L 47/92
Register summary
- Holders
- Itochu Minerals & Energy Of Australia Pty Ltd, Mitsui Iron Ore Corporation Pty Ltd, Bhp Minerals Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 25 May 2000
- Commenced
- 19 Dec 2002
- Expiry
- 18 Dec 2044
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A127640 | 2021 | Fortescue Metals Group Ltd | Opthalmia | 13% | C128/2011 Opthalmia Combined Final Surrender Report for the period for the period 23/04/2019 to 26/05/2021 |
| A127756 | 2021 | Fmg Pilbara Pty Ltd | Fig Tree | 13% | E47/3263 (Fig Tree) Final Surrender Report for the period 19/12/2017 to 31/05/2021 |
| A123858 | 2020 | Bhp Iron Ore Pty Ltd | Bonobo | 12% | Annmual Report for E52/2009 - Bonobo for the period ending 26/5/2020 |
| A124427 | 2020 | Fortescue Metals Group Ltd | Fig Tree | 12% | Fig Tree E47/3013 Final Surrender for the period ending 23/06/2020 |
| A123704 | 2020 | Bhp Iron Ore Pty Ltd | Ministers Bridge | 9.3% | Annual Report for E47/628 - Ministers Bridge - 4 May 2019 to 2 May 2020 |
234 more reports
| A122659 | 2020 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas C113/2007 Combined Annual Report for the period 11 November 2018 to 10 November 2019 |
| A121021 | 2019 | Fmg Pilbara Pty Ltd | Opthalmia | 4.7% | E47/2173 Opthalmia Partial Surrender Report for the period 8 November 2010 to 9 August 2019 |
| A118909 | 2019 | Fortescue Metals Group Ltd | Opthalmia | 2.2% | C128/2011 Opthalmia Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119330 | 2019 | Hancock Prospecting Pty Limited | East Angelas | 2.5% | East Angelas C113/2007 Combined Annual Report For the Period 11 November 2017 to 10 November 2018, E47/01307, |
| A120457 | 2019 | Bhp Iron Ore | Bonobo | 12% | Partial Surrender Report - for the Period 27th May 2013 to 26th May 2019 |
| A121446 | 2019 | Hamersley Iron Pty Ltd | Rhodes Ridge | 2.4% | Donated Drillcore from Hamersley Iron |
| A115829 | 2018 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas C113/2007 Combined Annual Report for the period 11 November 2016 to 10 November 2017, E47/01307, |
| A116165 | 2018 | Brockman East Pty Ltd | Ophthalmia | <1% | Surrender Report for P47/1715 Ophthalmia Project For the Period 2 April 2015 to 9 November 2017 |
| A116268 | 2018 | Fortescue Metals Group Ltd | Opthalmia | 2.2% | C128/2011 Opthalmia Annual Mineral Exploration Report for the period 1 January 2017 to 31 December 2017, E47/0 |
| A110819 | 2017 | Fortescue Metals Group Ltd | Marillana | 12% | Annual Report Marillana project E47/3013 For the Period 5 October 2015 to 4 October 2016. |
| A110821 | 2017 | Bhp Billiton Iron Ore Pty Ltd | North Flank, Packsaddle, Western Ridge | 1.2% | Donated Drill Core – GE2403DG, GE2455DG, PSB0454DG, PSD1204DG, PSB0451DG, PSB0453DG, WSR1302RD |
| A111861 | 2017 | Fortescue Metals Group Ltd | Mount Newman | 4.7% | E47/2173 (Mt Newman) Partial Surrender Report 8 November 2010 to 7 November 2016 |
| A111903 | 2017 | Hancock Prospecting Pty Limited | East Angelas | 2.5% | East Angelas C113/2007 Combined Annual Report 11 November 2015 to 10 November 2016 |
| A112500 | 2017 | Brockman Mining Australia Pty Ltd | Ophthalmia | <1% | OPHTHALMIA PROJECT C214/2010 - Combined Annual Report for the year ended 31st December 2016, E46/00781, E47/01 |
| A115022 | 2017 | Brockman East Pty Ltd | Ophthalmia | 1.4% | E 47/1599 (Ophthalmia) Partial Surrender Report For the Period 3 April 2008 to 2 April 2017 |
| A109107 | 2016 | Fortescue Metals Group Ltd | Opthalmia | 20% | C128/2011 Opthalmia Final Surrender Report for the period 28 June 2012 to 3 May 2016, E47/02619, P47/01626 |
| A107951 | 2016 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report C113/2007 for the Year Ending 10 November 2015, E47/1307; E47/1308 |
| A108509 | 2016 | Brockman Mining Australia Pty Ltd | Ophthalmia | <1% | OPHTHALMIA PROJECT C214/2010 – Combined Annual Report for the year ended 31st December 2015, E 46/00781, E 47/ |
| A104700 | 2015 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report - Combined Reporting Group C113/2007 East Angelas for the Year End |
| A105050 | 2015 | Brockman Mining Australia Pty Ltd | Ophthalmia | <1% | Ophthalmia Project C214/2010 – Combined Annual Report for the year ended 31st December 2014, E47/1598-99, E47/ |
| A105216 | 2015 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Annual Report Ministers North E47/682 Reporting Period 4 May 2014 – 3 May 2015 |
| A105586 | 2015 | Rio Tinto Iron Ore | Ophthalmia | 3.2% | Ophthalmia Ranges Project Area Combined Anual Report Exploration Licences 47/280 and 47/319 (C156/1996) Annual |
| A105685 | 2015 | Bhp Billiton Iron Ore Pty Ltd | Mount Newman | 12% | Annual report for the period 27th May 2014 to 26th May 2015, Bonobo Project, E52/2009 |
| A105867 | 2015 | Polaris Metals Pty Ltd | Central Pilbara | 3.1% | Central Pilbara Project C4/2013 Annual Report for the Period 1 February 2014 – 31 January 2015, M47/1359-I, M4 |
