M 37/1437 is a pending mining lease in the Shire of Leonora, Western Australia, applied for by Mt Malcolm Gold Holdings Pty Ltd (part of Mt Malcolm Mines NL). The application was received on 20 Aug 2025 and is awaiting a decision. The ground is covered by 119 historical WAMEX reports.
Register summary
- Holder
- Mt Malcolm Gold Holdings Pty Ltd
- Part of
- Mt Malcolm Mines NL (ASX:M2M) as at 2025-06-30
- Local government
- Shire of Leonora
- Application received
- 20 Aug 2025
The full record on M 37/1437
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Dealings, mortgages, caveats and transfer history
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A122744 | 2020 | Anova Metals Australia Pty Ltd | Malcolm | 3.5% | Combined Annual Report – Malcolm Project C134/2017 for the period 8 December 2018 to 7 December 2019 |
| A123331 | 2020 | Torian Resources Ltd | Malcolm | 95% | Malcolm Project P 37/8823 Annual Report for the period ending 20/08/2019 |
| A123344 | 2020 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8826 Annual Report for the period ending 20/08/2019 |
| A123895 | 2020 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8732 Annual Report for the period ending 8/2/2020 |
| A124016 | 2020 | Torian Resources Ltd | Malcolm | 99% | Malcolm Project P 37/8824 Annual Report for the period ending 20/08/2019 |
114 more reports
| A124017 | 2020 | Torian Resources Ltd | Malcolm Project P 37/8825 | 100% | Malcolm Project P 37/8825 Annual Report for the period ending 20/08/2019 |
| A125347 | 2020 | Magnetic Resources Nl | Raeside | <1% | Annual Report, C198/2017 Raeside (P37/8905–8912, E37/1331, E37/1367, P37/9204–9207), Western Australia, Report |
| A123882 | 2020 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8731 Annual Report for the period ending 08/02/2020 |
| A122009 | 2019 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8732 Annual Report for the period 9 February 2018 to 8 February 2019 |
| A122019 | 2019 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8754 Annual Report for the period 14 March 2018 to 13 March 2019 |
| A122054 | 2019 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P 37/8822 Annual Report for the period 21 August 2018 to 20 August 2019 |
| A121847 | 2019 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P 37/8116 Annual Report for the period 4 September 2017 to 3 September 2018 |
| A119475 | 2019 | Anova Metals Australia Pty Ltd | Malcolm | <1% | Combined Annual Report – Malcolm Project C134/2017 For the Period 8 December 2017 to 7 December 2018, M37/0116 |
| A121496 | 2019 | Magnetic Resources Nl | Raeside | <1% | Annual Report, C198/2017 Raeside (P37/8905–8912, E37/1331, E37/1367, P37/9204–9207), Western Australia for the |
| A121997 | 2019 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P 37/8116 Annual Report for the period 4 September 2018 to 3 September 2019 |
| A122004 | 2019 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P 37/8731 Annual Report for the period 9 February 2018 to 8 February 2019 |
| A122052 | 2019 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P 37/8820 Annual Report for the period 21 August 2018 to 20 August 2019 |
| A122053 | 2019 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P 37/8821 Annual Report for the period 21 August 2018 to 20 August 2019 |
| A115942 | 2018 | Anova Metals Australia Pty Ltd | Malcolm | <1% | Combined Annual Report - Malcolm Project - C134/2017 for the period 8 December 2016 to 7 December 2017, M37/01 |
| A118145 | 2018 | Magnetic Resources Nl | Raeside | <1% | Annual Report C198/2017 Raeside (P37/8905–8912), Western Australia, Reporting Period 21 August 2017 to 20 Augu |
| A110748 | 2017 | Exterra Resources Limited | Malcolm | 3.5% | EXTERRA RESOURCES LIMITED Annual Report, Malcolm Project M37/1164 |
