NextMapsWA TenementsE 69/4224

E 69/4224

PendingExploration LicenceShire of WilunaWarburton M.F. District
Area
48,360ha
Applied
Mar 2024
2 years ago
WAMEX reports
93
WA median is 53
Report drilling
25
of 93 reports
Wiluna Explore on the live map

Register summary

Holder
Five Wheels Pty Ltd
Local government
Shire of Wiluna
Application received
19 Mar 2024

Exploration history on this ground

93 historical WAMEX exploration reports intersect E 69/4224: 52 report geochemistry or sampling, 45 include a digital data package.
When this ground was worked
21970s
21980s
171990s
212000s
392010s
122020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154193 2026 Baracus Pty Ltd Earaheedy 1 <1% Annual Report for Earaheedy 1 E69/3841 for the period ending 07/02/2026.
A147516 2025 Recharge Resources Pty Ltd Hawkins <1% Hawkins E69/03823 Surrender Report for the period 3 February 2022 to 18 December 2024
A149974 2025 Baracus Pty Ltd Earaheedy 1 <1% Annual Report for Earaheedy 1 E69/3841 for the period ending 07/02/2025
A138205 2024 Northampton Mining Pty Ltd Earaheedy NW 84% Earaheedy NW Final Surrender report E69/3878 for the period ending 22/09/2023.
A138818 2024 Bpm Minerals Limited; Recharge Resources Pty Ltd Hawkins <1% Hawkins Project Annual Report E69/3823 for the period ending 02/02/2024.
88 more reports
A139211 2024 Baracus Pty Ltd Earaheedy 1 <1% Earaheedy 1 Annual Report for the period 8 February 2023 to 7 February 2024
A133439 2023 Zenith Minerals Limited Earaheedy - Miss Fairbairn 10% Annual Report E 69/3872 Earaheedy - Miss Fairbairn Project for the period ending 15/11/2022
A137717 2023 Mt Lockeridge Holdings Pty Ltd E69/3871 <1% Annual Report for E69/3871 for the period 25 August 2022 to 24 August 2023
A134070 2023 Bpm Minerals Limited Hawkins <1% Hawkins Project Annual Report E69/03823 for theperiod ending 02/02/2023
A134949 2023 Baracus Pty Ltd Earaheedy 1 <1% Earaheedy 1 Annual Report E69/3841 for the period ending 07/02/2023.
A137715 2023 Mt Lockeridge Holdings Pty Ltd E69/3871 <1% Surrender Report for E69/3871 for the period 25 August 2022 to 1 December 2023
A132674 2022 Northampton Mining Pty Ltd Earaheedy Northwest 36% Earaheedy Northwest Annual Report 1 Sep 2021 to 31 Aug 2022 Reporting Group C241/2022
A107865 2016 Fortescue Metals Group Ltd Fairbairn 3.1% C160/2014 Fairbairn Annual Report for the period 1 December 2014 to 30 November 2015, E 69/03177, E 69/03178,
A109899 2016 Zenith Minerals Limited Earaheedy 34% EARAHEEDY PROJECT E69/1771 Final Surrender Report For the Period 10 June 2008 to 22 July 2016
A109945 2016 Fortescue Metals Group Ltd Fairbairn 1.9% C160/2014 Fairbairn Final Surrender Report For the Period 5 August 2014 to 13 June 2016, E69/03199, E69/03237,
A104660 2015 Zenith Minerals Limited Earaheedy 64% Earaheedy Project (C49/2009) E69/2735 Final Surrender Report for the period 23 November 2010 to 12 December 20
A106100 2015 Zenith Minerals Limited Earaheedy 54% Earaheedy Project Final Surrender Report, E69/2255-I for the period 06 February 2009 to 19 January 2015
A107025 2015 Zenith Minerals Limited Earaheedy 19% ANNUAL REPORT For the Period 24 August 2014 to 23 August 2015 EARAHEEDY PROJECT Combined Annual Report C9/2010
A107360 2015 Zenith Minerals Limited Earaheedy Project 17% EARAHEEDY PROJECT C49/2009; COMBINED ANNUAL REPORT FOR PERIOD ENDING 9 OCTOBER 2015
A105840 2015 Zenith Minerals Limited Earaheedy 34% Partial Surrender Report E69/1771-I Earaheedy Project for the period 10 June 2008 to 6 May 2015
A107282 2015 Zenith Minerals Limited Earaheedy Project 34% EARAHEEDY PROJECT - C49/2009 PARTIAL SURRENDER REPORT - E69/1771-I