| A105162 | 2015 | Polaris Metals Pty Ltd | Central Pilbara - Wedge | 9.2% | Central Pilbara Project E47/2366-I (Wedge Prospect) Final Surrender Report for the Period 6 February 2012 – 13 |
| A101334 | 2014 | Fortescue Metals Group Ltd | Opthalmia | 4.8% | Opthalmia Project, Annual Report for the period 01/01/2013 to 31/12/2013, E47/2172-2173, 2459 & 2619; P47/1626 |
| A101590 | 2014 | Brockman Mining Australia Pty Ltd | Ophthalmia | <1% | Ophthalmia Project C214/2010 – combined annual report for the year ended 31st December 2013, E47/1598-99, E47/ |
| A101741 | 2014 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Annual Report Ministers North E47/628 Reporting Period 4 May 2013 – 3 May 2014 |
| A101823 | 2014 | Rio Tinto Iron Ore | Ophthalmia Ranges | 3.2% | Ophthalmia Range Combined Annual Technical Report Exploration Licences 47/280 and 47/319 C156/1996 for the pe |
| A102250 | 2014 | Process Minerals International | Central Pilbara | 1.6% | Final Surrender Report for the period 6 March 2012 to 16 February 2014 for E47/1236-I |
| A102255 | 2014 | Polaris Metals Pty Ltd | Central Pilbara | 2.8% | Combined – C004/2013 Annual Report for the period 1 February 2013 – 31 January 2014, E47/1236-I, E47/1238-I, E |
| A103377 | 2014 | Atlas Iron Ltd | Western Creek | <1% | Western Creek Project Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 6 |
| A104238 | 2014 | Atlas Iron Ltd | Western Creek | 1.9% | Western Creek Project (C179/2007) Final Surrender Report to the Department of Mines and Petroleum for the Peri |
| A105143 | 2014 | Fortescue Metals Group Ltd | Ophthalmia | 4.8% | Combined Mineral Exploration Report: C128/2011 Opthalmia Project for the period 1st January 2014 to 31st of De |
| A100578 | 2014 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report Combined Reporting Group C113/2007 East Angelas For the Year Endin |
| A102292 | 2014 | Bhp Billiton Iron Ore Pty Ltd | E52/2009 | 12% | Annual Report for the period 27th May 2013 to 26th May 2014, E52/2009 |
| A102836 | 2014 | Nexus Minerals Ltd | Hancock Range | <1% | Hancock Range Project, Annual Report for the period 26/07/2013 to 25/07/2014, E47/2110. |
| A97683 | 2013 | Rio Tinto Iron Ore | Ophthalmia Range | 2.2% | OPHTHALMIA RANGE COMBINED ANNUAL TECHNICAL REPORT C156/1996 EXPLORATION LICENCES 47/280, 47/319, 47/623 and 47 |
| A99004 | 2013 | Atlas Iron Ltd | Western Creek | <1% | Western Creek Project C179/2007Annual Technical Report to the Department of Mines and Petroleum for the Period |
| A99243 | 2013 | Nexus Minerals Ltd | Hancock Range | <1% | E47/2110 Hancock Range Project Annual Report for the period 26th July 2012 – 25th July 2013 |
| A96562 | 2013 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report - Combined Reporting Group C113/2007 East Angelas for the Year End |
| A97023 | 2013 | Fortescue Metals Group Ltd | Opthalmia | 4.2% | Annual report for the period 1 January 2012 to 31 December 2012 for the combined reporting group Opthalmia |
| A97301 | 2013 | Brockman Mining Australia Pty Ltd | Opthalmia | <1% | Opthalmia Project, Annual Report for the year ending 31st December 2012, E47/1598 & 1599. [C214/2010] |
| A97385 | 2013 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Annual Report Ministers North E47/628 Reporting period 4 May 2012 - 3 May 2013 |
| A98330 | 2013 | Process Minerals International | Central Pilbara | 2.8% | Central Pilbara Project, Annual Report for the period 01/02/2012 to 31/01/2013, E47/1236, 1238 & 2366; M47/135 |
| A93553 | 2012 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2011 to 16 February 2012 |
| A92670 | 2012 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report - Combined Reporting Group C113/2007 East Angelas for the Year End |
| A92999 | 2012 | Fortescue Metals Group Ltd | Opthalmia | 4.2% | Annual report for the period 1 January 2011 to 31 December 2011, for the combined reporting group Opthalmia, E |
| A93518 | 2012 | Brockman Resources Ltd | Ophthalmia | <1% | Ophthalmia Project C214/2010 Combined Annual Technical Report for the year ended 31st December 2011 |
| A93555 | 2012 | Rio Tinto Iron Ore | Ophthalmia Range | 2.2% | Combined Annual Technical Report for the Ophthalmia Range Project E47/280, 319, 623, 624, for the period 1 Apr |
| A94787 | 2012 | Hemisphere Resources Ltd | Hancock Range | <1% | E47/2110 HANCOCK RANGE ANNUAL REPORT 2012 Report Period: 26th July 2011 – 25th July 2012 |
| A93265 | 2012 | Midas Resources Ltd | Yandicoogina | 12% | Yandicoogina Project, Final Surrender Report for the period 17/08/2009 to 24/02/2012, E47/1901 & 1958. [C118/2 |
| A93947 | 2012 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Annual Report Minister’s North E 47/628 Reporting period 4 May 2011 - 3 May 2012. |
| A89881 | 2011 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | Annual Report, C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2010 to Fe |
| A89223 | 2011 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report - Combined Reporting Group C113/2007 East Angelas for the Year En |
