NextMapsWA TenementsM 37/638

M 37/638

LiveMining LeaseShire of LeonoraMt. Malcolm District
Area
401.9ha
Expires
Jan 2043
in 16 years
WAMEX reports
100
WA median is 53
Report drilling
63
of 100 reports
Leonora Explore on the live map

Register summary

Holder
Northern Star (Sr Mining) Pty Ltd
Local government
Shire of Leonora
Application received
16 Aug 1996
Commenced
10 Jan 2001
Expiry
9 Jan 2043
Term
21 Years (Renewed)

Exploration history on this ground

100 historical WAMEX exploration reports intersect M 37/638: 36 report geochemistry or sampling, 57 include a digital data package.
When this ground was worked · 98 of 100 reports dated
21970s
11980s
241990s
272000s
402010s
42020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154695 2026 Northern Star Resources Ltd P37/9079 <1% Final Surrender Report on P37/9079 for the period 16 April 2018 to 15 April 2026, (C28/2012).
A124133 2020 Sr Mining Pty Ltd Celtic Project 15% Celtic Project (C28/2012) Annual Report for the Period 1 April 2019 to 31 March 2020
A125341 2020 Round Oak Minerals Pty Ltd Teutonic Bore 2.2% Annual Report for E37/1306 Teutonic Bore Project for the period 13 September 2019 to 12 September 2020
A123220 2020 Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd Teutonic Bore Project <1% Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019
A119556 2019 Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd Teutonic Bore <1% C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018
95 more reports
A120292 2019 Williams S Celtic <1% Annual Report Celtic Project P37/9079 for the period 16 April 2018 to 15 April 2019
A120118 2019 Bligh Resources Limited Bundarra 15% Annual Report Bundarra Project C28/2012 for the period 1 April 2018 to 31 March 2019, M37/00350, M37/00488, M3
A121652 2019 Round Oak Jaguar Pty Ltd Teutonic Bore 2.2% Annual Report for E37/1306 Teutonic Bore Project 13 September 2018 to 12 September 2019
A118195 2018 Round Oak Jaguar Pty Ltd Teutonic Bore 2.2% Annual Report on E37/1306, Teutonic Bore Project, 13 September 2017 to 12 September 2018
A115994 2018 Independence Group Nl Teutonic Bore <1% Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2
A117050 2018 Bligh Resources Limited Bundarra 15% Annual Report C28/2012 Bundarra Project for the period 1 April 2017 to 31 March 2018, M37/00350, M37/00488, M3
A112037 2017 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016
A114129 2017 S R Mining Pty Ltd; Bligh Resources Limited Celtic 15% Celtic Project, Annual Report Covering 01/04/2016 to 31/03/2017, Combined Reporting Number C28/2012 for P37/83
A115151 2017 Bligh Resources Limited Bundarra <1% Surrender Report Bundarra Project P37/8306 for the period 15/05/2013 - 12/09/2017
A107737 2016 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015
A108840 2016 Sr Mining Pty Ltd; Bligh Resources Limited Celtic 23% Celtic Project Annual Report Covering 01/04/2015 – 31/03/2016 Combined Reporting Number C28/2012 For M37/350,
A109842 2016 Sr Mining Pty Ltd Bundarra 15% Bundarra Project C28/2012 Annual Report for the period 01/04/2015 to 31/03/2016, M37/00350, M37/00488, M37/005
A105903 2015 Sr Mining Pty Ltd Celtic 23% Annual Report for Celtic Project (M37/350,M37/488, M37/513, M37/514 and M37/638) for the period 1 April 2014 -
A105028 2015 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014,
A106044 2015 Sr Mining Pty Ltd; Bligh Resources Limited Bundarra - Celtic <1% Annual Report for P37/8306 Bundarra/Celtic Project covering the period 15/05/2014 - 14/05/2015
A101735 2014 Terrain Minerals Ltd Bundarra - Celtic <1% Bundarra - Celtic Project, M37/489, Final Surrender Report Report for the period 16/02/1995 - 17/03/2014.
A102069 2014 Independence Group Nl Teutonic Bore <1% Final Surrender Report on E37/914, part of Combined Reporting Group C157/2002, Teutonic Bore Project, for the
A103846 2014 Sr Mining Pty Ltd Bundarra <1% Bundarra Project Surrender Report for Tenement P37/8363 For the Period 09/09/2013 to 08/09/2014
A101281 2014 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013,
A101420 2014 Terrain Minerals Ltd Black Cat <1% Black Cat Project C202/2006 Annual Exploration Report for the Combined Reporting Group C202/2006 (E37/667, M37
A102616 2014 Sr Mining Pty Ltd Celtic - Bundarra <1% ANNUAL REPORT FOR P37/8306 BUNDARRA/ CELTIC PROJECT COVERING THE REPORTING PERIOD 15/05/2013 – 14/05/2014
A102399 2014 Bligh Resources Limited; Sr Mining Pty Ltd Celtic 23% Celtic Project, Annual Report for the period 01/04/2013 to 31/03/2014, M37/54, 350, 488, 513-514 & 638. [C28/2
A97108 2013 Terrain Minerals Ltd Black Cat <1% Black Cat Project Annual Report for the period 01/02/2012 to 31/01/2013, M37/326, M37/382, M37/480, P37/7200 t
