NextMaps›WA Tenements›M 39/232

M 39/232

LiveMining LeaseShire of LeonoraMt. Morgans District

M 39/232 is a live mining lease in the Shire of Leonora, Western Australia, held by Anglogold Ashanti Australia Limited and Northern Star (Carosue Dam) Pty Ltd (part of AngloGold Ashanti). Granted on 11 Sept 1990 for 21 years (renewed), it expires on 10 Sept 2032. The ground is covered by 79 historical WAMEX reports.

Area
94.485ha
Expires
Sept 2032
in 6 years
WAMEX reports
79
WA median is 53
Report drilling
59
of 79 reports
Free Tenure Pack for M 39/232
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For M 39/232 that covers 79 WAMEX reports · 64 open-file drillholes (3,406 m drilled) · 18 earlier titles on the ground since 1926 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Leonora Explore on the live map

Register summary

Holders
Anglogold Ashanti Australia Limited, Northern Star (Carosue Dam) Pty Ltd
Part of
AngloGold Ashanti, Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
Local government
Shire of Leonora
Application received
11 June 1990
Commenced
11 Sept 1990
Expiry
10 Sept 2032
Term
21 Years (Renewed)

The full record on M 39/232

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares, and all 13 changes of holder
  • The full record: 37 years of expenditure, 18 conditions and 2 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (25 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

