NextMaps›WA Tenements›L 47/1274

L 47/1274

PendingMiscellaneous LicenceShire of AshburtonWest Pilbara M.F. District

L 47/1274 is a pending miscellaneous licence in the Shire of Ashburton, Western Australia, applied for by Hamersley Iron Pty. Limited (part of Rio Tinto Limited). The application was received on 9 Jan 2026 and is awaiting a decision. The ground is covered by 57 historical WAMEX reports.

Area
4,868.02ha
Applied
Jan 2026
9 months ago
WAMEX reports
57
WA median is 53
Report drilling
26
of 57 reports
Free Tenure Pack for L 47/1274
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For L 47/1274 that covers 57 WAMEX reports · 17 open-file drillholes (522 m drilled) · 17 earlier titles on the ground since 1961 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Ashburton Explore on the live map

Register summary

Holder
Hamersley Iron Pty. Limited
Part of
Rio Tinto Limited (ASX:RIO) as at 2025-12-31
Local government
Shire of Ashburton
Application received
9 Jan 2026

The full record on L 47/1274

The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.

Free account
  • Current holders and their shares (no change of holder on record)
  • Expenditure history, conditions and endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • Expenditure compliance, expiry and ownership signals, once the application is granted
  • Every register dealing (4 on record), with mortgages, caveats and transfers flagged
See Premium

