L 45/826
L 45/826 is a live miscellaneous licence in the Shire of East Pilbara, Western Australia, held by Pilgangoora Operations Pty Ltd (part of PLS Group Limited). Granted on 10 Feb 2025 for 21 years, it expires on 9 Feb 2046. The ground is covered by 95 historical WAMEX reports.
Register summary
- Holder
- Pilgangoora Operations Pty Ltd
- Part of
- PLS Group Limited (ASX:PLS) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 30 July 2024
- Commenced
- 10 Feb 2025
- Expiry
- 9 Feb 2046
- Term
- 21 Years
The full record on L 45/826
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 8 conditions and 20 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123507 | 2020 | Altura Lithium Operations Pty Ltd | Pilgangoora | 1.7% | Pilgangoora - Annual Report C134_2011 - 1 May 2019 to 30 April 2020 |
| A123955 | 2020 | Kairos Minerals Limited | Mount York | 1.2% | Mt York C101/2017 Annual Report for the period ending 29/02/2020 |
| A119601 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 1.1% | E45/4684 Pilgangoora Lithium-Tantalum Project For the Period 2 February 2018 to 1 February 2019 |
| A119603 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 2.4% | Pilgangoora E45/04630 Annual Report for the period 6 February 2018 to 5 February 2019 |
| A120191 | 2019 | Kairos Minerals Limited | Mount York | 1.2% | Mt York C101/2017 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
90 more reports
| A119947 | 2019 | Altura Lithium Operations Pty Ltd | Pilgangoora | 1.7% | C134_2019 Pilgangoora – Annual Report for the period 1 May 2018 to 30 April 2019, E45/02287, E45/02363, E45/03 |
| A116425 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 1.1% | Annual Report for Pilgangoora Lithium -Tantalum Project - Tenement No. E45/4684 For the Period 2 February 2017 |
| A116426 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 2.4% | Pilgangoora Project E45/04630 Annual Report for the period 06/02/2017 - 05/02/2018 |
| A116600 | 2018 | Altura Lithium Operations Pty Ltd | Pilgangoora | 1.7% | Pilgangoora – Annual Report C134_2011, 01 May 2017 to 30 April 2018 |
| A116830 | 2018 | Kairos Minerals Limited | Mount York | 1.3% | Mt York Annual Report C101/2017 For the Period 1 March 2017 to 28 February 2018, P45/02988, P45/02989, P45/029 |
| A114175 | 2017 | Kairos Minerals Limited | Mount York | 11% | P45/2992 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A114041 | 2017 | Altura Lithium Operations Pty Ltd | Pilgangoora | 1.7% | C134/2011 Pilgangoora Project Combined Annual Report for the period 1 February 2016 to 30 April 2017, E45/0228 |
| A108899 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | 2.5% | Pilgangoora Exploration Licence 45/2363 Annual Report 1st May 2015 to 30th April 2016 |
| A105322 | 2015 | Fortescue Metals Group Ltd | Glacier Valley - Pinpin River 1 | 2.4% | Partial Surrender Mineral Exploration Report: E45/2854 (Pinpin River 1) Glacier Valley Project for the period |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | <1% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A106614 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | <1% | C120/2008 Glacier Valley Final Surrender Report for the period 13/02/2012 to 11/05/2015 |
| A105066 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Combined Annual Report for the Period 1 December 2013 to 30 November 2014, C120/2008, Glacier Valley Project E |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A102322 | 2014 | Trafford Resources Ltd | Lynas Find | <1% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2013 to 31/03/2 |
| A102356 | 2014 | Atlas Iron Ltd; Altura Mining Ltd | Abydos | <1% | Abydos Project, Annual Report for the period 01/05/2013 to 30/04/2014, E45/2308,2362-2363, 2728,2899, 3298, 33 |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A98065 | 2013 | Altura Exploration Pty Ltd | Pilgangoor | 2.5% | Pilgangoor Project, Annual Report for the period 1st May 2012 to 30th April 2013, E45/2363. [C40/2007] |
