M 37/638
M 37/638 is a live mining lease in the Shire of Leonora, Western Australia, held by Northern Star (Sr Mining) Pty Ltd (part of Northern Star Resources Ltd). Granted on 10 Jan 2001 for 21 years (renewed), it expires on 9 Jan 2043. The ground is covered by 100 historical WAMEX reports.
Register summary
- Holder
- Northern Star (Sr Mining) Pty Ltd
- Part of
- Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 16 Aug 1996
- Commenced
- 10 Jan 2001
- Expiry
- 9 Jan 2043
- Term
- 21 Years (Renewed)
The full record on M 37/638
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 6 changes of holder
- The full record: 26 years of expenditure, 24 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (28 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154695 | 2026 | Northern Star Resources Ltd | P37/9079 | <1% | Final Surrender Report on P37/9079 for the period 16 April 2018 to 15 April 2026, (C28/2012). |
| A124133 | 2020 | Sr Mining Pty Ltd | Celtic Project | 15% | Celtic Project (C28/2012) Annual Report for the Period 1 April 2019 to 31 March 2020 |
| A125341 | 2020 | Round Oak Minerals Pty Ltd | Teutonic Bore | 2.2% | Annual Report for E37/1306 Teutonic Bore Project for the period 13 September 2019 to 12 September 2020 |
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | <1% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A120118 | 2019 | Bligh Resources Limited | Bundarra | 15% | Annual Report Bundarra Project C28/2012 for the period 1 April 2018 to 31 March 2019, M37/00350, M37/00488, M3 |
95 more reports
| A120292 | 2019 | Williams S | Celtic | <1% | Annual Report Celtic Project P37/9079 for the period 16 April 2018 to 15 April 2019 |
| A121652 | 2019 | Round Oak Jaguar Pty Ltd | Teutonic Bore | 2.2% | Annual Report for E37/1306 Teutonic Bore Project 13 September 2018 to 12 September 2019 |
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | <1% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A118195 | 2018 | Round Oak Jaguar Pty Ltd | Teutonic Bore | 2.2% | Annual Report on E37/1306, Teutonic Bore Project, 13 September 2017 to 12 September 2018 |
| A117050 | 2018 | Bligh Resources Limited | Bundarra | 15% | Annual Report C28/2012 Bundarra Project for the period 1 April 2017 to 31 March 2018, M37/00350, M37/00488, M3 |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A114129 | 2017 | S R Mining Pty Ltd; Bligh Resources Limited | Celtic | 15% | Celtic Project, Annual Report Covering 01/04/2016 to 31/03/2017, Combined Reporting Number C28/2012 for P37/83 |
| A115151 | 2017 | Bligh Resources Limited | Bundarra | <1% | Surrender Report Bundarra Project P37/8306 for the period 15/05/2013 - 12/09/2017 |
| A108840 | 2016 | Sr Mining Pty Ltd; Bligh Resources Limited | Celtic | 23% | Celtic Project Annual Report Covering 01/04/2015 – 31/03/2016 Combined Reporting Number C28/2012 For M37/350, |
| A109842 | 2016 | Sr Mining Pty Ltd | Bundarra | 15% | Bundarra Project C28/2012 Annual Report for the period 01/04/2015 to 31/03/2016, M37/00350, M37/00488, M37/005 |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A105028 | 2015 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014, |
| A106044 | 2015 | Sr Mining Pty Ltd; Bligh Resources Limited | Bundarra - Celtic | <1% | Annual Report for P37/8306 Bundarra/Celtic Project covering the period 15/05/2014 - 14/05/2015 |
| A105903 | 2015 | Sr Mining Pty Ltd | Celtic | 23% | Annual Report for Celtic Project (M37/350,M37/488, M37/513, M37/514 and M37/638) for the period 1 April 2014 - |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A101420 | 2014 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project C202/2006 Annual Exploration Report for the Combined Reporting Group C202/2006 (E37/667, M37 |