| A108449 | 2016 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P37/8116 Mt Margaret Mineral Field Mt Malcolm District Annual Report Period 4 September 2014 t |
| A108012 | 2016 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P37/6998 Annual Report 2015, Period 20th June 2014 to 19th June 2015 |
| A108013 | 2016 | Torian Resources Ltd | Malcolm | <1% | Malcolm Project P37/6999 Annual Report 2015, Period 20th June 2014 to 19th June 2015 |
| A108042 | 2016 | Torian Resources Ltd | Malcolm | 99% | Malcolm Project P37/7094 Annual Report 2015 Period 23rd October 2014 to 22nd October 2015 |
| A108043 | 2016 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P37/7095 Annual Report 2015 Period 23rd October 2014 to 22nd October 2015 |
| A108045 | 2016 | Torian Resources Ltd | Malcolm | 95% | Malcolm Project P37/7097 Annual Report 2015 Period 23rd October 2014 to 22nd October 2015 |
| A107716 | 2016 | Exterra Resources Ltd | Malcolm | 3.5% | Annual Report Malcolm Project M37/1164 for the Period 8th December 2014 to 7th December 2015 |
| A108046 | 2016 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P37/7098 Annual Report 2015 Period 23rd October 2014 to 22nd October 2015 |
| A108047 | 2016 | Torian Resources Ltd | Malcolm | 100% | Malcolm Project P37/7099 Annual Report 2015 Period 23rd October 2014 to 22nd October 2015 |
| A109648 | 2016 | Torian Resources Limited | Malcolm | <1% | Malcolm Project P37/6998 Final Surrender Report for the period 20/06/2015 to 19/06/2016 |
| A109649 | 2016 | Torian Resources Limited | Malcolm | <1% | Malcolm Project P37/6999 Final Surrender Report for the period 20 June 2015 to 19 June 2016 |
| A104723 | 2015 | Exterra Resources Ltd | Malcolm | 3.5% | Annual Report, Malcolm Project M37/1164 for the Period 8th December 2013 to 7th December 2014 |
| A104502 | 2014 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7095 Annual Report for the period 23rd October 2013 to 22nd October 2014 |
| A104504 | 2014 | Cascade Resources Ltd | Malcolm | 95% | Malcolm Project P37/7097 Annual Report for the period 23rd October 2013 to 22nd October 2014 |
| A102021 | 2014 | Alphabrass Resources | Melita | <1% | Melita Project Relinquishment Report for E37/1123 for the period 12/6/2012 to 7/2/2014 |
| A104505 | 2014 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7098 Annual Report for the period 23rd October 2013 to 22nd October 2014 |
| A104506 | 2014 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7099 Annual Report 2014 Period 23rd October 2013 to 22nd October 2014 |
| A100620 | 2014 | Exterra Resources Ltd | Malcolm | 3.5% | Annual Report Malcolm Project M37/1164 For the period 8th December 2012 – 7th December 2013 |
| A104501 | 2014 | Cascade Resources Ltd | Malcolm | 99% | Malcolm Project P37/7094 Annual Report for the period 23rd October 2013 to 22nd October 2014 |
| A96273 | 2013 | Exterra Resources Pty Ltd | Malcolm | 3.5% | Annual Report Malcolm Project M37/1164 for the period 8th December 2011 – 7th December 2012 |
| A99279 | 2013 | Alphabrass Resources | Raeside | <1% | Raeside Project Combined Annual Technical Report C96/2013 For the period 12/62012 to 11/6/2013 |
| A100382 | 2013 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7098 Annual Report 2013 for the period 23rd October 2012 to 22nd October 2013 |
| A100381 | 2013 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7099 Annual Report 2013 for the Period 23rd October 2012 to 22nd October 2013 |
| A98877 | 2013 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6998 Annual Report 2013 Period 20th June 2013 to 19th June 2013 |
| A98879 | 2013 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6999 Annual Report 2013 Period 20th June 2012 to 19th June 2013 |
