | <1% | 2019 Annual Combined Group Technical Report - Minjar South Project for the period ending 31/12/2019 |
| A119648 | 2019 | Minjar Gold Pty Ltd | Minjar South | <1% | Minjar South C232/2007 Mineral Exploration Report for the period 1 January 2018 to 1 December 2018 |
| A119065 | 2019 | Egan Street Resources Ltd | Rothsay | 36% | Annual Report for Rothsay Project C166/1995 for the period 27/11/2017 to 26/11/2018, E59/1234, E59/2183, E59/2 |
| A119660 | 2019 | Gianni, Pr | Enchanted | <1% | Annual Tenement Report for Enchanted (E59/2230) from19/1/2018 to 18/1/2019 |
| A122146 | 2019 | Gianni, Pr | Enchanted | <1% | Annual Report for Enchanted (E59/2230) from 19 January 2019 to 18 January 2020 |
| A117165 | 2018 | Minjar Gold Pty Ltd | Minjar West | <1% | Minjar West E59/1210 Final Report for the period 26/10/2006 to 10/05/2018 |
| A116146 | 2018 | Egan Street Resources Ltd | Rothsay | 30% | ROTHSAY PROJECT C166/1995 (E59/1234, E59/1262, E59/1263, E59/1574, E59/2183, L59/24, M59/39, M59/40, P59/1746) |
| A116306 | 2018 | Minjar Gold Pty Ltd | Minjar South | <1% | Minjar South C232/2007 Annual Report for the period 01/01/2017 - 31/12/2017, E59/01327, E59/01329, E59/01330, |
| A116742 | 2018 | Auricup (Rothsay) Pty Ltd | Rothsay North Well | <1% | FINAL REPORT ON ROTHSAY NORTH WELL E59/1262 FOR THE PERIOD 10 AUGUST 2007 TO 9 AUGUST 2017 YALGOO MINERAL FIEL |
| A116743 | 2018 | Auricup (Rothsay) Pty Ltd | Rothsay North West | <1% | FINAL REPORT ON ROTHSAY NORTH-WEST E59/1263 FOR THE PERIOD 10 AUGUST 2007 TO 9 AUGUST 2017 YALGOO MINERAL FIEL |
| A112469 | 2017 | Minjar Gold Pty Ltd | Minjar South | <1% | 2016 Annual Report Minjar South C232/2007 for the period 1 January 2016 – 31 December 2016, E59/0887, E59/0935 |
| A112238 | 2017 | Egan Street Resources Ltd | Rothsay | 14% | Rothsay Project Annual Report for the period 27/11/2015 to 26/11/2016, C166/1995, E59/1234, E59/1262, E59/126 |
| A112471 | 2017 | Minjar Gold Pty Ltd | Minjar | <1% | 2017 Final Report E59/1139 for the period 13 October 2005 – 8 February 2017 |
| A114308 | 2017 | Minjar Gold Pty Ltd | Minjar West | <1% | Minjar West Project C118/2016 Annual Report For the Period 1 May 2016 to 30 April 2017, E59/01203, E59/01210, |
| A108370 | 2016 | Minjar Gold Pty Ltd | Minjar South | <1% | 2015 Annual Report Minjar South C232/2007 Report Period: 1 January 2015 – 31 December 2015 |
| A108608 | 2016 | Minjar Gold Pty Ltd | Minjar | 26% | 2016 FINAL REPORT E59/1136 Tenement: E59/1136 31 OCTOBER 2005 TO 4 FEBRUARY 2016 Yalgoo Mineral Field, WESTERN |
| A108807 | 2016 | Auricup Resources Ltd | Rothsay | 14% | Annual Report for Rothsay Project C166/1995 Western Australia, E59/1234, E59/1262, E59/1263, M59/39, M59/40 fo |
| A108974 | 2016 | Minjar Gold Pty Ltd | Karara | 6.8% | Combined Annual Technical Report C82/2007 KARARA PROJECT Tenements: E59/1070, E59/1136, E59/1139, E59/1140, E5 |
| A109522 | 2016 | Minjar Gold Pty Ltd | Minjar | 52% | Minjar Project P59/1796 Final Surrender Report for the period 24 June 2008 – 23 June 2016 |
| A105230 | 2015 | Minjar Gold Pty Ltd | Minjar South | <1% | Combined Annual Report for the Period 1/1/2014 – 31/12/2014 Minjar South Project C232/2007, E59/0887....P59/20 |
| A105345 | 2015 | Auricup Resources Ltd | Rothsay | 14% | Annual Report for Rothsay Project C166/1995 for the period 27/11/2013 to 26/11/2014, E59/1234, E59/1262, E59/1 |
