L 39/169
L 39/169 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Murrin Murrin Operations Pty Ltd. Granted on 16 Feb 2010 for 21 years, it expires on 15 Feb 2031. The ground is covered by 123 historical WAMEX reports.
Register summary
- Holder
- Murrin Murrin Operations Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 27 Nov 2006
- Commenced
- 16 Feb 2010
- Expiry
- 15 Feb 2031
- Term
- 21 Years
The full record on L 39/169
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and the one change of holder on record
- The full record: 13 conditions and 3 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (8 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137294 | 2023 | Formidable Resources Pty Ltd | West Windarra | 27% | West Windarra Annual Report E39/2279 for the period ending 08/10/2023. |
| A125752 | 2021 | Acacia Coal Limited | Windarra | 89% | Windarra Ni Project Annual Technical Report E39/1996 for the period ending 2/7/2020 |
| A128233 | 2021 | Acacia Coal Limited | Windarra | 89% | Surrender Report Windarra Nickel Project E39/01996 for the period ending 05/08/2021 |
| A123165 | 2020 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Annual Report Mount Zephyr Calcrete Project - C17/2000 - 1 January 2019 to 31 December 2019 |
| A124894 | 2020 | Poseidon Nickel Limited | Pool Well | <1% | Pool Well Project Combined Annual Report C252/2007 for the period ending 30/06/2020, M38/01244, M38/01245 |
118 more reports
| A119546 | 2019 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report Mount Zephyr Calcrete Project C17/2000 for the period 1 January 2018 to 31 December 20 |
| A121203 | 2019 | Poseidon Nickel Limited | Pool Well | <1% | Combined Annual Report for the Pool Well Project C252/2007 for the period 1 July 2018 to 30 June 2019. M 38/01 |
| A121245 | 2019 | Acacia Coal Limited | Windarra | 89% | Windarra Niickel Project E39/01996 Annual Technical Report for the period 3 July 2018 to 2 October 2019 |
| A116258 | 2018 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report for the Mount Zephyr Project - C17/2000 For the Period 1 January 2017 to 31 December 20 |
| A118106 | 2018 | Gianni, Pr | Mount Windarra | 89% | Annual Report for Mt Windarra E39/1996 from 3/7/2017 to 2/7/2018 |
| A117898 | 2018 | Poseidon Nickel Limited | Pool Well | <1% | Pool Well Project C252/2007 - Combined Annual Report for the period 1 July 2017 to 30 June 2018, M38/01244, M3 |
| A112421 | 2017 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report for the Mount Zephyr Calcrete Project - C17/2000 For the Period 1 January 2016 to 31 De |
| A111892 | 2017 | Poseidon Nickel Limited | Pool Well | <1% | POOL WELL PROJECT COMBINED ANNUAL REPORT C252/2007 1 July 2015 to 30 June 2016 |
| A112029 | 2017 | Poseidon Nickel Limited | Laverton West | <1% | Laverton West E38/1930 Surrender Report for the period 13/04/2007 to 11/05/2016 |
| A114914 | 2017 | Poseidon Nickel Limited | Pool Well | <1% | Pool Well Project C252/2007 - Combined Annual Report For the Period 1 July 2016 to 30 June 2017, M38/01244, M3 |
| A108204 | 2016 | Poseidon Nickel Limited | Laverton West | <1% | West Laverton (C85/2014) Annual Technical Report 01/01/2015 - 31/12/2015, E 38/01930, M 38/00372, M 38/00694, |
| A108254 | 2016 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report for the Mount Zephyr Calcrete Project 1 January 2015 to 31 December 2015, M 39/00446, M |
| A108533 | 2016 | Poseidon Nickel Limited | Pool Well | 40% | FINAL SURRENDER REPORT For the Period 14 November 2008 to 8 February 2016 POOL WELL M38/1243 - Final Surrender |
