E 77/3173
Register summary
- Holder
- Voyage Minerals Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 16 Nov 2023
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137407 | 2023 | Westar Resources Limited | Parker Dome | <1% | Partial Surrender Report E77/2424 Parker Dome for the period 14 September 2017 to 8 September 2023 |
| A137460 | 2023 | Westar Resources Limited | Parker Dome | <1% | Annual Report - Parker Dome - E77/2424 for the period ending 13/09/2023. |
| A137592 | 2023 | Zenith Minerals Limited | Split Rocks | 3.7% | E77/2388 Split Rocks Project for the period ending 15/10/2023. |
| A132834 | 2022 | Ramelius Resources Limited | Parker Dome | <1% | Annual Mineral Exploration Report — Parker Dome JV E77/2424 for the period ending 13/09/2022 |
| A128655 | 2021 | Ramelius Resources Limited | Parker Dome | <1% | Annual Mineral Exploration Report — Parker Dome Project for the period ending 13/09/2021 |
113 more reports
| A122971 | 2020 | Zenith Minerals Limited | Dulcie | 29% | Dulcie Operation Project C202/2012, M 77/00581, M 77/01246, M 77/01250, M 77/01267, P 77/04032, P 77/04102 for |
| A125314 | 2020 | Ramelius Resources Limited | Parker Dome | <1% | Parker Dome E77/2424 Annual Report for the period ending 13/09/2020 |
| A123301 | 2020 | Zenith Minerals Limited | Split Rocks | 2.6% | Split Rocks Project, C30/2018, 18 January 2019 to 17 January 2020 |
| A119557 | 2019 | Zenith Minerals Limited | Split Rocks | 2.7% | Split Rocks Project C30/2018 Annual Report for the period 18 January 2018 to 17 January 2019 |
| A121595 | 2019 | Westar Resources Ltd | Parker Dome | <1% | Annual Report – Parker Dome Project, E77/2424, for the period 14th September 2018 to 13th September 2019 |
| A118193 | 2018 | Tasex Geological Services Pty Ltd | Parker Dome | <1% | Parker Dome Project E77/02424 Annual Report for the period 14 September 2017 to 13 September 2018 |
| A116484 | 2018 | Zenith Minerals Limited | Split Rocks | <1% | C30/2018 Split Rocks - Combined Annual Report for the period 18/01/2017 - 17/01/2018, E77/02375, E77/02386, E7 |
| A104911 | 2015 | Black Oak Minerals Limited | Parker Dome | <1% | Combined annual report for the Parker Dome Project, C261/2008 (E77/1778, E77/1790, E77/1938–39, E77/1965, E77/ |
| A106454 | 2015 | Gondwana Resources Ltd | Parker Range Area | <1% | Surrender Report Parker Range Project Tenement: M77/669 Yilgarn Mineral Field, Parker Range Area Period covere |
| A106456 | 2015 | Gondwana Resources Ltd | Parker Range | <1% | Combined Annual Report C128/2005 Parker Range Project Period covered 4th March 2014 and 3rd March 2015, T en |
| A103250 | 2014 | Southern Cross Goldfields Ltd | Parker Range | 1.9% | Final surrender report for the Parker Range Project, P77/4016, P77/4036- 4038, P77/4079-4080, P77/4103, P77/41 |
| A100520 | 2014 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Combined Annual Report for the Parker Dome Project for the period 1 October 2012 to 30 September 2013 C261/200 |
| A104646 | 2014 | Urban Minerals Pty Ltd | Cheritons North | <1% | Cheritons North Project Surrender Report Exploration Licence E77/1475 for the period 11 August 2013 – 10 Augus |
| A101756 | 2014 | Dulcie Operations | Dulcie | 29% | Annual report for the period 1 January 2013 to 31 December 2013, Dulcie Project, : M770581, M77/1246, M77/1250 |
