M 27/219
M 27/219 is a live mining lease in the City of Kalgoorlie-Boulder, Western Australia, held by Kanowna Mines Pty Limited (part of Northern Star Resources Ltd). Granted on 27 May 2013 for 21 years, it expires on 26 May 2034. The ground is covered by 140 historical WAMEX reports.
Register summary
- Holder
- Kanowna Mines Pty Limited
- Part of
- Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 23 Dec 1994
- Commenced
- 27 May 2013
- Expiry
- 26 May 2034
- Term
- 21 Years
The full record on M 27/219
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 2 changes of holder
- The full record: 14 years of expenditure, 10 conditions and 14 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (13 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146096 | 2025 | Metal Hawk Limited | Kanowna East | <1% | Kanowna East Project E27/596 Partial Surrender Report for the period ending 04/12/2024 |
| A143710 | 2024 | Fmr Investments Pty Limited | Silver Swan South | <1% | Surrender Report for C101/2016 Silver Swan South Project for the period 17 July 2016 to 16 July 2024 |
| A130859 | 2022 | Everton Nominees Pty Ltd | Kanowna | <1% | Group Annual Report - Kanowna - C55/2015 the period ending 24/02/2022. |
| A132859 | 2022 | Evolution Mining (Mungari) Pty Ltd | Kanowna | <1% | Final Surrender Report - E27/597 Kanowna Project for the period ending ending 15/09/2022 |
| A131971 | 2022 | Metal Hawk Limited | Kanowna East | <1% | Kanowna East Completion Report- EIS Co-Funded Agreement For the Period 9 February 2022 to 23 August 2022 (R23) |
135 more reports
| A122536 | 2020 | Metal Hawk Limited | Kanowna East | <1% | Kanowna East Annual Report E27/596 for the period 18 December 2018 to 17 December 2019 |
| A123773 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kanowna | <1% | Annual Technical Report - Kanowna - C55/2015 for the period ending 24/02/2020 |
| A124374 | 2020 | Northern Star (Kanowna) Pty Limited | Kanowna Belle | 4.5% | Kanowna Belle Annual Technical Report C224/2007 for the period ending 31/05/2020 |
| A125138 | 2020 | Blackstone Minerals Limited | Silver Swan South | <1% | C101/2016 Silver Swan South Project Annual Report for the period 17/7/2019 to 16/07/2020 |
| A121793 | 2019 | Blackstone Minerals Limited | Silver Swan South | <1% | Silver Swan South Project C101/2016 Annual Report for the period 17 July 2018 to 16 July 2019, P 27/02191,P 27 |
| A119606 | 2019 | Northern Star (Kanowna) Pty Limited | Kanowna - Ranna | <1% | Kanowna Regional - Ranna C224/2007 Surrender Report for the period 9 June 2011 to 18 February 2019, P27/02025 |
| A120666 | 2019 | Northern Star (Kanowna) Pty Limited | Kanowna Belle | 3.5% | Kanowna Belle Annual Report C224/2007 for the period June 2018 to 31 May 2019 |
| A117345 | 2018 | Northern Star (Kanowna) Pty Limited | Kanowna Belle | 3.6% | Kanowna Belle C224/2007 Annual Technical Report for the period 1 June 2017 to 31 May 2018 |
| A117947 | 2018 | Blackstone Minerals Limited | Silver Swan South | <1% | C101/2016 Silver Swan South Project Annual Report for the period 17 July 2017 to 16 July 2018, P27/02191, P27/ |
| A114299 | 2017 | Northern Star (Kanowna) Pty Limited | Kanowna Belle | 3.3% | Kanowna Belle Project C224/2007 Annual Technical Report for the period 01/06/2016 - 31/05/2017 |
| A115434 | 2017 | Strategic Projects Mining Pty Ltd | Reidy Swamp | <1% | Reidy Swamp E27/362 Project Final Surrender Report for the period 8 March 2016 to 20 September 2017 |