| A100386 | 2013 | Cascade Resources Ltd | Malcolm | 99% | Malcolm Project P37/7094 Annual Report 2013 Period 23rd October 2012 to 22nd October 2013 |
| A100384 | 2013 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7095 Annual Report 2013 Period 23rd October 2012 to 22nd October 2013 |
| A100383 | 2013 | Cascade Resources Ltd | Malcolm | 95% | Malcolm Project P37/7097 Annual Report 2013 Period 23rd October 2012 to 22nd October 2013 |
| A95726 | 2012 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7099 Annual Report for the period 23rd October 2011 to 22nd October 2012 |
| A95727 | 2012 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7098 Annual Report 2012 Period 23rd October 2011 to 22nd October 2012 |
| A95728 | 2012 | Cascade Resources Ltd | Malcolm | 95% | Malcolm Project P37/7097 Annual Report Period 23rd October 2011 to 22nd October 2012 |
| A95735 | 2012 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7095 Annual Report for the period 23rd October 2011 to 22nd October 2012 |
| A95736 | 2012 | Cascade Resources Ltd | Malcolm | 99% | Malcolm Project P37/7094 Annual Report for Period 23rd October 2011 to 22nd October 2012 |
| A94482 | 2012 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6998 Annual Report 2012 Period 20th June 2011 to 19th June 2012 |
| A94483 | 2012 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6999 Annual Report 2012 for the period 20th June 2011 to 19th June 2012 |
| A95548 | 2012 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project E37/837 Annual Report for the period 12th September 2011 to 11th September 2012 |
| A92223 | 2011 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7098, Annual Report for the period 23rd October 2010 to 22nd October 2011. |
| A92226 | 2011 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7095, Annual Report for the period 23rd October 2010 to 22nd October 2011. |
| A92227 | 2011 | Cascade Resources Ltd | Malcolm | 99% | Malcolm Project, P37/7094, Annual Report for the period 23rd October 2010 to 22nd October 2011. |
| A91058 | 2011 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6999 Annual Report 2011 Period 20th June 2010 to 19th June 2011 |
| A91804 | 2011 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project, E37/837, Annual Report 2011for the period 12th September 2010 to 11th September 2011. |
| A92222 | 2011 | Cascade Resources Ltd | Malcolm | 100% | Malcolm Project P37/7099, Annual Report for the period 23rd October 2010 to 22nd October 2011. |
| A92224 | 2011 | Cascade Resources Ltd | Malcolm | 95% | Malcolm Project P37/7097, Annual Report for the period 23rd October 2010 to 22nd October 2011. |
| A91057 | 2011 | Cascade Resources Ltd | Malcolm | <1% | Malcolm Project P37/6998 Annual Report 2011, Period 20th June 2010 to 19th June 2011 |
| A82066 | 2009 | Metaliko Resources Ltd | MALCOLM | <1% | MALCOLM PROJECT ANNUALTECHNICAL REPORT FOR 12 MONTHS TO 7-4-2009, TENEMENTS PLs37/6763 - 6771 Combined reporti |
| A79943 | 2008 | Regal Resources Ltd | Malcolm | 3.5% | Annual Technical Report M 37/1164 Period 8th December 2007 - 7th December 2008 |
| A79187 | 2007 | Regal Resources Ltd | Malcolm | 3.5% | Annual Technical Report M37/1164 Period 8th December 2006 to 7th December 2007 |
| A72875 | 2006 | Liberty Gold Nl | Malcolm | 3.5% | Annual Report, Period 8 December 2004 to 7 December 2005, Malcolm Project M37/1164, Leonora, (Liberty Gold Rep |
| A73943 | 2006 | Regal Resources Ltd | Malcolm | 3.5% | Annual Technical Report, M37/1164, Period 8 December 2005 to 7 December 2006, (Malcolm Project, Leonora). |
| A68055 | 2004 | Johnsons Well Mining Nl | Melita | <1% | Exploraiton Licences: E37/689, Annual Report for the period 19 February 2003 to 18 February 2004 (Melita Proje |