| A102294 | 2014 | Gondwana Resources Ltd | Parker Range | <1% | COMBINED ANNUAL REPORT C128_2005_2013A Parker Range Project Tenements E77/1362, E77/1396, E77/1734, etc Period |
| A96719 | 2013 | Southern Cross Goldfields Ltd | Parker Dome | <1% | Parker Dome Project C261/2008 Combined Annual Report for the period 1 October 2011 to 30 September 2012, E77/1 |
| A97682 | 2013 | Dulcie Operations | Dulcie | 18% | Dulcie Project , Annual Report for the period 1st January 2011 to 31st December 2012, M77/581, M77/1246, M77/ |
| A100224 | 2013 | Urban Minerals Pty Ltd | Cheritons North | <1% | Cheritons North Project Exploration Licence E77/1475 for the period 11 August 2012 – 10 August 2013 |
| A96412 | 2013 | Southern Cross Goldfields Ltd | Dulcie | <1% | E77/1937 Dulcie Project Annual Report for the period 19/10/2011 to 18/10/2012 |
| A97460 | 2013 | Gondwana Resources Ltd | Parker Range | <1% | Parker Range Project, Annual Report for the period 4th March 2012 to 3rd March 2013, E77/1362, 1396 & 1734;M77 |
| A92668 | 2012 | Southern Cross Goldfields Ltd | Parker Dome | 7.2% | Surrender report for the Parker Dome Project — E77/1063, E77/1171, P77/3601–3604 & P77/3818 (C261/2008), Yilga |
| A93559 | 2012 | Gondwana Resources Ltd | Parker Range | <1% | Parker Range Project C128/2005 Combined Annual Report 4th March 2011 3rd March 2012 |
| A96532 | 2012 | Gondwana Resources Ltd | Parker Range | 100% | SURRENDER REPORT, Parker Range Gold Project, P77/3684 to the period 13th July 2012 |
| A96584 | 2012 | Urban Minerals Pty Ltd | Cheritons North | <1% | Cheritons North Project Annual Report Exploration Licence E77/1475 11 August 2011 – 10 August 2012 |
| A92662 | 2012 | Southern Cross Goldfields Ltd | Parker Dome | 2.7% | Parker Dome Project, Annual Report for the period 1st October 2010 to 30th September 2011, E77/1063, 1314, 177 |
| A96032 | 2012 | Southern Cross Goldfields Ltd | Dulcie | 22% | Dulcie Project, Tenement M77/1246 annual report for the period 8April, 2011 - 7 April, 2012 |
| A94856 | 2012 | Gondwana Resources Ltd | Parker Range | 100% | SURRENDER REPORT, Parker Range Gold Project, Tenement P77/3706 Report Period: to 13th July 2012 |
| A93983 | 2012 | Gondwana Resources Ltd | Parker Range | <1% | Surrender Report Parker Range Gold Project Tenement E77/1118 Yilgarn Mineral Field, Parker Range Area, Period |
| A90372 | 2011 | Gondwana Resources Ltd | Parker Range | <1% | Parker Range Project, Annual Report for the period ending 03/05/2011, Tenements as per Combined Reporting Grou |
| A91143 | 2011 | Gondwana Resources Ltd | Parker Range | <1% | Partial Surrender Report, Parker Range Gold Project Tenement E77/1118, Yilgarn Mineral Field, Parker Range Are |
| A89007 | 2011 | Southern Cross Goldfields Ltd | Parker Dome | 12% | Parker Dome Project, Partial Surrender Report for the period 16/10/2006 to 24/09/2010, E77/1063. |
| A91919 | 2011 | Urban Minerals Pty Ltd | Cheritons North | <1% | Cheritons North Project Annual Report Exploration Licence E77/1475, 11 August 2010 – 10 August 2011 |
| A85795 | 2010 | Southern Cross Goldfields Ltd | Parker Dome | 12% | Partial Surrender Report Exploration Licence E77/1063 Report Period: 16/10/2006 to 15/10/2009 |
