M 27/189 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Wingstar Investments Pty Ltd. Granted on 16 Dec 1994 for 21 years (renewed), it expires on 15 Dec 2036. The ground is covered by 90 historical WAMEX reports.
Register summary
- Holder
- Wingstar Investments Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 13 June 1994
- Commenced
- 16 Dec 1994
- Expiry
- 15 Dec 2036
- Term
- 21 Years (Renewed)
The full record on M 27/189
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 8 changes of holder
- The full record: 32 years of expenditure, 38 conditions and 3 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (58 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131600 | 2022 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.8% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2021 to May 3rd 2022.E 27/552,E 27/554,E 27/555 |
| A127639 | 2021 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.8% | Bulong Project (C75/2016) Annual Report for the Period 4th May 2020 to 3rd May 2021 |
| A124136 | 2020 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.6% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2019 to May 3rd 2020 |
| A122836 | 2020 | Black Cat (Bulong) Pty Ltd | Bulong | <1% | Annual Report for the Bulong Gold Project C314/1992 for the period ending 31/12/2019 |
| A123984 | 2020 | Wingstar Investments Pty Ltd | Avalon | 16% | Avalon C156/2006 Annual Technical Report for the period ending 27/03/2020 |
85 more reports
| A125648 | 2020 | Black Cat (Bulong) Pty Ltd | Yarri East | <1% | C24/2018 Annual Report E27/431 & E27/449 Yarri East Project for the period ending 11/09/2020 |
| A119240 | 2019 | Black Cat (Bulong) Pty Ltd | Bulong | <1% | Annual Report for the Bulong Gold Poject C314/1992 for the period 01/01/2018 - 31/12/2018 |
| A120132 | 2019 | Wingstar Investments Pty Ltd | Avalon | 16% | C156/2006 Avalon Annual Technical Report for the period 28 March 2018 to 27 March 2019, M25/00075, M25/00076, |
| A120323 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.6% | Annual Report for Bulong Project C75/2016 for the period 4 May 2018 to 3 May 2019, E27/00551, E27/00552, E27/0 |
| A122075 | 2019 | Newmont Goldcorp Exploration Pty Ltd | Yarri East | <1% | Combined Annual Report for C 24/2018 (Yarri East project) for the period 12th September 2018 to 11th September |
| A117189 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.6% | Annual Report for Bulong Project C75/2016 for the period 04/05/2017 - 03/05/2018, E27/00551, E27/00552, E27/00 |
| A116898 | 2018 | Wingstar Investments Pty Ltd | Avalon | 16% | Avalon Project C156/2006 Annual Technical Report for the period 28 March 2017 to 27 March 2018, M25/00075, M25 |
| A118412 | 2018 | Newmont Exploration Pty Ltd | Yarri East | <1% | Combined Annual Report C24/2018 (Yarri East Project) for the period 12th September 2017 to 11th September 2018 |
| A113911 | 2017 | Wingstar Investments Pty Ltd | Avalon | 16% | Avalon Project C156/2006 Combined Annual Report For the Period 28 March 2016 to 27 March 2017, M25/00075, M25/ |
| A113952 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | 1.6% | Bulong Project C75/2016 Annual Report for the period May 2016 to May 2017, E27/00551, E27/00552, E27/00554, E2 |
| A115168 | 2017 | Newmont Exploration Pty Ltd | Yarri East | 13% | Annual Report for E 27/449 (Yarri East Project) for the period 12th September 2016 to 11th September 2017 |
| A109098 | 2016 | Wingstar Investments Pty Ltd | Avalon | 16% | Avalon Project C156/2006 Combined Annual Report M 25/00075, M 25/00076, M 25/00077, M 25/00078, M 27/00189 for |
| A110550 | 2016 | Rbr Group Limited | Yindarlgooda | 13% | Yindarlgooda Project Annual Report E27/00449 for the period 1 November 2015 to 31 October 2016 |
| A105853 | 2015 | Wingstar Investments Pty Ltd | Bulong | 16% | Bulong Project C156/2006 Combined Annual Report for the period 28/03/2014 to 27/03/2015, M25/75, 76, 77, 78, M |