| A64444 | 2002 | Jubilee Mines Nl | Malcolm Project | 27% | Malcolm Project Combined Annual Report For E37/225, E37/302, M37/423, 430, 431, 433, 475-477, P37/4101-4102, 4 |
| A61737 | 2001 | Jubilee Gold Mines Nl | Malcolm Project | 27% | Malcolm Project Combined Annual Report for E37/225, E37/302, M37/423, 430, 431, 433, 475-477, P37/4101-4102, 4 |
| A59824 | 2000 | Jubilee Gold Mines Nl | Malcom | 27% | Malcom Project Combined Annual Report for E37/225,M37/423, 430-433,475-477,P37/4101-4102,4300-4302,4374,4534,4 |
| A58975 | 1999 | Triton Resources Ltd | Raeside | <1% | Raeside Project C49/1994 Annual Technical Report for year ending 30/06/99 |
| A53682 | 1998 | North Ltd | Malcolm South | 27% | Annual Mineral Exploration Report on the Malcolm South JV Tenements. Leonora Project, for the period 01/12/96 |
| A53685 | 1998 | North Ltd | Leonora | 67% | Annual Mineral Exploration Report, period 26 Jan 1997 - 25 Jan 1998, on the Richmond Gem Option, M37/207, Leon |
| A55897 | 1998 | Triton Resources Ltd | Raeside | <1% | Raeside Project, Annual Report Year Ended: 30/06/98 E37/199, 275, 289, L37/77 etc. |
| A49966 | 1997 | North Ltd | Malcolm South | 22% | Report No. WA97/16S Annual Mineral Exploration Report on the Malcolm South Joint Venture Tenements Leonora Pro |
| A50641 | 1997 | North Ltd | Leonora | 67% | Annual Mineral Exploration Report, period 25 Jan 1996 - 26 Jan 1997, on the Richmond Gem Option, M37/207, Leon |
| A51809 | 1997 | North Ltd | Raeside East | <1% | Raeside East (JV) Project, Annual Report for the period 1st July 1996 to 30th June 1997, P37/4611-14, 4629-50, |
| A52364 | 1997 | Triton Resources Ltd | Raeside | <1% | Raeside Project (Project Status Reference C49/1994) Annual report for the year ended 30/06/97 |
| A46853 | 1996 | Titan Resources Nl | Mount Malcolm | 67% | Annual Report for the period 26 January 1995 to 25 January 1996, Mt Malcolm, M37/207. |
| A46958 | 1996 | North Ltd | Malcolm South | 42% | Annual report Malcolm South Joint Venture Leonora Project for year ended 30 November 1995 E37/302 M37/430 M37/ |
| A49564 | 1996 | Triton Resources Ltd | Raeside | <1% | Raeside Project C49/1994 Annual report for the year ended 30 June 1996 |
| A43629 | 1995 | Titan Resources Nl | Mount Malcolm | 67% | Annual Report for the period 26 January 1994 to 25 January 1995, M37/207, Mt. Malcolm. |
| A47655 | 1995 | Normandy Exploration Ltd | Malcolm North | <1% | Malcolm North (JV) Project, PL37/4575 to PL37/4606 M37/423 and M37/476 and Tenements previously surrendered P |
| A43667 | 1995 | Jubilee Gold Mines Nl | Malcolm | <1% | Malcolm project Leonora W.A E37/225, M37/475, 423, P37/4997 4102, 4081, 3977, 3978, 3606. Annual report, 1994 |
| A45322 | 1995 | Triton Resources Ltd | Raeside | <1% | The period 1 July to 30 June 1995 Raeside Joint Venture Project Status G.S.W.A Refernce M7694/1 C49/1994 |
| A42894 | 1994 | Westchester Pty Ltd | Raeside | <1% | Annual report Raeside Project Leonora for the year ending 30 June 1994 Encompassing lease numbers E37/172 E37/ |
| A39576 | 1993 | Triton Resources Ltd | Raeside | <1% | Raeside Project, Partial Surrender Report for the period ending 2nd September 1993, E37/172. |
| A40127 | 1993 | Mt Martin Gold Mines Nl | Mount Malcolm | 67% | Mt. Malcolm Project, Annual Report for period 01/01/1992 to 31/12/1992, M37/207 ( Richmond Gem). |
| A39858 | 1993 | Westchester Pty Ltd | Raeside | <1% | Annual Report for the period 30/06/92-30/06/93 Raeside Project |
| A37081 | 1992 | Triton Resources Ltd | Raeside | <1% | Partial Surrender Report , Geological Report for Part E37/172 (Raeside Project, Partial surrender 1992). |
| A37317 | 1992 | Triton Resources Ltd | Raeside | <1% | Raeside Project, Annual Report for the period 23/11/1991 to 23/11/1992 , E37/172 |
