NextMapsWA TenementsM 37/439

M 37/439

LiveMining LeaseShire of LeonoraMt. Malcolm District
Area
842ha
Expires
Apr 2036
in 10 years
WAMEX reports
91
WA median is 53
Report drilling
62
of 91 reports
Leonora Explore on the live map

Register summary

Holder
Round Oak Jaguar Project Pty Ltd
Local government
Shire of Leonora
Application received
1 Dec 1993
Commenced
27 Apr 1994
Expiry
26 Apr 2036
Term
21 Years (Renewed)

Exploration history on this ground

91 historical WAMEX exploration reports intersect M 37/439: 43 report geochemistry or sampling, 63 include a digital data package.
When this ground was worked · 88 of 91 reports dated
41970s
21980s
231990s
282000s
262010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A131139 2022 Xplore Resources Pty Ltd Weebo <1% Annual Combined Report C63/2017 for Exploration Activity - Weebo Project Period Ending 31 March 2022
A127402 2021 Xplore Resources Pty Ltd Weebo <1% Annual Combined Report C63/2017 for Exploration Activity- Weebo Project Period Ending 31 March 2021
A125691 2020 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2019 to 30 September
A123220 2020 Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd Teutonic Bore Project 1.8% Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019
A124119 2020 Tyranna Resources Limited Weebo <1% Combined Annual Technical Report C63/2017 (Weebo) for the period ending 31/03/2020
86 more reports
A119556 2019 Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd Teutonic Bore 1.8% C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018
A119854 2019 Tyranna Resources Ltd Weebo <1% C63/2017 Combined Annual Technical Report For the Period 1 April 2018 to 31 March 2019, E36/00880, E37/01275,
A122153 2019 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2018 to 30 September
A115994 2018 Independence Group Nl Teutonic Bore 1.8% Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2
A116925 2018 Independence Group Nl Jaguar <1% Final Surrender Report for Tenement E37/677 Jaguar Project for the period 26 June 2006 to 5 April 2018
A118601 2018 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2017 to 30 September
A112037 2017 Independence Group Nl Teutonic Bore 1.7% Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016
A115512 2017 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2016 to 30 September
A107988 2016 St Barbara Limited Wilson Creek 1.4% Final Surrender Report E37/740 Wilson Creek Project for the period 08/06/2006 to 10/11/2015
A107737 2016 Independence Group Nl Teutonic Bore 1.7% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015
A110551 2016 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2015 to 30 September
A105579 2015 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A105028 2015 Independence Group Nl Teutonic Bore 2.1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014,
A107603 2015 St Barbara Limited Gwalia <1% Gwalia Project C55/2004 Combined Annual Report for the Period 1 October 2014 to 30 September 2015
A101281 2014 Independence Group Nl Teutonic Bore 1.8% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013,
A102258 2014 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A98017 2013 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41
A98608 2013 Independence Group Nl Teutonic Bore 1.8% Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37
A97747 2013 Independence Group Nl Teutonic Bore 1.8% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012,
A93519 2012 Jabiru Metals Ltd Teutonic Bore 1.8% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011
A93822 2012 St Barbara Ltd Leonora <1% Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012
A89792 2011 Jabiru Metals Ltd Teutonic Bore 1.3% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010
A90352 2011 St Barbara Ltd Leonora 1.2% Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep
A85496 2010 St Barbara Ltd McEast 13% McEast C162/2006 E37/496, Partial Surrender Report for the Period 22 September 2005 to 21 September 2009
A87123 2010 St Barbara Ltd Leonora 1.2% Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37
