NextMaps›WA Tenements›E 77/2560

E 77/2560

LiveExploration LicenceShire of YilgarnYilgarn M.F. District

E 77/2560 is a live exploration licence in the Shire of Yilgarn, Western Australia, held by Aurumin Mt Dimer Pty Ltd (part of Forrestania Resources Limited). Granted on 14 May 2019 for 5 years (extended), it expires on 13 May 2029. The ground is covered by 54 historical WAMEX reports.

Area
295.909ha
Expires
May 2029
in 3 years
WAMEX reports
54
WA median is 53
Report drilling
21
of 54 reports
Free Tenure Pack for E 77/2560
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 77/2560 that covers 54 WAMEX reports · 46 open-file drillholes (3,668 m drilled) · 16 earlier titles on the ground since 1992 · 1 native title claim · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Yilgarn Explore on the live map

Register summary

Holder
Aurumin Mt Dimer Pty Ltd
Part of
Forrestania Resources Limited (ASX:FRS) as at 2026-06-30
Local government
Shire of Yilgarn
Application received
18 July 2018
Commenced
14 May 2019
Expiry
13 May 2029
Term
5 Years (Extended)

The full record on E 77/2560

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares, and the one change of holder on record
  • The full record: 8 years of expenditure, 4 conditions and 11 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (8 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