| A37103 | 1992 | Sir Samuel Mines Nl | Malcolm | 25% | Annual Report for the Period 01/12/91 - 30/11/92 Malcolm Project |
| A37360 | 1992 | Mt Martin Gold Mines Nl | Mount Malcolm - Richmond Gem | 67% | Mount Malcolm - Richmond Gem Project, Annual Report for the period 08/01/1992 to 07/01/1993, M37/207. |
| A32488 | 1991 | Mt Martin Gold Mines Nl | North Star | 67% | 1990 Annual Report M37/207, Mt. Malcolm, W.A. |
| A33559 | 1991 | Ashton Gold Mines Pty Ltd | Malcolm Nova | 78% | Annual Report Malcolm Nova Project Mining licences M37/138-139 M37/298 M37/318 for the period 01/01/90-31/12/9 |
| A34706 | 1991 | Mt Martin Gold Mines Nl | North Star | 67% | North Star Project, Annual Report for the period 08/01/1991 to 07/01/1992,M37/207. |
| A30518 | 1990 | Ashton Gold Wa Ltd | Malcolm | 85% | Malcolm Project, 1989 Annual Report, January 1990, M37/138 & 139. |
| A30105 | 1990 | Mt Martin Gold Mines Nl | Mount Malcolm | 67% | 1989 Annual Report M37/207, Mt. Malcolm, W.A. |
| A29042 | 1989 | North Eastern Gold Mines Nl | Malcolm | <1% | Malcolm Project, GML37/2217, Annual report, January 1989 |
| A23207 | 1988 | Mt Martin Gold Mines Nl | Mount Malcolm | 1.3% | Annual Report (1987), Mt. Malcolm Project, tenements PL37/1696 - 1698, GML37/2151 - 2153, Mt. Margaret M.F., |
| A24682 | 1988 | Polaris Pacific Nl | Malcolm | 85% | Polaris Pacific NL Malcolm Project. Annual Report for year ending 1987/1988. P37/1520, P37/2080. P37/995 (M37/ |
| A26344 | 1988 | Brunswick Oil Nl | Mt Malcolm | 1.3% | Mt Malcolm , Annual report, GML37/2151-2153, P37/1696-1698. |
| A24789 | 1987 | North Eastern Gold Mines Nl | Redcastle | <1% | Redcastle Project, Annual Report, [Exploration Programme of the Malcom , Bendigo and Redcaslte Tenements] , Fe |
| A14925 | 1985 | Esso Exploration Aust Inc | North Gwalia | <1% | North Gwalia Project Annual & Final Report , February 1985, MC37/6387 M37/6410 to M37/6415 M37/6418 to M37/61 |
| A15608 | 1985 | Hann Gold Mining Ltd | Malcolm | <1% | Malcolm Prospect Annual report period 07/04/84 to 06/04/85 Prospecting Licences P37/195 P37/199 and P37/200 (1 |
| A20395 | 1985 | Esso Exploration Aust Inc | North Gwalia & South Leonora | <1% | North Gwalia & South Leonora Project, Non-statutory Report:Airborne Geophysical Survey Leonora Area Flight Log |
| A13541 | 1984 | Brunswick Oil Nl | North Star | 1.3% | Final Report on the 1983 exploration programme at the North Star property, Malcolm, Western Australia. |
| A11244 | 1982 | Chevron Exploration Corp | Mount Malcolm | <1% | Mt Malcolm Project, Non-statutory Report: Final & Annual Report for the period 01/06/1981 to 31/05/1982,TR70/7 |
| A20391 | 1982 | Esso Exploration Aust Inc | North Gwalia - South Leonora | <1% | North Gwalia - South Leonora Project, Non-statutory Report: Aerial Magnetic Survey Flight Logs, May 1982. |
| A10208 | 1981 | Chevron Exploration Corp | Mount Malcolm | <1% | Mount Malcolm Project, Non-statutory Report: Annual Report fo rthe period 12th June 1980 to 11th June1981, TR7 |
| A9294 | 1980 | Chevron Exploration Corp | Mount Malcolm | <1% | Mt Malcolm Project, Annual Report, August 1980, TR70/7046H. |
| A20390 | 1977 | Esso Exploration Aust Inc | North Gwalia - South Leonora | <1% | North Gwalia - South Leonora Project, Non-statutory Report: Transparent Aerial Magnetic Survey Images; Transpa |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A60594 | 1969 | Mines Administration Pty Ltd | Leonora | 15% | Progress Report on Nickel Exploration, Leonora Mineral Claim Western Australia July, 1969. Mines Administratio |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 37/1437 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 37/1437? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.