| A111912 | 2017 | Strategic Projects Mining Pty. Ltd. | Reidy Swamp | <1% | Reidy Swamp Project Annual Report 2016 |
| A115000 | 2017 | Blackstone Minerals Limited | Silver Swan South | <1% | Silver Swan South Project C101/2016, P27/02191, P27/02192, P27/02193, P27/02194, P27/02195, P27/02196 Annual R |
| A108450 | 2016 | Strategic Projects Mining Pty Ltd | Reidy Swamp | <1% | Annual Report Reidy Swamp Project E27/362, M27/102, M27/255, P27/1861, P27/1916-1918 Combined Reporting Ref. - |
| A109459 | 2016 | Northern Star (Kanowna) Pty Limited | Kanowna Belle | 3.4% | Kanowna Belle Annual Technical Report |
| A106184 | 2015 | Northern Star (Kanowna) Limited | Kanowna Belle | 3.8% | Kanowna Belle Annual Technical Report |
| A106972 | 2015 | Strategic Projects Mining Pty Ltd | Reidy Swamp | <1% | Annual Technical Exploration report for the period 1st January 2014 – 31st December 2014, Reidy Swamp, E27/360 |
| A102078 | 2014 | Strategic Projects Mining Pty Ltd | Reidy Swamp | <1% | Annual Report Reidy Swamp Project for the period 1st January 2013 - 31st December 2013 C179/2001 E27/360, 362, |
| A102979 | 2014 | Northern Star Resources Ltd | Kanowna Belle | 3.8% | Kanowna Belle Project, Annual Report for the period 01/06/2013 to 31/05/2014, E24/151; E27/457; M27/18........ |
| A97877 | 2013 | Strategic Projects Mining Pty Ltd | Reidy Swamp | <1% | Reidy Swamp Project, Annual Report for the period 1st January 2012 to 31st December 2012, E27/360 & E27/362; M |
| A98749 | 2013 | Barrick (Kanowna) Ltd | Kanowna Belle | 3.9% | Kanowna Belle Project, Annual Report for the period 01/06/2012 to 31/05/2013, M27/18.........M27/438; P27/1126 |
| A94041 | 2012 | Fe Limited | Reidys Dam | <1% | Reidys Dam Project P27/2026 Annual Report, 9th June 2011 – 8th June 2012 |
| A94524 | 2012 | Barrick (Australia Pacific) Ltd | Golden Valley - KMC - Four Mile Hill - K | 3.9% | Golden Valley - KMC - Four Mile Hill - Kanowna West - Six Mile Project Annual Report period 1 June 2011 - 31 M |
| A88928 | 2011 | Paddington Gold Pty Ltd | Reidy Swamp | <1% | MINERAL EXPLORATION REPORT C179/2001 REIDY SWAMP PROJECT 1 JAN 2010 to 31 DEC 2010 |
| A90847 | 2011 | Barrick (Australia Pacific) Ltd | Golden Valley - KMC - Four Mile Hill - K | 3.9% | GOLDEN VALLEY, FOUR MILE HILL, KANOWNA WEST, SIX MILE, Annual Report Period 1 June 2010 – 31 May 2011, C224/20 |
| A92271 | 2011 | Paddington Gold Pty Ltd | Reidy Swamp | <1% | Reidy Swamp Project C197/2001 Mineral Exploration Report, Reporting Period: Period: 01/01/2011 to 31/12/2011 |
| A85485 | 2010 | Paddington Gold Pty Ltd | Reidy Swamp | <1% | Reidy Swamp Project C197/2001, E27/79, E27/191, M27/102, M27/191, P27/1885, P27/1886, Mineral Exploration Repo |
| A87444 | 2010 | Barrick (Australia Pacific) Ltd | Kanowna Belle | 4.3% | ANNUAL REPORT Period 1 June 2009 – 31 May 2010, C224/2007 M27/103, M27/114, M27/122- 123, M27/127- 128, M27/13 |
| A80964 | 2009 | Paddington Gold Pty Ltd | Reidy Swamp | <1% | Reidy Swamp Project C197/2001 Mineral Exploration Report, Period: 01/01/2008-31/12/2008, E27/79, E27/191, M27/ |
| A82954 | 2009 | Barrick Gold Of Australia Ltd | Kanowna Belle | 4.7% | ANNUAL REPORT PERIOD 1 JUNE 2008 – 31 MAY 2009, C224/2007, TECHNICAL REPORT No. 1310, PROJECT 8202 GOLDEN VALL |
| A78297 | 2008 | Paddington Gold Pty Ltd | Reidy Swamp | <1% | Reidy Swamp Project C197/2001 Annual Report Report Period 01/01/2007 - 31/12/2007 Tenements: E27/79 and E27/19 |