| A98064 | 2013 | Atlas Iron Ltd | Abydos | <1% | Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 32 |
| A98484 | 2013 | Trafford Resources Ltd | Lynas Find | <1% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A94018 | 2012 | Atlas Iron Ltd | Abydos | <1% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A93939 | 2012 | Trafford Resources Ltd | Lynas Find | <1% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A90513 | 2011 | Atlas Iron Ltd | Abydos | <1% | Abydos Project, Annual Report for the period ending 30th April 2011,E45/2362, 2363, 2404, 2471, 2728, 2765, 28 |
| A87472 | 2010 | Atlas Iron Ltd | Abydos | <1% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2009 to 30/04/2010 |
| A82658 | 2009 | Atlas Iron Ltd; Shaw River Resources Ltd | Abydos | <1% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2008 to 30/04/2009 Tenements: E45 |
| A78725 | 2008 | Atlas Iron Ltd | Abydos | <1% | Annual Report to the Department of Industry and Resources Abydos for the period 01/05/07 to 30/05/08, TENEMENT |
| A80482 | 2008 | Trafford Resources Ltd | LYNAS FIND | 1.2% | LYNAS FIND PROJECT, PROSPECTING LICENCES P45/2557 – P45/2560 & P45/2562 – P45/2567, ANNUAL TECHNICAL REPORT ON |
| A75373 | 2007 | Atlas Iron Ltd | Abydos | <1% | Annual Report for the Period 01/05/06 to 30/04/07 Tenements:E45/2362,E45/2363,E45/2404,E45/2471,E45/2594, E45/ |
| A76745 | 2007 | Trafford Resources Ltd | Lynas Find | 1.2% | LYNAS FIND PROJECT EXPLORATION LICENCES P45/2557 - P45/2560 & P45/2562 - P45/2567 ANNUAL TECHNICAL REPORT ON E |
| A73865 | 2006 | Trafford Resources Ltd | Lynas Find | 1.2% | Lynas Find Project P45/2557-2560,2562-2567, Annual Technical Report on Exploration for the Period 14/10/2005 t |
| A63518 | 2001 | De Beers Australia Exploration Ltd | Carlindi | <1% | Annual Report for Exploration Licences 45/2195 - 45/2200. |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | <1% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A54854 | 1998 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project Annual Report For The Tenemj!nts M45/278, 281, 282, 355, 356, 464, 511, 523 - 525, P45/233 |
| A55500 | 1998 | Lynas Gold Nl | Panorama / Lynas East | <1% | Lynas East JV Annual Report for the Tenements E45/1207, 1288, 1290, 1423, & 1438 for the period 1st January 19 |
| A49963 | 1997 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project Annual report for the tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45 |
| A53154 | 1997 | Lynas Gold Nl | Lynas Find | 2.1% | Lynas Find Project, Annual Report for the period 02/10/1996 to 01/10/1997, E45/1283. |
| A53743 | 1997 | Sipa Resources Ltd | Panorama | 1% | Dept of Minerals and Energy E45/1288 &1290 Partial Surrender Report Pincunah Exploration Area, Panorama Proje |
| A50546 | 1997 | Lynas Gold Nl | Lynas East | <1% | Lynas East (JV) Project, Annual Report for the Tenements E45/1207, 1288, 1290, 1423 & 1438 for the period 1st |
| A50712 | 1997 | Lynas Gold Nl | Lynas Find | 3.6% | Lynas Find Project ,Annual report for the tenements E45/1616 15th February 1996 to 14th February 1997. |
| A49588 | 1996 | Lynas Gold Nl | Lynas Find | 2.1% | Lynas Find Project E45/1283 Annual Report |
| A47225 | 1996 | Lynas Gold Nl | Lynas East | <1% | Lynas East Gold Exploration Project, Annual Report 1995, Tenements E45/1288, 1290, 1423, 1438 AND 1207. |
| A47226 | 1996 | Sipa Resources Ltd | Panorama | <1% | Panorama Project, Annual Report Overing the Period 1 January 1995 to 31 December 1995, Tenements E45/1207, 128 |
| A47404 | 1996 | Lynas Gold Nl | Lynas Find | <1% | Annual report for 1995 for Tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45/523 M45/524 M |
| A48323 | 1996 | Lynas Gold Nl | Lynas Find | 2.1% | Lynas Find Project, Annual Report for the period 02/10/1994 to 02/10/1995, E45/1283. |