A88117 2010 St Barbara Ltd Wilson Creek 1.4% Partial Surrender Report for the Period 2 June 2006 to 31 August 2010
A84566 2009 St Barbara Ltd Wilson Creek <1% Wilson Creek E37/677 Partial Surrender Report for the Period 26 June 2006 to 6 July 2009
A78149 2008 Jabiru Metals Ltd Teutonic Bore <1% COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37
A78842 2008 St Barbara Ltd Leonora 1.7% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E
A79282 2008 Bathurst Resources Ltd Mount Clifford 1.4% Mount Clifford Project Annual Report E37/740 8th June 2007-7th June 2008
A80228 2008 Montezuma Mining Company Ltd WEEBO <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008
A74019 2007 St Barbara Ltd Cambrian 1.7% Cambrian Project E37/281, Surrender Report for the Period 29 January 1993 to 28 September 2006, (St Barbara Re
A74695 2007 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007
A75283 2007 St Barbara Ltd Leonora 2.1% Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02)
A75604 2007 Cazaly Resources Ltd Mount Clifford 1.4% Annual Report E37/0740 Mount Clifford Project For the period 8 June 2006 to 7 June 2007
A77253 2007 Montezuma Mining Company Ltd Weebo <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007
A72988 2006 St Barbara Mines Ltd McEast - Robinsons 3% McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C
A70216 2005 Newmont Australia Ltd Heather Bore <1% Annual report for the period 08/02/04 - 07/02/05 Heather Bore Project, E37/319, Leonora, Report number 31817
A68376 2004 Newmont Yandal Operations Ltd Heather Bore <1% Annual Report for the period 08/02/2003-07/02/2004 Heather Bore Project E37/319
A68604 2004 Gutnick Resources Nl Teutonic Bore 1.3% Joint Surrender Report for the Period 19 October 2000 to 21 March 2003 (C68/2002) - Teutonic Bore E37/602, E37
A68976 2004 Sons Of Gwalia Ltd McEast-Robinsons 3.7% McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004
A68561 2004 Sons Of Gwalia Ltd Wilson Creek 23% Wilson Creek Project, Annual report for the period 1 April 2003 to 30 June 2003, (C115/1999), M37/438-440, M37
A65855 2003 Sons Of Gwalia Ltd Cambrian <1% Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3
A65856 2003 Sons Of Gwalia Ltd Wilson Creek 11% Annual Report for period 01/04/01 to 31/03/02 Wilson Creek Project Area E36/306, P36/1246-1248, M37/437-440, M
A67765 2003 Pacmin Mining Corporation Ltd Cambrian <1% Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37
A66101 2003 Newmont Australia Ltd Heather Bore <1% Annual Report for the period 01/01/2002 to 31/12/2002 Heather Bore Project,C72/2001 E37/319, 553, 556.
A66608 2003 Sons Of Gwalia Ltd Wilson Creek 23% Wilson Creek Project , Annual Report for the period 1 April 2002-31 March 2003, Group C115/1999, M37/438-40, 4
A66925 2003 Sons Of Gwalia Ltd Cambrian <1% CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294,
A64410 2002 Newmont Yandal Operations Ltd Heather Bore <1% Annual Report form the period 1/01/2001 To 31/12/2001. Project Heather Bore E37/319 E37/553 E37/556.
A63374 2001 Pacmin Mining Corporation Ltd Wilson Creek 8.6% 2000/01 Annual Report Wilson Creek Project Area E36/306, P36/1246-1248, E37/261, M37/437-440, M37/493-495, P37
A62593 2001 Normandy Yandal Operations Ltd Heather Bore <1% Annual Report On Exploration For Period 7/02/2000 To 6/02/2001. Project Heather Bore E37/319.
A63376 2001 Pacmin Mining Corporation Ltd Cambrian <1% 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44
A59560 2000 Pacmin Mining Corporation Ltd Wilson Creek 5.7% 1998/99 Annual Report, Wilson Creek Project Area, E36/306, E37/183, E37/200, E37/261, E37/412, M37/403, M37/40
A60957 2000 Pacmin Mining Corporation Ltd Wilson Creek 8.9% 1999/2000 Annual Report, Wilson Creek Project Area, E36/ 306, E37/261,M37/437-440,493-495, P37//5159, Combine
A57477 1999 Pacific Mining Corporation Ltd Cambrian <1% Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434
A59344 1999 Pacmin Mining Corporation Ltd Cambrian <1% Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/