| A105641 | 2015 | Minjar Gold Pty Ltd | Minjar | 33% | E59/1070 Final Report Minjar Gold Project for the period 12/09/2002 to 30/04/2015 |
| A105698 | 2015 | Gindalbie Metals Ltd | Karara | 8.8% | Karara Project C82/2007 Combined Annual Report for the period 01/05/2014 to 30/04/2015, E59/1070, E59/1136, E5 |
| A105938 | 2015 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | 1.9% | Karara Iron Project C82/2007 Annual Report to the Department of Mines and Petroleum for the period 01/05/15 to |
| A106311 | 2015 | Gindalbie Metals Ltd | Karara | <1% | Karara Iron Project C82/2007 Final Surrender Report for the period September 7 2008 to June 18 2015, E59/1522, |
| A101379 | 2014 | Minjar Gold Pty Ltd | Minjar South | <1% | 2013 Annual Report Minjar South Project C232/2007 Combined Annual Report for the Period 1/1/2013 – 31/12/2013, |
| A102270 | 2014 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | 2.5% | Karara Iron Project C82/2007 Annual Report for the period 01/05/13 to 30/04/2014, E59/817-I, E59/1068-I, E59/1 |
| A100728 | 2014 | Auricup Resources Ltd | Rothsay | 13% | Rothsay Project C166/1995 E59/1234, E59/1262, E59/1263, E59/1455, E59/1574, L59/24, M59/39, M59/40, P59/1746) |
| A102409 | 2014 | Gindalbie Metals Ltd | Damperwah Hills | <1% | Damperwah Hills Project, Final Surrender Report E59/1535 for the period 16 June 2009 to 4 June 2014. |
| A98329 | 2013 | Gindalbie Metals Ltd | Karara | 1.6% | Karara Project, Annual Report for the period 01/05/2012 to 30/04/2013, C82/2007. |
| A97137 | 2013 | Minjar Gold Pty Ltd | Minjar South | <1% | 2012 Annual Report MINJAR SOUTH PROJECT C232/2007 Combined Annual Report for the Period 1/1/2012 – 31/12/2012, |
| A96478 | 2013 | Auricup Resources Pty Ltd | Rothsay | 13% | Rothsay Project C166/2005 Annual Report for the period 27/11/2011 to 26/11/2012, E59/1234, E59/1262, E59/1263, |
| A98328 | 2013 | Gindalbie Metals Ltd | Karara | <1% | Karara Project, Final Surrender Report for the period 13/10/2005 to 31/05/2013, E59/1140. |
| A98767 | 2013 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | <1% | Karara Project, Final Surrender Report[s] for the period 13/10/2005 to 31/05/2013, E59/1140. |
| A93186 | 2012 | Minjar Gold Pty Ltd | Minjar South | <1% | 2011 Annual Report Minjar South Project C232/2007 combined annual report for the period 1/1/2011 – 31/12/2011 |
| A94032 | 2012 | Karara Mining Ltd | Karara | 1.5% | Karara Project C82/2007 Annual Report for the period 01/05/11 to 30/04/12. |
| A93255 | 2012 | Auricup Resources Pty Ltd | Rothsay | 13% | Rothsay Project, Annual Report for the period 27/11/2010 to 26/11/2011, E59/1234, 1262-1263, 1455 & 1574; M59 |
| A89816 | 2011 | Minjar Gold Pty Ltd | Karara | <1% | KARARA IRON ORE PROJECT MINJAR JOINT VENTURE MINJAR SOUTH C232/2007 2010 ANNUAL REPORT FOR THE PERIOD 01/01/20 |
| A88934 | 2011 | Silver Lake Resources Ltd | Rothsay | 13% | Annual Report for Rothsay Project 27/11/2009 to 26/11/2010, C166/1995, E59/1234, E59/1262, E59/1263, E59/1455, |
| A90773 | 2011 | Karara Mining Ltd | Karara | 1.5% | Karara Iron Project C82/2007, Annual Report to the Department of Mines and Petroleum for the period 01/05/10 t |
