L 26/269
Register summary
- Holder
- Norton Gold Fields Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 21 May 2014
- Commenced
- 5 Dec 2014
- Expiry
- 4 Dec 2035
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138136 | 2024 | Paddington Gold Pty Limited | Binduli | <1% | Annual Report on the Binduli project, C181/2005 for the period 1 December 2022 to 30 November 2023 |
| A133462 | 2023 | Paddington Gold Pty Limited | Binduli | <1% | C181/2005 Binduli Project Mineral Exploration Report for thge period ending 30/11/2022 |
| A136352 | 2023 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Annual Report for the period ending 30/6/2023 |
| A131932 | 2022 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period ending 30/06/2022 |
| A127321 | 2021 | Black Mountain Gold Limited | Teal - Binduli | <1% | Teal – Binduli E26/0168 Partial Surrender Report 15 February 2021 |
141 more reports
| A126561 | 2021 | First Au Limited | Gimlet | <1% | Report on the Gimlet Project - Cofunded drillhole - 20GDD004 - Round 20 - DAG2020/00111601 |
| A127829 | 2021 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Report C36/2009 for the period 1 July 2020 to 30 June 2021. |
| A129086 | 2021 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 for the period ending 30/11/2021 |
| A126359 | 2021 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project [C181/2005] Annual Mineral Exploration Report for the period ending 30/11/2020 |
| A123588 | 2020 | Horizon Minerals Limited | White Flag | <1% | White Flag C4/2017 Annual Report 1 Janaury 2019 to 31 December 2019 |
| A122545 | 2020 | First Au Limited | Gimlet | <1% | Gimlet E26/174 Annual Report for the period 7 November 2018 to 6 November 2019 |
| A124772 | 2020 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project Annual Mineral Exploration Report C36/2009 for the period ending 30/06/2020 |
| A122128 | 2019 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Annual Mineral Exploration Report C181/2005 for the period 1 December 2018 to 30 November 2019 |
| A118659 | 2019 | First Au Limited | Gimlet | <1% | Gimlet E26/174 Annual Report For the Period 7 November 2017 to 6 November 2018 |
| A118828 | 2019 | Paddington Gold Pty Limited | Binduli | <1% | Binduli Project C181/2005 Mineral Exploration Report for the period 1 December 2017 to 30 November 2018 |
| A119913 | 2019 | Black Mountain Gold Limited | White Flag | <1% | White Flag C4/2017 Combined Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120671 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 1 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A121477 | 2019 | First Au Limited | Gimlet | <1% | Donated Drillcore from First Au Ltd, Drillhole 18GDD001 |
| A120672 | 2019 | Paddington Gold Pty Limited | Paddington | <1% | Mineral Exploration Report Volume 2 of 2 Paddington Project for the period 1 July 2018 to 30 June 2019, C36/20 |
| A115581 | 2018 | Drillabit Pty Ltd | Gimlet | <1% | Gimlet E26/174 Annual Report for the period ending 06/11/2017 |
| A116231 | 2018 | Evolution Mining (Mungari) Pty Ltd | White Flag | <1% | Annual Report White Flag Project C4/2017 for the period 1 January 2017 to 31 December 2017 |
| A117392 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 for the period 1 July 2017 to 30 June 201 |
| A117404 | 2018 | Paddington Gold Pty Limited | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 2 of 2 for the period 1 July 2017 to 30 June 201 |
| A110647 | 2017 | Paddington Gold Pty Limited | Binduli | <1% | Binduli Project Mineral Exploration Report |
| A112406 | 2017 | Black Mountain Gold Limited; Intermin Resources Ltd | White Flag | <1% | Annual Report on the White Flag Project C04/2017 For the Period 1 January 2016 to 31 December 2016, E24/00183. |
| A114535 | 2017 | Paddington Gold Pty Limited | Paddington | <1% | Annual Mineral Exploration Report Paddington Project C36/2009 for the period 1 July 2016 to 30 June 2017 |