| A87001 | 2010 | Gondwana Resources Ltd | Parker Range | <1% | Annual Report Parker Range Gold Project Tenement E77/1118 Yilgarn Mineral Field, Parker Range Area Period cove |
| A87717 | 2010 | Gondwana Resources Ltd | South Parker Range | <1% | Combined Annual Report, South Parker Range Gold Project Period covered to 30th June 2010, C129/2005, M77/52, |
| A87718 | 2010 | Gondwana Resources Ltd | Parker Range | <1% | Partial Surrender Report for the period 15th May 2009 to 14th May 2010 for E77/1118 |
| A88742 | 2010 | Southern Cross Goldfields Ltd | Parker Dome | 2.6% | Parker Dome Project C261/2008 Combined Annual Report for the Period 1/10/2009 to 30/9/2010 |
| A79724 | 2009 | Gondwana Resources Ltd | South Parker Range | 2.1% | COMBINED ANNUAL REPORT South Parker Range Gold Project Tenements E77/351, E77/1101, M77/52, M77/423, M77/561, |
| A82539 | 2009 | Gondwana Resources Ltd | North Parker Range | <1% | Combined Annual Report North Parker Range Gold Project Tenements E77/1118, M77/0089, M77/0565, M77/0657, M77/0 |
| A84462 | 2009 | Gondwana Resources Ltd | South Parker Range | <1% | COMBINED ANNUAL REPORT, South Parker Range Gold Project, Period covered to 30th June 2009, C129/2005 Tenements |
| A85232 | 2009 | Southern Cross Goldfields Ltd | Parker Dome | 2.7% | Parker Dome Project Combined Annual Report for the Period 1/10/2008 to 30/9/2009, C261/2008, E77/1163, E77/117 |
| A81231 | 2009 | Crusader Resources Ltd | DULCIE | 32% | Combined Report C57/2006 DULCIE Annual Report for the period 4 November 2007 to 3 November 2008 |
| A78360 | 2008 | Gondwana Resources Ltd | North Parker Range | <1% | COMBINED ANNUAL REPORT North Parker Range Gold Project Tenements E77/435, E77/1118, M77/89, M77/565, M77/657, |
| A80627 | 2008 | Southern Cross Goldfields Ltd | PARKER | 12% | PARKER DOME PROJECT, ANNUAL REPORT FOR THE PERIOD 16 OCTOBER 2007 – 15 OCTOBER 2008 E77/1063 |
| A76941 | 2008 | Polaris Metals Nl | British Hill North | 12% | BRITISH HILL NORTH PROJECT, ANNUAL REPORT FOR THE PERIOD 16 OCTOBER 2006 - 15 OCTOBER 2007 E77/1063 |
| A77223 | 2008 | Crusader Holdings Nl | Dulcie | 32% | Combined Annual Report C57/2006 M2340/3 DULCIE Annual Report 4 November 2006 to 3 November 2007 M 77/581, P 77 |
| A76559 | 2007 | Gondwana Resources Ltd | Parker Range | 2.1% | COMBINED ANNUAL REPORT South Parker Range Gold Project Yilgarn Mineral Field, Parker Range Period covered to 3 |
| A74253 | 2007 | Crusader Holdings Nl | Dulcie | 92% | Dulcie Project, Annual Report for the period 12th December 2005 to 11th December 2006, P77/3478 & 3479. |
| A71634 | 2006 | International Goldfields Ltd | Dulcie Jean- British Hills | 100% | Surrender Report, Tenement P77/3348 for the period of tenure 12/10/2001 to 11/10/2005, Dulcie Jean - British H |
| A74497 | 2006 | Crusader Holdings Nl | Dulcie | 32% | Annual Report for the Dulcie Project M77/581, P77/3111, P77/3201, P77/3204, P77/3260, and P77/3415 Reporti ng |
| A73133 | 2006 | Gondwana Resources Ltd | South Parker Range | 1.6% | Combined Annual Report, South Parker Range Gold Project, Period Covered to 30 June 2006, Combined Reporting No |
| A70255 | 2005 | Polaris Metals Nl | British Hill | <1% | Annual report for the period 01/01/04 - 31/12/04 British Hill Project, C25/2001, P77/3308-3312, P77/3341-3346 |