| A87070 | 2010 | Karara Mining Ltd | Karara | 2.8% | Karara Iron Ore Project Annual Combined Report for the period 30/04/2009 - 01/05/2010 E 59/817-I, E 59/1068-I, |
| A86536 | 2010 | Minjar Gold Pty Ltd | Minjar South | <1% | MINJAR SOUTH COMBINED REPORTING GROUP ANNUAL REPORT FOR THE PERIOD 01/01/2009 to 31/12/2009 |
| A88656 | 2010 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 10 September 2009 – 9 September 20 |
| A81262 | 2009 | Silver Lake Resources Ltd | Rothsay | 9.8% | Annual Report for Rothsay Project Western Australia, 27/11/2007 to 26/11/2008 |
| A82654 | 2009 | Gindalbie Metals Ltd | Karara | 9.7% | KARARA IRON ORE PROJECT, MINJAR GOLD E59/1070, E59/1136, E59/1139, E59/1203, E59/1210, M59/379, M59/380 2008 A |
| A82650 | 2009 | Minjar Gold Pty Ltd | MINJAR SOUTH | <1% | C232/2007 MINJAR SOUTH – GROUP #2 COMBINED REPORTING GROUP ANNUAL REPORT FOR THE PERIOD 05/06/2008 to 04/06/20 |
| A85531 | 2009 | Silverlake Resources Ltd | Rothsay | 9.7% | Annual Report for Rothsay Project WA, Reporting period 27/11/2008–26/11/2009, Combined Reporting Group: C166/2 |
| A81695 | 2009 | Dominion Mining Ltd | MULGINE WELL | <1% | SURRENDER REPORT E59/1386 MULGINE WELL PROJECT, From 7 August 2008 to 13 February 2009 |
| A84478 | 2009 | Sinosteel Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report, Combined Report Group C4/2001 Leases E59/1059, E59/1175, M59/59 |
| A77082 | 2008 | Silver Lake Resources Ltd | Rothsay | 10% | Annual Report, Rothsay Project, (M59/39 and M59/40, E59/1234 and E59/1262-3, P59/1745-7: C166/1995), For the p |
| A77411 | 2008 | Monarch Gold Mining Company Ltd | E59/1140 | <1% | 2006/07 ANNUAL REPORT FOR PERIOD 13/10/06 to 12/10/07 E59/1140 |
| A77492 | 2008 | Monarch Gold Mining Company Ltd | E59/1136 | 26% | E59/1136 2006/07 ANNUAL REPORT FOR PERIOD 31/10/06 to 30/10/07 Yalgoo Mineral Field Western Australia |
| A77589 | 2008 | Karara Management Services Pty Ltd | Karara | <1% | Karara Iron Ore Project, Minjar Joint Venture E59/991, E59/983, E59/1012, E59/1021, E59/1023, E59/1139, M59/37 |
| A77659 | 2008 | Monarch Gold Mining Company Ltd | E59/1139 | <1% | E59/1139 2006/07 ANNUAL REPORT FOR PERIOD 13/10/06 to 12/10/07 Yalgoo Mineral Field Western Australia |
| A77733 | 2008 | Monarch Gold Mining Company Ltd | Yalgoo | <1% | E59/1210 2006/07 ANNUAL REPORT FOR PERIOD 26/10/06 to 25/10/07 . |
| A79551 | 2008 | Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group Annual Report Combined Report Group C4/2001 Leases E59/971, E59/1059, E59/1175 |
| A74306 | 2007 | Royal Resources Ltd | Rothsay | <1% | Annual Report, Rothsay Project (M59/39, M59/40, C166/1995), For the Period 4 December 2005 to 3 December 2006, |
| A75740 | 2007 | Monarch Gold Mining Company Ltd | Minjar South | 2.7% | Minjar South Project Area Annual Report For Period 01/06/06 to 31/05/07, Group Reporting No. C21/2002 |
| A76386 | 2007 | Midwest Corporation Ltd | Blue Hill Range | <1% | Blue Hills Range Tenement Group, Annual Report Combined Report Group C4/2001 Leases E59/971, E59/1059, E59/ 11 |
| A76695 | 2007 | Monarch Gold Mining Company Ltd | Rothsay/ Karara/ Minjar | 33% | E59/1070 2006/07 Annual Report for period 12/09/06 to 11/09/07, Yalgoo Mineral Field, Western Australia |
| A72204 | 2006 | United Gold Ltd | Rothsay | <1% | Annual Report, Rothsay Project M59/39,40, Combined Reporting No. C166/1995, Murchison Province, For the Period |