79 historical WAMEX exploration reports intersect M 39/232: 42 report geochemistry or sampling, 53 include a digital data package.
Work on record: RC drilling 31 · Rock chip sampling 28 · Diamond drilling 26 · Mineral resource estimate 20 · Soil sampling 20 · Rotary drilling 18. Resource declared in A108161 (2016), A101830 (2014), A97624 (2013), A93583 (2012) and 16 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on M 39/232, free for new accounts.
When this ground was worked · 76 of 79 reports dated
61960s
61970s
41980s
161990s
172000s
212010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A148374 2025 Anglogold Ashanti Australia Limited Butcher Well JV <1% Butcher Well JV (E39/1875) Partial Surrender Report for the period ending 21/02/2025.
A135977 2023 Anglogold Ashanti Australia Limited Butcher Well 1.2% Butcher Well JV (E39/1410) Partial Surrender Report for the period 23/07/2009 to 22/07/2023
A129296 2022 Anglogold Ashanti Australia Limited Butcher Well JV Group <1% Butcher Well JV (E39/1875) Compulsory Partial Surrender Report to the Department of Mines, Industry Regulation
A128442 2021 Anglogold Ashanti Australia Limited; Northern Star Resources Butcher Well 1.2% Butcher Well JV (E39/1410) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety
A122816 2020 Anglogold Ashanti Australia Limited Butcher Well <1% Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019
74 more reports
A122817 2020 Anglogold Ashanti Australia Limited Otway <1% Otway (C145/2018) Annual Group Report for the period ending 31/12/2019
A119199 2019 Anglogold Ashanti Australia Limited Butcher Well <1% Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018
A119201 2019 Anglogold Ashanti Australia Limited Otway <1% Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A115966 2018 Anglogold Ashanti Australia Limited Butcher Well <1% Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A112355 2017 Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi Butcher Well <1% Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312
A108266 2016 Saracen Gold Mines Pty Ltd Mount Howe <1% Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E
A108161 2016 Saracen Gold Mines Pty Ltd Butcher Well - Mount Minnie- Mount Flore <1% VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015,
A105467 2015 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I
A106102 2015 Saracen Gold Mines Pty Ltd Mount Howe <1% Mount Howe Project Exploration Licence 39/1403 Surrender Report for the Period 23 July 2009 to the 9 April 201
A107019 2015 Saracen Gold Mines Pty Ltd Mount Howe 4.7% Exploration License 39/1504 (Mount Howe) Surrender Report for the Period 27 July 2010 to 26 July 2015
A105466 2015 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063
A101784 2014 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I
A101830 2014 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39
A97624 2013 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279;
A97466 2013 Saracen Gold Mines Pty Ltd Mount Howe <1% MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007.
A93045 2012 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011
A93583 2012 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011
A89379 2011 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010
A89855 2011 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project Annual Report for the period 01 January 2010 to December 2010
A86442 2010 Saracen Gold Mines Pty Ltd Butcher Well <1% BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993)
A86118 2009 Rubicon Resources Ltd Mount Howe <1% Combined Annual Technical Report Mt Howe Project, 1st January 2009 – 31 December 2009, E39/1132, 1182, 1317, 1
A78034 2008 Saracen Gold Mines Pty Ltd Butcher Well <1% BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678
A78141 2008 Minara Resources Ltd Murrin Murrin East <1% TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997
A74902 2007 Minara Resources Ltd Murrin Murrin East <1% Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2
A75083 2007 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993)
A72256 2006 Minara Resources Ltd Eucalyptus / Murrin Murrin East <1% Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar
A71147 2005 Minara Resources Ltd Camelback 1.1% TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August
A69663 2005 Sons Of Gwalia Ltd Butcher Well <1% Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449
A68195 2004 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39
A66524 2003 Sons Of Gwalia Ltd Butcher Well <1% Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423,
A67427 2003 Anaconda Operations Pty Ltd Camelback 1.1% Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312
A64070 2002 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344,
A64638 2002 Anaconda Nickel Ltd Camelback 1.1% Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p
A65603 2002 Anaconda Nickel Ltd Camelback 1.1% Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For
A62854 2001 Sons Of Gwalia Ltd Camelback / Butcher Well / Linden <1% Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3
A61380 2000 Anaconda Nickel Ltd Camelback 1.1% Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999
A61790 2000 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1
A58497 1999 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475
A59148 1999 Anaconda Nickel Ltd Camelback 1.1% Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999
A54584 1998 Mount Burgess Mining Nl Butcher Well <1% Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1
A56201 1998 Homestake Gold Of Australia Ltd Camelback Bore 1.1% Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374
A50531 1997 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme
A52508 1997 Plutonic Operations Ltd Camelback Bore 1.1% Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647,
A53120 1997 Plutonic Operations Ltd Camelback Bore 1.1% Camelback Bore Project, Partial Surrender Report, December 1997, E39/374
A47727 1996 Sons Of Gwalia Ltd Camelback-Butcher Well <1% Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R
A43925 1995 Mount Burgess Mining Nl Butcher Well <1% Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232
A45800 1995 Dominion Mining Ltd Camelback Bore 1.1% Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995
A40601 1994 Mount Burgess Mining Nl Camelback, Butcher Well, Linden <1% Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93
A42793 1994 Dominion Mining Ltd Camelback Bore 1.1% Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994
A38219 1993 Mount Burgess Mining Nl Camelback - Butcher Well North 4.4% Annual report for the period ending 30/09/92 Butcher Well/Camelback Gold Project M39/118-120 M39/230 M39/232
A39628 1993 Mount Burgess Mining Nl Camelback - Butcher Well North 4.4% Camelback - Butcher Well North Project, Annual Report for the period 30th September 1993, M39/118-120, 230 & 2
A34829 1991 Mim Exploration Pty Ltd Camelback 4.4% Annual report for the period ending 30/09/91 Camelback Project M39/118 to M39/120 M39/230 M39/232 MIM Explorat
A33077 1991 Western Mining Corporation Ltd Camelback 4.4% Annual report on Camelback Project M39/118 to M39/120, M39/232 for the period 05/10/89 to 04/10/90 WMC
A28980 1989 Western Mining Corporation Ltd Camelback <1% Annual report on Camelback M39/118, M39/119, M39/120, E39/64, and P39/2187. 5 October 1988 to 4 October 1989.
A25868 1988 Western Mining Corporation Ltd Camelback <1% Annual report on Camelback. E39/64. M39/118 to M39/120 Period 05 October 1987 to 4 October 1988
A9922 1981 Mr Porter B New Era 34% New Era Project, Annual Report for period ending 28th April 1981, GML39/674.
A9551 1980 Swan Resources Ltd Camel Back Range <1% Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H.
A3932 1973 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37
A2782 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H.
A2829 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H.
A3618 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3
A941 1971 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H.
A271 1970 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H.
A1121 1969 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on
A1122 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the
A1123 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re
A270 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep
A269 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H.
A268 1967 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H.
A85883 1753 Saracen Gold Mines Pty Ltd Butcher Well 12% M39/232 – BUTCHER WELL PROJECT PARTIAL SURRENDER REPORT – 11 SEPTEMBER 1990 TO 23 SEPTEMBER 2009
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A81890 1753 Saracen Gold Mines Pty Ltd BUTCHER WELL <1% BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over M 39/232 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold M 39/232? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.