| A102399 | 2014 | Bligh Resources Limited; Sr Mining Pty Ltd | Celtic | 23% | Celtic Project, Annual Report for the period 01/04/2013 to 31/03/2014, M37/54, 350, 488, 513-514 & 638. [C28/2 |
| A102616 | 2014 | Sr Mining Pty Ltd | Celtic - Bundarra | <1% | ANNUAL REPORT FOR P37/8306 BUNDARRA/ CELTIC PROJECT COVERING THE REPORTING PERIOD 15/05/2013 – 14/05/2014 |
| A101735 | 2014 | Terrain Minerals Ltd | Bundarra - Celtic | <1% | Bundarra - Celtic Project, M37/489, Final Surrender Report Report for the period 16/02/1995 - 17/03/2014. |
| A102069 | 2014 | Independence Group Nl | Teutonic Bore | <1% | Final Surrender Report on E37/914, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the |
| A103846 | 2014 | Sr Mining Pty Ltd | Bundarra | <1% | Bundarra Project Surrender Report for Tenement P37/8363 For the Period 09/09/2013 to 08/09/2014 |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A97108 | 2013 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project Annual Report for the period 01/02/2012 to 31/01/2013, M37/326, M37/382, M37/480, P37/7200 t |
| A98355 | 2013 | Bligh Resources Limited | Celtic | 23% | M37/54, M37/350,M37/488, M37/513, M37/514 and M37/638 Annual Report for Celtic Project covering the period 01/ |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | <1% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A94121 | 2012 | Sr Mining Pty Ltd | Celtic | 23% | Celtic Project annual report for the period 01/04/2011 - 31/03/2012 M37/350, M37/488, M37/513, M37/514, M37/54 |
| A93160 | 2012 | Terrain Minerals Ltd | Celtic | <1% | Celtic Project Annual report for the period 01/01/2011 to 31/12/2011, M37/489, P37/7199, and P37/7212 - P37/72 |
| A93422 | 2012 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat Project Annual Report for the period 1 Feb 2011 to 31/01/2012, C202/2006, M37/326, 382, 480, P37/720 |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A89204 | 2011 | Terrain Minerals Ltd | Celtic | 14% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2010 TO 31/12/2010 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A89481 | 2011 | Terrain Minerals Ltd | Black Cat | <1% | BLACK CAT PROJECT, ANNUAL REPORT FOR THE PERIOD 01/02/2010 TO 31/01/2011, M37/326, M37/382, M37/480, P37/7200 |
| A89792 | 2011 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010 |
| A90352 | 2011 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A85496 | 2010 | St Barbara Ltd | McEast | <1% | McEast C162/2006 E37/496, Partial Surrender Report for the Period 22 September 2005 to 21 September 2009 |
| A87123 | 2010 | St Barbara Ltd | Leonora | <1% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A85881 | 2010 | Terrain Minerals Ltd | Celtic | 14% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A86226 | 2010 | Terrain Minerals Ltd | Black Cat | <1% | Black Cat JV Project 2009 Annual Report for the period 01/02/2009 to 31/01/2010, M37/326, M37/382, M37/480, P3 |
| A86577 | 2010 | Jabiru Metals Ltd | Teutonic Bore | <1% | Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009, |
| A81103 | 2009 | Terrain Minerals Ltd | CELTIC | 14% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A81243 | 2009 | Jabiru Metals Ltd | TEUTONIC BORE | <1% | TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008 |
| A81616 | 2009 | Terrain Minerals Ltd | BLACK CAT | <1% | BLACK CAT PROJECT ANNUAL REPORT FOR THE PERIOD 01/02/2008 TO 31/01/2009 M37/326, M37/382, M37/480, P37/7200 to |
| A78149 | 2008 | Jabiru Metals Ltd | Teutonic Bore | <1% | COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37 |
