L 47/1312
L 47/1312 is a pending miscellaneous licence in the Shire of Ashburton, Western Australia, applied for by Piop Mine Co Pty Ltd. The application was received on 12 June 2026 and is awaiting a decision. The ground is covered by 21 historical WAMEX reports.
Register summary
- Holder
- Piop Mine Co Pty Ltd
- Local government
- Shire of Ashburton
- Application received
- 12 June 2026
The full record on L 47/1312
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (3 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125300 | 2020 | Fmg Pilbara Pty Ltd | Mount Sacha - Solomon West | 1.1% | E47/3205 Mt Sacha (Solomon West) Partial Surrender Report for the period ending 11 September 2020 |
| A125539 | 2020 | Polaris Metals Pty Ltd | Weelumurra | <1% | Annual Report E47/1557 Weelumurra for the period 7/10/2019 to 6/10/2020 |
| A121723 | 2019 | Forge Resources Swan Pty Ltd | Weelumurra | <1% | Weelumurra Project E47/01557 Annual Technical Report for the period 7 October 2018 to 6 October 2019 |
| A118232 | 2018 | Forge Resources Swan Pty Ltd | Weelumurra | <1% | Weelumurra Project E47/01557 Annual Technical Report for the period 07/10/2017 - 06/10/2018 |
| A115203 | 2017 | Forge Resources Swan Pty Ltd | Weelumurra | <1% | Weelumurra Project E47/01557 Annual Technical Report for the period 7 October 2016 to 6 October 2017 |
16 more reports
| A108158 | 2016 | Polaris Metals Pty Ltd | Weelumurra | <1% | ANNUAL REPORT For the Period 7 October 2014 to 6 October 2015 E47/1557 "WEELUMURRA" |
| A110315 | 2016 | Polaris Metals Pty Ltd | Weelumurra | <1% | Annual Mineral Exploration Report Weelumurra Project E47/01557 for the period 7 October 2015 to 6 October 2016 |
| A107481 | 2015 | Rio Tinto Iron Ore | Weelamurra | <1% | Weelamurra Project Area Combined Annual Report, Exploration Licence 47/1311 and Prospecting Licence 47/1702 (C |
| A104071 | 2014 | Rio Tinto Iron Ore | Weelamurra | <1% | Weelamurra Project Area Combined Annual Report, Exploration Licence 47/1311 and Prospecting Licence 47/1702 (C |
| A104073 | 2014 | Polaris Metals Pty Ltd | Weelumurra | <1% | WEELUMURRA PROJECT E47/1557-I ANNUAL REPORT FOR THE PERIOD 7 OCTOBER 2013 TO 6 OCTOBER 2014 |
| A100195 | 2013 | Robe River Mining Co Pty Ltd | Weelamurra | <1% | Annual Technical Report for Exploration Licence 47/1311 for the Period 1 November 2012 to 31 October 2013 |
| A99857 | 2013 | Polaris Metals Pty Ltd | Weelumurra | <1% | Weelumurra Project E47/1557-I Annual Report for the period 7 October 2012 to 6 October 2013 |
| A95788 | 2012 | Polaris Metals Pty Ltd | Weelumurra | <1% | Weelumurra Project E47/1557-1 Partial Surrender Report for the period 7 Nov 2009 – 28 Oct 2012 |
| A96174 | 2012 | Polaris Metals Pty Ltd | Weelumurra | <1% | Weelumurra Project, Annual Report for the period 7th October 2011 to 6th October 2012, E47/1557. |
| A92619 | 2012 | Polaris Metals Pty Ltd | Weelumurra | <1% | Weelumurra Project, Annual Report for the period 7th October 2010 to 6th October 2011, E47/1557. |
| A88698 | 2010 | Polaris Metals Pty Ltd | Weelumurra | <1% | WEELUMURRA PROJECT E47/1557-I ANNUAL REPORT FOR THE PERIOD 6 DECEMBER 2009 – 5 DECEMBER 2010 |
| A51410 | 1997 | Robe River Mining Co Pty Ltd | Cabbage Gum Bore | <1% | Cabbage Gum Bore Project, Surrender Report for E47/722 , April 1997. |
| A50489 | 1997 | Robe River Mining Co Pty Ltd | Cabbage Gum Bore - Robe Headwaters | <1% | Cabbage Gum Bore/ Robe Headwaters E47/722 E47/656 E47/733 E47/787 14 Febuary 1996 to 13 Febuary 1997 |
| A47101 | 1996 | Robe River Mining Co Pty Ltd | Cabbage Gum Bore | <1% | Cabbage Gum Bore Project, Annual Report 14 February 1995 - 13 February 1996, E47/722. |
| A7707 | 1978 | Dampier Mining Co Ltd | Wallina Well-Matapan Well -High Bluff | <1% | Wallina Well-Matapan Well -High Bluff Project, Non-statutory Report: Annual & Final Report , April 1978, TR70/ |
| A7709 | 1977 | Broken Hill Pty Co Ltd | Weelumurra - Caliwinga | <1% | Weelumurra - Caliwinga Project, Non-statutory Report: Resistivity Survey, September 1977, TR70/6483-6485. |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 47/1312 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 47/1312? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.