| A89413 | 2011 | Rio Tinto Iron Ore | Hope Downs | 1.4% | Exploration Licences E47/427, E47/428, E47/429 and E47/430. Hope Downs, Combined Annual Report for the Period |
| A89697 | 2011 | Midas Resources Ltd | Yandicoogina | 12% | Yandicoogina Project , Annual Report , C118/2010 Tenement: E47/1901-I, E47/1958-I period 25/02/10 to 24/02/11 |
| A89995 | 2011 | Brockman Resources Ltd | Opthalmia | <1% | Opthalmia Project, C214/2010, Combined Annual Technical Report for the year ending 31st December 2010. (E47/15 |
| A90068 | 2011 | Rio Tinto Iron Ore | Opthalmia Range | 2.2% | Opthalmia Range Project, Annual Report for the period 01/04/2010 to 31/03/2011, E47/280, E47/319, E47/ 623 & E |
| A90979 | 2011 | Brockman Resources Ltd | Ophthalmia | 1.4% | Partial Surrender Report – Ophthalmia Project E47/1599, Western Australia. |
| A91569 | 2011 | Hemisphere Resources Ltd | Hancock Range | <1% | EXPLORATION LICENCE E47/2110 HANCOCK RANGE WESTERN AUSTRALIA ANNUAL REPORT FOR THE YEAR ENDED 25 July 2011 |
| A90397 | 2011 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Ministers North Project, Annual Report for the period 4th May 2010 to 3rd May 2011, E47/628. |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | Mesa J - Yandi Junction - Mesa A - Bunga | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me |
| A85705 | 2010 | Hancock Prospecting Pty Ltd | East Angeles | 2.5% | Combined Annual Report, Combined Reporting Group C113/2007 East Angelas for the year ending 10 November 2009 E |
| A85981 | 2010 | Rio Tinto Iron Ore | Hope Downs | 1.4% | Hope Downs 4, 5 and 6 E47/427, E47/428, E47/429 and E47/430. Annual Technical Report for the Period 2/2/2009 t |
| A87343 | 2010 | Rio Tinto Exploration Pty Ltd | Leisker East | 5.1% | Partial Surrender Report for the Period Ending 16 June 2010, E47/1330 Leisker East |
| A87379 | 2010 | Rio Tinto Exploration Pty Ltd | Leisker | 2.1% | Combined Annual Report (C5/2007 Leisker) for the Period 1 July 2009 to 30 June 2010, E47/1329 Leisker and E47/ |
| A86725 | 2010 | Iron Ore Holdings Ltd | Marillana - Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2009 to February 2010, E4 |
| A86705 | 2010 | Rio Tinto Iron Ore | OPHTHALMIA RANGE | 2.2% | OPHTHALMIA RANGE COMBINED ANNUAL TECHNICAL REPORT EXPLORATION LICENCES E47/280, E47/319, E47/623 and E47/624 ( |
| A86772 | 2010 | Brockman Resources Ltd | Ophthalmia | 1.4% | Annual Technical Report – Ophthalmia Project, Western Australia. Period ending 2nd April 2010 |
| A87013 | 2010 | Bhp Billiton Iron Ore Pty Ltd | Minister's North | 9.3% | Annual Report Minister's North E47/0628, Reporting period 4 May 2009 – 3 May 2010 |
| A81176 | 2009 | Rio Tinto Exploration Pty Ltd | HOPE DOWNS 4, 5 and 6 | 1.4% | Hope Downs 4, 5 and 6 E47/427, E47/428, E47/429 and E47/430. Annual Technical Report for the Period 02/02/2008 |
| A81924 | 2009 | Rio Tinto Exploration Pty Ltd | OPHTHALMIA RANGE | 2.2% | OPHTHALMIA RANGE, COMBINED ANNUAL TECHNICAL REPORT, EXPLORATION LICENCES E47/280, E47/319, E47/623 and E47/624 |
| A81931 | 2009 | Rio Tinto Iron Ore | HOPE DOWNS | 2.7% | HOPE DOWNS ANNUAL TECHNICAL REPORT, MINING LEASE ML282SA, East Pilbara Mineral Field Western Australia , Annua |
| A82525 | 2009 | Bhp Billiton Iron Ore Pty Ltd | MINISTER'S NORTH | 9.3% | ANNUAL REPORT MINISTER'S NORTH E 47/0628, Reporting period 4 May 2008 - 3 May 2009 |
| A82190 | 2009 | Iron Ore Holdings Ltd | Marillana – Yandicoogina | <1% | C40/2005 – Marillana - Yandicoogina Project Annual Report For the Period 17 February 2008 to February 2009. |
| A83023 | 2009 | Rio Tinto Exploration Pty Ltd | Leisker East | 5.1% | Partial Surrender Report for the Period Ending 11 June 2009, E47/1330 Leisker East, Western Australia |
| A83024 | 2009 | Rio Tinto Exploration Pty Ltd | Leisker | 2.1% | Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the Period 1 July 2008 to |
| A83094 | 2009 | Brockman Resources Ltd | OPHTHALMIA | 1.4% | OPHTHALMIA PROJECT E47/1599 Annual Technical Report for the year ended 2nd April 2009 |
| A85253 | 2009 | Hancock Prospecting Pty Ltd | East Angelas | 5.5% | E47/1313 East Angelas Project Partial Surrender Report 2009 Combined Reporting Group C113/2007 East Angelas E4 |
| A77539 | 2008 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report - E47/1236-1239 Marillana- Yandicoogina Project - For the Period 17 February 2007 to 16 February |
| A77635 | 2008 | Hamersley Hms Pty Ltd | Hope Downs 4,5 and 6 | 1.4% | Hope Downs 4,5 and 6, Exploration licences E47/427, E47/428, E47/429 and E47/430, West Pilbara Mineral Field, |
| A78218 | 2008 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range EXPLORATION LICENCES E47/280, 319,623 and 624 Annual Report for the Period Ending 31 March 20 |
| A78653 | 2008 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | ANNUAL REPORT MINISTER'S NORTH E47/0628 Reporting period 4 May 2007 - 3 May 2008 |