| A43237 | 1995 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project, Annual Report M45/278, 282, 355, 356, 464, 523, 524, & 525, December 1994. |
| A45049 | 1995 | Sipa Resources Ltd | Panorama / Pincunah | <1% | Panorama / Pincunah Project, 1994 Annual Report on the Pincunah Exploration Area, Panorama Project (covering t |
| A44305 | 1995 | Sipa Exploration Nl | McDonalds | 8.2% | McDonalds Project, 1994 Annual Report P45/2228 for the period ending 17th December 1994. |
| A47224 | 1995 | Lynas Gold Nl | Lynas Find | 3.4% | Lynas Find Project, Old Faithful, Annual Report 1995. |
| A41344 | 1994 | Sipa Resources Ltd | Panorama - Pincunah | <1% | Panorama - Pincunah Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/971, 1 |
| A43107 | 1994 | Lynas Gold Nl | Lynas Find | 2.1% | Lynas Find Project,Annual Report E45/1283 for period 01/12/1993 to 01/12/1994. |
| A38897 | 1993 | Lynas Gold Nl | Pilbara Gold | 1.3% | R Report for the period 03/93 Pilbara Gold Project M45/278,280-282,511,523-525 |
| A39176 | 1993 | Sipa Resources Ltd | Panorama - Pincunah | <1% | Panorama - Pincunah Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/971,12 |
| A39949 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 8.2% | McPhees Cairn Project, Annual Report for the period to 17th December 1993, P45/2228. |
| A38526 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 8.2% | McPhees Cairn Project, 1992 Annual Report, June 1993, P45/2228. |
| A39844 | 1993 | Lynas Gold Nl | Lynas Find | 2.1% | Lynas Find Project, Annual report for the period 01/01/1993 to 31/12/1993, E45/1238. |
| A37339 | 1992 | Lynas Gold Nl | Lynas Find | 1.6% | Report for the period 01/03/92 - 01/06/92 Lynas Find Project M45/278,281-282,511,523-525, P45/2229, E4 5/1283 |
| A36474 | 1992 | Mim Exploration Pty Ltd | McPhees Cairn | 8.2% | McPhees Cairn Project,1991 Annual Report, June 1992, M45/280. |
| A37340 | 1992 | Lynas Gold Nl | Lynas Find | 1.6% | LYNAS FIND, PILBARA, W .A. INTERIM REPORT FOR THE PERIOD I JULY - OCTOBER, 1992 I VOLUME I (M45/278, 281-282 |
| A34835 | 1991 | Mim Exploration Pty Ltd | Mali | 7.9% | Mali Project, Annual Report for the period 16/06/1990 to 15/06/1991, P45/1916. |
| A33048 | 1991 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 8.2% | McPhees Cairn Project, 1990 Annual Report, February 1991, M45/280. |
| A34418 | 1991 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project, Non-statutory Report:Exploration Report, February 1991, M45/278,281 & 282; P45/1412-1413, |
| A31602 | 1990 | Lynas Gold Nl | Lynas Find | 1.7% | Lynas Find Project, Final Surrender Report, July 1990, E45/967. |
| A31777 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 14% | Mali Project, Non-statutory Report: Surrender Report on the work conducted by Carpentaria Exploration Co Pty L |
| A30417 | 1990 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 8.2% | McPhees Cairn Project, Non-statutory Report:Report on the work conducted by Carpentaria Exploration Company Lt |
| A31018 | 1990 | Lynas Gold Nl | McPhee's Patch South | 1.5% | Exploration Report on Reverse Circulation Percussion Drilling at McPhee's Patch South, Mining lease M45/282 an |
| A31491 | 1990 | Lynas Gold Nl | Iron Stirrup | 3.4% | Non-statutory Report:R Report for 1989; M45/278) Pre-feasibility Study for a Gold Processing Plant for the Iro |
| A31776 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 7.9% | Mali Project, 1989/1990 Annual Report, October 1990, |
| A27293 | 1989 | Lynas Gold Nl | Pommy Well | 4.6% | Final Report, Exploration Licence 45/820, Pommy Well. |
| A29685 | 1989 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project,Annual Report for the period 01/01/1989 to 31/12/1989, M45/278,281 & 282 ; P45/1412, P45/1 |