| A78884 | 2008 | Jackson Minerals Ltd | Four Mile Hill | 12% | Four Mile Hill Project P27/1642 2007-2008 Annual Report Report Period: 21 June 2007 - 20 June 2008 |
| A79108 | 2008 | Barrick Gold Of Australia Ltd | KANOWNA BELLE | 4.5% | ANNUAL REPORT Period 1 January 2007 to 31 May 2008 C224/2007; Kanowna Belle, M27/103, M27/114, M27/122-123, et |
| A74281 | 2007 | Barrick (Kanowna) Ltd | Four Mile Hill | 31% | Four Mile Hill Project M27/182, P27/1126-1128, 1132-1134, 1155, Annual Report, 01/01/2006 to 31/12/2006, Combi |
| A74282 | 2007 | Barrick (Kanowna) Ltd | Reidy Swamp | <1% | Reidy Swamp Project E27/79,191, Annual Report, 01/01/2006 to 31/12/2006, Combined Reporting No. C197/2001, (K |
| A74739 | 2007 | Barrick Gold Of Australia Ltd | Golden Valley | <1% | Golden Valley Project, M27/103, M27/122, M27/123, M27/128, M27/157, M27/18, M27/191,iod 1 Jan 2006 to 31 Dec 2 |
| A74740 | 2007 | Barrick Gold Of Australia Ltd | Kanowna Mining Centre (KMC) | 5.3% | Kanowna Mining Centre Project C71/1995 Annual Report for the Period 01/01/2006 to 31/12/2006 (Kurnalpi) |
| A75805 | 2007 | Jackson Gold Ltd | Four Mile Hill | 12% | Four Mile Hill Project P27/1642 2006-2007 Annual Report Report Period: 21 June 2006 - 20 June 2007. |
| A72674 | 2006 | Placer Dome Australia Ltd | Kalgoorlie Region | 53% | Non-statutory Report : Kalgoorlie Region Gravity Data, September 2005, (P27/1440, Reference No. A66623). |
| A71902 | 2006 | Placer Dome Asia Pacific Ltd | Four Mile Hill | 31% | Four Mile Hill Project, Annual Report, Period 01/01/2005 to 31/12/2005, C119/2001, Tenements M27/182,P27/1126- |
| A71926 | 2006 | Placer Dome Asia Pacific Ltd | Reidy Swamp | <1% | Reidy Swamp Project, Annual Report, Period 01/01/2005 to 31/12/2005, E27/79 & E27/191, Combined Reporting No. |
| A72020 | 2006 | Placer Dome Asia Pacific Ltd | Golden Valley | <1% | Golden Valley Project, Annual Report 01/01/2005 to 31/12/2005, Combined Reporting No. C427/1995, Kurnalpi, (Pl |
| A70348 | 2005 | Jackson Gold Ltd | Four Mile Hill | 31% | Annual report for the period 01/01/04 - 31/12/04 Four Mile Hill Dam Project, C119/2001, P27/1126-1128, P27/113 |
| A70351 | 2005 | Placer Dome Asia Pacific Ltd | Golden Valley | <1% | Annual report for the period 01/01/04 - 31/12/04 Golden Valley Project, C427/1995, M27/18, 22, 23, 37, 53, 92 |
| A70354 | 2005 | Placer Dome Asia Pacific Ltd | Kanowna Mining Centre (KMC) | 5.3% | Annual report for the period 01/01/04 - 31/12/04 KMC Project, C71/1995, M27/49, 57, 127, 133, 159, 164, 245, M |
| A70395 | 2005 | Jackson Gold Ltd | Reidy Swamp | <1% | Annual Report, Reidy Swamp Project, E27/79, E27/191, Reporting Period 01/01/04 - 31/12/04. |
| A71932 | 2005 | Placer Dome Australia Ltd | Kanowna Mining Centre (KMC) | 5.3% | Kanowna Mining Centre, M27/127, M27/133......P27/1440 and P27/1504, Annual Report, Period 1 January 2005 - 31 |
| A68029 | 2004 | Placer Dome Asia Pacific Ltd | Four Mile Hill | 31% | Four Mile Hill Project, Annual Report 01/01/2003 - 31/12/2003 C119/2001: P27/1126-28, P27/1132-P27/1134, P27/1 |
| A68368 | 2004 | Placer Dome Asia Pacific Ltd | Golden Valley | <1% | Golden Valley Project, Annual Report, 01/01/2003-31/12/2003, C427/1995,( P27/1080-1083, P27/1105, P27/1189, M2 |
| A68369 | 2004 | Placer Dome Asia Pacific Ltd | Kanowna Mining Centre (KMC) | 5.3% | Annual Report for the period 01/01/2003-31/12/2003 Kanowna Mining Centre (KMC) Project, (C71/1995), M27/49, M2 |