| A107604 | 2015 | Rubicon Resources Ltd | Yindarlgooda | 2.6% | Yindarlgooda Project C210/2007 Combined Annual Report for the period 1 November 2014 – 31 October 2015, E25/35 |
| A101496 | 2014 | Norilsk Nickel Australia Ltd | Avalon | 16% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2013 to 27 March 2014 Avalon Pr |
| A104148 | 2014 | Heron Resources Ltd | Little Bulong | 2.6% | Little Bulong Project C55/2012, Annual Report for the period 29/09/2013 to 28/09/2014, M25/151,187 & 476. |
| A104174 | 2014 | Rubicon Resources Ltd | Yindarlgooda | 2.3% | Yindarlgooda C210/2007 Combined Annual Report E25/355, 392, 422, E27/425, 430, 443, 449 P27/1949 for the perio |
| A104404 | 2014 | Rubicon Resources Ltd | Bulong - Yindarlgooda | 12% | Bulong / Yindarlgooda E25/355 Final Report for the period 10 November 2009 – 9 November 2014 |
| A100909 | 2013 | Heron Resources Ltd | Little Bulong | 2.6% | Little Bulong Project, Annual Report for the period 29/09/2012 to 28/09/2013, M25/151 & 187; E25/476. [C55/201 |
| A97785 | 2013 | Heron Resources Ltd | North Dam | 4.6% | North Dam Project, Final Surrender Report for the period 9th February 2009 to 12th June 2012, E27/330. |
| A96527 | 2013 | Bulong Mining Pty Ltd | Bulong | 1% | Bulong Project (C314/1992) Annual Report for the period 01/01/2012 to 31/12/2012 |
| A97318 | 2013 | Norilsk Nickel Avalon Pty Limited | Avalon | 16% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2012 to 27 March 2013 Avalon Pr |
| A100409 | 2013 | Rubicon Resources Ltd | Yindarlgooda | 1.7% | Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, |
| A96114 | 2012 | Rubicon Resources Ltd | Yindarlgooda | 1.1% | Yindarlgooda Project, Annual Report for the period 1st November 2011 to 31st October 2012, E25/355, 392, 422, |
| A93609 | 2012 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 16% | Annual Report To the Department of Mines and Petroleum For the period 28 March 2011 to 27 March 2012 Avalon Pr |
| A89962 | 2011 | Heron Resources Ltd | Bulong | <1% | Surrender report for the period 22 January 2008 to 14 February 2011, Bulong Project, E27/356, P27/1759- 1761 |
| A88967 | 2011 | St Barbara Ltd | Yindarlgooda - Rocky Dam | <1% | Yindarlgooda (Rocky Dam) Project, Annual Report for the Period 1 November 2009 to 31 October 2010,C210/2007 Te |
| A88987 | 2011 | Bulong Mining Pty Ltd | New Bulong | 1% | Annual Report for the period 1 January 2010 to 31st December 2010, New Bulong Project C314/1992 |
| A89960 | 2011 | Heron Resources Ltd | Bulong | 1.1% | Combined annual report for the period 1 January 2010 to 31 December 2010, Bulong Project, C224/1995 |
| A90201 | 2011 | Norilsk Nickel ( Avalon) Pty Ltd | Avalon | 16% | Avalon Project, Annual Report for the period 28th March 2010 to 27th March 2011, M25/75-78, & M27/189. (C156/2 |
| A92275 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 1% | Yindarlgooda C210/2007 Combined Annual Report 1 November 2010 – 31 October 2011 |
| A85597 | 2010 | Heron Resources Ltd | Lake Penny | 3.1% | Surrender report for the period 30 September 1992 to 26 November 2009, Lake Penny Project, E27/94 |
| A86572 | 2010 | Heron Resources Ltd | Bulong | <1% | Annual report for the period 1 January 2009 to 31 December 2009, Bulong Project, C224/1995, E25/250, M25/59, M |
| A82323 | 2009 | Norilsk Nickel Australia Ltd | AVALON | 16% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2008 TO 27 MARCH 2009, MT MARGARET MINERAL FIELD, |
| A84968 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | <1% | Annual Report for the Period 1 November 2008 to 31 October 2009 C210/2007, Tenement Numbers E25/273, E25/316, |
| A77762 | 2008 | Inco Resources (Australia) Pty Ltd | Bulong | 1.3% | BULONG PROJECT C224/1995, E25/250....M25/59...P27/1754 to P27/1761, Combined Annual Report C224/1995, |
| A77925 | 2008 | Yilgarn Gold Ltd | New Bulong | 1.2% | Annual report for the period 1 January 2007 to 31 December 2 007, New Bulong Project E25/90 & 218, M25/24, 83, |