A107369 2015 Zenith Minerals Limited Earaheedy Project 41% EARAHEEDY PROJECT E69/2257 FINAL SURRENDER REPORT FOR PERIOD 25 November 2008 to 09 November 2015
A101322 2014 Rio Tinto Exploration Pty Ltd Karri 1 54% Annual Technical Report for Karri 1, E69/2255 for the period 6th February 2013 – 5th February 2014
A104261 2014 Zenith Minerals Limited Earaheedy 17% EARAHEEDY PROJECT C49/2009 E69/1771-I, E69/1907-I, E69/2733-I, E69/2735, E69/2736, E69/2737 COMBINED ANNUAL RE
A104262 2014 Zenith Minerals Limited Earaheedy 24% Earaheedy Project C49/2009 Partial Surrender Report, E69/1771-I, E69/2733-I, E69/2735 for the period 10 Octobe
A104264 2014 Zenith Minerals Limited Earaheedy 100% Earaheedy Project C49/2009 Final Surrender Report, E69/2734 for the period 10 October 2013 to 9 October 2014
A104266 2014 Zenith Minerals Limited Earaheedy 19% Earaheedy Project C9/2010 Partial Surrender Report, E69/2256-I, E69/2257-I for the period 24/08/2009 to 09/10/
A103236 2014 Rio Tinto Exploration Pty Ltd Earaheedy 19% Earaheedy Project Combined Annual Report Exploration Licences 69/2256 & 69/2257 (C9/2010) for the period 24 Au
A103411 2014 Fortescue Metals Group Ltd Karri Karri 1 - Fairbairn 100% Annual Report for the Period 31 August 2013 to 30 August 2014, E69/3038 (Karri Karri 1 - Fairbairn)
A104267 2014 Zenith Minerals Limited Earaheedy 54% Earaheedy Project Partial Surrender Report, E69/2255-I for the period ended 09/10/2014
A99117 2013 Rio Tinto Exploration Pty Ltd Earaheedy 19% Combined Annual Report C9/2010 Earaheedy Exploration Licences 69/2256, and E69/2257 for the period 24th August
A100116 2013 Zenith Minerals Limited Earaheedy 17% Earaheedy Project C49/2009; Combined Annual Report for the Period 10 October 2012 to 9 October 2013, E69/1771-
A96787 2013 Rio Tinto Exploration Pty Ltd Karri 1 54% KARRI 1 ANNUAL REPORT EXPLORATION LICENCE E69/2255; Annual Report for the Period 6th February 2012 to 5th Febr
A100056 2013 Fortescue Metals Group Ltd Karri Karri 1 - Fairbairn 100% Annual Mineral Exploration Report: E69/3038 (Karri Karri 1 / Fairbairn) 31 August 2012 to 30 August 2013
A92946 2012 Rio Tinto Iron Ore Karri 1 54% Annual Technical Report for Karri 1, E69/2255, for the period 6th February 2011 – 5th February 2012
A94355 2012 Zenith Minerals Limited Earaheedy 34% Partial Surrender Report, Earaheedy Project, E69/1771-I, 10 June 2008 to 9 June 2012
A94614 2012 Rio Tinto Exploration Pty Ltd Earaheedy 19% Earaheedy Project Area Combined Annual Technical Report for the period 24 August 2011 to 23 August 2012, C9/20
A96027 2012 Zenith Minerals Limited Earaheedy 17% Earaheedy Project, Annual Report for the period 10th October 2011 to 9th October 2012, E69/1771, 1907 & 2732,-
A96292 2012 Atlas Iron Ltd Earaheedy 3.1% Earaheedy Project, Annual Report for the period ending 31st December 2012, E69/1768, 1897, 2072 & 2289. [C201/
A89480 2011 Rio Tinto Exploration Pty Ltd Karri 1 54% Annual Report for the Period 6 February 2010 to 5 February 2011, E69/2255, Karri 1, Pilbara Iron Ore Programme
A91191 2011 Rio Tinto Exploration Pty Ltd Earaheedy 19% Combined Annual Report C9/2010 Earaheedy For the Period 24 August 2010 to 23 August 2011, E69/2257, Illyee 1 a
A91220 2011 Zenith Minerals Limited Earaheedy 34% Partial Surrender Report, Earaheedy Project E69/1771 for the period 10 June 2010 to 9 June 2011
A92080 2011 Intra Energy Corporation Limited Eraheedy 9.9% Final Surrender Report ERAHEEDY PROJECT, C20/2010 (tenements E69/2101,2102,2103 and2183)
A92081 2011 Atomic Resources Ltd Karri Karri 100% Partial Surrender Karri Karri Project E69/2101
A92348 2011 Zenith Minerals Limited Earaheedy 18% Earaheedy Project C49/2009; Combined Annual Report for the Period 10 October 2010 to 9 October 2011, E69/1771,