| A72331 | 2006 | Gindalbie Metals Ltd | Rothsay/ Karara/ Minjar | 33% | E59/1070, 2003/04 Annual Report for Period 12/09/03 to 11/09/04, Yalgoo Mineral Field, WA |
| A72332 | 2006 | Gindalbie Metals Ltd | Rothsay/ Karara/ Minjar | 33% | E59/1070, 2004/05 Annual Report for Period 12/09/04 to 11/09/05, Yalgoo Mineral Field, WA |
| A73592 | 2006 | Midwest Corporation Ltd | Blue Hills Range | <1% | Blue Hills Range Tenement Group, Combined Report Group C4/2001, Lease E59/971, E59/1059, E59/1175, M59/595 and |
| A73637 | 2006 | Monarch Gold Mining Company Ltd | Minjar South | 1.8% | Minjar South Project Area. 2005/06 Annual Report for the period 01/06/05 to 31/05/06. Combined Reporting Group |
| A73640 | 2006 | Monarch Gold Mining Company Ltd | Rothsay/ Karara/ Minjar | 33% | 2005/06 Annual Report for the period 12/09/05 to 11/09/06 Rothsay Project E59/1070 Yalgoo Mineral Field |
| A73753 | 2006 | Monarch Gold Mining Company Ltd | E59/1139 | <1% | E59/1139, 2005/06 Annual Report for Period 13/10/05 to 12/10/06, (Rothsay Project, Perenjori). |
| A73752 | 2006 | Monarch Gold Mining Company Ltd | E59/1140 | <1% | E59/1140, 2005/06 Annual Report for Period 13/10/05 to 12/10/06, (Rothsay Project, Perenjori). |
| A73744 | 2006 | Gindalbie Metals Ltd | Minjar South | 1.8% | Minjar South Project Area, 2005/06 Annual Report for Period 01/06/05 to 31/05/06, Combined Reporting No. C21/2 |
| A73754 | 2006 | Monarch Gold Mining Company Ltd | E59/1136 | 26% | E59/1136, 2005/06 Annual Report for Period 31/10/05 to 30/10/06, (Rothsay Project, Perenjori). |
| A71452 | 2005 | Midwest Corporation Ltd | Blue Hills | <1% | Blue Hills tenement group, Annual report, Combined report group C4/2001, Leases E59/971,E59/1059,E59/1175,M59/ |
| A70302 | 2005 | United Gold Ltd | Rothsay | <1% | Rothsay Project, Annual Report for the period 04/12/2003 to 03/12/2004, M59/39, M59/40.(C166/1995) |
| A71289 | 2005 | Gindalbie Metals Ltd | Minjar South | 2% | Minjar South Project Area, E59/519,632,671,723,817,849-850, 1021,1023,1047, M59/431,552, P59/1599,1611-1612, 2 |
| A68031 | 2004 | Thundelarra Exploration Ltd | Rothsay | <1% | Annual Report, Rothsay Project (M59/39 and M59/39/40: C166/1995) Murchison Province, Western Australia for the |
| A69048 | 2004 | Gindalbie Gold Nl | Minjar South | 2.7% | Annual report for the period 01/06/03 - 31/05/04 Minjar South Project, C21/2002 |
| A65803 | 2003 | Gindalbie Gold Nl | Minjar South | 4.3% | Minjar South Project , E59/403, E59/486, E59/519, E59/632 , E59/671, E59/817, E59/849, E59/850. 2001/02 Annual |
| A66187 | 2003 | Thundelarra Exploration Ltd | Rothsay | <1% | Annual Report for the period 27 November 2001 to 26 November 2002 Rothsay Project C166/1995: M59/39 and M59/40 |
| A66808 | 2003 | Gindalbie Gold Nl | Minjar South | 12% | Minjar South Project Area, E59/850, Partial Relinquishment Report for the period 15/12/99 to 06/06/03, [C21/20 |
| A67759 | 2003 | Gindalbie Gold Nl | Minjar South | 2.8% | Annual report for the period 01/06/2002 - 31/05/2003 Minjar South Project. Group Reporting No. C21/2002 |
| A65313 | 2002 | Thundelarra Exploration Ltd | Rothsay | <1% | Annual Report, Rothsay Project, M59/39 and M59/40, (C166/1995). Murchison Province, Western Australia for the |