| A77450 | 2008 | Terrain Minerals Ltd | Wilson Creek-Garden Well-McEast | 14% | CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 M37/350, M37/488, M37/489, M37/513, M37/5 |
| A78842 | 2008 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E |
| A80228 | 2008 | Montezuma Mining Company Ltd | WEEBO | <1% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008 |
| A74353 | 2007 | Terrain Minerals Ltd | Wilson Creek-Garden Well-McEast | 14% | Celtic Project E37/251,M37/350,488-489,513-514,638,P37/6029, Annual Report for the Period 01/01/2006 to 31/12/ |
| A75283 | 2007 | St Barbara Ltd | Leonora | <1% | Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02) |
| A77253 | 2007 | Montezuma Mining Company Ltd | Weebo | <1% | Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007 |
| A74695 | 2007 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007 |
| A72388 | 2006 | Jabiru Metals Ltd | Teutonic Bore | <1% | Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti |
| A72988 | 2006 | St Barbara Mines Ltd | McEast - Robinsons | <1% | McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C |
| A68976 | 2004 | Sons Of Gwalia Ltd | McEast-Robinsons | 1.7% | McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004 |
| A65855 | 2003 | Sons Of Gwalia Ltd | Cambrian | <1% | Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3 |
| A66925 | 2003 | Sons Of Gwalia Ltd | Cambrian | <1% | CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294, |
| A66942 | 2003 | Sons Of Gwalia Ltd | McEast/ Robinsons | 6.5% | McEast/Robinsons Project C5/1996, Annual Report for the period 1 July 2001 to 30 June 2002,M37/350,326,382,480 |
| A67321 | 2003 | Sons Of Gwalia Ltd | Wilson Creek-Garden Well-McEast | 6.5% | Annual Report for the period 1 July 2002 to 30 June 2003 McEast/Robinsons Project C5/1996: M37/350,326,382,480 |
| A67747 | 2003 | Sons Of Gwalia Ltd | Cambrian | 4.4% | Surrender Report for the period 14/10/1992- 14/10/2003, Cambrian Project, C327/1995, P37/4402, P37/4434. |
| A67765 | 2003 | Pacmin Mining Corporation Ltd | Cambrian | <1% | Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37 |
| A64066 | 2002 | Sons Of Gwalia Ltd | McEast | 7.6% | 2000/01 Annual Report McEast Project area combined report for period 01/07/00 to 30/06/01 E37/251, E37/411, E3 |
| A64800 | 2002 | Sons Of Gwalia Ltd | Woodard | <1% | Woodard Prospect M37/489 2001/02 Annual Report For Period 16/02/01 to 15/02/02 Mount Margaret Mineral Field We |
| A62448 | 2001 | Pacmin Mining Corporation Ltd | Woodard | <1% | 2000/01 Annual Report Woodard Prospect M37/489 Report For Period 16/02/00 to 15/02/01 Mount Margaret Mineral F |
| A63376 | 2001 | Pacmin Mining Corporation Ltd | Cambrian | <1% | 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44 |
| A60954 | 2000 | Pacmin Mining Corporation Ltd | Woodard | <1% | 1999/2000 Annual Report, Woodard Prospect, M37/489, Report for Period 16/02/1999 to 15/02/2000, Mount Margaret |
| A60952 | 2000 | Pacmin Mining Corporation Ltd | Celtic | <1% | 1999/2000 Annual Report, Celtic Prospect, M37/350, Report for Period 10/01/1999 to 09/01/2000, Mount Margaret |
| A62610 | 2000 | Pacmin Mining Corporation Ltd | McEast | 9.6% | 1999/2000 Annual Report McEast Project Area E37/251,E37/411 E37/456, M37/382, M37/480, M37/488, P37/3870-P37/3 |
| A57477 | 1999 | Pacific Mining Corporation Ltd | Cambrian | <1% | Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434 |
| A57478 | 1999 | Pacific Mining Corporation Ltd | Celtic | <1% | Annual Report 1998-1999. Exploration and development of the Celtic Project Area. M37/250. |
| A58461 | 1999 | Pacmin Mining Corporation Ltd | Woodard | <1% | Woodard Project - Mt Margaret Mineral Field W.A. 15/02/98 - 14/02/99 M37/489 |