| A104754 | 2015 | Poseidon Nickel Limited | Laverton West | <1% | C85/2014 LavertonWest Project - Annual Report for the period 1 January 2014 to 31 December 2014, E38/1930, M38 |
| A105111 | 2015 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report, Mount Zephyr Project, C17/2000 for the period 1 January 2014 to 31 December 2014 |
| A106682 | 2015 | Poseidon Nickel Limited | Pool Well | 16% | Pool Well Project C252/2007 M38/01243, M38/01244, M38/01245 Annual Report for the period 01/07/2014 to 30/06/ |
| A102352 | 2014 | Poseidon Nickel Limited | Laverton West | <1% | Laverton West Project E38/1930 for the period 13 April 2013 to 12 April 2014 |
| A101678 | 2014 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 17% | Combined Annual Report For The Period: 1 January 2013 to 31 December 2013 Mount Zephyr Calcrete Project C17/20 |
| A103742 | 2014 | Poseidon Nickel Ltd | Pool Well | 16% | Pool Well Project C252/2007 (M38/1243, M38/1244, M38/1245) Annual Report for the period 1 July 2013 to 30 June |
| A99043 | 2013 | Poseidon Nickel Limited | Windarra | 24% | Windarra Nickel Project - Combined Annual Report For the Period 22 April 2012 to 21 April 2013, C79/2006, E38/ |
| A97205 | 2013 | Focus Minerals (Laverton) Pty Ltd; Panoramic Resources Ltd | West Laverton | <1% | West Laverton Project, Annual Report for the period 30/11/2011 to 29/11/2012, E38/1930; E39/1296; M38/46, 372, |
| A97315 | 2013 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 5.1% | Combined Annual Report, Mount Zephyr Project, C17/2000 for the period 1 January 2012 to 31 December 2012, E39/ |
| A98016 | 2013 | Focus Minerals (Laverton) Pty Ltd | West Laverton | <1% | PARTIAL SURRENDER REPORT ON EXPLORATION FOR THE PERIOD 13 APRIL 2007 to 12 APRIL 2013 Tenement: E38/1930 [West |
| A99706 | 2013 | Poseidon Nickel Ltd | Pool Well | 16% | Pool Well Project - Combined Annual Report CR# C252/2007 M38/1243, M38/1244, M38/1245 for the period 1 July 20 |
| A92556 | 2012 | Poseidon Nickel Limited | Windarra | 5.7% | Windarra Project, Final Surrender Report for the period 3rd October 2006 to 2nd October 2011, E38/1622. (C79/2 |
| A92730 | 2012 | Poseidon Nickel Limited | Windarra | 21% | Windarra Project, Final Surrender Report for the period 3rd May 2004 to 23rd November 2011, E39/930. (C79/2006 |
| A93512 | 2012 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 5.1% | Combined Annual Report for the Period 1 January 2011 to 31 December 2011, Mt Zephyr Project, C17/2000, E 39/12 |
| A94461 | 2012 | Poseidon Nickel Limited | Windarra | 9.2% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2011 to 21 April 2012, C79/2006, E38/ |
| A92841 | 2012 | Crescent Gold Ltd; Magma Metals Ltd; Poseidon Nickel Ltd | West Laverton | <1% | West Laverton Project, Annual Report for the period 30/11/2010 to 29/11/2011, E38/1930; E39/1296; M38/46, 372, |
| A94653 | 2012 | Poseidon Nickel Limited | Pool Well | 16% | Pool Well Project - Combined Annual Report C252/2007, M38/1243, M38/1244, M38/1245, Report Period: 1 July 201 |
| A89806 | 2011 | Crescent Gold Ltd | West Laverton | <1% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; West Laverton Project; C5/2011 |
| A91181 | 2011 | Poseidon Nickel Limited | Windarra | 10% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2010 to 21 April 2011, C79/2006, E38/ |
| A91345 | 2011 | Poseidon Nickel Limited | Weebo Well Intrusion | 1.8% | Weebo Well Intrusion - Co-Funded Government- Industry Drilling Program for the Period ending 30 June 2011 (R#2 |
