M 37/515
M 37/515 is a live mining lease in the Shire of Leonora, Western Australia, held by Round Oak Jaguar Pty Ltd (part of Aeris Resources Limited). Granted on 14 Feb 2005 for 21 years (renewed), it expires on 13 Feb 2047. The ground is covered by 93 historical WAMEX reports.
Register summary
- Holder
- Round Oak Jaguar Pty Ltd
- Part of
- Aeris Resources Limited (ASX:AIS) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 15 Mar 1995
- Commenced
- 14 Feb 2005
- Expiry
- 13 Feb 2047
- Term
- 21 Years (Renewed)
The full record on M 37/515
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 5 changes of holder
- The full record: 22 years of expenditure, 12 conditions and 20 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (26 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131139 | 2022 | Xplore Resources Pty Ltd | Weebo | 6.9% | Annual Combined Report C63/2017 for Exploration Activity - Weebo Project Period Ending 31 March 2022 |
| A127402 | 2021 | Xplore Resources Pty Ltd | Weebo | <1% | Annual Combined Report C63/2017 for Exploration Activity- Weebo Project Period Ending 31 March 2021 |
| A123290 | 2020 | Tyranna Resources Limited | Weebo | 9.2% | Annual Technical Report Weebo Project, E37/1353, 8 February 2019 to 7 February 2020 |
| A124133 | 2020 | Sr Mining Pty Ltd | Celtic Project | <1% | Celtic Project (C28/2012) Annual Report for the Period 1 April 2019 to 31 March 2020 |
| A125341 | 2020 | Round Oak Minerals Pty Ltd | Teutonic Bore | 4.1% | Annual Report for E37/1306 Teutonic Bore Project for the period 13 September 2019 to 12 September 2020 |
88 more reports
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | 1.8% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A120118 | 2019 | Bligh Resources Limited | Bundarra | <1% | Annual Report Bundarra Project C28/2012 for the period 1 April 2018 to 31 March 2019, M37/00350, M37/00488, M3 |
| A121652 | 2019 | Round Oak Jaguar Pty Ltd | Teutonic Bore | 4.1% | Annual Report for E37/1306 Teutonic Bore Project 13 September 2018 to 12 September 2019 |
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | 1.8% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | 1.8% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A118195 | 2018 | Round Oak Jaguar Pty Ltd | Teutonic Bore | 4.1% | Annual Report on E37/1306, Teutonic Bore Project, 13 September 2017 to 12 September 2018 |
| A117050 | 2018 | Bligh Resources Limited | Bundarra | <1% | Annual Report C28/2012 Bundarra Project for the period 1 April 2017 to 31 March 2018, M37/00350, M37/00488, M3 |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | 1.7% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A114129 | 2017 | S R Mining Pty Ltd; Bligh Resources Limited | Celtic | <1% | Celtic Project, Annual Report Covering 01/04/2016 to 31/03/2017, Combined Reporting Number C28/2012 for P37/83 |
| A108840 | 2016 | Sr Mining Pty Ltd; Bligh Resources Limited | Celtic | <1% | Celtic Project Annual Report Covering 01/04/2015 – 31/03/2016 Combined Reporting Number C28/2012 For M37/350, |
| A109842 | 2016 | Sr Mining Pty Ltd | Bundarra | <1% | Bundarra Project C28/2012 Annual Report for the period 01/04/2015 to 31/03/2016, M37/00350, M37/00488, M37/005 |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | 1.7% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A105028 | 2015 | Independence Group Nl | Teutonic Bore | 2.1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014, |
| A105086 | 2015 | Terrain Minerals Ltd | Black Cat - Garden Well | <1% | Final Surrender Report for E37/667 from 22/03/2006 to 15/12/2015 |
| A105903 | 2015 | Sr Mining Pty Ltd | Celtic | <1% | Annual Report for Celtic Project (M37/350,M37/488, M37/513, M37/514 and M37/638) for the period 1 April 2014 - |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | 1.8% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A101420 | 2014 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project C202/2006 Annual Exploration Report for the Combined Reporting Group C202/2006 (E37/667, M37 |
| A102399 | 2014 | Bligh Resources Limited; Sr Mining Pty Ltd | Celtic | <1% | Celtic Project, Annual Report for the period 01/04/2013 to 31/03/2014, M37/54, 350, 488, 513-514 & 638. [C28/2 |
| A102403 | 2014 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project, Partial Surrender Report for the period 22/03/2006 - 13/03/2014, E37/667. |
| A103845 | 2014 | Sr Mining Pty Ltd | Bundarra | <1% | Bundarra Project Surrender Report for Tenement P37/8362 For the Period 09/09/2013 to 08/09/2014 |