| A59088 | 1999 | Pacmin Mining Corporation Ltd | Robinsons/ McEast | 9.6% | Robinsons/McEast Project Area E37/251, 411, 456, M37/382 01/07/98-30/06/99 Mount Margaret Mineral Field |
| A59344 | 1999 | Pacmin Mining Corporation Ltd | Cambrian | <1% | Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/ |
| A55249 | 1998 | Tarmoola Australia Pty Ltd | Celtic | <1% | Annual Report 1997/1998, Celtic Project Area M37/350 Mount Margaret Mineral Field, Mount Malcolm District 37 W |
| A55684 | 1998 | Pacific Mining Corporation Ltd | McEast | <1% | Woodard Tenement, McEast Project Area, 15/02/97 - 14/02/98 Mount Margaret Mineral Field, Mount Malcolm Distric |
| A55963 | 1998 | Pacific Mining Corporation Ltd | Celtic | <1% | Celtic Project Area, Annual Report M37/350 Mt MArgaret Mineral Field, W.A. 10/01/96 - 09/01/97 |
| A56685 | 1998 | Pacific Mining Corporation Ltd | McEast | 3.9% | Annual report for 1997 and 1998 on the exploration of the McEast Project Area. 01/07/96-30/06/97 & 01/07/97-30 |
| A50583 | 1997 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Final Report Exploration Licence E37/247 for the period 18th December 1991 to 17th Dece |
| A50590 | 1997 | Mt Edon Gold Mines Aust Ltd | Wilson Creek | <1% | Annual report on the Exploration of the Woodard Tenement Wilson Creek Project Area for the reporting period - |
| A50936 | 1997 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical |
| A49707 | 1996 | Mt Edon Gold Mines Aust Ltd | Leonora | <1% | Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294 |
| A47244 | 1996 | Goldfields Exploration Pty Ltd | Teutonic Bore | <1% | Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te |
| A49404 | 1996 | Mt Edon Gold Mines Aust Ltd | Wilson Creek | <1% | Annual report on Exploration of the Wilson Creek Project area West E37/183 M37/493 to M37/495 E37/200 E37/261 |
| A50390 | 1996 | Mt Edon Gold Mines Aust Ltd | Celtic | <1% | Annual report M37/350 (Celtic Project Area) for the period 10/01/95 to 09/01/96 Mount Margaret Mineral Field W |
| A44162 | 1995 | Pancontinental Gold Operations Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/ |
| A48976 | 1995 | Mt Edon Gold Mines Aust Ltd | Cambrian | <1% | Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J |
| A49902 | 1995 | Mt Edon Gold Mines Aust Ltd | Celtic | <1% | Annual report on the Exploration of the Celtic Project area M37/350 Mount Margaret Mineral Field Western Austr |
| A46039 | 1995 | Mt Edon Gold Mines Aust Ltd | Wilson Creek | 1.9% | Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3 |
| A42934 | 1994 | Mt Edon Gold Mines Nl | Wilson Creek | 1.9% | Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3 |
| A40253 | 1993 | Mim Exploration Pty Ltd | Junior Hill | <1% | Junior Hill Project, Annual Report for the year ending 17th December 1993, E37/247. |
| A38799 | 1993 | Mt Edon Gold Mines Nl | Wilson Creek | 1.9% | Annual Report for the period 06/92-05/93 Wilson Creek Project |
| A37540 | 1992 | Mim Exploration Pty Ltd | Junior Hill | <1% | Junior Hill Project, Annual Report for the year ending December 17th 1992, E37/247. |
| A10299 | 1981 | Seltrust Mining Corp Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3 |
| A21875 | 1978 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648- |
| A7295 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A82836 | 1753 | St Barbara Ltd | Leonora | <1% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235, |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 37/638 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 37/638? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.