| A65959 | 2003 | Placer Dome Asia Pacific Ltd | Reidy Swamp | <1% | Surrender Report 01/01/2001-04/12/2002 Reidy Swamp Project E27/77. |
| A66126 | 2003 | Placer Dome Asia Pacific Ltd | Four Mile Hill | 26% | Four Mile Hill Project, Annual Report 01/01/2002 - 31/12/2002 C119/2001: M27/182, P27/1126-38, P27/1140, P27/1 |
| A66132 | 2003 | Placer Dome Asia Pacific Ltd | Reidy Swamp | <1% | Annual Report 01/01/2002 - 31/12/2002 Reidy Swamp Project C197/2001: E27/77, 79, 166, 191 Report No: WA02.105 |
| A66602 | 2003 | Placer Dome Asia Pacific Ltd | Golden Valley | <1% | Golden Valley JV Project,Annual Report 01/01/2002-31/12/2003 C427/1995, Tenements: M27/18, 22-3, 37, 53, 92, 1 |
| A66623 | 2003 | Placer Dome Asia Pacific Ltd | Kanowna Mining Centre (KMC) | 5.3% | Annual Report 01/01/2002-31/12/2002 Kanowna Mining Centre (KMC) Project C71/1995: M27/49, 57, 127, 133, 159, 1 |
| A66907 | 2003 | Placer Dome Asia Pacific Ltd | Four Mile Hill | 21% | Four Mile Hill Project, Surrender Report for the Period 30/01/1991 to 11/02/2003 7/1130-31,35-36,40,42-43 P27/ |
| A67356 | 2003 | Placer Dome Asia Pacific Ltd | Four Mile Hill | 16% | Four Mile Hill Project, Surrender Report 30/01/1991-01/08/2003, P27/1129,1137-1138,1140. Placer Report No. WA0 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | <1% | Kalgoorlie High Resolution Gravity Surveys. |
| A64534 | 2002 | Delta Gold Ltd | Four Mile Hill | 26% | Four Mile Hill Project, Annual Report P27/1126-1138, P27/1140 P27/1142, P27/1143, P27/1155, M27/182. February |
| A64535 | 2002 | Delta Gold Ltd | Reidy Swamp | <1% | Reidy Swamp, Annual Report E27/77, E27/79, E27/166, E27191 31/12/2001 - 28/02/2002. |
| A64761 | 2002 | Delta Gold Ltd | Golden Valley | <1% | Annual Report 2001 Dome Reference: C427/1995 Tenement/s M27/18, 22, 23, 37, 53, 92, 103, 122, 123, 128, 157, 1 |
| A64904 | 2002 | Auriongold Exploration Pty Ltd | Kanowna Mining Centre (KMC) | 5.3% | Annual Report 2001 Reporting Period: 1/1/2001 - 31/12/2001 DMPR Reference: C71/1995. Tenement/s M27/49, 57, 12 |
| A62891 | 2001 | Delta Gold Ltd | Four Mile Hill | 26% | Four Mile Hill M27/182, P27/1126-1138, 1140, 1142, 1143, 1155 Annual Report 1 January 2000 to 31 December 2000 |
| A62858 | 2001 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Annual Report 2000 Dome Reference: C427/1995 Tenement/s M27/18, 22, 23, 37, 53, 92, 103, 122, 12 |
| A62907 | 2001 | Delta Gold Ltd | Reidy Swamp Dingo Dam | <1% | Reidy Swamp Dingo Dam E27/77 Annual Report 5 December 1999 to 4 December 2000 Dome Reference: M7129/1. Delta R |
| A59640 | 2000 | North Ltd | Dingo Dam | <1% | E27/77, Annual Report , Dingo Dam Project, for the period 05/12/98 - 04/12/99. |
| A59988 | 2000 | North Ltd | Four Mile Hill | 26% | Annual Mineral Exploration Report for Period 01/01/1999 to 31/12/1999 for the Four Mile Hill Project M27/182,P |
| A60036 | 2000 | North Ltd | Harper Lagoon | <1% | Report No. WA2000/34S annual Mineral Exploration Report for Period 19/01/1999 to 18/01/2000 by North Limited f |
| A60150 | 2000 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Project, 1999 Annual Report, M27/18,22,23,37, 53,92,103,122-123,128,157,191,198, P27/1080-1083,1 |
| A60219 | 2000 | Delta Gold Ltd | Golden Valley | <1% | Report on Evaluation of Resources on M27/53 Report No. WA00.018 Project No. 455. Moonlight Deep Lead. Delta Go |
| A60556 | 2000 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre, Western Australia, 1999 Annual Report M27/49,127,133,164,159,245 and GML27/1745. Report |