A92455 2011 Atlas Iron Ltd Earaheedy 3.1% Earaheedy Project E69/1768, E69/1897, E69/2072, E69/2289 ANNUAL TECHNICAL REPORT TOTHE DEPARTMENT OF MINES AND
A87789 2010 Rio Tinto Exploration Pty Ltd Earaheedy 19% Combined Annual Report C9/2010 Earaheedy For the Period 24 August 2009 to 23 August 2010, E69/2257, Illyee 1 a
A86099 2010 Rio Tinto Exploration Pty Ltd Karri 1 54% Annual Report For the Period 6 February 2009 to 5 February 2010, E69/2255, Karri 1, Western Australia
A88182 2010 Atomic Resources Ltd Karri Karri 100% ANNUAL REPORT FOR THE PERIOD TO 21st AUGUST 2010, KARRI KARRI PROJECT E69/2101
A88645 2010 Zinc Co Australia Limited Earaheedy 16% Earaheedy Project C49/2009, Combined Annual Report for the Period 10 October 2009 to 9 October 2010, E69/1771;
A89567 2010 Giralia Resources Nl Earaheedy 3.1% EARAHEEDY PROJECT, E69/1768, E69/1897, E69/2072, E69/2289, C 201/2007 ANNUAL TECHNICAL REPORT FOR THE PERIOD
A84888 2009 Zinc Co Australia Limited EARAHEEDY 16% COMBINED ANNUAL REPORT FOR PERIOD 10 October 2008 to 9 October 2009 EARAHEEDY PROJECT C49/2009 E69/1907, E69/1
A85115 2009 Atomic Resources Ltd Karri Karri 100% Annual report for the period 1 September 2008 - 30 August 2009
A85384 2009 Bhp Billiton Minerals Pty Ltd Nabberu 64% Surrender Mineral Exploration Report : E69/2317-I, 16 December 2008 – 26 November 2009
A85387 2009 Bhp Billiton Minerals Pty Ltd Nabberu 7.6% Surrender Mineral Exploration Report : E69/2324-I, 16 December 2008 – 26 November 2009
A85388 2009 Bhp Billiton Minerals Pty Ltd Nabberu 100% Surrender Mineral Exploration Report : E69/2315-I, Nabberu, 16 December 2008 – 26 November 2009
A85379 2009 Bhp Billiton Minerals Pty Ltd Nabberu 22% Surrender Mineral Exploration Report : E69/2322-I, 10 December 2009
A85393 2009 Giralia Resources Nl Earaheedy 3.1% Earaheedy Project E69/1768, E69/1897, E69/2072, E69/2289 Annual Report to DMP Period Ending 31 December, 2009
A85419 2009 Rio Tinto Exploration Pty Ltd ILLYEE 1 41% First Annual Report E69/2257 Illyee1 for the period 25 November 2008 to 24 November 2009
A77204 2008 Giralia Resources Nl Earaheedy 3.8% C201/2007 Earaheedy Project E69/1768,1897,2072 Annual Technical Report for the 12 months ending 31 December 20
A80753 2008 Giralia Resources Nl Earaheedy 3.1% Earaheedy Project E69/1768, E69/1897, E69/2072 Annual Report to DOIR Period Ending 31 December, 2008
A81750 2008 Atomic Resources Ltd Karri Karri 100% ANNUAL REPORT FOR THE PERIOD TO 1 SEPTEMBER 2008 for E69/2101, KARRI KARRI PROJECT, Eraheedy, Western Austral
A71413 2005 Ramelius Resources Ltd Blue Hills gold/base metals exploration 6.4% Ingebong Hills Tenement Group, Exploration licences 69/1549, 69/1653,69/1657, Warburton Mineral Field Western
A69934 2005 Ramelius Resources Ltd Blue Hills 12% Final surrender report for the period 01/02/01 - 20/01/05 Blue Hills Project, E69/1657, Wiluna, Warburton mine
A67957 2004 Ramelius Resources Ltd Blue Hills 12% Partial Surrender Report, Blue Hills Project Exploration Licence E69/1657 for the period 1/2/2001- 31/1/2004.
A69428 2004 Ramelius Resources Ltd Ingebong Hills 6.4% Combined Annual Report Ingebong Hills E69/1549, E69/1653 E69/1657 for the period 22/10/03 - 21/10/04.(C58/2002
A66702 2003 Ramelius Resources Ltd Blue Hills 12% Annual Report period 01/02/02 to 31/01/03 Blue Hills E69/1657 in Group C58/2002
A67440 2003 Ramelius Resources Ltd Ingebong Hills 6.4% Combined Technical Report for the period 22/10/02 - 21/10/03 Ingebong Hills Tenement Group C58/2002: E69/1549,
A64040 2002 Comserv Pty Ltd Blue Hills 12% Annual Report for Blue Hills EL69/1657 for the period 01/02/01 to 31/01/02 Warburton Mineral Field.