| A70739 | 2005 | Gondwana Resources Ltd | Dulcie | 9.5% | Dulcie (JV) Project, Annual Report for the period 4th November 2003 to 3rd November 2004, E77/351. |
| A69865 | 2005 | Polaris Metals Nl | British Hill | 100% | Annual report for the period 12/10/02 - 11/10/03 British Hill Project, P77/3348, Southern Cross, Report number |
| A71279 | 2005 | Gondwana Resources Ltd | Parker Range | 100% | Parker Range Project, Annual Report for the period 25th March 2003 to 24th March 2005,P77/3000 . |
| A69866 | 2005 | International Goldfields Ltd | Dulcie Jean | 100% | Annual report for the period 12/10/01 - 11/10/02 Dulcie Jean Project, P77/3348, South Yilgarn, Southern Cross |
| A71246 | 2005 | Gondwana Resources Ltd | Parker Range | <1% | Annual Report, For the Golden Virgin, North Cheritons, Intrepid Pig & Parker range Prospects, Tenements M77/66 |
| A68728 | 2004 | Gondwana Resources Ltd | Parker Range/Cheritons | <1% | Annual report for the period 01/07/2002-30/06/2003 Parker Range/Cheritons Project (C82/1998), M77/669, P77/26 |
| A67261 | 2003 | Sons Of Gwalia Ltd | Parker Range Cheritons | <1% | Annual Report for the period 1 July 2002 to 30 June 2003 Parker Range Cheritons Project C82/1998: M77/669, P77 |
| A67721 | 2003 | Sons Of Gwalia Ltd | Dulcie | 9.5% | Annual Report for the period 4 November 2002-3 November 2003 Dulcie JV Project E77/351 |
| A66931 | 2003 | Sons Of Gwalia Ltd | Mount Hope/Pointer7 | 24% | Surrender Report for C137/2001 Tenemtns surrendered on 4 February 2003 Pointer 7 Project Report No. 0467-2003- |
| A66465 | 2003 | Sons Of Gwalia Ltd | Little Dulcie | 100% | Annual Report for the period 25 March 2002 - 24 March 2003,Little Dulcie Project, P77/3000. |
| A65674 | 2002 | Sons Of Gwalia Ltd | Dulcie | 9.5% | Dulcie JV Annual Report For The Period 4/11/01-3/11/02. Tenement: E77/351. |
| A62999 | 2001 | Sons Of Gwalia Ltd | Pointer 7, White Horseshoe & Little Cher | 13% | Pointer 7, White Horseshoe & Little Cheritons Annual Report For The Period 1/7/97-30/6/01 Tenements: M77/131, |
| A62953 | 2001 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Lock Joint Venture Annual Report For The Period 1 January 1997 To 31 December 2000. Tenements: E77/435, |
| A63425 | 2001 | Viceroy Australia Pty Ltd | Parker Range - Cheritons | <1% | Combined Mineral Exploration Report On The Parker Range- Cheritons Reporting Group, Forrestania District, WA, |
| A59790 | 2000 | Abador Gold Nl | Tardis | 6.3% | Annual Report Tardis Project P77/3220,P77/3221 Yilgarn Mineral Field WA Southern Cross 1:250,000 (SH51-16) Che |
| A61216 | 2000 | Bounty Gold Mine Pty Ltd | Parker Range - Cheritons | <1% | Parker Range - Cheritons Project, for the period 1st July 1999 to 30th June 2000, M77/669; P77/2610, P77/2615, |
| A59730 | 2000 | Sons Of Gwalia Ltd | Dulcie | 9.5% | Dulcie JV 04/11/98-03/11/99 E77/351 |
| A58137 | 1999 | Sons Of Gwalia Ltd | Dulcie | 9.5% | Dulcie JV E77/351 Annual Report For the Period 4/11/97-3/11/98 |
| A59400 | 1999 | Forrestania Gold Nl | Parker Range- Cheritons | <1% | Combined Mineral Exploration Report on the Parker Range- Cheritons Reporting Group, Forrestania District, WA f |
| A57516 | 1999 | Fargo Investments Pty Ltd | Olga Rocks | 14% | P77/3221 Olga Rocks Project Annual Report. Reporting period from 21 January 1998 to 20 January 1999 |