54 historical WAMEX exploration reports intersect E 77/2560: 17 report geochemistry or sampling, 36 include a digital data package.
Work on record: Geophysical interpretation 10 · Geological reconnaissance 9 · RC drilling 8 · Rock chip sampling 8 · Soil sampling 8 · Mineral resource estimate 7. Resource declared in A114565 (2017), A113926 (2017), A109699 (2016), A99009 (2013) and 3 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 77/2560, free for new accounts.
When this ground was worked
71990s
102000s
272010s
102020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149061 2025 Beacon Minerals Limited P 77/4568 Surrender Report <1% P77/4568 Final Surrender Report for the period ending 10/04/2025.
A142948 2024 Aurumin Mt Dimer Pty Ltd; Beacon Minerals Limited Mt Dimer <1% Mt Dimer P 77/4568 Annual Technical Report for the period ending 11/04/2024.
A143489 2024 Aurumin Mt Dimer Pty Ltd Mount DImer <1% Surrender Report for E77/1992 for the period 17/04/2012 to 16/04/2024
A126060 2021 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 10/11/2020
A126208 2021 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Rzange E77/2226 for the Period 19/1/2015 to 12/2/2021
49 more reports
A124527 2020 Polaris Metals Pty Ltd Yilgarn Iron Ore Project East <1% Annual Report C104/2015 Yilgarn Iron Ore Project East for the period 24/6/2019 to 23/6/2020. M 77/01244,M 77/0
A123794 2020 Acertim Resources Ltd Mount Dimer <1% Annual Report on the Mt Dimer Project C42/2002 for the period ending 30/3/2020
A123974 2020 Abrossimov A Mount Dimer 100% Annual Report on the Mt Dimer Project, E77/2560 for the period 14th May 2019 to 13th May 2020
A123990 2020 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 18/1/2020
A124664 2020 Aurum Minerals Pty Ltd Mount Dimer <1% Mount Dimer P77/4081 and P77/4086 Surrender Report for the period ending 02/08/2020
A119706 2019 Golden Iron Resources Ltd Mount Dimer <1% Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2018 to 30th March 2019
A120389 2019 Polaris Metals Pty Ltd Yilgarn East <1% Combined Annual Report C104/2015 Yilgarn East Iron Ore Project for the period 24/6/2018 to 23/6/2019, M77/0124
A117505 2018 Polaris Metals Pty Ltd Yilgarn Iron Ore (East) <1% Combined Annual Exploration Report Yilgarn iron Ore (East) Project, C104/2015, 24 June 2017 - 23 June 2018
A116911 2018 Polaris Metals Pty Ltd Yilgarn West <1% Final Surrender E77/1543 Yilgarn Iron Ore West For the Period 7 August 2012 to 7 March 2018
A117064 2018 Golden Iron Resources Ltd Mount Dimer 11% Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2017 to 30th March 2018, E77/01992, E
A118028 2018 Golden Iron Resources Ltd Mount Dimer 100% Final Surrender Report E77/2050 for the period 22nd October 2012 to 18th July 2018
A114565 2017 Polaris Metals Pty Ltd Yilgarn East <1% Combined Mineral Exploration Report Yilgarn Iron Ore (East) C104/2015 For the Period 24 June 2016 to 23 June 2
A113926 2017 Golden Iron Resources Ltd Mount Dimer 11% Mount Dimer Project C42/2002 Annual Report for the period 31 March 2016 to 30 March 2017, E77/01992, E77/02050
A115053 2017 Polaris Metals Pty Ltd Yilgarn <1% Combined Annual Exploration Report for the period from 2 September 2016 to 1 September 2017 Yilgarn Iron Ore P
A109699 2016 Polaris Metals Pty Ltd Yilgarn East <1% Yilgarn Iron Ore East Combined Annual Mineral Exploration Report C104/2015, E77/01418, M77/01244, M77/01261, M
A108961 2016 Toil Resources Pty Ltd Mount Dimer 11% Mt Dimer Annual Report C42/2002, M77/427, M77/428, M77/965, M77/957, M77/958, E77/1992, E77/2050, P77/4081 & P
A110439 2016 Polaris Metals Pty Ltd Yilgarn West <1% C96/2015 Combined Annual Mineral Exploration Report for 2 Sept 2016 to 1 Sept 2016, E77/01543, E77/01739, E77/
A106666 2015 Polaris Metals Pty Ltd Yilgarn <1% Combined Annual Report – C83/2003 Yilgarn Iron Ore Project for the period 24 June 2014 to 23 June 2015
A107402 2015 Imperial Resources Management Pty Ltd Bungalbin Hill <1% Annual Technical Report Bungalbin Hill Project C148/2012 for the period 1 July 2013 to 30 June 2014, E77/1359
A103605 2014 Polaris Metals Pty Ltd Yilagarn <1% Yilgarn Iron Ore Project C83/2003 Combined Annual Report for the period 24 June 2013 to 23 June 2014
A101579 2014 Vector Resources Ltd Mount Dimer 11% Mount Dimer Project, Annual Report for the period 31/03/2013 to 30/03/2014, M77/427-428, 957-958, & 965; E77/1