Exploration history on this ground

57 historical WAMEX exploration reports intersect L 47/1274: 15 report geochemistry or sampling, 33 include a digital data package.
Work on record: RC drilling 21 · Geological mapping 14 · Geological reconnaissance 11 · Aboriginal site surveys 10 · Mineral resource estimate 8 · Rock chip sampling 8. Resource declared in A93311 (2012), A92807 (2012), A68005 (2004), A61798 (2001) and 4 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on L 47/1274, free for new accounts.
When this ground was worked
31980s
141990s
122000s
252010s
32020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A145062 2024 Fortescue Ltd E47/1301 1% E47/1301 Partial Surrender Report for the period ending 03/10/2024.
A127749 2021 Fmg Pilbara Pty Ltd Jeerinah <1% Jeerinah E47/3220 Final Surrender Report for the period 14/11/2014 to 31/05/2021
A123918 2020 Brockman Exploration Pty Ltd Duck Creek East 14% Duck Creek East Project C146/2016 Annual Report forperiod ending 31/12/2019
A119780 2019 Brockman Exploration Pty Ltd Duck Creek East 14% Duck Creek East Project C146/2016 Annual Report for the period 1 January 2018 to 31 December 2018, E47/02994,
A120942 2019 Fmg Pilbara Pty Ltd Jeerinah <1% E47/3220 Jeerinah Partial Surrender for the period 15 October 2015 to 9 August 2019
52 more reports
A116712 2018 Brockman Mining Australia Pty Ltd Duck Creek East 14% Duck Creek East Project C146/2016 Combined Annual Report for the period 1 January 2017 to 31 December 2017, E4
A115864 2018 Hamersley Iron Pty Limited Bourne Highway <1% Bourne Highway Project Area Combined Annual Report for the period 18 January 2017 to 17 January 2018, Explorat
A112673 2017 Brockman Exploration Pty Ltd Duck Creek East 14% DUCK CREEK EAST PROJECT C146/2016, E47/02215, E47/02994 ANNUAL REPORT FOR THE YEAR ENDED 31 MARCH 2017
A110560 2016 Fortescue Metals Group Ltd Jeerinah 18% C134/2005 Jeerinah Project Final Surrender Report For the Period 1 July 2011 to 2 November 2016, E47/03080, E4
A104779 2015 Rio Tinto Iron Ore Bourne Highway <1% Bourne Highway Project, Annual Report for the period 18/01/2014 to 17/01/2015, E47/1783-1786; P47/1328-1330 &
A105340 2015 Fortescue Metals Group Ltd Jeerinah 3% Combined Annual Report: C134/2005 Jeerinah Project for the period 1st January 2014 to 31st December 2014, E47/
A101035 2014 Rio Tinto Iron Ore Bourne Highway <1% Bourne Highway Project, Annual Report for the 18/01/2013 to 17/01/2014, E47/1783-1786; P47/1328-1330, 1332-133
A101477 2014 Fortescue Metals Group Ltd Jeerinah 3.1% Combined Annual Report: C134/2005 Jeerinah for the period 1st January 2013 to 31st December 2013, E47/1195....
A96783 2013 Rio Tinto Exploration Pty Ltd Bourne Highway <1% BOURNE HIGHWAY PROJECT AREA COMBINED ANNUAL REPORT (C88/2008) EXPLORATION LICENCES 47/1783, 47/1784, 47/1785 &
A97435 2013 Fortescue Metals Group Ltd Jeerinah 3.1% Jeerinah Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1195-1196, 1299-130
A100371 2013 Kalamazoo Resources Pty Ltd Mt Wall - Anthiby Well <1% Mt Wall / Anthiby Well E47/2212 Annual Report for the period 18/11/2012 to 17/11/2013
A95858 2012 Cazaly Resources Ltd Pinarra Well 10% Annual Report Pinarra Well – E47/1562 For the Period 7th November 2011 to 6th November 2012
A96072 2012 Atlas Iron Ltd Mount Wall - Anthiby Well <1% Mount Wall - Anthiby Well Project, E47/2212 Annual Technical Report for the Period Ending 17 November 2012
A92807 2012 Rio Tinto Iron Ore Bourne Highway <1% Bourne Highway Project Annual Technical Report for the Period 18/01/2011 to 17/01/2012 for C88/2008, E47/1783,
A93311 2012 Fortescue Metals Group Ltd Jeerinah 3.1% Jeerinah Project, Annual Report for the period 1st January 2011 to 31st December 2011, E47/1195-1196, 1299-130
A89157 2011 Cazaly Resources Ltd Pinarra Well 10% Annual Report Pinarra Well E47/1562 For the Period 7 November 2009 to 6 November 2010
A89175 2011 Rio Tinto Exploration Pty Ltd Bourne Highway <1% Combined Annual Report (C88/2008) For the Period 18 January 2010 to 17 January 2011, Bourne Highway, E47/1783,
A89912 2011 Fmg Pilbara Pty Ltd Jeerinah 2.9% Annual report for the period 1 January 2010 to 31 December 2010, Jeerinah Project
A92217 2011 Cazaly Resources Ltd Pinarra Well 10% Annual Report Pinarra Well – E47/1562 For the Period 7 November 2010 to 6 November 2011
A85807 2010 Cazaly Resources Ltd PINARRA WELL 10% PARTIAL SURRENDER REPORT PINARRA WELL – E47 / 1562 For the Period 7 November 2006 to 6 November 2009
A85808 2010 Cazaly Resources Ltd PINARRA WELL 10% Annual Report PINARRA WELL – E47 / 1562, For the Period 7 November 2008 to 6 November 2009
A86225 2010 Fmg Pilbara Pty Ltd Jeerinah 2.9% Annual report for the period 1 January 2009 to 31 December 2009, Jeerinah Project