| A115524 | 2017 | Paddington Gold Pty Limited | Binduli | <1% | Binduli Project Mineral Exploration Report on C181/2005 for the period 01/12/2016-30/11/2017 |
| A108137 | 2016 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report 1 January 2015 to 31 December 2015 Binduli Project M26/346, M26/499, M26/621, M26/549 P |
| A108300 | 2016 | Evolution Mining Pty Ltd | Binduli | <1% | Addendum to Previously Submitted Annual Report for the Combined Reporting Group (C66/2009) for the period 1 Ja |
| A109215 | 2016 | Evolution Mining Pty Ltd | Binduli North | <1% | E26/168 Binduli North Project Annual Report for the period 09/03/2015 to 08/03/2016 |
| A109539 | 2016 | Paddington Gold Pty Limited | Paddington | <1% | Annual Report For the Period 1 July 2015 to 30 June 2016 PADDINGTON PROJECT C36/2009 |
| A105676 | 2015 | Intermin Resources Ltd | Binduli | <1% | Binduli Project C66/2009 Combined Annual Report for the period 1 January 2014 to 31 December 2014, M26/346, M2 |
| A105744 | 2015 | Black Mountain Gold Ltd | Binduli | 2.3% | Binduli Project P26/3923 Annual Report for the period 28 March 2014 to 27 March 2015 |
| A106287 | 2015 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report for the period 01 July 2014 to 30 June 2015, M24/16.... |
| A107461 | 2015 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 for the Reporting Period 1 December 2014 to 30 November 2 |
| A101161 | 2014 | Intermin Resources Ltd | Binduli (Teal) Project | <1% | Annual Report for the period 01/01/2013 to 31/12/2013, Binduli (Teal) Project M26/346, M26/499, M26/621, M26/5 |
| A103131 | 2014 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 Reporting Period: 01 July 2013 to 30 June |
| A104555 | 2014 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 Reporting Period: 1 December 2013 to 30 November 2014 Ten |
| A99302 | 2013 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2012 to 30 June 2013, M16/211.....P26/3613 |
| A100337 | 2013 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 Reporting Period: 1 December 2012 to 30 November 2013 Ten |
| A96158 | 2013 | Intermin Resources Ltd | Binduli | <1% | Binduli Project, Annual Report for the period 1st January 2012 to 31st December 2012, M26/346, 499, 549 & 621; |
| A98341 | 2013 | Pandell Pty Ltd | Gimlet | <1% | Gimlet Project, E26/120, Annual Report for the period 4 May 2012 to 3 May 2013. |
| A92563 | 2012 | Intermin Resources Ltd | Binduli | <1% | Binduli Project Combined Annual Report 1 January 2011 to 31 December 2011, C66/2009, M26/346, 499, 621, 549, P |
| A96069 | 2012 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project, Mineral Exploration Report, C181/2005, Reporting Period: 1 December 2011 to 30 November 2012 |
| A94115 | 2012 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project, E26/120 , Annual Report For the Period 4 May 2011 to 3 May 2012. |
| A94404 | 2012 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project E26/120 Western Australia Partial Surrender Report for the period 4 May 2007 to 3 May 2012 |
| A94950 | 2012 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Volumes 1 to 7, Reporting Period: 01 July 2011 to 30 J |
| A89516 | 2011 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report, 1 January 2010 to 31 December 2010, Binduli Project M26/346, M26/499, M26/621, M26/54 |
| A90899 | 2011 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report, Reporting Period: 01 July 2010 to 30 June 2011 |
| A92214 | 2011 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 Reporting Period: 1 December 2010 to 30 November 2011 |
| A90782 | 2011 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project E26/120, Annual Report for the period 4 May 2010 to 3 May 2011. |
| A85893 | 2010 | Intermin Resources Ltd | Binduli | <1% | Combined Annual Report 1 January 2009 to 31 December 2009 Binduli Project M26/346, M26/499, M26/621, M26/549 P |