A103814 2014 Imperial Resources Management Pty Ltd Bungalbin Hill <1% ANNUAL TECHNICAL REPORT BUNGALBIN HILL PROJECT FOR THE PERIOD 1 July 2013 to 30 June 2014, E77/1377.
A99730 2013 Imperial Resources Management Pty Ltd Bungalbin Hill <1% Annual Technical Report Bungalbin Hill Project E77/1377 for the period 1 July 2012 to 30 June 2013
A97618 2013 Vector Resources Ltd Mount Dimer <1% Mount Dimer Project, Annual Report for the period 31st March 2012 to 30th March 2013, M77/427-428, 957-958, 96
A98008 2013 Polaris Metals Pty Ltd Yilgarn 20% Yilgarn Project, Final Surrender Report for the period 14th March 2008 to 25th February 2013, E77/1129.
A99009 2013 Independence Group Nl; Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Iron Ore Project Combined Annual Report for C83/2003 Reporting Period 24 June 2012 – 23 June 2013, E15
A93733 2012 Polaris Metals Pty Ltd Yilgarn 20% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 9th March 2012 , E77/11
A94669 2012 Imperial Resources Management Pty Ltd Bungalbin Hill <1% Annual Mineral Exploration Report, Bungalbin Hill Project E77/1377, for the period 01/04/2011 to 31/03/2012
A94781 2012 Independence Group Nl; Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project Annual Report for the period 24th June 2011 to 23 June 2012, E15/1196; E16/410; E7
A91315 2011 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project, Annual Report for the period 24th June 2010 to 23rd June 2011, E16/370; E77/842, 9
A89679 2011 Polaris Metals Pty Ltd Yilgarn 20% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 13th March 2011, E77/11
A88125 2010 Polaris Metals Nl Yilgarn <1% Yilgarn (Iron Ore) Project , Annual Report for the period 24th June 2009 to 23rd June 2010, E16/370; E77/842,
A80837 2009 Scimitar Resources Ltd Bungalbin 4.5% Bungalbin Project E 77/1106, Final Relinquishment Report for the Period 17th October 2003 to 16th October 2008
A82500 2009 Sullivan M P MT DIMER 28% MT DIMER GOLD PROJECT SURRENDER REPORT M77/964, PERIOD: 20/08/2007 to 20/02/2009
A84365 2009 Cauldron Energy Ltd; Polaris Metals Nl Yilgarn <1% Yilgarn Project, Annual Report for the period 24th June 2008 to 23rd June 2009, E77/842, 919, 946, 1076-1077,
A79425 2008 Polaris Metals Nl Yilgarn <1% Yilgarn Project, Annual Report for the period 24th June 2007 to 23rd June 2008, E77/946, 1076-1077, 1097, 1099
A78033 2008 Scimitar Resources Ltd Bungalbin 4.5% Bungalbin Project E77/1106 Partial Surrender Report to the Department of Industry and Resources for the Period
A74670 2007 Scimitar Resources Ltd Bungalbin 4.5% Bungalbin Project E77/1106 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 (Jackson)
A75316 2007 Scimitar Resources Ltd Bungalbin 4.5% Bungalbin Project E77/1106 Partial Surrender Report for the period 17th October 2003 to 16th October 2006
A73052 2006 Scimitar Resources Ltd Bungalbin 4.5% Bungalbin Project E77/1106, Annual Report for the Period 17 October 2004 to 16 October 2005, (Jackson).
A61950 2001 Tectonic Resources Ltd Mount Dimer <1% Mt Dimer 2000 Annual Report on the mining leases E77/490, 687, 691, 712 & P77/3156-3163, 3180-3183 (Northern P
A59768 2000 Tectonic Resources Ltd Mount Dimer <1% Mt Dimer 1999 Annual Report on the Mining Leases E77/490,687 691,712,P77/3156-3163,3180-3183 Northern Project
A55453 1998 Sons Of Gwalia Ltd Mount Dimer 1.7% Mount Dimer, Partial Surrender Report 03/02/93 - 09/04/98 E77/490
A55698 1998 Sons Of Gwalia Ltd Mount Dimer 1.2% Mount Dimer, Annual Report for 25/05/97 - 24/05/98 E77/432, 439, 490, P77/3215
A52631 1997 Sons Of Gwalia Ltd Mount Dimer <1% Mount Dimer Project, Annual Report for the period 25/5/96-24/5/97, E77/431, E77/432, E77/439, E77/440, E77/441
A48612 1996 Sons Of Gwalia Ltd Mount Dimer <1% Mt Dimer Project, Annual Report for the period 26/5/95 to 25/5/96, E77/431, 432, 439, 440, 441, & 490.
A45002 1995 Burmine Ltd Mount Dimer West <1% Mt Dimmer West Project Exploration Licences 77/431, 77/432, 77/439, 77/440, 77/441 & 77/490, Annual Report for
A41525 1994 Burmine Ltd Mount Dimer West <1% Annual report for the period 26/05/93-25/05/94, Mt Dimer West Project, E77/431 E77/432 E77/439 E77/440 E77/441
A38822 1993 Burmine Ltd Mount Dimer West <1% Annual Report for the period 04/03/92-25/05/93 Mt Dimer West Project E77/431-432,439-441,490

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 77/2560 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 77/2560? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.