A98355 2013 Bligh Resources Limited Celtic 23% M37/54, M37/350,M37/488, M37/513, M37/514 and M37/638 Annual Report for Celtic Project covering the period 01/
A98608 2013 Independence Group Nl Teutonic Bore <1% Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37
A97747 2013 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012,
A93160 2012 Terrain Minerals Ltd Celtic <1% Celtic Project Annual report for the period 01/01/2011 to 31/12/2011, M37/489, P37/7199, and P37/7212 - P37/72
A93422 2012 Terrain Minerals Ltd Black Cat <1% Black Cat Project Annual Report for the period 1 Feb 2011 to 31/01/2012, C202/2006, M37/326, 382, 480, P37/720
A93519 2012 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011
A94121 2012 Sr Mining Pty Ltd Celtic 23% Celtic Project annual report for the period 01/04/2011 - 31/03/2012 M37/350, M37/488, M37/513, M37/514, M37/54
A89204 2011 Terrain Minerals Ltd Celtic 14% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2010 TO 31/12/2010 M37/350, M37/488, M37/489, M37/513, M37/5
A89481 2011 Terrain Minerals Ltd Black Cat <1% BLACK CAT PROJECT, ANNUAL REPORT FOR THE PERIOD 01/02/2010 TO 31/01/2011, M37/326, M37/382, M37/480, P37/7200
A89792 2011 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010
A90352 2011 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep
A85496 2010 St Barbara Ltd McEast <1% McEast C162/2006 E37/496, Partial Surrender Report for the Period 22 September 2005 to 21 September 2009
A85881 2010 Terrain Minerals Ltd Celtic 14% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 M37/350, M37/488, M37/489, M37/513, M37/5
A86226 2010 Terrain Minerals Ltd Black Cat <1% Black Cat JV Project 2009 Annual Report for the period 01/02/2009 to 31/01/2010, M37/326, M37/382, M37/480, P3
A86577 2010 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009,
A87123 2010 St Barbara Ltd Leonora <1% Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37
A81103 2009 Terrain Minerals Ltd CELTIC 14% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008 M37/350, M37/488, M37/489, M37/513, M37/5
A81243 2009 Jabiru Metals Ltd TEUTONIC BORE <1% TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008
A81616 2009 Terrain Minerals Ltd BLACK CAT <1% BLACK CAT PROJECT ANNUAL REPORT FOR THE PERIOD 01/02/2008 TO 31/01/2009 M37/326, M37/382, M37/480, P37/7200 to
A78149 2008 Jabiru Metals Ltd Teutonic Bore <1% COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37
A78842 2008 St Barbara Ltd Leonora <1% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E
A80228 2008 Montezuma Mining Company Ltd WEEBO <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008
A77450 2008 Terrain Minerals Ltd Wilson Creek-Garden Well-McEast 14% CELTIC PROJECT ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 M37/350, M37/488, M37/489, M37/513, M37/5
A74353 2007 Terrain Minerals Ltd Wilson Creek-Garden Well-McEast 14% Celtic Project E37/251,M37/350,488-489,513-514,638,P37/6029, Annual Report for the Period 01/01/2006 to 31/12/
A74695 2007 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007
A75283 2007 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02)
A77253 2007 Montezuma Mining Company Ltd Weebo <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007
A72388 2006 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti
A72988 2006 St Barbara Mines Ltd McEast - Robinsons <1% McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C
A68976 2004 Sons Of Gwalia Ltd McEast-Robinsons 1.7% McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004
A65855 2003 Sons Of Gwalia Ltd Cambrian <1% Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3
A67765 2003 Pacmin Mining Corporation Ltd Cambrian <1% Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37
A66925 2003 Sons Of Gwalia Ltd Cambrian <1% CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294,
A66942 2003 Sons Of Gwalia Ltd McEast/ Robinsons 6.5% McEast/Robinsons Project C5/1996, Annual Report for the period 1 July 2001 to 30 June 2002,M37/350,326,382,480
A67321 2003 Sons Of Gwalia Ltd Wilson Creek-Garden Well-McEast 6.5% Annual Report for the period 1 July 2002 to 30 June 2003 McEast/Robinsons Project C5/1996: M37/350,326,382,480
A67747 2003 Sons Of Gwalia Ltd Cambrian 4.4% Surrender Report for the period 14/10/1992- 14/10/2003, Cambrian Project, C327/1995, P37/4402, P37/4434.
A64800 2002 Sons Of Gwalia Ltd Woodard <1% Woodard Prospect M37/489 2001/02 Annual Report For Period 16/02/01 to 15/02/02 Mount Margaret Mineral Field We
A64066 2002 Sons Of Gwalia Ltd McEast 7.6% 2000/01 Annual Report McEast Project area combined report for period 01/07/00 to 30/06/01 E37/251, E37/411, E3