| A78740 | 2008 | Iron Ore Holdings Ltd | Yandicoogina | 1.6% | Partial Surrender Report E47/1236 Yandicoogina Project For the Period 17 February 2007 to 16 February 2008 |
| A79274 | 2008 | Rio Tinto Exploration Pty Ltd | Pilbara Iron Ore | 2.1% | Combined Annual Report (C5/2007 Leisker) E47/1329 Leisker, E47/1330 Leisker East For the period 1 July 2007 |
| A80531 | 2008 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | East Angelas Project Combined Annual Report Combined Reporting Group C113/2007 East Angelas For the Year Endin |
| A77380 | 2008 | Hancock Prospecting Pty Ltd | East Angelas | 2.5% | Combined Annual report for the year ending November 10 2007; Combined Reporting Group C 113/2007 East Angelas |
| A74422 | 2007 | Hamersley Iron Pty Ltd | Hope Downs 4,5 & 6 | 1.4% | Hope Downs 4,5 & 6 Exploration licences E47/427, E47/428, E47/429, and E47/430, Combined Annual Report for the |
| A74794 | 2007 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report for Exploration Licences E47/1336 - 1239 Yandicoogina Project, for the Period 17 February 2006 t |
| A75818 | 2007 | Rio Tinto Exploration Pty Ltd | Leisker East | 2.1% | Annual Report (Combined Report C5/2007) E47/1329 Leisker, E47/1330 Leisker East 1 July 2006 to 30 June 2007 Pi |
| A74970 | 2007 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range, Exploration Licences E47/280, E47/319, E47/623 and E47/624, Annual Report for the Period End |
| A75371 | 2007 | Bhp Billiton Iron Ore Pty Ltd | Minister's North | 9.3% | Annual Report Minister's North E47/0628 Reporting period 4 May 2006 - 3 May 2007 |
| A71912 | 2006 | Hope Downs Iron Ore Pty Ltd | East Angelas | 1.4% | East Angelas Project Area, Exploration Licences E47/427-430, West Pilbara Mineral Field Western Australia, Com |
| A72197 | 2006 | Iron Ore Holdings Ltd | Yandicoogina | <1% | Annual Report for Exploration licences E47/1236-1239, 17 February 2005 - 16 February 2006, (Yandicoogina Proje |
| A73122 | 2006 | Rio Tinto Exploration Pty Ltd | Leisker East | 5.1% | First Annual Report for the Period Ending 30 June 2006, E47/1330 Leisker East, Pilbara Iron Ore Programme, Roy |
| A73654 | 2006 | Hallmark Minerals Nl | Yandicoogina | 1.2% | (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, Western Australia, Annual report for the |
| A74050 | 2006 | Hancock Prospecting Pty Ltd | East Angelas | 5.5% | Annual Report for Year Ending 11 November 2006, E47/1313, (East Angelas Project, Newman). |
| A72336 | 2006 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range E47/280,319,623,624, Annual Report for the Period Ending 30 April 2006, (Hamersley Iron GDSR |
| A72960 | 2006 | Hancock Prospecting Pty Ltd | East Angelas | 1.4% | Combined Annual Exploration Report for E47/427-430 for the Period 2 February 2003 to 1 February 2004, (East An |
| A70246 | 2005 | Iron Ore Holdings Ltd | Yandi | <1% | Annual report for the period 17 February 2004 to 17 February 2005, E47/1236, E47/1237, E47/1238 and E47/1239, |
| A70458 | 2005 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Annual report for the period 31/05/05 - 30/05/05 Ophthalmia Range Project, C156/1996, E47/280, E47/319, E47/62 |
| A70669 | 2005 | Hope Downs Iron Ore Pty Ltd | East Angelas | 1.4% | Combined annual exploration report for E47/427-E47/430 inclusive, for the period 2nd February 2004 to 1st Febr |
| A68544 | 2004 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Annual report for the period 31/05/2003-30/05/2004 Ophthalmia Range Project E47/280, E47/319, E47/623, E47/62 |
| A68551 | 2004 | Bhp Billiton Iron Ore Pty Ltd | Minister's North | 9.3% | Annual report for the period 04/05/2003-03/05/2004 Minister's North Project E47/628 |
| A68928 | 2004 | Hancock Prospecting Pty Ltd | East Angelas | 1.4% | Combined annual exploration report for E47/427-E47/430 inclusive for the period 2nd February 2002 to 1st Febru |
| A66067 | 2003 | Bhp Billiton Iron Ore Pty Ltd | Ministers North | 9.3% | Annual Report for the period 4 May 2002 to 3 May 2003 Minister's North E47/628. |
| A66596 | 2003 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Annual Report for the period ending 30 May 2003 Opthalmia Range E47/280, 319, 623, 624 GDSR No 4317 |
| A64684 | 2002 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range Exploration Licences E47/623, E47/624 E47/280 and E47/319 West Pilbara Mineral Field Western |
| A64679 | 2002 | Bhp Billiton Iron Ore Pty Ltd | Mount Goldsworthy | 9.3% | Annual Report Ministers North E47/628 Period 4 May 2001 To 3 May 2002. |
| A65988 | 2002 | Hope Downs Iron Ore Pty Ltd | Hope Downs | 3.8% | Combined Annual Report for the period 24 April 2001 to 23 April 2002 for E47/243, 47/308, 47/597 Hope Downs 1 |
| A62429 | 2001 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range Project Area Exploration Licences E47/623, 624, 280 AND 319 Annual Report for the year ending |
| A63292 | 2001 | Hope Downs Ltd | Hope Downs | 3.8% | Combined Annual Report for Hope Downs 1 for the period 24 Ap ril 2000 to 23 April 2001 E47/243, E47/308, E47/5 |