| A88703 | 2010 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005 Reporting Period: 1 December 2009 to 30 November 2010 |
| A87371 | 2010 | Laconia Resources Ltd | Gimlet | <1% | Gimlet Project (E26/120) Annual Report 4 May 2009 to 3 May 2010 |
| A87700 | 2010 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report 01 July 2009 to 30 June 2010 |
| A82616 | 2009 | Pandell Pty Ltd | GIMLET | <1% | GIMLET PROJECT, E26/120 WESTERN AUSTRALIA, ANNUAL REPORT FOR THE PERIOD 4 MAY 2008 to 3 MAY 2009 |
| A81155 | 2009 | Bellamel Mining Ltd | Kalgoorlie West | <1% | KALGOORLIE WEST GOLD PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2008 to 31/12/2008 ON TENEMENTS M26/115, M26/2 |
| A81891 | 2009 | Intermin Resources Ltd | Abattoir South | <1% | Annual Report 1 April 2008 – 30 March 2009, Abattoir South Project P26/3578-P26/3589 E26/127, Combined Report |
| A84181 | 2009 | Paddington Gold Pty Ltd | Paddington | <1% | Paddington Project C36/2009 Mineral Exploration Report Volume 1 of 2 , Reporting Period: 01 March 2008 to 30 J |
| A77848 | 2008 | Bellamel Mining Ltd | Kalgoorlie West | <1% | Kalgoorlie West Gold Project Annual Report for the period 01/01/2007 to 31/12/2007 Combined Reporting Number C |
| A78105 | 2008 | Intermin Resources Ltd | Abattoir South | <1% | Annual Report 2 March 2007 to 1 March 2008 Abattoir South Project M26/346, P26/1952, P26/2360, P26/2550, P24/3 |
| A78409 | 2008 | Paddington Gold Pty Ltd | ABATTOIR NORTH | <1% | ABATTOIR NORTH PROJECT Annual Report C107/2004 Reporting Period: 1 April 2007 - 31 March 2008 Tenements: E24/5 |
| A80540 | 2008 | Paddington Gold Pty Ltd | Janet Ivy | <1% | Janet Ivy Project Mineral Exploration Report Reporting Period: 30/11/2007 to 29/11/2008, Tenements: M26/446, P |
| A78909 | 2008 | Pandell Pty Ltd | Gimlet | <1% | GIMLET PROJECT E26/120 WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 4 May 2007 to 3 May 2008 |
| A74408 | 2007 | Barrick Gold Of Australia Ltd | Abbottoir South | <1% | Abattoir South Project C100/2004 Annual Report for the Period 01/01/2006 to 31/12/2006 Report No.1215 (Kalgoor |
| A75242 | 2007 | Barrick Gold Of Australia Ltd | Abattoir North | <1% | Abattoir North Project, (C107/2004) Annual Report for the period 1st April 2006 to 31st March 2007, E24/, 103, |
| A77481 | 2007 | Paddington Gold Pty Ltd | Janet Ivy | <1% | Janet Ivy Project Annual Report, Reporting Period: 30/11/2006 to 29/11/2007, M26/446. |
| A74700 | 2007 | Croesus Mining Nl | Binduli | <1% | Binduli Project, Annual Report for the Period 01/12/2005 to 30/11/2006 on Tenements E26/45, 85; M26/115, 243, |
| A72021 | 2006 | Placer Dome Asia Pacific Ltd | Abattoir South | <1% | Abattoir South Project, Annual Report, 01/01/2005-31/12/2005 (C100/2004), E26/45, E26/53, E26/85, M26/115..... |
| A72446 | 2006 | Placer Dome Asia Pacific Ltd | Black Flag (Mount Pleasant) | <1% | Abattoir North Project, Annual Report, 1 April 2005 to 31 March 2006, C107/2004, E24/57.................M24/22 |
| A73326 | 2006 | De Grey Mining Ltd | Horan's Dam | <1% | Annual Technical Report, Exploration licence E26/58 Horans Dam Project, 12 Months Ended 24 June 2006, (Kalgoor |
| A70545 | 2005 | Placer Dome Asia Pacific Ltd | Abbattoir North | <1% | Abattoir North Project, Annual Report, 1 April 2004 to 31 March 2005, C107/2004,E24/57, ...........,M24/101, M |
| A82885 | 2005 | Placer (Granny Smith) Pty Ltd | Binduli | <1% | Preliminary notes on results of Binduli North IP Surveys, Jan - Feb 2005 |
| A69802 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual report for the period 30/11/03 - 29/11/04 Janet Ivy/Binduli Project, C21/2000, P26/2701, M26/446, Kalgo |
| A69985 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Binduli (Janet Ivy) project, Interim annual report 30 November 2004 - 31 December 2004, C21/200, Tenements: M2 |