| A58296 | 1999 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Loch Joint Venture 01/01/98 - 31/12/98 E77/435, 480, 543, 676 |
| A59169 | 1999 | Mr Strange Vw | Mountain Devil | 83% | Mountain Devil Project. P77/3201, Annual Report for the period 27/09/98-26/09/99. |
| A56257 | 1998 | Mr Strange Vw | Mountain Devil | 83% | Mountain Devil Project , P77/3201 , Annual Report for the period 27/09/97-27/09/98. |
| A56258 | 1998 | Mr Strange Vw | Janetta | 53% | Janetta Project, P77/3204, Annual Report for the period 27/09/97-27/09/98. |
| A56331 | 1998 | Forrestania Gold Nl | Parker Range - Cheritons | <1% | Parker Range,Cheritons Reporting Group, Forrestania District W.A. 01/01/97 - 30/06/98 ML77/669, PL77/2610, 26 |
| A53796 | 1998 | Minair Exploration Pty Ltd | Olga Rocks | 6.3% | P77/3220 and P77/3221 Olga Rocks Project Annual Report. Reporting period from 21 January 1997 to 20 January 19 |
| A54549 | 1998 | Sons Of Gwalia Ltd | Dulcie | 9.5% | Dulcie JV Annual report for the period 04/11/96-03/11/97 Tenement E77/351. |
| A52864 | 1997 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Loch Joint Venture Project, Annual report for the period 01/01/96-31/12/96. |
| A50365 | 1997 | Gasgoyne Gold Mines Nl | Dulcie | 9.5% | Dulcie Joint Venture E77/351 Annual report year ending 3 November 1996 |
| A52395 | 1997 | Mr Strange Vw | Mountain Devil | 83% | Mountain Devil Project, P77/3201, Annual Report for the period 27/09/96-27/09/97. |
| A52396 | 1997 | Mr Strange Vw | Janetta | 53% | Janetta Project, P77/3204, Annual Report for the period 27/09/96-27/09/97. |
| A47632 | 1996 | Gasgoyne Gold Mines Nl | Dulcie | 9.5% | 1995 Annual report for Exploration Licence E77/351 Dulcie Joint Venture Yilgarn Mineral Field |
| A46874 | 1996 | Gasgoyne Gold Mines Nl | Dulcie | 9.5% | Partial Surrender Report for the period 04/11/91-03/11/94 Dulcie JV Project E77/351 |
| A47581 | 1996 | Gasgoyne Gold Mines Nl | Marvel Loch Joint Venture | <1% | 1995 Annual report Marvel Loch Joint Venture Marvel Loch, Yilgarn Mineral Field Tenements (E77/435, E77/480, E |
| A49187 | 1996 | Gasgoyne Gold Mines Nl | Dulcie | 13% | Annual report to 30 June 1996 on Dulcie Combined Reporting Tenement Group M77/131 M77/132 M77/154 M77/423 M77/ |
| A49310 | 1996 | Forrestania Gold Nl | Dulcie/ Parker Range | <1% | Dulcie/Parker Range Project M77/669 P77/2610 P77/2615 P77/2616 P77/2640 P77/2653 P77/2654 P77/2667 P77/2678 So |
| A44802 | 1995 | Gasgoyne Gold Mines Nl | Marvel Loch | <1% | 1994 Annual report for the Marvel Loch Joint Venture Marvel Loch, Yilgarn Mineral Field |
| A44913 | 1995 | Audax Resources Nl | Dulcie | 9.5% | 1994 Annual Report for Exploration Licence E77/351 Dulcie Joint Venture Project ,Yilgarn Mineral Field Gasgoyn |
| A40799 | 1994 | Audax Resources Nl | Dulcie | 9.5% | Annual Report for the period 11/92-11/93 Dulcie JV Project E77/351 |
| A41172 | 1994 | Gasgoyne Gold Mines Nl | Marvel Loch | <1% | 1993 Annual Report for the Marvel Loch Joint Venture: Marvel Loch Yilgarn Mineral Field (E77/251, E77/435, E7 |
| A41447 | 1994 | Aztec Mining Co Ltd | Parker Range | 18% | Annual report for the period ending 13/05/94 Parker Range JV Project M77/131 M77/132 M77/154 |
| A42272 | 1994 | Read & Associates Pty Ltd | Dulcie | 85% | Non-statutory Report : Dulcie (JV) Project, M77/312 & GML77/4818, September 1994. |