A65394 2002 Ramelius Resources Ltd Ingebong Hills 6.4% Combined Annual Report C58/2002 Ingebong Hills Tenement Group Exploration Licences 69/1549: 69/1653: 69/1657:
A65107 2002 Giralia Resources Nl Earaheedy 25% Earaheedy Project E69/1489 'Cohn Hill' Annual Report For The Period 7/4/01 - 6/4/02 GSWA Ref No: M11470
A62975 2001 Giralia Resources Nl Earaheedy l 25% Earaheedy Project E69/1489 'Cohn Hill' Annual Report For The Period 7/4/00 - 6/4/01.
A53541 1998 Rgc Exploration Pty Ltd Hawkins Knob 17% Combined Annual Mineral -Exploration Report For Period 12/07/96 to 31/12/97 Hawkins Knob Project, Exploration
A55626 1998 Adasam Pty Ltd Blue Hills 9.8% Surrender Report E69/1194 for period 30th December 1997 to 12th March 1998. (Blue Hills Prospect).
A52112 1997 Rgc Exploration Pty Ltd Hawkins Knob 31% Hawkins Knob Project, Surrender Report. September 1997, E69/1167 & 1168.
A52176 1997 Rgc Exploration Pty Ltd Hawkins Knob 9.7% Hawkins Knob Project, Partial Surrender Report, September 1997, E69/1164-1165 & E69/1169-1170.
A43524 1995 Resolute Resources Ltd Nabberu 11% Nabberu Project, Final Report E52/ 374, 375,395, E69/329,E69/507- 515, and Annual Report E69/330, E69/331, Feb
A43526 1995 Stockdale Prospecting Ltd Lake Nabberu 13% Lake Nabberu Project, Final Report Exploration Licences E69/507-511 & E69/515, February 1995.
A43527 1995 Stockdale Prospecting Ltd Lake Nabberu 2.3% Lake Nabberu Project, Final Report Exploration Licences E69/329, E69/330 ( B&C) & E69/331(A&C), February 1995.
A46923 1995 Stockdale Prospecting Ltd Lake Nabberu 21% Surrender Report for the period 06/03/92-04/01/94, Lake Nabberu Project, E69/512-514.
A40975 1994 Resolute Resources Ltd Nabberu 11% Nabberu Project, Annual Report for the period 01/08/1993 to 01/12/1993, E52/374-375, E52/ 395; E69/329-331, E6
A41579 1994 Stockdale Prospecting Ltd Lake Nabberu 16% Lake Nabberu Project, Annual Report for the period ending 5th March 1994, E69/507-515.
A39442 1993 Quicksilver Resources Nl Nabberu 23% Annual Report for the period 07/08/91-06/08/93 Nabberu Project E69/523,578-582
A37880 1993 Stockdale Prospecting Ltd Nabberu 1.3% Nabberu Project, Annual Report for the period 30th August 1991 - 29th August 1992, E52/374-375, 395; E69/329-3
A39336 1993 Stockdale Prospecting Ltd Lake Nabberu 1.3% Lake Nabberu Project, Annual Report for the period 30th August 1992 to 29th August 1993, E52/374-375, 395; & E
A38356 1993 Stockdale Prospecting Ltd Lake Nabberu 16% Lake Nabberu Project, Annual Report for the year ending 05/03/1993, E69/507-515.
A38484 1993 Stockdale Prospecting Ltd Nabberu 2.3% Nabberu Project, Partial Surrender Report for the period 10/12/1989 to 9/12/1992 ,E69/329, 330 & 331.
A34508 1991 Stockdale Prospecting Ltd Lake Nabberu 1.3% Lake Nabberu Project, Annual Report for the period 30th August 1990 to 29th August 1991, E52/374,375, 395, E69
A31900 1990 Stockdale Prospecting Ltd Lake Nabberu 1.3% Lake Nabberu Project, Annual Report for the period 30th August 1989 to 29th August 1990, E52/374,375,395; E69/
A26215 1989 Minsaco Resources Pty Ltd Nabberu 21% Final Report, Nabberu.
A9060 1980 Chevron Exploration Corp Miss Fairburn Hills 7.3% Miss Fairburn Hills, Non-statutory Report: Final Report ( A supplement to the 1979 Annual Report ), May 1980,
A8723 1979 Chevron Exploration Corp Miss Fairburn Hills 7.3% Miss Fairburn Hills Project, Annual Report for the year ending September 1979, TR70/6807 & 6808.
A7739 1978 Dampier Mining Co Ltd Nabberu Basin 2.6% Nabberu Basin Project, Non-statutory Report:Final Report, April 1978, TR70/6492-6497H.
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 69/4224 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 69/4224 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 69/4224? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.