| A70006 | 2005 | Placer Dome Asia Pacific Ltd | Abbatoir South | <1% | Annual report for the period 01/01/04 - 31/12/04 Abbatoir South Project 8504, C100/2004, E26/45, E26/53, E26/8 |
| A70007 | 2005 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual report for the period 01/01/04 - 31/12/04 Binduli North Joint Venture Project 8504, C202/1995, E26/53, |
| A71337 | 2005 | De Grey Mining Ltd | Horan's Dam Project | <1% | Annual exploration report, Horan's Dam Project, Exploration licence 26/58 For the period 25th June 2004 to 24t |
| A68414 | 2004 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Binduli North JV Pproject, Annual Report 01/01/2003- 31/12/2003 (C202/1995), P24/3296, P26/1949-52, P24/2136, |
| A68696 | 2004 | Placer Dome Asia Pacific Ltd | Border Gidji | <1% | Border Gidji JV Project, Annual Report, 01/04/2003 - 31/03/2004 (C115/2002), E24/57, M24/444 to M24/447, P24/3 |
| A68806 | 2004 | De Grey Mining Ltd | Horan's Dam | <1% | Annual technical report, Exploration licence E26/58, Horan's Dam Project, 12 months ended 24 June 2004, Kalgoo |
| A69173 | 2004 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Binduli Project, Annual report 01/07/2003-30/06/2004, (C140/1996), E26/45, M26/115, M26/243, M26/387, M26/420, |
| A65952 | 2003 | Placer Dome Asia Pacific Ltd | Janet Ivy / Binduli | <1% | Annual Report 30/11/2001-29/11/2002 Janet Ivy/Binduli Project C21/2000 Tenements P26/2701, M26/446 Report No W |
| A67142 | 2003 | Placer Dome Asia Pacific Ltd | Border Gidgi | <1% | Border Gidgi Project, Annual Report for the period 01/04/2002 to 31/03/2003 C115/2002: E24/57, M24/444-47, P24 |
| A67325 | 2003 | De Grey Mining Ltd | Horan's Dam | <1% | Annual Report for 12 months ended 24 June 2003 E26/58 Horans Dam Project Kalgoorlie |
| A67360 | 2003 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Binduli Project, Annual Report, 01/07/2002 to 30/06/2003, C140/1996: E26/45, M26/115,243,387,420,430, 445,447, |
| A67888 | 2003 | Placer Dome Asia Pacific Ltd | Janet Ivy/Binduli | <1% | Annual Report for the period 30/11/2002- 29/11/2003 Janet Ivy/Binduli Project P26/2701, M26/446 |
| A82883 | 2003 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Placer gravity Survey, December 2003, Survey Report |
| A66499 | 2003 | Placer Dome Asia Pacific Ltd | Binduli North | <1% | Annual Report 01/01/2002-31/12/2002 Binduli North Project C202/1995: P26/1949-52, 2136, 2212-13, 2241-43, 2248 |
| A64371 | 2002 | Delta Gold Ltd | Binduli North | <1% | Annual Report 01/01/2001 to 31/12/2001. Binduli North Joint Venture C202/1995. Tenement/s P26/1949-1952, 2136, |
| A65210 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | <1% | Mt Pleasant Project Annual Report 01/04/2000 - 30/04/2002 C330/1997 Tenement/s E24/57, 68, M24/16, 60, 79-82, |
| A65376 | 2002 | Auriongold Exploration Pty Ltd | Mount Pleasant | <1% | Mt Pleasant Project Annual Report 01/04/2000 – 30/04/2002 P24/3351,P26/2296-2297, E24/57, M24/444-447 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A65187 | 2002 | Placer Dome Asia Pacific Ltd | Binduli | <1% | Annual Report For The Period 01/07/2001 to 30/06/2002 on Tenements E26/45, L26/197, L26/202, L26/203, L26/204 |
| A65514 | 2002 | Domain Mining Nl | Horan's Small Dam | <1% | Annual Report Of Activities 12 Months Ended 24th June 2002 Exploration Licence 26/58 Horan's Small Dam |
| A63636 | 2001 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report 1st January 2000 to 31st December 2000. Tenements E26/53, |
| A82890 | 2001 | Placer (Granny Smith) Pty Ltd | Kalgoorlie/ Teal | <1% | Sub-audio magnetics surveys, logistics and data processing report |
| A63323 | 2001 | De Grey Mining Nl | Horan's Small Dam | <1% | Annual Report Of Activities 12 Months ended 24th June 2001 Exploration Licence 26/58 Horan's Small Dam. |
| A63511 | 2001 | Croesus Mining Nl | Binduli | <1% | Binduli Project Annual Report for the period 01/07/2000 to 3 0/06/2001 on Tenements E26/45, L26/197, L26/202, |