| A62758 | 2000 | Delta Gold Ltd | Kanowna Mining Centre | 5.3% | Kanowna Mining Centre 2000 Annual Report DME Reference: C71/1995 Tenement/s M27/49, 127, 133, 164, 159, 245 & |
| A57670 | 1999 | North Ltd | Kanowna | <1% | 05/12/97 - 04/12/98 North Limited For Exploration Licence E27/77 - Dingo Dam |
| A57672 | 1999 | North Ltd | Four Mile Hill | 26% | Four Mile Hill Project 01/01/98 - 31/12/98 M27/182, P27/1126-1138, 1140, 1142-1143, 1155 |
| A57836 | 1999 | North Ltd | Harper Lagoon | <1% | Harper Lagoon Project, Annual Report for the period 19/01/1998 to18/01/1999, E27/79. |
| A57864 | 1999 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Joint Venture 1998 Annual Report M27/18, 22-23, 37, 53, 92, 103, 122-123, 128, 157, 191, 198 P27 |
| A57933 | 1999 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre WA 1998 Annual report M27/49, 127, 133, 164, 159, GML27/1745 |
| A53847 | 1998 | North Ltd | Dingo Dam | <1% | Annual Mineral Exploration Report for period 05/12/96- 04/12/97 for Exploration Licence 27/77 Dingo Dam Projec |
| A53949 | 1998 | North Ltd | Harper Lagoon | <1% | Annual mineral exploration report for the period 19/01/97-18/01/98. E27/79. Harper Lagoon Project. |
| A54291 | 1998 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Joint Venture, 1997 Annual Report M27/18, 22, 23, 37, 53, 92, 103, 122-123, 128, 157, 188 etc. 0 |
| A54328 | 1998 | North Ltd | Four Mile Hill | 26% | Four Mile Hill Project, Annual Mineral Exploration Report 01/1997 - 01/1998 M27/182, P27/1126-1138, 1140, 1142 |
| A54781 | 1998 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre W.A. Delta Gold NL 1997 Annual Report. GML27/1745, M27/49, M27/127, M27/133, M27/159 and |
| A55662 | 1998 | Heron Resources Ltd | Kanowna East | 53% | Kanowna East Project, Kanowna East, Prospecting Licence: 27/1440, Annual Report 11/02/97 - 10/02/98 |
| A50401 | 1997 | North Ltd | Kalpini | <1% | North Limited Report No. WA97/21S Annual Mineral Exploration Report for 19th January 1996 to 18th January 1997 |
| A51549 | 1997 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre Western Australia 1996 Annual report Tenements M27/49 M27/127 M27/133 and M27/164 Report |
| A50402 | 1997 | North Ltd | Four Mile Hil | 28% | Report No. WA97/20S Annual Mineral Exploration Report for the period January 1996 to January 1997 Four Mile Hi |
| A51519 | 1997 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Joint Venture 1996 Annual report Tenements M27/18 M27/22 M27/23 M27/37 M27/53 M27/92 M27/103 M27 |
| A47359 | 1996 | North Ltd | Kalpini | <1% | North Limited Annual Report No. WA96/41S Exploration carried out on E27/79 Harper Lagoon, Kanowna W.A. Januar |
| A47719 | 1996 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre Western Australia 1995 Annual report Tenements M27/127 M27/133 and M27/164. Report No. W |
| A47983 | 1996 | North Ltd | Four Mile Hill | 22% | Report No. WA96/54S Report on Exploration carried out on the Four Mile Hill Project M27/182 P27/1126 to P27/11 |
| A48153 | 1996 | Delta Gold Ltd | Golden Valley JV | <1% | Golden Valley Joint Venture 1995 Annual report Tenements M27/18 M27/22 M27/23 M27/37 M27/53 M27/92 M27/103 M27 |
| A43953 | 1995 | North Ltd | Dingo Dam | <1% | Partial Surrender Report for a portion of E27/77, Dingo Dam, Kanowna, Work carried out between December 1991- |