| A89112 | 2011 | Poseidon Nickel Limited | Windarra | 5.7% | Windarra Project, Partial Surrender Report for the period 3rd October 2006 to 28th September 2010, E38/1622. |
| A89851 | 2011 | Murrin Murrin Operations Pty Ltd | Mount Zephyr | 5.1% | Combined Annual Technical Report for C17/2000, 1 January 2010 to 31 December 2010 |
| A92008 | 2011 | Poseidon Nickel Ltd | Pool Well | 16% | POOL WELL PROJECT Combined Annual Report CR# 252/2007 Mining Licences M 38/1243, M 38/1244 & M 38/1245 Period |
| A85529 | 2010 | Poseidon Nickel Ltd | Windarra | 5.7% | Windarra Nickel Project C79/2006, E38-1622 - Partial Surrender Report, Period: 3rd October 2006 to 10th Septem |
| A86678 | 2010 | Minara Resources Ltd | Mount Zephyr | 5.1% | Mt Zephyr Project Eleventh Combined Annual Technical Report C17/2000, 1st January 2009 to 31st December 2009, |
| A86798 | 2010 | Barrick (Australia Pacific) Ltd | Laverton | <1% | Project 8871 Laverton Joint Venture Annual Report period 1 January 2009 – 31 December 2009, Technical Report N |
| A87137 | 2010 | Poseidon Nickel Limited | Windarra | 10% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2009 to 21 April 2010, CR# C79/2006, |
| A87846 | 2010 | Poseidon Nickel Limited | Pool Well | 16% | Pool Well Project - Combined Annual Report for the Period 1 July 2009 to 30 June 2010, C252/2007, M38/1243, M3 |
| A80998 | 2009 | Poseidon Nickel Limited | Windarra Nickel | 21% | Windarra Nickel Project, E39-930 - Partial Surrender Report, 3rd May 2004 to 10th December 2008 |
| A84361 | 2009 | Poseidon Nickel Ltd | POOL WELL | 16% | Pool Well Project - Combined Annual Report for the Period 1 July 2008 to 30 June 2009, CR# C252/2007 |
| A81556 | 2009 | Gryphon Minerals Ltd | Mt Windarra | 45% | Final Surrender Report E39-984 Mount Windarra, 18 December 2003 to 17 December 2008 |
| A82038 | 2009 | Barrick Gold Of Australia Ltd | Laverton Exploration JV | <1% | LAVERTON EXPLORATION JOINT VENTURE ANNUAL, REPORT Period 1 January 2008 – 31 December 2008 TECHNICAL REPORT No |
| A82530 | 2009 | Poseidon Nickel Ltd | Windarra | 9.6% | Windarra Project - Combined Annual Report for the Period 22 April 2008 to 21 April 2009, C79/2006 |
| A77335 | 2008 | Poseidon Nickel Ltd | Pool Well | 40% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3196 PERIOD 9th November 2006 to 8th November 2007 |
| A77336 | 2008 | Niagara Mining Ltd | Pool Well | <1% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3197 PERIOD 9th November 2004 to 8th November 2005 |
| A77337 | 2008 | Niagara Mining Ltd | Pool Well | <1% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3197 PERIOD 9th November 2005 to 8th November 2006 |
| A77338 | 2008 | Poseidon Nickel Ltd | Pool Well | <1% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3197 PERIOD 9th November 2006 to 8th November 2007 |
| A77520 | 2008 | Minara Resources Ltd | Mount Zephyr | 2.3% | TR1414 MT ZEPHYR PROJECT NINTH COMBINED ANNUAL TECHNICAL REPORT C17/2000 |
| A77628 | 2008 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mount Windarra Project, Annual Report for the period 18th December 2006 to 17th December 2007, E39/984. |
| A78114 | 2008 | Barrick (Granny Smith) Pty Ltd | Laverton | <1% | PROJECT 8871, LAVERTON Project, (ALL TENEMENTS), ANNUAL REPORT, Period 1 January 2007 31 December 2007, TECH |
| A77333 | 2008 | Niagara Mining Ltd | Pool Well | 40% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3196 PERIOD 9th November 2004 to 8th November 2005 |