| A60399 | 2000 | Pacminex Pty Ltd | Yandicoogina | <1% | Annual Reprot on Exploration to February 1978 Temporary Reserves for Iron 6501H, 6502H, 6504H, Yandicoogina Pr |
| A60401 | 2000 | Csr Ltd | Yandicoogina | <1% | Density Measurements at Yandicoogina and Yandicoodgina Ore Grade Variability Study (1985, TR70/5604 TR70/6501 |
| A60403 | 2000 | Pacminex Pty Ltd | Yandicoogina | <1% | A Review of the Exploration and Metallurgical testing of the Junction and Weeli Wolli Deposits Yandicoogina Pr |
| A60404 | 2000 | Csr Ltd | Yandicoogina | <1% | Yankicoogina Iron Ore Project 1980 Drilling Programme and Ore Reserves Calculations in the Mine Block (1980, T |
| A60448 | 2000 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Opthalmia Range Exploration Licences E47/623,624,280 and 319 West Pilbara Mineral Field, Western Australia Ann |
| A60715 | 2000 | Csr Ltd | Yandicoogina | 1.3% | Yandicoogina Iron Ore Project Summary (1983, E47/4 to E47/12 TR70/5201 TR70/5259 TR70/5603 to TR70/5604 TR70/6 |
| A60823 | 2000 | Hope Downs Iron Ore Pty Ltd | Hope Downs | 3.8% | Combined Annual Report for the Exploration Licences E47/243,308,597, Hope Downs 1 Area for the Period 24/04/19 |
| A61519 | 2000 | Hancock Prospecting Pty Ltd | Round Hill | 3.3% | Annual Report for Exploration Licence E47/807, Round Hill, for the period 07/11/1999 to 06/11/2000. |
| A62228 | 2000 | Bhp Iron Ore Pty Ltd | Ministers North | 4.8% | Annual Report E47/628 Ministers North, E47/629 Lamb Creek period 4 May 2000 to 3 May 2001. |
| A60638 | 2000 | Csr Ltd | Yandicoogina | <1% | CSR Ltd. Yandicoogina Prospect. |
| A57253 | 1999 | Hope Downs Iron Ore Pty Ltd | East Angelas | 3.3% | East Angelas Project W.A. Exploration Licence: 47/807 06/11/1998 |
| A58183 | 1999 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2.2% | Ophthalmia Range - West Pilbara Mineral Field W.A. Exploration Licence E47/623, 624, 280, 319 30/05/1999 |
| A58187 | 1999 | Hamersley Iron Pty Ltd | Ophthalmia Range | 5.9% | Mt Newman - West Pilbara Mineral Field W.A. Exploration Licence: E47/751 Surrender Report: 04/1999 |
| A58585 | 1999 | Hope Downs Ltd | Hope Downs 1 | 3.8% | Hope Downs 1 Project, Annual Report for the period 24th April 1998 to 23rd April 1999, E47/243,308 & 597. |
| A59397 | 1999 | Hamersley Iron Pty Ltd | Yandicoogina | 1.2% | (HIY) Yandicoogina, Mining Lease ML274SA, West Pilbara Mineral Field, WA, Annual Report for the Period 14/10/1 |
| A59451 | 1999 | Hancock Prospecting Pty Ltd | East Angelas | 3.3% | Partial Surrender Report for Exploration Licence 47/807, East Angelas Project, for the period 07/11/1996 to 29 |
| A54707 | 1998 | Hope Downs Ltd | East Angelas | 1.4% | Combined Mineral Exploration Report 02/02/97 to 01/02/98 East Angelas Exploration Licences E47/427 to E47/430 |
| A57498 | 1998 | Bhp Iron Ore Pty Ltd | Mac North | 4.8% | Annual Report Mac North Project. E47/628-629. Period 04/05/98-03/05/99. |
| A54184 | 1998 | Bhp Iron Ore Pty Ltd | Ministers North | 4.8% | Annual Report, Ministers North E47/628, Lamb Creek E47/629 04/05/97 - 03/05/98 |
| A54793 | 1998 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2% | Ophthalmia Range, West Pilbara Mineral Field, W.A. E 47/280, E47/319, E47/623, E47/624 and E47/751 Period End: |
| A55434 | 1998 | Hope Downs Iron Ore Pty Ltd | Hope Downs | 3.8% | Hope Downs E47/243, 308, 579, (04/97 - 04/98) |
| A56742 | 1998 | Hamersley Iron Pty Ltd | Yandicoogina | 1.2% | (HIY) Yandicoogina, Mining Lease ML 274SA West Pilbara Mineral Field W.A. Annual Report 14/10/97 - 13/10/98 |
| A52352 | 1997 | Hancock Prospecting Pty Ltd | Hope Downs | 3.8% | Annual Report, Hope Downs 1 Area. Exploration Licence: 47/243, 308, 597 24/04/1996 - 23/04/1997 |
| A52457 | 1997 | Robe River Mining Co Pty Ltd | Upper Coondiner Creek | <1% | Upper Coondiner Creek Project, Annual & Final Report for the period 10th June 1996 to 9th June 1997, E47/799 & |
| A53225 | 1997 | Hancock Prospecting Pty Ltd | East Angelas | 3.3% | East Angelas Project, Geological Progress Report Exploration Licence: 47/807 Annual Report, 07/11/96 - 06/11/9 |
| A51198 | 1997 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2% | Opthalmia Range Exploration Licences E47/623 E47/624 E47/280 E47/751 and E47/319 West Pilbara Mineral Field We |
| A51676 | 1997 | Bhp Iron Ore Pty Ltd | Ministers North / Lamb Creek | 4.8% | Second Compulsory Surrender Report, Ministers North E47/628, Lamb CreekE47/629 for the period 4th May 1993 to |
| A51677 | 1997 | Bhp Iron Ore Pty Ltd | Ministers North | 4.8% | Annual report Period 4 May 1996 to 3 May 1997 Ministers North E47/629 Lamb Creek E47/629 BHP Iron Ore Pty Ltd |
| A53188 | 1997 | Hamersley Iron Pty Ltd | Yandicoogina Project | <1% | Annual Report (Combined Mineral Exploration Report), Yandicoogina Project Area - Exploration Licence: 47/4 - |
| A47744 | 1996 | Bhp Iron Ore Pty Ltd | Mount Goldsworthy Area C and Mudlark Wel | 4.8% | Annual report Period 4 May 1995 to 3 May 1996 Ministers North E47/628 Lamb Creek E47/629 BHP Iron Ore Pty Ltd |