| A37560 | 1993 | Audax Resources Nl | Dulcie | 9.5% | Annual Report for the Period 01/11/91 - 01/11/92 Dulcie Project E77/351 |
| A37803 | 1993 | Aztec Mining Co Ltd | Parker Range | 18% | Annual report for the period 01/01/92-31/12/92 Parker Range JV Project M77/131 M77/132 M77/154 |
| A34815 | 1991 | Gwalia Minerals Nl | Parker Range - Dulcie | 86% | Dulcie(JV)- Parker Range Project, Annual Report for GML77/4818, M77/312, M77/516. |
| A31143 | 1990 | Cra Exploration Pty Ltd | Dalrymple | 53% | Dalrymple Project, Annual Report for the period to 27th August 1989, P77/1703,1708, 1709, 1746, 1747, & 1823. |
| A31292 | 1990 | Dalrymple Resources Nl | Cheritons | 53% | Cheritons Project, Annual Report for the period 28th August 1989 to 31st July 1990, P77/1703, 1708-1709, 1746 |
| A25131 | 1988 | Dalrymple Resources Nl | Cheritons | 53% | Cheritons, Annual report for period ended 29 July 1988, P77/1703 |
| A18004 | 1986 | Thames Mining Nl | Parker Range | 12% | Progress Report April 1986 Parker Range Prospects M77/5097 M77/5124 M77/5125 M77/44 M77/4905 M77/4821 M77/453 |
| A19554 | 1986 | Thames Mining Nl | Parker Range | 8.6% | Report on Air Core/Reverse Circulation Drill Programme Parker Range 6 June to 9 July 1986 |
| A19555 | 1986 | Thames Mining Nl | Parker Range | 8.6% | Report on July 1986 RAB Drilling Programme Parker Range |
| A19556 | 1986 | Thames Mining Nl | Parker Range | 8.6% | Parker Range Prospects Rotary Air Blast Drilling Programme November 1986 |
| A15069 | 1985 | Belsoo Pty Ltd | Constance Una - Cheritons | 83% | Constance Una - Cheritons Project, Annual Report for the period ending 31/12/1984, GML77/5113-5116, 5190-5194. |
| A15748 | 1985 | Thames Mining Nl | Parker Range | 5.4% | Parker Range Prospect (1984) |
| A14509 | 1984 | Belsoo Pty Ltd | Parker Range - Constance Una | 83% | Parker Range - Constance Una (JV) Project, Annual Report ( Report on Phase One Programme), October 1984, P77/7 |
| A21257 | 1984 | Belsoo Pty Ltd | Parker Range | 1.8% | Parker Range Joint Venture Report on the Phase 1 programme (Cheritons Project 1984) |
| A13552 | 1983 | West Aust Gold Development Nl | Constance Una gold exploration. | 67% | Inspection Report On Constance Una Gold Mine MC 1880, Parker Range, W.A. for Claytel Pacific Pty Ltd, Perth WA |
| A5446 | 1974 | Kennecott Exp Aust Pty Ltd | Parker Range - Southern Cross | <1% | Parker Range Examination, Final report [non-statutory] on Southern Cross Claim Blocks One, Two, Three, Four, F |
| A13553 | 1971 | West Aust Gold Development Nl | Constance Una gold exploration. | 67% | Constance Una Mine A Proposed Inspection Programme for Altarama Search Pty Ltd (MC77/1880 - March 1971) |
| A53374 | 1753 | Sons Of Gwalia Ltd | Pointer 7, White Horseshoe & Little Cher | 13% | Pointer 7, White Horseshoe & Little Cheritons Annual Report, 01/07/1996 - 30/06/1997 M77/131, 132, 154, P77/29 |
| A48494 | 1753 | Alva Investments Pty Ltd | Dulcie South | 100% | Dulcie South Project, Annual Report on M77/516, for the period 8.8.95 to 8.8.96. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/3173 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/3173 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/3173? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.