| A102069 | 2014 | Independence Group Nl | Teutonic Bore | 1.2% | Final Surrender Report on E37/914, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A103846 | 2014 | Sr Mining Pty Ltd | Bundarra | <1% | Bundarra Project Surrender Report for Tenement P37/8363 For the Period 09/09/2013 to 08/09/2014 |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | 1.8% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A97108 | 2013 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project Annual Report for the period 01/02/2012 to 31/01/2013, M37/326, M37/382, M37/480, P37/7200 t |
| A98355 | 2013 | Bligh Resources Limited | Celtic | <1% | M37/54, M37/350,M37/488, M37/513, M37/514 and M37/638 Annual Report for Celtic Project covering the period 01/ |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | 1.8% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A94121 | 2012 | Sr Mining Pty Ltd | Celtic | <1% | Celtic Project annual report for the period 01/04/2011 - 31/03/2012 M37/350, M37/488, M37/513, M37/514, M37/54 |
| A93422 | 2012 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project Annual Report for the period 1 Feb 2011 to 31/01/2012, C202/2006, M37/326, 382, 480, P37/720 |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | 1.8% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A89204 | 2011 | Terrain Minerals Ltd | Celtic | <1% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2010 TO 31/12/2010 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A89481 | 2011 | Terrain Minerals Ltd | Black Cat | <1% | BLACK CAT PROJECT, ANNUAL REPORT FOR THE PERIOD 01/02/2010 TO 31/01/2011, M37/326, M37/382, M37/480, P37/7200 |
| A89792 | 2011 | Jabiru Metals Ltd | Teutonic Bore | 2.8% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010 |
| A90352 | 2011 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A85496 | 2010 | St Barbara Ltd | McEast | 16% | McEast C162/2006 E37/496, Partial Surrender Report for the Period 22 September 2005 to 21 September 2009 |
| A87123 | 2010 | St Barbara Ltd | Leonora | <1% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A85881 | 2010 | Terrain Minerals Ltd | Celtic | <1% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A86226 | 2010 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat JV Project 2009 Annual Report for the period 01/02/2009 to 31/01/2010, M37/326, M37/382, M37/480, P3 |
| A86577 | 2010 | Jabiru Metals Ltd | Teutonic Bore | 3% | Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009, |
| A81103 | 2009 | Terrain Minerals Ltd | CELTIC | <1% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A81243 | 2009 | Jabiru Metals Ltd | TEUTONIC BORE | 3.1% | TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008 |
| A81616 | 2009 | Terrain Minerals Ltd | BLACK CAT | <1% | BLACK CAT PROJECT ANNUAL REPORT FOR THE PERIOD 01/02/2008 TO 31/01/2009 M37/326, M37/382, M37/480, P37/7200 to |
| A78149 | 2008 | Jabiru Metals Ltd | Teutonic Bore | 2.9% | COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37 |
| A77450 | 2008 | Terrain Minerals Ltd | Wilson Creek-Garden Well-McEast | <1% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A77801 | 2008 | Terrain Minerals Ltd | Black Cat | <1% | BLACK CAT PROJECT ANNUAL REPORT FOR THE PERIOD 01/02/2007 TO 31/01/2008 Combined Reporting Group C202/2006 |
| A78842 | 2008 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E |
| A80228 | 2008 | Montezuma Mining Company Ltd | WEEBO | 4% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008 |
| A74353 | 2007 | Terrain Minerals Ltd | Wilson Creek-Garden Well-McEast | <1% | Celtic Project E37/251,M37/350,488-489,513-514,638,P37/6029, Annual Report for the Period 01/01/2006 to 31/12/ |
| A74681 | 2007 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project C202/2006 Annual Report for the Period 01/02/2006 - 31/02/2007 (Leonora) |
| A75283 | 2007 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02) |
| A77253 | 2007 | Montezuma Mining Company Ltd | Weebo | 4% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007 |
| A74695 | 2007 | Jabiru Metals Ltd | Teutonic Bore | 2.7% | Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007 |
| A72388 | 2006 | Jabiru Metals Ltd | Teutonic Bore | 5.1% | Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti |
| A72988 | 2006 | St Barbara Mines Ltd | McEast - Robinsons | 1.4% | McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C |
| A70505 | 2005 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined annual report, E37/258, 501, 512, 691, M37/44, P37/4326, and 6235, Teutonic Bore Project, C157/2002, |
| A68874 | 2004 | Pilbara Mines Ltd | Teutonic Bore | <1% | Exploration Licences E37/258, M37/44, E37/501, E37/691, E37/512, P37/6235, Teutonic Bore Project Combined Annu |
| A68976 | 2004 | Sons Of Gwalia Ltd | McEast-Robinsons | <1% | McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004 |