| A47246 | 1996 | Hancock Prospecting Pty Ltd | East Angelas | 1.4% | Annual report for East Angelas Exploration Licences (E) 47/427, 47/428, 47/429, and 47/430. For the period 2 F |
| A47995 | 1996 | Hamersley Iron Pty Ltd | Ophthalmia Range | 2% | Opthalmia Range Exploration Licences E47/623 E47/624 E47/280 E47/751 and E47/319 West Pilbara Mineral Field We |
| A48110 | 1996 | Bhp Iron Ore Pty Ltd | Ministers North / Lamb Creek | 4.8% | Ministers North / Lamb Creek Project, Partial Surrender Report for the period 4th May 1993 to 3rd May 1996, E4 |
| A49164 | 1996 | Hancock Prospecting Pty Ltd | Hope Downs | 3.8% | Annual Report for Hope Downs 1 Exploration Licences E47/243 E47/308 E47/597 for the period 24 April 1995 to 23 |
| A45771 | 1995 | Hamersley Iron Pty Ltd | Pamelia South | <1% | Exploration Licence E47/319 Pamelia South West Pilbara Mineral Field Western Australia Annual Report for the p |
| A44507 | 1995 | Hamersley Iron Pty Ltd | Ophthalmia South | 3.8% | Annual Report for Opthalmia South Tenements E47/280 West Pilbara Mineral Field Western Australia (1995) |
| A45364 | 1995 | Hope Downs Ltd | Hope Downs | 3.8% | Annual report for Hope Downs 1 Exploration Licences E47/243 E42/308 E47/597 for the period 24 April 1994 to 23 |
| A41062 | 1994 | Bhp Iron Ore Pty Ltd | Area C North | 4.8% | Annual Report for the Period 04/05/93 to 03/05/94 Ministers North / Lamb Creek E47/628, E47/629 BHP Iron Ore P |
| A41692 | 1994 | Hope Downs Ltd | Hope Downs | 3.8% | Annual report for the period 24/04/93-23/04/94 Hope Downs 1 Project E47/243 E47/308 E47/597 |
| A42355 | 1994 | Hamersley Iron Pty Ltd | Pamelia South | <1% | Annual Report for the Period 10/09/93 - 09/09/94 Pamelia South Project E47/319 |
| A43088 | 1994 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Yandicoolgina Project , Annual Report for the period 8th June 1993 to 7th June 1994, E47/4-12. |
| A43947 | 1994 | Bhp Iron Ore Pty Ltd | Ministers North | 4.8% | Annual report period 4 May 1994 to 3 May 1995 Ministers North E47/628 Lamb Creek E47/629 |
| A38853 | 1993 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report for the period 08/06/92-07/06/93 Yandicoogina Project E47/4-12 |
| A38985 | 1993 | Hancock Resources Ltd | Hope Downs | 3.8% | Hope Downs Project, Annual Report for the period 24/04/1992 to 23/04/1993, E47/243, E47/308, & E47/597. |
| A35550 | 1992 | Hamersley Iron Pty Ltd | Ophthalmia Range | 3.8% | Annual Report for the Period 01/04/91 - 01/04/92 Opthalmia Project E47/280 |
| A36954 | 1992 | Hancock Resources Ltd | Hope Downs | 6.5% | Annual Report for the Period 24/04/91 - 23/04/92 Hope Downs 1 Project |
| A35543 | 1992 | Bhp Iron Ore Pty Ltd | Mining Area C and Mudlark Well iron ore | 1.2% | Exploration status report Mining Area 'C' TR3156H (TR70/3156) May 1992 BHP Iron Ore |
| A36823 | 1992 | Hancock Resources Ltd | Hope Downs | 3.4% | Hope Downs Project, Non-statutory Report: Geological Report, September 1992, E47/243, 308-309 & 431. |
| A37130 | 1992 | Bhp Iron Ore Pty Ltd | ML 244 SA - Weeli Wolli | 3.3% | Surrender report. Period to 02/05/91. Sections 4, 5, 6 and 21. ML 244 SA |
| A33354 | 1991 | Bhp Iron Ore Pty Ltd | Mount Goldsworthy | 1.2% | Exploration status report. Mining area 'C' 04/91 TR3156H (TR70/3156) BHP Iron Ore |
| A34584 | 1991 | Cra Exploration Pty Ltd | Pamelia South | <1% | R Report for the Period of 1991 Pamelia South Project E47/319 |
| A33245 | 1991 | Pilbara Port Railroad & Resource Co Ltd | Hope Downs | 6.5% | Hope Downs 1 Iron Ore Deposit Evaluation of the in-situ resource Interim Report (E47/243 E47/308, 1990) |
| A34107 | 1991 | Cra Exploration Pty Ltd | Ophthalmia | 3.8% | Ophthalmia Project, Partial Surrender Report for period to 4th April 1991, E47/280. |
| A34277 | 1991 | Cra Exploration Pty Ltd | Ophthalmia Range | 3.2% | Annual Report on Ophthalmia E47/280 and Pamelia South E47/319, Newman WA. Ending 05/04/91. Newman SF 50-16 |
| A34609 | 1991 | Pilbara Port Railroad & Resource Co Ltd | Hope Downs | 6.5% | Annual report for E47/308 and E47/243 for the period 24/04/90-23/04/91 and 22/03/90-21/03/91 respectively (Hop |
| A30279 | 1990 | Cra Exploration Pty Ltd | Ophthalmia Range | 3.2% | Annual report for Pamelia South E47/319 & Ophthalmia E47/280 Ophthalmia Range, Newman, WA for year ending 5 Ap |
| A30398 | 1990 | Hancock Mining Ltd | East Angelas | 1.4% | Annual report for exploration licences 47/427-430 East Angelas. 02/02/1989 to 01/02/1990 Report No:312-90-003 |
| A31058 | 1990 | Hancock Mining Ltd | Hope Downs | 6.5% | Annual report for Exploration Licences E47/308 and E47/243 Hope Downs 1. for the period 23/03/89 - 22/02/90 |
| A29395 | 1989 | Pennant Resources Ltd | McCamey's Monster | 1.5% | Annual report for ML70/266SA McCamey's Monster for the period 11/10/88-10/10/89 |
| A27196 | 1989 | Cra Exploration Pty Ltd | Ophthalmia Range | 3.2% | Annual report for the Ophthalmia, EL47/280 and Pamelia South EL47/319, Opthalmia Range, Newman, W.A. 05/04/198 |