A85732 2010 Rio Tinto Exploration Pty Ltd Bourne Highway <1% Combined Annual Report (C88/2008) For the Period 18 January 2009 to 17 January 2010, Bourne Highway, E47/1783,
A80764 2009 Cazaly Resources Ltd PINARRA WELL 10% Annual Report PINARRA WELL – E47 / 1562 For the Period 7 November 2007 to 6 November 2008 West Pilbara Mineral
A81026 2009 Rio Tinto Exploration Pty Ltd Bourne Highway <1% Combined Annual Report (C88/2008), For the Period 18 January 2008 to 17 January 2009, Bourne Highway, E47/1783
A81391 2008 Fortescue Metals Group Ltd Jeerinah 2.9% Annual report for the period 1 January 2008 to 31 December 2008, Jeerinah Project, E47/1195, E47/1196, E47/129
A77112 2008 Cazaly Resources Ltd Pinarra Well 10% Annual Report Pinarra Well - E47/1562 For the period 7 November 2006 to 6 November 2007
A74051 2007 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area E47/31,48,53,1037 & 1038, Combined Reporting No. C118/1996, Combined Annual Rep
A71660 2006 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area, Exploration Licences E47/31, E47/48,E47/53,E47/1037 & E47/1038, Combined Repor
A69893 2005 Hamersley Iron Pty Ltd Brockman Syncline <1% Combined annual report for the period 18/12/03 - 17/12/04 Brockman Syncline Project, C118/1996, E47/31, E47/48
A68005 2004 Hamersley Iron Pty Ltd Brockman Syncline <1% Combined Annual Report for the period 18/12/2002 to 17/12/20 03 Brockman Syncline Project (C118/1996), E47/31
A65921 2003 Hamersley Iron Pty Ltd Brockman Syncline <1% Combined Annual Report for the period 18/12/2001 to 17/12/02 Brockman Syncline Project Area E47/31, E47/46, E4
A64057 2002 Hamersley Iron Pty Ltd Mount Brockman <1% Combined Annual Report for the period 18/12/2000 to 17/12/2001 Brockman Syncline Project Area exploration lice
A61798 2001 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area exploration licences E47/31, E47/46, E47/48, E47/51, E47/52, E47/53 & E47/290 W
A59733 2000 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area Exploration Licences E47/31, E47/46,E47/48,E47/51,E47/52,E47/53 & E47/290 West
A57232 1999 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area Exploration Licences E47/31 E47/46 E47/48 E47/51 E47/52 E47/53 E47/290 Combined
A53572 1998 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area Exploration Licences E47/31, 46, 48, 51, 52, 53 and 290 West Pilbara Mineral Fi
A55496 1998 Hamersley Iron Pty Ltd Brockman West <1% Brockman West Project Area, 09/06/97 - 08/06/98 West Pilbara Mineral Field W.A. Exploration Licence: E47/7
A56205 1998 Hamersley Iron Pty Ltd Brockman West <1% Duck Creek, Exploration Licence: E47/782 West Pilbara Mineral Field W.A. - Final Surrender Report 10/06/96 - 2
A50099 1997 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Project Area E47/31 E47/46 E47/48 E47/51 E47/52 E47/53 E47/290 Annual report 18/12/95 to 17/
A51860 1997 Hamersley Iron Pty Ltd Brockman West <1% Brockman West Project Area Exploration Licences E47/778 E47/779 E47/780 E47/781 E47/782 and E47/783 West Pilba
A47104 1996 Hamersley Iron Pty Ltd Mount Brockman <1% Brockman Syncline Project Area Exploration Licences E47/31 E47/46 E47/48 E47/51 E47/52 E47/53 and E47/290 West
A43469 1995 Hamersley Iron Pty Ltd Brockman Syncline <1% Brockman Syncline Exploration Licences E47/31 E47/46 E47/48 E47/51 E47/52 E47/53 E57/290 Annual report 18/12/9
A48231 1995 Hamersley Iron Pty Ltd Mount Brockman <1% Annual Progress Report E47/535 to the period 09/05/1995 to 08/05/1996 GDSR No. 2599
A40194 1994 Hamersley Iron Pty Ltd Brockman Syncline <1% Annual report for the period 18/12/92-19/01/94 Brockman Syncline Project E47/31 E47/46 E47/48 E47/51-53 E47/29
A37650 1993 Hamersley Iron Pty Ltd Brockman Syncline <1% Annual report for the period 18/12/91-17/12/92 and 20/01/92- 19/01/93 for E 47/290 Brockman Syncline E47/31 E4
A35026 1992 Hamersley Iron Pty Ltd Brockman Syncline <1% Annual Report for the period 18/12/90-17/12/91 Brockman Syncline - Brockman 4 Project E47/53
A32452 1991 Hamersley Iron Pty Ltd Brockman <1% Turner Syncline - Brockman 4 Exploration Licence E47/53 Annual report 17/12/89-18/12/90 West Pilbara Mineral F
A29709 1990 Hamersley Iron Pty Ltd Silvergrass / Brockman <1% Annual report 18/12/88 to 17/12/89 Exploration licence E47/53 Hamersley Iron Pty Ltd
A27076 1989 Hamersley Iron Pty Ltd Silvergrass / Brockman <1% Annual report 18/12/87 to 17/12/88 E47/53
A23090 1987 Hamersley Iron Pty Ltd Mount Brockman <1% Mount Brockman Iron Ore Exploration Annual report 18/12/86-14/12/87 Exploration Licence E47/53
A20981 1986 Hamersley Exp Pty Ltd Boolgeeda <1% Boolgeeda Project, Annual Report for the period 18/12/1985 to 17/12/1986, E47/53.

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over L 47/1274 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold L 47/1274? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.