| A63654 | 2001 | Intermin Resources Nl | Binduli North | <1% | Combined Annual Report for the period 30 November 2000 to 29 November 2001, East Coolgardie Mineral Field, Eas |
| A60024 | 2000 | Delta Gold Ltd | Binduli North | <1% | Binduli North Joint Venture Combined Annual Report C202/1995 01/01/1999 to 31/12/1999 Tenements E26/53,M26/346 |
| A61068 | 2000 | Croesus Mining Nl | Binduli | <1% | Binduli Project, Annual Report for the Period 01/07/1999 to 30/06/2000, Project Sataus for E26/45, L26/197,202 |
| A61193 | 2000 | De Grey Mining Nl | Horan's Small Dam | <1% | Annual Report of Activities, 12 months ended 24th June 2000, Exploration Licence E26/58 Horan's Small Dam situ |
| A61373 | 2000 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mount Pleasant Project, Annual Report for the period 1st April 1999 to 31st March, Combined Reporting Group: C |
| A61448 | 2000 | Intermin Resources Nl | Binduli North | <1% | Combined Annual Report for the Period 30 November 1999 to 29 November 2000. Binduli North Project C202/1995. M |
| A58935 | 1999 | Yamarna Goldfields Nl | Horan's Small Dam | <1% | Annual report of activities 12 months ended 24 June 1999, Exploration licence E26/58 Horans Small Dam. |
| A59138 | 1999 | Croesus Mining Nl | Binduli | <1% | Binduli Project Annual Report for the Period 1-7-98 to 30-6- 99, Project Status for E26/45, M26/115, 243, 387, |
| A59091 | 1999 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | Mt Pleasant Project, (Joint) Annual Report for the period 01/04/1998 to 31/03/1999, C330/1997-Mt Pleasant. |
| A59311 | 1999 | Intermin Resources Nl | Binduli North | <1% | Combined Annual Report for the period 30 November 1998 to 29 November 1999 East Coolgardie Mineral Field East |
| A55746 | 1998 | Centaur Mining & Exploration Ltd | Mount Pleasant | <1% | C330/1997 - Mt. Pleasant Joint Annual Report 01/04/97 - 31/03/98 Exploration Licence: E24/57, 68, Gold Lease: |
| A53911 | 1998 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North - Project Area C202/1995 Annual Report 01/01/1997 - 31/12/1997 E26/53, M23/346, 446, P26/1949-19 |
| A56547 | 1998 | Yamarna Goldfields Nl | Horan's Small Dam | <1% | Horan's Small Dam - Kalgoorlie W.A. 12 Months ended 24/07/1998 Exploration Licence: 26/58 |
| A56988 | 1998 | Intermin Resources Nl | Binduli North | <1% | Binduli North Project - East Coolgardie Mineral Field, East Coolgardie District 01/01/98 - 31/12/98 Mining L |
| A50285 | 1997 | Pegasus Gold Australia Pty Ltd | Binduli North | <1% | Annual Technical Report Reporting period: 1 January to 31 December 1996 Binduli North Project Area Combined Re |
| A51943 | 1997 | Pandell Pty Ltd | Horan's Small Dam | <1% | Annual Mineral Exploration Report Exploration Licence E26/58 for the period 25th June 1996 to 24th June 1997 G |
| A52085 | 1997 | Croesus Mining Nl | Binduli | <1% | Binduli Project Annual report for the period 01/07/96 to 30/06/97 Project Status for All tenements M26/115 M26 |
| A46920 | 1996 | Pandell Pty Ltd | Horan's Small Dam | <1% | Annual report of Activities 12 Months ended 24th June 1995 Exploration Licence E26/58 Horan's Small Dam situat |
| A48365 | 1996 | Border Gold Ltd | Gidji | <1% | Annual report to 31st March 1996 Exploration Licence E24/57 Mining Leases M24/444 to M24/447 Prospecting Licen |
| A48681 | 1996 | Croesus Mining Nl | Binduli | <1% | Annual report for the period 01/07/95 to 30/06/96 Due 30-August, 1996 Project Status C140/1996 for all tenemen |
| A49031 | 1996 | Pandell Pty Ltd | Horan's Small Dam | <1% | Annual report of Activities 12 months ended 24 June 1996 Exploration Licence E26/58 Horan's Small Dam Geoff Bl |
| A44791 | 1995 | Border Gold Ltd | Gidji | <1% | Annual report to 6th April 1995 Exploration licence E24/57 Minning leases M24/444 to 447 Prospecting licences |