| A66942 | 2003 | Sons Of Gwalia Ltd | McEast/ Robinsons | <1% | McEast/Robinsons Project C5/1996, Annual Report for the period 1 July 2001 to 30 June 2002,M37/350,326,382,480 |
| A66964 | 2003 | Pilbara Mines Ltd | Teutonic Bore | <1% | Combined Annual Report for the period ending 17 January 2003 C157/2002 (formerly C417/1994): E37/258, M37/44, |
| A67321 | 2003 | Sons Of Gwalia Ltd | Wilson Creek-Garden Well-McEast | <1% | Annual Report for the period 1 July 2002 to 30 June 2003 McEast/Robinsons Project C5/1996: M37/350,326,382,480 |
| A64066 | 2002 | Sons Of Gwalia Ltd | McEast | <1% | 2000/01 Annual Report McEast Project area combined report for period 01/07/00 to 30/06/01 E37/251, E37/411, E3 |
| A61673 | 2001 | Pilbara Mines Ltd | Teutonic Bore | <1% | Digital Data at November 2000 on P37/4326, E37/258,501,512, M37/44,636,705, Teutonic Bore. |
| A62610 | 2000 | Pacmin Mining Corporation Ltd | McEast | <1% | 1999/2000 Annual Report McEast Project Area E37/251,E37/411 E37/456, M37/382, M37/480, M37/488, P37/3870-P37/3 |
| A57259 | 1999 | Pilbara Mines Nl | Teutonic Bore | <1% | Teutonic Bore, Mining Lease 37/44 Period End 17/12/1998, Mt Margaret Mineral Field |
| A59088 | 1999 | Pacmin Mining Corporation Ltd | Robinsons/ McEast | <1% | Robinsons/McEast Project Area E37/251, 411, 456, M37/382 01/07/98-30/06/99 Mount Margaret Mineral Field |
| A53866 | 1998 | Pilbara Mines Nl | Teutonic Bore | <1% | Teutonic Bore M37/44. Annual report for period ending 17/12/97. |
| A56685 | 1998 | Pacific Mining Corporation Ltd | McEast | <1% | Annual report for 1997 and 1998 on the exploration of the McEast Project Area. 01/07/96-30/06/97 & 01/07/97-30 |
| A50583 | 1997 | Goldfields Exploration Pty Ltd | Teutonic Bore | 22% | Teutonic Bore Project, Final Report Exploration Licence E37/247 for the period 18th December 1991 to 17th Dece |
| A50936 | 1997 | Goldfields Exploration Pty Ltd | Teutonic Bore | 4.4% | Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical |
| A47244 | 1996 | Goldfields Exploration Pty Ltd | Teutonic Bore | 4.4% | Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te |
| A49404 | 1996 | Mt Edon Gold Mines Aust Ltd | Wilson Creek | <1% | Annual report on Exploration of the Wilson Creek Project area West E37/183 M37/493 to M37/495 E37/200 E37/261 |
| A44162 | 1995 | Pancontinental Gold Operations Pty Ltd | Teutonic Bore | 4.6% | Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/ |
| A46039 | 1995 | Mt Edon Gold Mines Aust Ltd | Wilson Creek | <1% | Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3 |
| A40837 | 1994 | Mim Exploration Pty Ltd | Teutonic Bore | <1% | Annual Report Mining Lease M37/44 Teutonic Bore Year Ended December 17 1993 |
| A42934 | 1994 | Mt Edon Gold Mines Nl | Wilson Creek | <1% | Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3 |
| A37457 | 1993 | Mim Exploration Pty Ltd | Teutonic Bore | <1% | Annual report for the period 19/12/91-18/12/92 Teutonic Bore Project M37/44 |
| A40253 | 1993 | Mim Exploration Pty Ltd | Junior Hill | 22% | Junior Hill Project, Annual Report for the year ending 17th December 1993, E37/247. |
| A38799 | 1993 | Mt Edon Gold Mines Nl | Wilson Creek | <1% | Annual Report for the period 06/92-05/93 Wilson Creek Project |
| A34839 | 1992 | Mim Exploration Pty Ltd | Teutonic Bore | <1% | Annual report for the period 18/01/91-17/01/92 Teutonic Bore Project M37/44 |
| A36370 | 1992 | Mt Edon Gold Mines Nl | Wilson Creek | <1% | Wilson Creek Project, Non-statutory Report: Exploration Report for the year ending 31/12/1992, P37/3870-3873 & |
| A37540 | 1992 | Mim Exploration Pty Ltd | Junior Hill | 22% | Junior Hill Project, Annual Report for the year ending December 17th 1992, E37/247. |
| A33832 | 1991 | Mt Isa Mines Ltd | Teutonic Bore | <1% | Teutonic Bore M37/44. Annual Report for period ending 17/01/91. |
| A10299 | 1981 | Seltrust Mining Corp Pty Ltd | Teutonic Bore | 3.7% | Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3 |
| A21875 | 1978 | Australian Selection Pty Ltd | Teutonic Bore | 3.3% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648- |
| A7295 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | 1.9% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4 |
| A8321 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Claim Group Progress Report 1st October, 1977 to 31st December 1978 |
| A6164 | 1975 | Carpentaria Exp Co Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report , March 1975, MC37/4648-4659. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A82836 | 1753 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235, |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 37/515 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 37/515? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.