| A61855 | 2001 | Thundelarra Exploration Ltd | Rothsay | <1% | Annual Report Rothsay Gold Project Thundelarra Exploration Ltd & Central West Gold NL Joint Venture for the ye |
| A62123 | 2001 | Gindalbie Gold Nl | Minjar South | 5.5% | Annual Report for the period ended 31 July 2000, Minjar South Project, E59/486, E59/519, E59/403, E59/632, E5 |
| A62751 | 2001 | Thundelarra Exploration Ltd | Warriedar | 12% | Warriedar Project, Annual Report For E59/850 Murchison Province Western Australia For The Period 15 December 1 |
| A60809 | 2000 | Gullewa Ltd | Gullewa 2 | <1% | Gullewa 2 Project, Non-statutory Report (CD format), July 2000,E59/360, 419, 438, 457, 459, 483 etc ( Multiple |
| A57696 | 1999 | Resource Exploration Nl | Rothsay | 4.2% | Annual Report - Rothsay Project - Murchison Province W.A. 25/11/97 - 24/11/98 E59/408, 723, 722 |
| A59193 | 1999 | Normandy Gold Ltd | Minjar South | 5.5% | Minjar South Project, Annual Report for the period ending 31/07/1999, E59/486, 519, 403, 632, 671. |
| A56083 | 1998 | Normandy Exploration Ltd | Minjar | 3.7% | Combined Annual report on Exploration for the period ended 31/07/98 Minjar South E59/399 M59/373 M59/374 M59/3 |
| A53392 | 1997 | Hunter Exploration Nl | Rothsay | 26% | Rothsay Gold Project - Annual Report Hunter Exploration NL : Central West Gold NL Joint Venture Year Ended: 26 |
| A52007 | 1997 | Aztec Mining Co Ltd | Minjar | 3.4% | Combined Annual report on Exploration for period ended 31 July 1997 Minjar South M59/373 M59/374 M59/375 M59/3 |
| A52574 | 1997 | Aztec Mining Co Ltd | Rothsay | 11% | Rothsay Project, Partial Surrender Report for the period ending 2nd September 1997, E59/403. |
| A47441 | 1996 | Aztec Mining Co Ltd | Warriedar - Minjar | 6.2% | Warriedar - Minjar Project, Partial Surrender Report For Period ended 31 January 1996, E59/486. |
| A48951 | 1996 | Aztec Mining Co Ltd | Minjar South | 3.4% | Combined Annual report on Exploration for period ended 31 July 1996 Minjar South M59/373 M59/374 M59/375 M59/3 |
| A44521 | 1995 | Roxbury Mining Pty Ltd | Rothsay | 26% | Rothsay Project, Annual Report for the periods :- 04/12/1993 to 03/12/1994, M59/39-40 & 242; 11/03/1994 to 10/ |
| A44755 | 1995 | Aztec Mining Co Ltd | Warriedar- Minjar | 6.2% | Annual Report for E59/486 Warriedar_Minjar Project, for the period ended 1 February 1995. |
| A44963 | 1995 | Aztec Mining Co Ltd | RothsayMinjar | 11% | Partial surrender report on E59/403, Rothsay, Minjar Project, for period ending 13/4/95 |
| A42842 | 1994 | Aztec Mining Co Ltd | Rothsay - Minjar | 11% | Annual report on E59/403, Rothsay - Minjar Project for the period 15th August 1993 to 14th August 1994. |
| A42843 | 1994 | Aztec Mining Co Ltd | Warriedar- Minjar | 6.2% | Annual Report , E59/486, Warriedar - Minjar Project , 2 February 1993 to 1 February 1994. |
| A37848 | 1993 | Metana Minerals Nl | Karara | 12% | Karara Project, Final Surrender Report for period ending 03/10/1992, E59/175. |
| A39625 | 1993 | Aztec Mining Co Ltd | Rothsay | 11% | Annual Report to Department of Minerals and Energy WA E59/403 Rothsay 15/08/1991 to 30/09/1993 |
| A35573 | 1992 | Metana Minerals Nl | Rothsay | 12% | Rothsay Project, Partial Surrender Report for the period to 04/10/1991, E59/175. |
| A32074 | 1990 | Metana Minerals Nl | Rothsay | 12% | Rothsay Project, Partial Surrender Report for the period ending 4th October 1990, E59/175. |