| A27823 | 1989 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project, Annual report 1988 on M45/278, M45/281, M45/282, P45/1412, P45/1413, P45/1481, P45/1482, |
| A28919 | 1989 | Lynas Gold Nl | Pilgangoora - Lynas Find | 1.2% | Non-statutory Report : Regional Assessment Pilgangoora District Central Pilbara WA (1989) M45/54, M45/278, M45 |
| A29865 | 1989 | Lynas Gold Nl | Lynas Find - Iron Stirrup | 2% | Lynas Find -Iron Stirrup Project, Non-statutory Report: Insitu Gold Resource Estimation at the Iron Stirrup Pr |
| A23913 | 1988 | Lynas Gold Nl | Lynas Find | 4% | Lynas Find Project, -1987 Annual Report . P45/193-194, 241-242, 278, 449-451, 632. M45/54 , February 1988. |
| A19763 | 1987 | Clackline Refractories Ltd | Lynas Find | 3.7% | Non-statutory Report: Report on Geochemical Exploration at the Lynas Find Project Report for P45/449 to P45/45 |
| A18530 | 1986 | Clackline Refractories Ltd | McPhee's Cairn | <1% | Annual Report on PL45/188 McPhee's Cairn Project, Lynas Find Gold` Prospect Western Australia (1986) |
| A18659 | 1986 | Clackline Refractories Ltd | Lynas Find | 3.6% | Lynas Find Project, Annual Report for the period 01/11/1985 to 01/08/1986, M45/54; P45/241 & 242.[Iron Stirrup |
| A18529 | 1985 | Clackline Refractories Ltd | Lynas Find | 3.6% | Lynas Find Project, Non-statutory Report, December 1985 PL45/188 PL45/193 PL45/194 PL45/241 PL45/242 PL45/278 |
| A11368 | 1982 | International Nickel Aust Ltd | McPhees | 8.2% | McPhees Project, Non- Statutory Report : Annual Report for the period 01/01/1982 to 31/12/1982, TR70/8275-8260 |
| A10303 | 1981 | Amax Iron Ore Corporation | McPhees Patch | 1.7% | McPhees Patch Project, Final Surrender Report, September 1981, GML45/1576-78 & MC45/9498. |
| A5570 | 1975 | Esso Exploration Aust Inc | McPhee | 5.6% | Annual report for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7698-7702 [Plates 7-30 see A5571] |
| A5571 | 1975 | Esso Exploration Aust Inc | McPhee | 5.6% | Annual report [non-statutory] for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7702 [Plates 7-30, |
| A5561 | 1975 | Esso Australia Ltd | Chinnamon Creek | <1% | Chinnamon Creek, Annual report [non-statutory] for period ending 16th March 1975, Temporary Reserve 5723H [ TR |
| A5195 | 1974 | Esso Australia Ltd | Chinnamon Creek | <1% | TR70/5723, Chinnamon Creek Project, Quarterly report [non-statutory] for the period ending August 16th 1974 |
| A4517 | 1974 | Esso Australia Ltd | Chinnamon Creek | <1% | Chinnamon Creek Project, Annual Report for the period ending 16th March 1974, TR70/5723H. |
| A5476 | 1974 | Esso Australia Ltd | Chinnamon Creek | <1% | Temporary Reserve 5723H [ TR70/5723 ], Chinnamon Creek, Quarterly report [non-statutory] for period ending 16t |
| A3663 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 3.4% | Pilgangoora (JV) Project, Final Surrender Report, March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A3664 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 3.4% | Pilgangoora Project, Final Surrender Report, (Appendix), March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A893 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 3.4% | Pilgangoora Project, Annual (Progress) Report for the period ending 31/12/1970, ( Field Season) TR70/4931H. |
| A894 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 3.4% | Pilgangoora Project, Non-statutory Report: Plans to accompany A893, for the period ending 31/12/1970, TR70/49 |
| A892 | 1970 | Mcintyre Mines Pty Ltd | Pilgangoora | 3.4% | Pilgangoora Project, Annual Report for the year ending 31/12/1969, TR70/4931H. |
| A40993 | 1753 | Lynas Gold Nl | Lynas Find | <1% | Annual report for the period 01/93-12/93 Lynas Find Project M45/278 M45/281-282 M45/355-356 M45/464 M45/511 M4 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 45/826 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 45/826? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.