| A77334 | 2008 | Niagara Mining Ltd | Pool Well | 40% | POOL WELL ANNUAL REPORT Prospecting Licence P38-3196 PERIOD 9th November 2005 to 8th November 2006 |
| A78633 | 2008 | Poseidon Nickel Ltd | Windarra | 9.6% | Windarra Nickel Project - Combined Annual Report for the period 22 April 2007 to 21 April 2008, CR79/2006 |
| A79933 | 2008 | Poseidon Nickel Limited | Pool Well | 16% | POOL WELL COMBINED ANNUAL REPORT Prospecting Licences P 38-3196, P 38-3197 & P 38-3198, PERIOD 1st July 2007 t |
| A74717 | 2007 | Minara Resources Ltd | Mount Zephyr | 2.3% | TR1406 Mount Zephyr Project Eighth Combined Annual Technical Report C17/2000 for the Period 1st January 2006 t |
| A75073 | 2007 | Barrick Gold Of Australia Ltd | Laverton | 7.4% | Project 8871, Laverton Project, Annual Report, Period 1 January 2006 - 31 December 2006, Technical Report No.1 |
| A75378 | 2007 | Dynasty Metals Australia Ltd | Woodline Well | 21% | EL39/930 Annual Report For the period 3/05/2005 -1/05/2007 Woodline Well Project |
| A75544 | 2007 | Dynasty Metals Australia Ltd | Woodline Well | 21% | Woodline Well Project, Partial Surrender Report for the period 03/05/2005 to 01/05/2007, E39/930. [C79/20006] |
| A75957 | 2007 | Dynasty Metals Australia Ltd | Laverton | 7.6% | LAVERTON PROJECT COMBINED REPORT E38/1450/1586/1587/1622/ 1752, E39/929/930/1325/1326/3272-3274 Annual Technic |
| A77522 | 2007 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mt Windarra Project, Partial Surrender Report for the period 18th December 2003 to 7th December 2007, E39/984. |
| A71750 | 2006 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mt Windarra Project, Annual Report for the period 18th December 2004 to 17th December 2005, E39/984. |
| A72077 | 2006 | Minara Resources Ltd | Mount Zephyr | 2.3% | Mt Zephyr Project, Seventh Combined Annual Technical Report C17/2000, E39/482,M39/446,671,672,723, For the Per |
| A72560 | 2006 | Dynasty Metals Australia Ltd | Laverton | 21% | Laverton Project E39/930, Annual Technical Report Period Ending 3 May 2006. |
| A72705 | 2006 | Barrick Gold Of Australia Ltd | Laverton | 5.7% | Laverton Exploration JV, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, Combined |
| A73096 | 2006 | Metex Resources Ltd | Laverton | <1% | Laverton Exploration Joint Venture, M38/45, M38/47, E38/556, E38/658, E38/837, Final Surrender Report & M38/46 |
| A74181 | 2006 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mt Windarra Project , Partial Surrender Report, December 2006, E39/984. |
| A73904 | 2006 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mt Windarra Project, Annual Report for the period 18th December 2005 to 17th December 2006, E39/984 |
| A69813 | 2005 | Metex Resources Ltd | Laverton | 5.7% | Annual report for the period 01/02/04 - 31/12/04 Laverton Exploration Project, C5/2002, E38/411, E38/556, E38/ |
| A69933 | 2005 | Gryphon Minerals Ltd | Mount Windarra | 45% | Mt Windarra Project, Annual Report for the period 18/12/2003 to 17/12/2004, E39/984. |
| A70580 | 2005 | Minara Resources Ltd | Mount Zephyr | 2.3% | Annual technical report for the period 01/01/04 - 31/12/04 Mount Zephyr Project, C17/2000, E39/482, M39/446, M |
| A70792 | 2005 | Target Minerals Australia Pty Ltd | Laverton | 21% | Laverton (Woodline Well) Project E39/930, Annual technical report for the period ending 2nd May 2005. |
| A68340 | 2004 | Minara Resources Ltd | Mt Zephyr | 10% | Combined Annual Report for the period 01/01/2003-31/12/2003 Mount Zephyr (C17/2000), E39/541, E39/482, M39/446 |
| A68953 | 2004 | Metex Resources Ltd | Laverton | 5.8% | Laverton JV Project (C5/2002),Annual Report for the period 01/02/2003-31/12/2003 Laverton JV Project (C5/2002) |