| A78871 | 2008 | Norilsk Nickel Australia Ltd | Avalon | 16% | ANNUAL REPORT ON THE AVALON PROJECT FOR THE PERIOD 28 MARCH 2007 TO27 MARCH 2008 MT MARGARET MINERAL FIELD, WA |
| A80490 | 2008 | Rubicon Resources Ltd | YINDARLGOODA | <1% | YINDARLGOODA PROJECT COMBINED REPORT, C210/2007, E25/273, E25/316, E25/326, E25/335, E27/291, E27/337, E28/15 |
| A81471 | 2008 | Vale Inco Australia Limited Partnership | Bulong | 1.2% | BULONG PROJECT C224/1995 FOR THE PERIOD 1 JANUARY 2008 – 31 DECEMBER 2008 |
| A74679 | 2007 | Inco Australia Ltd | Bulong | 1.4% | Bulong Project C224/1995 Comb Annual Report for the Period 1 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A75205 | 2007 | Yilgarn Gold Ltd | New Bulong | 1.2% | New Bulong Project E25/90 & 218, M25/24, 83, 91 & 129, P25/ 1125-1136, 1191 & 1788 and P25/1312, Combined Annu |
| A75476 | 2007 | Lionore Australia (Avalon) Pty Ltd | Avalon | 16% | Annual Report on the Avalon Project For the period 28 March 2006 TO 27 March 2007 Mount Margaret Field,Western |
| A72025 | 2006 | Yilgarn Gold Ltd | New Bulong | 1.2% | Annual Report for the period 01/01/05 to 31/12/05, New Bulong Project, E25/90,218, M25/24,83,91,129, P25/1125- |
| A72377 | 2006 | Heron Resources Ltd | Bulong | 1.8% | Bulong Project Combined Report C224/1995, Annual Report, 1 January 2004 to 31 December 2005, (Kurnalpi). |
| A73311 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2005 to 27 March 2006, (Kurnalpi). |
| A73312 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | <1% | Annual Report on the Avalon Nickel Project M25/78, For the Period 28 March 2004 to 27 March 2005, (Kurnalpi). |
| A73319 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 91% | Annual Report on the Avalon Nickel Project M27/189, For the Period 16 December 2003 to 15 December 2004, (Kurn |
| A73320 | 2006 | Lionore Australia (Avalon) Pty Ltd | Avalon | 91% | Annual Report on the Avalon Nickel Project M27/189, For the Period 16 December 2004 to 15 December 2005, (Kurn |
| A70093 | 2005 | Yilgarn Gold Ltd | New Bulong | 1.2% | Annual report for the period 01/01/04 - 31/12/04 New Bulong Project, C314/1992, E25/90, E25/218, M25/24, M25/8 |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | 2.5% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A68527 | 2004 | Yilgarn Gold Ltd | Bulong | 1.2% | Annual report for the period 01/01/2003-31/12/2003 New Bulong Project (C314/1992), E25/90, E25/218, M25/24, M2 |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | 2.5% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A66108 | 2003 | Yilgarn Gold Ltd | Bulong | 1.2% | Annual Report/Technical Review February 2003 New Bulong Project M25/24, 83, 91, 129, P25/1125-36, 1191, 1312, |
| A90338 | 2002 | Mpi Mines Ltd | Black Swan | 16% | Black Swan Nickel Mine, Drill Hole SUD 821, October 2002, E27/67; M27/189, 200, 288-289; P27/1433-1434. ( M27/ |
| A63586 | 2002 | Anglogold Australia Ltd | New Bulong | 1.1% | New Bulong (JV) Project M25/83, E25/85, E25/218, P25/1125-1136, P25/1191 & P27/1312, Annual Report for the per |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | 2.7% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A65132 | 2002 | Anglogold Australia Ltd | New Bulong | 1.5% | Final Report for the Period 22 August 1997 to 13 June 2002 [ C314/92]. New Bulong (JV) Project, E25/85. |
| A59936 | 2000 | Acacia Resources Ltd | New Bulong | <1% | New Bulong (JV) Project, E25/85, P25/1125-1136,1191 , GML27/1709, P27/1312, M25/83, E26/77, Annual Report for |
| A61983 | 2000 | Anglogold Australasia Ltd | New Bulong | 1.1% | New Bulong JV Project E25/85, P25/1125-1136, P25/1191, GML27/1709, P27/1312, M25/83 & E25/218 Verification Rep |
| A54344 | 1998 | Acacia Resources Ltd | Bulong | <1% | New Bulong Joint Venture Project - Annual Report E25/85, MLA25/163-164, MLA27/332, P25/1125-1127, etc. 01/01/1 |