| A45155 | 1995 | Croesus Mining Nl | White Dam | <1% | White Dam Project, Annual Report on E26/45 and M26/447 for the period 17/6/94 to 16/6/95 |
| A47642 | 1995 | Intermin Resource Corp Ltd | Binduli North | <1% | Binduli North/North Peyes Farm Project Annual report for the period 1 January 1995 to 31 December 1995 for ten |
| A41335 | 1994 | Border Gold Ltd | Gidji | <1% | Annual report for the period 07/04/93 to 06/04/94 Gidji Project E24/57 Border Gold Ltd, Ramsgate Resources |
| A41201 | 1994 | Croesus Mining Nl | Binduli | <1% | R Report for the Period 1994 Binduli Project P26/2444 |
| A42495 | 1994 | Croesus Mining Nl | White Dam | <1% | Annual Report for the period 04/01/94-16/06/94 White Dam Project E26/45 |
| A42500 | 1994 | Pandell Pty Ltd | Horan's Small Dam | <1% | Annual Report for the period 06/93 to 06/94 Horans Small Dam Project E26/58 Denis O'Meara Prospecting |
| A42987 | 1994 | Black Mountain Gold Nl | Victoria North | 1.1% | Report on Victoria North Tenements P26/2573 to P26/2575 East Coolgardie Goldfield (06/94 to 10/94) |
| A39645 | 1993 | Banyan Pty Ltd | Peyes Farm | <1% | Peyes Farm Project, Annual Report for the period 30/09/1992 to 29/09/1993, E26/53. |
| A39032 | 1993 | Border Resources Nl | Gidji | <1% | Annual report for the period 07/04/92-06/04/93 Gidji Project E24/57 |
| A39381 | 1993 | Afmeco Pty Ltd | White Dam | <1% | Annual Report White Dam Project, E26/45. For the period 17 June 1992 to 16 June 1993. |
| A36415 | 1992 | Afmeco Pty Ltd | White Dam | <1% | Annual Report for the period 17/06/91-16/06/92 White Dam Project E26/45 |
| A38617 | 1992 | Ramsgate Resources Ltd | Gidji | <1% | Annual report for the period 07/04/91-06/04/92 Gidji Project E24/57 |
| A35283 | 1991 | Acm Gold Ltd | Binduli North | <1% | R Report for the period 1991 Binduli North JV Project M26/213 M26/214 |
| A30614 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | <1% | Kalgoorlie Project. Annual report. December 1989. M16/85, M24/1270139, 210, 286, 305, 312-314, M26/134, 135, 2 |
| A32566 | 1990 | Ramsgate Resources Ltd | Kalgoorlie | <1% | Kalgoorlie Project Surrender Report October 1990 |
| A27516 | 1989 | Intercontinental Gold & Minerals Nl | Binduli | <1% | Binduli Prospect 04/1989 M26/213-214, P26/1271, 1292, 1294 |
| A28591 | 1989 | Ramsgate Resources Ltd | Kalgoorlie | <1% | Kalgoorlie Project. Annual report. December 1988. E24/1, 2. P24/1538; 26/1121. M16/85; 24/127-130, 210; 26/13 |
| A25086 | 1987 | Ramsgate Resources Ltd | Ramsgate | <1% | The Ramsgate Gold Prospect, Kalgoorlie, WA. E24/1-2, 127-130. M26/134-135, 1121, M24/1538. Exploration program |
| A4331 | 1973 | Broken Hill Pty Co Ltd | Carnilya Hill | <1% | Carnilya Hill Project, Non-statutory Report : Diamond Drill Logs DDH 79-81, 12/03/1973 to 12/05/1973, MC25/122 |
| A4332 | 1973 | Broken Hill Pty Co Ltd | Carnilya Hill | <1% | Carnilya Hill Project, Non-statutory Report: Sample Sheets & Analysis Results, 1969-1970 & 1973, MC25/122..... |
| A1053 | 1970 | Broken Hill Pty Co Ltd | Mount Monger | <1% | Mount Monger Project, Non-statutory Report: Exploration Report for the period ending 31/12/1970, TR70/3697, 38 |
| A85336 | 1753 | Paddington Gold Pty Ltd | Binduli | <1% | Binduli Project Mineral Exploration Report C181/2005, Reporting Period: 1 December 2008 to 30 November 2009, T |
| A55798 | 1753 | Croesus Mining Nl | Binduli | <1% | Binduli Project 01/01/97 - 30/06/98 E24/80, E26/45, L26/197, L26/202-204 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43625 | 1753 | Black Mountain Gold Nl | White Dam | <1% | Report on White Dam Project, P26/2546-2551, P24/3296, P26/2360, P26/2136, East Coolgardie Mineral Field for th |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 9 years · 4 Dec 2035
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 26/269 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 26/269? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.