| A28186 | 1989 | Hancock Mining Ltd | Hope Downs | 4.1% | Hope Downs Exploration 1988 EL47/243, 47/308 & 47/309 Hammersely Range W.A. |
| A25801 | 1988 | Cra Exploration Pty Ltd | Ophthalmia Range | <1% | Pamelia South, EL 47/319, Ophthalmia Range, Newman W.A. Annual Report (11/1988) |
| A26740 | 1988 | Bhp-Utah Minerals International | Yandicoogina | 4.1% | Yandicoogina(Marillina)Pisoloite Project Reconnaissance Mapping of Basal Stratigraphy;The Weeli Wolli Formatio |
| A25803 | 1988 | Cra Exploration Pty Ltd | Ophthalmia Range | 3.8% | Annual Report for Ophthalmia. E47/280. Ophthalmia Range, Newman, WA. 04/88. |
| A20508 | 1987 | Goldsworthy Mining Ltd | Nimingarra | 1.1% | Nimingarra Project, Non-statutory Report[s]: Quarterly Reports covering the period 01/01/1987 to 31/03/1987,TR |
| A20721 | 1987 | Bhp Minerals Pty Ltd | Yandicoogina | 4.1% | Non-statutory Report: The Yandicoogina Central Eastern Iron Pisolite Deposit of Western Australia Stage 1 Dril |
| A20722 | 1987 | Bhp Minerals Pty Ltd | Central Eastern - Yandicoogina | 4.1% | Non-statutory Report : Central Eastern -Yandicoogina Assay Results YC 110 - YC 112, YCD 009 YCD 013 - YCD 018, |
| A22014 | 1987 | Hancock & Wright Prospecting Pty Ltd | Hope Downs | 13% | Annual report on Exploration Licence E47/243 Hope Downs No.1 for the period 23/03/86 to 22/03/87 Ref: 3-11-87R |
| A23851 | 1987 | Bhp Minerals Pty Ltd | Yandicoogina (Marillana) Eastern Mesa 2 | 4.1% | Yandicoogina (Marillana) Eastern Mesa 2. 12/1987 E47/294 |
| A17480 | 1986 | North Flinders Mines Ltd | Newman - Turee Creek | 1.2% | Newman - Turee Creek Project, Exploration Report for Quarterly Period ended 31st March 1986, TR70/3156H. |
| A18058 | 1986 | Csr Ltd | Yandicoogina | <1% | Annual report Exploration Licences E47/4 to E47/12 Yandicoogina Project, Pilbara Region, Western Australia for |
| A19351 | 1986 | Bhp Minerals Pty Ltd | Yandicoogina | 4.1% | Yandicoogina Project, Non-statutory Report: Large Diameter Core Drilling at Yandicoogina, WA, August 1986, TR7 |
| A19352 | 1986 | Bhp Minerals Pty Ltd | Yandicoogina | 4.1% | Yandicoogina Project, Non-statutory Report: Eastern Pisolite Iron Ore Deposit of Western Australia: Stage 1 D |
| A14967 | 1985 | Goldsworthy Mining Ltd | Goldsworthy | <1% | Goldsworthy Project, Annual Report for the year ending December 31st 1984, TR703156H & E47/13-17. |
| A17088 | 1985 | Goldsworthy Mining Ltd | Goldsworthy | 1.2% | Goldsworthy Project, Annual Report for the year ending 31/12/1985, TR70/3156H.[Weeli Wolli Springs] |
| A19347 | 1985 | Bhp Minerals Pty Ltd | Yandicoogina | 4.1% | Yandicoogina Project, Non-statutory Report: Report on the Low Alumina Study 1984, April 1985. TR70/3359H. |
| A15302 | 1985 | Csr Ltd | Yandicoogina | <1% | Annual report Exploration Licence E47/4 to E47/12 Yandicoogina Project Pilbara Region Western Australia for th |
| A15303 | 1985 | Csr Ltd | Yandicoogina | <1% | Yandicoogina Project, Non-statutory Report:Paper presented to the Fourth International Iron Ore Symposium, Rom |
| A11062 | 1982 | Csr Ltd | Ophthalmia | 3.8% | Ophthalmia Project, Annual Report for the year ending 3rd February 1982, TR70/5201 & 6505H. |
| A12378 | 1982 | Csr Ltd | Ophthalmia | 3.8% | Ophthalmia Project, Final Surrender Report 1969-1971, TR70/5201H & TR70/6505H. |
| A9714 | 1981 | Csr Ltd | Ophthalmia | 3.8% | Ophthalmia Project, Annual Report for the year ending 3rd February 1981, TR70/5201 & 6505H. |
| A60402 | 1980 | Csr Ltd | Yandicoogina | <1% | Yandicoogina Iron Ore Prospect 1979 Drilling programme and ore reserves Calculations in the Initial Mine Block |
| A8191 | 1979 | Pacminex Pty Ltd | South Weeli Wolli | 13% | South Weeli Wolli Project, Annual Report for the year ending 31/12/1978, TR70/6686H. |
| A8313 | 1979 | Pacminex Pty Ltd | Ophthalmia | 3.8% | Ophthalmia Project, Annual Report for the period ending 03/02/1979, TR70/5201 & 6505H. |
| A7509 | 1978 | Pacminex Pty Ltd | Ophthalmia | 6.2% | Ophthalmia Project, Annual Report for the period ending 31/05/1977, TR70/6505H. |
| A7806 | 1978 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia Project, Annual Report for the year ending 31st May 1978, TR70/5201H. |
| A7121 | 1977 | Pacminex Pty Ltd | Yandicoogina | 2.3% | Yandicoogina Project, Annual Report for the period ending 31/05/1977,TR70/5604H. |
| A7138 | 1977 | Pacminex Pty Ltd | Ophthalmia | 9.7% | Ophthalmia Project, Annual Report for the period ending 31/05/1977, TR70/5200H. |
| A7146 | 1977 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia Project, Annual Report for the period ending 31/05/1977, TR70/5201H. |
| A6449 | 1976 | Pacminex Pty Ltd | Ophthalmia | 7.1% | Ophthalmia Project, Annual Report for the year ending 18/05/1976,TR70/5200 & 5223H. |
| A6450 | 1976 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia Project, Annual Report for the period ending 31/05/1976, TR70/5201H. |