| A56082 | 1998 | Resolute Ltd | Bulong | 7.5% | Combined Annual Mineral-Exploration Report Bulong Project Tenements Exploration Licences E27/72 Prospecting Li |
| A56108 | 1998 | Resolute Ltd | Bulong | <1% | Combined annual mineral exploration report. Bulong Project. 01/01/97-31/12/97. E15/286. E25/67. E27/94,95. P25 |
| A57394 | 1998 | Acacia Resources Ltd | New Bulong | <1% | New Bulong (JV) Project, Annual Report for the period 01/01/98 - 31/12/98, E25/85, P25/1125-1136, 1191 GML27 |
| A53093 | 1997 | Resolute Ltd | Bulong | 2.3% | Bulong Nickel Cobalt Project. Annual Report 01/01/96 - 31/12/96. Bulong (Water) Tenement Group: E27/94-95, |
| A53417 | 1997 | Resolute Ltd | Bulong | 6.5% | Bulong Nickel Cobalt Project. Annual report 01/01/96-31/12/96. E25/67. E27/72. M25/75-78,127-128. M27/189-190. |
| A48489 | 1996 | Resolute Samantha Ltd | Bulong | <1% | Bulong Nickel Cobalt Project Annual report Bulong (water) Tenements Group E15/286 E15/324 E27/94 E27/95 P25/10 |
| A48478 | 1996 | Resolute Samantha Ltd | Bulong | 6.7% | Bulong Nickel Cobalt Project Annual report Bulong (Nickel) Tenement Group M25/75 to M25/78 M25/127 M25/128 M27 |
| A43697 | 1995 | Cyprus Gold Australia Corporation | Bulong | <1% | Bulong (JV) Project , Annual Report for the period March 1,1994 to February 28,1995 E25/85,E25/90,P25/1125 to |
| A40973 | 1994 | Cyprus Gold Australia Corporation | Bulong | 1.1% | Annual report for the period 01/03/93-28/02/94 Bulong JV Project E25/85 P25/1125-1136 P25/1192 |
| A37734 | 1993 | Ernmik Exploration | Bulong | 1.1% | Annual report for the period ending 31/12/1992 Bulong/North Queen Margaret Gold Project E25/85 P25/1125- 1136 |
| A38139 | 1993 | Western Mining Corporation Ltd | Bulong | 1% | Annual report for the period 06/92-03/93 Bulong Project E15/286 E27/94-95 P25/1196-1214 P27/1247 P27/1252 |
| A38666 | 1993 | Western Mining Corporation Ltd | Kalgoorlie Groundwater | 1% | Annual report for the period 06/92-06/93 Kalgoorlie Groundwater Project E15/286 E27/94-95 P25/1193-1194 P25/11 |
| A30258 | 1990 | Geopeko | Kalpini | <1% | Kalpini Project, Annual Report for the year ending 31/12/1989 . (E27/22, E27/52, E27/53;M27/60-70, & M27/79; P |
| A24768 | 1988 | Energy Oil & Gas Nl | Bulong | 2.5% | Bulong Project June 1987 to May 1988 Report No 878005 E25/11, E25/46, M25/34, M27/66 Geological Consultants In |
| A1288 | 1983 | Western Nickel Pty Ltd | Bulong | 6.6% | Bulong Project, Non-statutory Report: Report on Exploration Data, Drill Holes & Sections, January 1983, MC25/1 |
| A5073 | 1973 | Western Nickel Pty Ltd | Bulong | 1.8% | Bulong Project, Non-statutory Report: Geological Report for the period 1st January 1972 to 31st March 1973, |
| A1279 | 1970 | Western Nickel Pty Ltd | Bulong | 1.7% | Bulong Project, Annual Report for the period ending 31/12/1970, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A1277 | 1968 | Western Nickel Pty Ltd | Bulong | 1.7% | Bulong Project, Annual Report for the period ending 31/12/1968, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A47290 | 1753 | Cyprus Gold Australia Corporation | Bulong JV | 1% | Bulong Joint Venture Project Annual report March 1, 1995 to February 28, 1996 E25/85 E25/90 M25/163 M25/164 M2 |
| A5072 | 1753 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Annual Report, Year Ending 31st March 1974 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A39278 | 1753 | Western Mining Corporation Ltd | Bulong | 6.9% | Annual Report for the period 18/10/90 to 27/03/93 WMC : Resolute Resources : Energy, Oil and Gas NL Bulong nic |
| A41487 | 1753 | Western Mining Corporation Ltd | Bulong | 6.9% | Annual report for the period 28/03/93-27/03/94 Bulong Laterite Project E25/67 E27/72 M25/75-78 P25/909 P25/10 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 27/189 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 27/189? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.