| A44022 | 1995 | North Ltd | Four Mile Hill | 22% | Report no. WA95/48S Report on The Four Mile Hill Project (P27/1126-1138, 1140-1144, 1150, 1154, 1155 and M27/1 |
| A44165 | 1995 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre Western Australia 1994 Annual report Tenements M27/127 M27/133 and M27/164 Report No. WA |
| A44420 | 1995 | North Ltd | Harper Lagoon | <1% | Report No. WA95/64S Exploration work carried out on E27/79 Harper Lagoon, Near Kanowna during the period Janua |
| A45988 | 1995 | Delta Gold Ltd | Golden Valley JV | <1% | Golden Valley Joint Venture 1994 Annual report Tenement M27/18 M27/22 M27/23 M27/37 M27/53 M27/92 M27/103 M27/ |
| A41003 | 1994 | Geopeko | Four Mile Hill | 17% | Annual report for the period 01/93-01/94 Four Mile Hill Project P25/1059-1060 P27/1126-1156 |
| A41384 | 1994 | North Mining Ltd | Reidy Swamp | <1% | Exploration work carried out on E27/79, Harper Lagoon, near Kanowna. January 1993 to January 1994 North Explor |
| A43442 | 1994 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Joint Venture 1993 Annual report Tenement M27/22 M27/23 M27/37 M27/53 M27/92 M27/103 M27/123 M27 |
| A43613 | 1994 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Mining Centre Western Australia 1993 Annual report Tenements M27/127 M27/133 and M27/164 Report NO. WA |
| A37661 | 1993 | Geopeko | Harper Lagoon | <1% | Exploration work carried out on E27/79 Harper Lagoon, Kanowna WA. During the Period January 0992 to January 19 |
| A38068 | 1993 | Delta Gold Ltd | Kanowna | 5.3% | Annual report for the period 12/91-12/92 Kanowna Gold Project M27/127 M27/133 M27/136 P27/1112 |
| A38177 | 1993 | Geopeko | Four Mile Creek | 18% | Annual report for the period 02/92-01/93 Four Mile Creek Project P27/1059 P27/1060 P27/1126-1156 |
| A38534 | 1993 | Delta Gold Ltd | Golden Valley | <1% | Annual report for Jan 1992 to Dec 1992. Golden Valley JV Project -Kanowna. M27/22-23, M27/37, M27/53, M27/92, |
| A35286 | 1992 | Geopeko | Four Mile Hill | 17% | Annual report for the period 02/91-01/92 Four Mile Hill Project P27/1059-1060 P27/1126-1156 |
| A35575 | 1992 | Delta Gold Ltd | Kanowna | 5.3% | Kanowna Gold Prospect WA 1991 Annual report covering M27/127, 27/133, 27/136 and P27/1112 May 1992 |
| A30254 | 1990 | Delta Gold Ltd | Kanowna | 5.6% | Kanowna Gold Prospect 1989 Annual Report covering PL27/952-953,955; M27/2-3,5,21 ,40,90,93-94,101,127,136,133; |
| A30274 | 1990 | Delta Gold Ltd | East Robinson/ O'Hallahans | 13% | Progress report on East Robinson/ O'Hallahans Prospect at Kanowna. January 1990 Project No:463/02 (M27/127, R |
| A31189 | 1990 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley JV Kanowna Annual report for 1989 E27/3, M27/22 to M27/23, M27/37, M27/53, M27/92, M27/103, M2 7 |
| A33131 | 1990 | Delta Gold Ltd | Kanowna | 5.3% | Delta Gold NL. Kanowna Gold Project WA. Annual Report 1990 M27/127,133,136 |
| A28265 | 1989 | Delta Gold Ltd | Kanowna | 12% | Report on the Relinquished Portions of Former M27/93 and M27/94. |
| A20991 | 1987 | Delta Gold Ltd | Kanowna | <1% | Kanowna Gold Prospect Western Australia 1986 Annual report PL's 27/19 PL27/21 PL27/22 PL27/24 PL27/25 PL27/26 |
| A22634 | 1987 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Prospect Kanowna Annual report for 1987 E27/3 M27/37 M27/53 P27/780 Project No. 359 Delta Gold |
| A31500 | 1987 | Delta Gold Ltd | Kanowna | <1% | Feasibility Study; Kanowna Tailings (R Report for 1987; E27/25, LTT70/58, M27/5,37,53) |