| A66299 | 2003 | Anaconda Operations Pty Ltd | Mt Zephyr | 10% | Fourth Combined Annual Technical Report for the period 1st January 2002 to 31st December 2002 Mt Zephyr Projec |
| A66477 | 2003 | Metex Resources Ltd | Laverton | 3.4% | 2002 Annual Report for period 01/02/02 to 31/12/02 Laverton Exploration Joint Venture C5/2002: E38/389, 406, 4 |
| A66763 | 2003 | Anaconda Operations Pty Ltd | Mount Zephyr (MurrinMurrin) | 20% | Mt Zephyr Project, Surrender Report, , E39/541,for the period 7 February 1997 to 12 May 2003, Report Number T |
| A64553 | 2002 | Anaconda Operations Pty Ltd | Mount Zephyr | 20% | Mt Zephyr Project, Partial Surrender Report, April 2002, E39/541. |
| A65027 | 2002 | Metex Resources Ltd | Laverton | 6.2% | Combined Annual Technical Report, Laverton Project, Lancefield Tenement Group (DME Ref: C382/1995) Laverton, W |
| A65047 | 2002 | Anaconda Operations Pty Ltd | Mt Zephyr | 10% | Mt Zephyr Project Combined Reporting Number C17/2000 Third Annual Technical Report For The Period 1 January 20 |
| A61886 | 2001 | Metex Resources Ltd | Hawk Nest North | 29% | Partial Surrender Report at 4 April 2000 E38/822. Laverton (SH51-02) 1:250,000, Laverton (3340) 1:100,000 map |
| A61889 | 2001 | Metex Resources Nl | Hawk Nest North | <1% | Final Surrender Report at 30 June 2000 M38/42, M38/43. |
| A62098 | 2001 | Anaconda Operations Pty Ltd | Mount Zephyr | 10% | Mt Zephyr Project Second Combined Annual Technical Report number C17/2000 for the period 1st January 2000 to 3 |
| A62445 | 2001 | Metex Resources Nl | Laverton | 6.1% | Combined Annual Technical Report Period 1 February 2000 To 31 January 2001. Laverton Project Lancefield Teneme |
| A63778 | 2001 | Metex Resources Ltd | Windarra South | <1% | Partial Surrender Report Windarra South Project Laverton, Western Australia, exploration lease E38/658. |
| A63779 | 2001 | Metex Resources Ltd | Danny Bore | 29% | Partial Surrender Report Danny Bore Project Laverton, Western Australia exploration lease E38/822. |
| A60027 | 2000 | Anaconda Nickel Ltd | Mount Zephyr | 10% | Mt Zephyr Project M39/446,E39/482,E39/541 Combined Reporting Number C17/2000 First Annual Technical Report for |
| A60731 | 2000 | Metex Resources Nl | Laverton/Lancefield | 6.3% | Combined Annual Technical Report Period 01/02/1999 to 31/01/2000 Laverton Project, Lancefield Tenement Group E |
| A57879 | 1999 | Anaconda Nickel Ltd | Windarra | 20% | Windarra Calcrete Project - E39/541 07/02/98 - 06/02/99 |
| A57921 | 1999 | Metex Resources Nl | Laverton | 6.4% | Laverton Project, Laverton Exploration J.V. Beasley Creek Oxide J.V. 01/02/1998 - 31/01/1999 E38/658, 822 |
| A53305 | 1998 | Wmc Resources Ltd | Windarra | 1.6% | Windarra Nickel Project, Annual Mineral Exploration Report for the period 01/01/97-31/12/97 Mining Leases 38/ |
| A54427 | 1998 | Anaconda Nickel Ltd | Windarra | 20% | Windarra Calcrete Prospect, E39/541 Mt Margaret Mineral Field, First annual technical report, 7 February 1997 |
| A54448 | 1998 | Metex Resources Nl | Windarra South | <1% | Annual Report for the period 01/02/97-31/01/98, Windarra South Project, E38/658 E38/837. |
| A54899 | 1998 | Metex Resources Nl | Laverton | 10% | Laverton Project - Lancefield Tenement Group E38/365, 822, 835, M38/37, 38, 39, 40, 45 etc. 01/02/97 - 31/12/9 |
| A50200 | 1997 | Wmc Resources Ltd | Windarra | 1.6% | Windarra Nickel Project Annual Mineral Exploration Report for the period 1 January 1996 to 31 December 1996 Mi |