A54141 1998 Great Central Mines Ltd Clilfford Bore - Heather Bore <1% Exploration Licence E37/319 'Clifford Bore' (Heather Bore Project) Annual report for the period 07/02/97-06/02
A55964 1998 Pacific Mining Corporation Ltd Wilson Creek 8.7% The Wilson Creek Project Area, Mt Margaret Mineral Field, W.A. 01/06/97 - 31/05/98 E36/306, E37/183, (MLA37/4
A50583 1997 Goldfields Exploration Pty Ltd Teutonic Bore 6% Teutonic Bore Project, Final Report Exploration Licence E37/247 for the period 18th December 1991 to 17th Dece
A50936 1997 Goldfields Exploration Pty Ltd Teutonic Bore 1.2% Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical
A52220 1997 Mt Edon Gold Mines Aust Ltd Wilson Creek 5.7% Annual report on the Exploration of the Wilson Creek Project area E37/183 E37/261 E36/306 P37/5117 P37/5118 P3
A47244 1996 Goldfields Exploration Pty Ltd Teutonic Bore 1.2% Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te
A49404 1996 Mt Edon Gold Mines Aust Ltd Wilson Creek 2% Annual report on Exploration of the Wilson Creek Project area West E37/183 M37/493 to M37/495 E37/200 E37/261
A49707 1996 Mt Edon Gold Mines Aust Ltd Leonora <1% Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294
A44162 1995 Pancontinental Gold Operations Pty Ltd Teutonic Bore 1.3% Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/
A48976 1995 Mt Edon Gold Mines Aust Ltd Cambrian <1% Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J
A43995 1995 Mt Edon Gold Mines Aust Ltd Leonora 1.7% Leonora Project, Annual Report for the period ending January 28, 1995, E37/281.
A46039 1995 Mt Edon Gold Mines Aust Ltd Wilson Creek 4% Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3
A41263 1994 Mt Edon Gold Mines Nl Cambrian 1.7% Annual Reprt for the period 28/01/94 - 28/01/95 Tenements E37/281 Mt Margaret Mineral Field WA (Cambrian Proje
A42934 1994 Mt Edon Gold Mines Nl Wilson Creek 4% Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3
A38799 1993 Mt Edon Gold Mines Nl Wilson Creek 4% Annual Report for the period 06/92-05/93 Wilson Creek Project
A40253 1993 Mim Exploration Pty Ltd Junior Hill 6% Junior Hill Project, Annual Report for the year ending 17th December 1993, E37/247.
A37726 1993 Mt Edon Gold Mines Nl Wilson Creek 15% Annual Report for the period ending 1992 ,Wilson Creek Project, E37/183.
A37540 1992 Mim Exploration Pty Ltd Junior Hill 6% Junior Hill Project, Annual Report for the year ending December 17th 1992, E37/247.
A37727 1992 Mt Edon Gold Mines Nl Wilson Creek 15% Wilson Creek Project, Partial Surrender Report, December 1992, E37/183.
A34674 1991 Mt Edon Gold Mines Nl Wilson Creek 8.2% Wilson Creek Project, Annual Report for the period 01/10/1990 to 01/10/1991, E37/183 & 200.
A32411 1990 Mt Edon Gold Mines Nl Wilson Creek 8.2% Wilson Creek Prospect,(3710) Annual Report 1990 (E37/183)
A20565 1987 Chevron Exploration Corp Smith Bore 38% M37/78, Smith Bore, Relinquishment [final surrender] report,To February 9 1987
A10299 1981 Seltrust Mining Corp Pty Ltd Teutonic Bore 3.7% Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3
A21875 1978 Australian Selection Pty Ltd Teutonic Bore 3.4% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648-
A7295 1977 Australian Selection Pty Ltd Teutonic Bore 2.3% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4
A6285 1976 Cra Exploration Pty Ltd Smith's Bore 18% Smith's Bore Project, Annual Report for the year ending 31/12/1975, MC37/4736-4752 & 5069.
A5725 1975 Cra Exploration Pty Ltd Smith's Bore 18% 1974 Annual report of MC37/4736 to 37/4752, Smith's Bore prospect, 10th March 1975
A82836 1753 St Barbara Ltd Leonora 1.5% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235,
A84016 1753 St Barbara Ltd WILSON CREEK 1.4% WILSON CREEK PROJECT - PARTIAL SURRENDER REPORT FOR THE PERIOD, 8 JUNE 2006 – 7 JUNE 2009
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
10 years · 26 Apr 2036
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over M 37/439 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold M 37/439? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.