| A17721 | 1986 | Delta Gold Ltd | Kanowna | <1% | Kanowna Gold Prospect Western Australia 1985 Annual report PL's P27/7 P27/19 to P27/22 P27/24 P27/25 P27/30 P2 |
| A15313 | 1985 | Delta Gold Ltd | Kanowna | <1% | Kanowna Gold Project Western Australia 1984 Annual report covering PL's P27/19 P27/21 P27/22 P27/24 P27/25 P27 |
| A10865 | 1982 | Western Mining Corporation Ltd | Four Mile Hill | 17% | Four Mile Hill Project, Annual Report for the period 10th December 1980 to 8th December 1981, MC27/1794 & 1795 |
| A10414 | 1981 | Esso Australia Ltd | Black Swan | <1% | Black Swan Project, Non-statutory Report: Final Report, November 1981, TR70/7178H. |
| A9518 | 1981 | Esso Australia Ltd | Black Swan | <1% | Black Swan Project, Annual Report for the period ending 10/11/1980, TR70/7178H. |
| A8164 | 1979 | Aquitaine Aust Minerals Pty Ltd | Four Mile Hill | 33% | Four Mile Hill Project, Non-statutory Report: Final Report, February 1979, MC27/1841-1846. |
| A7814 | 1978 | Esso Exploration Aust Inc | Perkollili | 49% | Perkollili Project, Non-statutory Report: Final Report, June 1978, MC27/1655-1660. |
| A6143 | 1976 | Australian Selection Pty Ltd | Golden Valley - Kanowna | <1% | Golden Valley - Kanowna Project, Non-statutory Report: Report for the year ending 31/12/1975 , MC27/13-18, 525 |
| A5982 | 1975 | Great Boulder Mines Ltd | Kanowna | 13% | Kanowna Project, Non-statutory Report: Geological Report(s) for the period ending 17th June 1975, MC27/152-15 |
| A5903 | 1975 | Union Oil Development Corp | Mount Mulcahy | <1% | Mount Mulcahy Project, Non-statutory Report:12 ( W.M.C.) Plans for work carried out in the period 1973/1974, M |
| A6106 | 1975 | Great Boulder Mines Ltd | Kanowna | 47% | Kanowna Project, Final Surrender Report for the period 27th May 1974 to 18th April 1975, MC27/252, 269, 291-2 |
| A3827 | 1973 | Magnum Explorations Nl | Kanowna | <1% | Preliminary Report. Kanowna Nickel Project Westen Australia, July 1973, GML27/1648-1653; MC26/1088-1089; MC27/ |
| A19919 | 1971 | Mountain View Gold Nl | Kanowna | <1% | Kanowna, [Non-statutory report], MC27/635 ... 27/1284 |
| A1606 | 1970 | Western Selcast Pty Ltd | Golden Valley -Kanowna | <1% | Non-statutory Report : Report for the period ending 31/12/1969, Golden Valley - Kanowna Project, MC27/13-18 M |
| A2023 | 1970 | Anglo American Exploration (Australia) Pty Ltd | Kanowna | <1% | Kanowna Project, Non-statutory Report: Results of Exploration of Mineral Claims for the period ending 31/12/19 |
| A11290 | 1969 | Noranda Australia Ltd | Kanowna | 12% | Kanowna Project, Non-statutory Report: Final Report, December 1969, MC27/ 152-154, 474,282,169-170,172-182,319 |
| A26721 | 1753 | Delta Gold Ltd | Golden Valley | <1% | Golden Valley Joint Venture. Kanowna annual report for 1988 (E27/3, M27/22, M27/23, M27/37, M27/53, M27/71, M |
| A23023 | 1753 | Delta Gold Ltd | Kanowna | <1% | Kanowna Gold Prospect Western Australia 1987 Annual report PL's27/19 27/22 27/355 27/356 27/528 27/596 M's 27/ |
| A26348 | 1753 | Delta Gold Ltd | Kanowna | <1% | Kanowa Gold Prospect W.A. 1988 Annual report E27/25, |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A82888 | 1753 | Placer Dome Asia Pacific Ltd | Kanowna / Homestead | 1.5% | Ground Geophysics Survey |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 27/219 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 27/219? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.