A62448 2001 Pacmin Mining Corporation Ltd Woodard <1% 2000/01 Annual Report Woodard Prospect M37/489 Report For Period 16/02/00 to 15/02/01 Mount Margaret Mineral F
A63376 2001 Pacmin Mining Corporation Ltd Cambrian <1% 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44
A60952 2000 Pacmin Mining Corporation Ltd Celtic <1% 1999/2000 Annual Report, Celtic Prospect, M37/350, Report for Period 10/01/1999 to 09/01/2000, Mount Margaret
A62610 2000 Pacmin Mining Corporation Ltd McEast 9.6% 1999/2000 Annual Report McEast Project Area E37/251,E37/411 E37/456, M37/382, M37/480, M37/488, P37/3870-P37/3
A60954 2000 Pacmin Mining Corporation Ltd Woodard <1% 1999/2000 Annual Report, Woodard Prospect, M37/489, Report for Period 16/02/1999 to 15/02/2000, Mount Margaret
A57477 1999 Pacific Mining Corporation Ltd Cambrian <1% Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434
A58461 1999 Pacmin Mining Corporation Ltd Woodard <1% Woodard Project - Mt Margaret Mineral Field W.A. 15/02/98 - 14/02/99 M37/489
A59088 1999 Pacmin Mining Corporation Ltd Robinsons/ McEast 9.6% Robinsons/McEast Project Area E37/251, 411, 456, M37/382 01/07/98-30/06/99 Mount Margaret Mineral Field
A57478 1999 Pacific Mining Corporation Ltd Celtic <1% Annual Report 1998-1999. Exploration and development of the Celtic Project Area. M37/250.
A59344 1999 Pacmin Mining Corporation Ltd Cambrian <1% Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/
A55684 1998 Pacific Mining Corporation Ltd McEast <1% Woodard Tenement, McEast Project Area, 15/02/97 - 14/02/98 Mount Margaret Mineral Field, Mount Malcolm Distric
A55249 1998 Tarmoola Australia Pty Ltd Celtic <1% Annual Report 1997/1998, Celtic Project Area M37/350 Mount Margaret Mineral Field, Mount Malcolm District 37 W
A55963 1998 Pacific Mining Corporation Ltd Celtic <1% Celtic Project Area, Annual Report M37/350 Mt MArgaret Mineral Field, W.A. 10/01/96 - 09/01/97
A56685 1998 Pacific Mining Corporation Ltd McEast 3.9% Annual report for 1997 and 1998 on the exploration of the McEast Project Area. 01/07/96-30/06/97 & 01/07/97-30
A50583 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Final Report Exploration Licence E37/247 for the period 18th December 1991 to 17th Dece
A50590 1997 Mt Edon Gold Mines Aust Ltd Wilson Creek <1% Annual report on the Exploration of the Woodard Tenement Wilson Creek Project Area for the reporting period -
A50936 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical
A47244 1996 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te
A49404 1996 Mt Edon Gold Mines Aust Ltd Wilson Creek <1% Annual report on Exploration of the Wilson Creek Project area West E37/183 M37/493 to M37/495 E37/200 E37/261
A49707 1996 Mt Edon Gold Mines Aust Ltd Leonora <1% Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294
A50390 1996 Mt Edon Gold Mines Aust Ltd Celtic <1% Annual report M37/350 (Celtic Project Area) for the period 10/01/95 to 09/01/96 Mount Margaret Mineral Field W
A44162 1995 Pancontinental Gold Operations Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/
A48976 1995 Mt Edon Gold Mines Aust Ltd Cambrian <1% Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J
A49902 1995 Mt Edon Gold Mines Aust Ltd Celtic <1% Annual report on the Exploration of the Celtic Project area M37/350 Mount Margaret Mineral Field Western Austr
A46039 1995 Mt Edon Gold Mines Aust Ltd Wilson Creek 1.9% Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3
A42934 1994 Mt Edon Gold Mines Nl Wilson Creek 1.9% Annual report on the Exploration of the Wilson Creek Project area P37/3917 to P37/3920 P37/3870 to P37/3873 P3
A38799 1993 Mt Edon Gold Mines Nl Wilson Creek 1.9% Annual Report for the period 06/92-05/93 Wilson Creek Project
A40253 1993 Mim Exploration Pty Ltd Junior Hill <1% Junior Hill Project, Annual Report for the year ending 17th December 1993, E37/247.
A37540 1992 Mim Exploration Pty Ltd Junior Hill <1% Junior Hill Project, Annual Report for the year ending December 17th 1992, E37/247.
A10299 1981 Seltrust Mining Corp Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3
A21875 1978 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648-
A7295 1977 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4
A82836 1753 St Barbara Ltd Leonora <1% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235,
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
16 years · 9 Jan 2043
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over M 37/638 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold M 37/638? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.