| A6454 | 1976 | Pacminex Pty Ltd | Yandicoogina | 2.3% | Yandicoogina Project, Annual Report for the year ending 31/07/1976, TR70/5604H. |
| A5544 | 1975 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia, Completion report [non-statutory] on exploration for iron ore, Temporary Reserve 5254H [ TR70/5254 |
| A5922 | 1975 | Pacminex Pty Ltd | Ophthalmia | 9.7% | Ophthalmia Project, Annual Report for the year ending 31/05/1975, TR70/5200H. |
| A5954 | 1975 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia Project, Annual Report for the period ending 31/05/1975, TR70/5201H. |
| A6063 | 1975 | Pacminex Pty Ltd | Yandicoogina | 2.3% | Yandicoogina Project, Annual Report for the year ending 28/07/1975, TR70/5604H. |
| A5220 | 1974 | Pacminex Pty Ltd | Ophthalmia | <1% | Annual report on exploration for iron ore, 12 months ending May 1974, TR70/5201, Ophthalmia Prospect |
| A4598 | 1974 | Pacminex Pty Ltd | Ophthalmia | 9.7% | Ophthalmia Project, Non-statutory Report: Summary Exploration Report for the period ending 30/04/1974, TR70/ |
| A4599 | 1974 | Pacminex Pty Ltd | Ophthalmia | <1% | Ophthalmia Project, Non-statutory Report:Summary Exploration Report for the period ending 30/04/1974, TR70/520 |
| A5308 | 1974 | Pacminex Pty Ltd | Ophthalmia | 9.7% | Ophthalmia Prospect, Annual report on exploration for iron ore, 12 months ending May 1974, TR70/5200 |
| A3674 | 1973 | Pacminex Pty Ltd | Ophthalmia | 4% | Ophthalmia Project, Non-statutory Report: Report on Geological Mapping, April 1973, TR70/5200,5201 & 5223H. |
| A3675 | 1973 | Pacminex Pty Ltd | Ophthalmia Range | 4% | Ophthalmia Range Project, Non-statutory Report: Report on Geological Exploration & Drilling for Iron Ore for t |
| A3677 | 1973 | Pacminex Pty Ltd | Juna Downs | <1% | Juna Downs Project, Non-statutory Report: Report on Exploration Drilling, April 1973, TR70/5254H. |
| A3853 | 1973 | Pacminex Pty Ltd | Ophthalmia Range | 3.4% | Ophthalmia Range Project, Non-statutory Report: Plans & Sections of Haematite Deposits & Proposals on Future W |
| A2376 | 1972 | Pacminex Pty Ltd | Newman | 7.6% | Newman Project, Annual Report for the period ending 31st December 1971, TR70/5239 & 5242H. |
| A2781 | 1972 | Australian Steel & Mining Corp | Weeli Wolli Springs | 14% | Weeli Wolli Springs Project, Non-statutory Report:Brief Exploration Report, June 1972, TR70/5240& 5241H. ( Als |
| A3197 | 1972 | Pacminex Pty Ltd | Roy Hill | 1.2% | Roy Hill Project, Non-statutory Report: Report on Geological Exploration, October 1972, TR70/ 5602-5604H. |
| A3708 | 1972 | Pacminex Pty Ltd | Ophthalmia | 3.4% | Ophthalmia Project, Non-statutory Report: Report on Geological Exploration, December 1972, Tr70/5200-5202 & 52 |
| A2371 | 1972 | Pacminex Pty Ltd | Newman | <1% | Newman Project, Annual Report for the period ending 31st December1971, TR70/5224, 5226-5228 & 5249H. |
| A2424 | 1972 | Australian Steel & Mining Corp | Hamersley Ranges | <1% | Hamersley Ranges Project, Non-statutory Report: Progress Report, April 1972 ,TR70/4189-4191, 4268, 4503, & 451 |
| A2978 | 1972 | Australian Steel & Mining Corp | Hamersley Ranges | <1% | Hamersley Ranges Project, Non-statutory Report: An Evaluation of Iron Ore Temporary Reserves, August 1972, TR7 |
| A968 | 1972 | Western Mining Corporation Ltd | Menzies - Comet Vale - Ora Banda | <1% | Menzies - Comet Vale - Ora Banda Project, Non-statutory Report: |
| A1379 | 1970 | Pacminex Pty Ltd | Hamersley | <1% | Temporary Reserves for iron ore West Pilbara and Peak Hill Goldfields. Report for the quarter ended 30th June, |
| A1417 | 1966 | Broken Hill Pty Co Ltd | Wilga | <1% | Wilga Project, Non-statutory Report: Annual & Quarterly Reports for the periods ending 31st December 1966, TR7 |
| A781 | 1964 | Us Metals Refining Co | Wonmunna | <1% | Wonmunna Project, Annual Report for the period 01/02/1964 to 31/08/1964,(Field Report) TR70/2749H. |
| A22483 | 1753 | Goldsworthy Mining Ltd | Mining Area C | 1.2% | Annual Exploration Report for year ending 31/12/87 Temporary Reserve T.R. 3156H Mining area 'C' Iron Ore (Mt G |
| A23446 | 1753 | Hancock & Wright Prospecting Pty Ltd | Hope Downs | 13% | Annual Report For Exploration Licence E 47/243 23 March 1987 to 22 March 1988 |
| A46438 | 1753 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report Yandicoogina Project Area Exploration Licences E47/4 to E47/12 8 June 1994 to 7 June 1995 Minera |
| A49724 | 1753 | Hamersley Iron Pty Ltd | Yandicoogina | <1% | Annual report Yandicoogina Project Area Exploration Licence E47/4 to E47/12 Reporting period 8 June 1995 to 7 |
| A132491 | Csiro | Hope Downs | 2.7% | Core Library Sampling Report For Drillholes GD10H1N011 and GC08HD40005 (P1375) | |
| A151811 | Hamersley Iron Pty Ltd | Yandi Braid | 1.2% | Donated hole geology DD15YBBR0002 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 18 years · 18 Dec 2044
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 47/92 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 47/92? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.