| A30882 | 1990 | Acm Gold Ltd | Boojal Springs - Rothsay | 11% | Boojal Springs - Rothsay Project, Final Surrender Report, June1990, E59/272. |
| A34036 | 1990 | Metana Minerals Nl | Rothsay | 12% | Rothsay Project M59/39, M59/40, E59/175 Perenjori, Western Australia Progress report on exploration 4 December |
| A24466 | 1988 | Western United Mining Services Pty Ltd | Rothsay | 12% | Rothsay Project Yalgoo Mineral Field WA Progress report Kia Ora Report No. WA.88/31 for period 11/87-05/88 Ten |
| A16777 | 1986 | Gencor Australia Pty Ltd | Rothsay | 11% | Report on 1985 Exploration Programme The Rothsay Gold Prospect (GML59/1492 P59/196 P59/232 to P59/238) |
| A14820 | 1985 | Minefields Exploration Nl | Mount Mulgine | <1% | Exploration Report on Mount Mulgine Tenements, Yalgoo MF |
| A15778 | 1985 | Gencor Australia Pty Ltd | Rothsay | 11% | Annual report The Rothsay Gold Prospect Yalgoo Goldfield Western Australia |
| A11228 | 1982 | Aquitaine Aust Minerals Pty Ltd | Rothsay | 7.2% | Rothsay Project, Non-statutory Report: Final Report for the period ending 19/05/1982, June 1982, TR70/8397H. |
| A7612 | 1978 | Geopeko | Rothsay | 1.9% | Rothsay Project, Annual Report for the year ending 31/12/1977, TR70/6442H. |
| A7988 | 1978 | Western Mining Corporation Ltd | Rothsay | 35% | Rothsay Project, Non-statutory Report: Soil Geochemistry Results, Master File Report, September 1978, MC59/590 |
| A8070 | 1978 | Geopeko | Rothsay | 1.9% | Rothsay Project, Non-statutory Report: Final Report, December 1978, TR70/6442H. |
| A6604 | 1976 | Western Mining Corporation Ltd | Rothsay | 35% | Rothsay Project, Annual Report for the period 01/10/1974 to 30/04/1976, MC59/5903-5906 & 5971-5978. (See also |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A16768 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report: Notes on Preliminary Investigation of Aeromagnetic Anomalie |
| A2396 | 1972 | Kennecott Exp Aust Pty Ltd | Fields Find | 2.3% | Fields Find Project, Non-statutory Report: Final Report ( Paynes Find Examination) , April 1972, TR70/3800H. |
| A121 | 1969 | Geotechnics (Aust) Pty Ltd | Fields Find | <1% | Fields Find Project, Non-statutory Report: Summary of Geological & Geohpysical Investigations, March 1969, TR7 |
| A159 | 1969 | Newmont Pty Ltd | Mount Mulgine | <1% | Non-statutory Report : Progress Report on Molybdenite Prospect Mount Mulgine, Western Australia. |
| A7984 | 1753 | Kennecott Exp Aust Pty Ltd | Rothsay- Paynes Find | 35% | Rothsay - Paynes Find Project, Non-statutory Report: Final Report, December 1971, MC59/113-118. |
| A79862 | 1753 | Monarch Gold Mining Company Ltd | Minjar South | 33% | Minjar South Project Area E59/1070 2008 PARTIAL RELINQUISHMENT REPORT FOR PERIOD 12/09/03 to 11/02/08, Group R |
| A81127 | 1753 | Monarch Gold Mining Company Ltd | E59/1140 | <1% | KARARA IRON ORE PROJECT MINJAR JOINT VENTURE, E59/1140 2008 ANNUAL REPORT FOR THE PERIOD 13/10/2007 TO 12/10/2 |
| A129381 | Mcnab R A | Rothsay | <1% | Annual Report E59/02411 Rothsay project for the period 30/10/2020 - 29/10/2021 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 6 months · 23 Feb 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/2183 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 59/2183? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.