| A50315 | 1997 | Metex Resources Nl | Danny Bore | 29% | Interim Technical Report W112 Danny Bore Project Exploraiton Licence E38/822 for the period 10 April 1996 to 3 |
| A51243 | 1997 | Metex Resources Nl | Lancefield | 18% | Annual Technical Report Period 1 Febuary 1996 to 31 January 1997 Laverton Develpment Project Lancefield Teneme |
| A51279 | 1997 | Crest Resources Australia Nl | Hawk Nest North | <1% | Hawk Nest North Gold Exploration Project Eastern Goldfields of Western Australia E38/658 Annual Exploration Pr |
| A52275 | 1997 | Voyager Gold Nl | Minara | <1% | Annual report E39/525 Minara Project for the year ending 01/07/1997 |
| A46930 | 1996 | Crest Resources Australia Nl | Hawk Nest North | <1% | Hawk Nest North Gold Exploration Project Eastern Goldfields of Western Australia E38/658 Annual Exploration Pr |
| A47424 | 1996 | Western Mining Corporation Ltd | Windarra | 1.6% | Windarra Nickel Project Annual Mineral Exploration Report for the period 1 January 1995 to 31 December 1995 Mi |
| A43233 | 1995 | Western Mining Corporation Ltd | Windarra | <1% | Technical Report Windarra Leases for the period 01/07/93 to 31/12/94 (AML70/261, M38/38 to M38/43, M38/45 to M |
| A43145 | 1994 | Western Mining Corporation Ltd | Windarra | <1% | Technical Report Windarra Leases for the period 01/07/92 to 30/06/93 Windarra Nickel Project (M38/38 to M38/43 |
| A35126 | 1992 | Western Mining Corporation Ltd | Mount Windarra | <1% | Mount Windarra Project, Annual Report for the period 01/07/1989 to 30/06/1991, SA261;M38/38-43, 45-49, 52-53, |
| A31396 | 1989 | Western Mining Corporation Ltd | Windarra | <1% | Technical Report; Windarra Leases For The Period 1 July 1988 to 30 June 1989. (Annual Report M38/38 to 43, M38 |
| A22647 | 1988 | Western Mining Corporation Ltd | Windarra | <1% | Annual Report, Windara Mining Leases, SA261,M38/38, M38/39, M38/40, M38/41, M38/42, M38/43, M38/45, M38/46, M3 |
| A26696 | 1988 | Western Mining Corporation Ltd | Windarra | <1% | Windarra Mining leases SA261, M38/38-43, 45-49, 52-53, 60. M39/25 1/7/87 to 30/6/88 Windarra Nickel Project 1 |
| A19838 | 1986 | Western Mining Corporation Ltd | Windarra | <1% | Annual report Windarra Nickel Project Mining Leases SA261 M38/33 M38/34 M38/38 to M38/43 M38/45 to M38/49 M38/ |
| A17197 | 1985 | Western Mining Corporation Ltd | Mount Windarra | <1% | Mount Windarra Project, Annual Report for the period 20th June 1984 to 18th June 1985, ML38/27-29; M38/33-34, |
| A12117 | 1983 | Newmont Holdings Pty Ltd | Escott Well | 27% | Escott Well Project, Final Surrender Report, 1971, MC38/5715-5718, 5832, 5879-5891. |
| A7305 | 1977 | Western Mining Corporation Ltd | Windarra | 6.9% | Windarra Project, Annual Report for the year ending 28th June 1977, MC39/4483-4485 & 4473-4475; MC38/739-745,1 |
| A5990 | 1975 | Carpentaria Exp Co Pty Ltd | Windarra | 67% | Windarra Project, Non-statutory Report: Final Report, March 1975, MC39/745-752; MC38/838-839. |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A3993 | 1973 | Carpentaria Exp Co Pty Ltd | Windarra | 100% | Windarra Project, Non-statutory Report: Report on Rotary Drilling , May 1973, MC39/750. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A81627 | 1753 | Minara Resources Ltd | MT ZEPHYR | 5% | MT ZEPHYR PROJECT, TENTH COMBINED ANNUAL TECHNICAL REPORT, C17/2000, Concerning Tenements: Concerning Tenement |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 39/169 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 39/169? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.