M 40/166
M 40/166 is a live mining lease in the Shire of Menzies, Western Australia, held by Ulysses Mining Pty Ltd (part of Genesis Minerals Limited). Granted on 29 Jan 2001 for 21 years (renewed), it expires on 28 Jan 2043. The ground is covered by 94 historical WAMEX reports.
Register summary
- Holder
- Ulysses Mining Pty Ltd
- Part of
- Genesis Minerals Limited (ASX:GMD) as at 2026-06-30
- Local government
- Shire of Menzies
- Application received
- 30 June 1995
- Commenced
- 29 Jan 2001
- Expiry
- 28 Jan 2043
- Term
- 21 Years (Renewed)
The full record on M 40/166
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 7 changes of holder
- The full record: 26 years of expenditure, 63 conditions and 4 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (32 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A131631 | 2022 | Ulysses Mining Pty Ltd | Leonora South | 99% | Final Report for the Government EIS Co-Funded Drilling across M40/166 for the Period 01 June 2021 to 31 May 20 |
| A122775 | 2020 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | Annual Technical Report, C130/2009 North kookynie project for the period 1 January 2019 to 31 December 2019 |
| A124444 | 2020 | Genesis Minerals Limited | Leonora South | 4.7% | Annual Report for Leonora South C274/2011 for the period ending 03/05/2020 |
| A119204 | 2019 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | Annual Technical Report C130/2009 North Kookynie Project for the period 1 January 2018 to 31 December 2018 |
| A120635 | 2019 | Genesis Minerals Limited | Leonora South | 5% | Annual Report for Leonora South project C274/2011 for the period 4 May 2018 to 3 May 2019,E 40/00295,E 40/0031 |
89 more reports
| A121461 | 2019 | Genesis Minerals Ltd | Leonora South | 7.4% | E40/312 Leonora South Project Partial Surrender for the period 27 August 2013 to 26 August 2019 |
| A115988 | 2018 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project C130/2009 - Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A115823 | 2018 | Ulysses Mining Pty Ltd | Leonora South | 5% | Leonora South Project Partial Surrender For E40/295 for the period 14 October 2011 to 11 October 2017 |
| A117324 | 2018 | Ulysses Mining Pty Ltd | Leonora South | 5.4% | Annual Report for Leonora South C274/2011 For the Period 4 May 2017 to 3 May 2018, E40/00295, E40/00312, M40/0 |
| A112097 | 2017 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project Annual Technical Report C130/2009 for the period 1 January 2016 to 31 December 2016, E4 |
| A114399 | 2017 | Genesis Minerals Limited | Leonora South | 5.4% | Annual Report for Leonora South C274/2011, M40/00166, E40/00312, E40/00295 for the period 4 May 2016 to 3 May |
| A108113 | 2016 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 NORTH KOOKYNIE [C130/2009 (E 40/00229.....P 40 |
| A109584 | 2016 | Ulysses Mining Pty Ltd | Leonora South | 5.4% | Annual Report for Leonora South |
| A104837 | 2015 | A & C Mining Investment Pty Ltd | North Kookynie | <1% | North Kookynie Project, Annual Report for the period 01/01/2014 to 31/12/2014, C130/2009, E40/229......P 40/12 |
| A106691 | 2015 | Genesis Minerals Limited | South Leonora | 5.4% | South Leonora Project C274/2011, E40/295, E40/312 Annual Report for the period 1 June, 2014 to 31 May, 2015 |
| A105579 | 2015 | St Barbara Ltd | Leonora | 3% | Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April |
| A101709 | 2014 | Nex Metals Explorations Limited | Kookynie North | <1% | Annual Technical Report Kookynie North Project C130/2009 for the period 01 January – 31 December 2013, E40/229 |
| A102258 | 2014 | St Barbara Ltd | Leonora | 1.8% | Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April |
| A103714 | 2014 | Resource Assets Pty Ltd | South Leonora | 5.4% | SOUTH LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 4 MAY, 2013 to 3 MAY, 2014 E40/295, E40/312 Combined Report |
| A97421 | 2013 | Nex Metals Explorations Limited | North Kookynie | <1% | North Kookynie Project, Annual Report for the period 01/01/2012 to 31/12/2012, E40/229, 263, 291 & 306; M40/3. |
| A98017 | 2013 | St Barbara Ltd | Leonora | 2% | Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41 |
| A99067 | 2013 | Midas Resources Ltd | South Leonora | 3.1% | South Leonora C274/2011 (E40/294, E40/295, P40/1282) Annual Report to the Department of Mines and Petroleum fo |
| A93278 | 2012 | Nex Metals Explorations Limited | Kookynie North | <1% | Kookynie North Project, Annual Report for the period 01/01/2011 to 31/12/2011, E40/229; M40/3, 20............ |
| A94374 | 2012 | Midas Resources Ltd | South Leonora | 3.1% | South Leonora Project Annual Report To the Department of Mines and Petroleum For the period 04/05/2011 – 03/0 |
| A94816 | 2012 | Nex Metals Explorations Limited | Kookynie North | <1% | Annual Technical Report Kookynie North Project for the period 01 January – 31 December 2011 C130/2009 E 40/229 |
| A93822 | 2012 | St Barbara Ltd | Leonora | 1.7% | Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012 |
| A89824 | 2011 | Nex Metals Explorations Ltd | Kookynie North | <1% | Annual Technical Report Kookynie North Project C130/2009, Period: 01 January – 31 December 2010 |
| A90352 | 2011 | St Barbara Ltd | Leonora | 1.4% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A86198 | 2010 | Nex Metals Explorations Ltd | Kookynie North | <1% | Annual Technical Report Kookynie North Project, Combined Reporting Number C130/2009, Report Period: 01 January |
| A87092 | 2010 | Crucible Resources Pty Ltd | Kookynie | 7.4% | Annual Report Kookynie Exploration Licence 40/231 WA Period 9 March 2009 to 8 March 2010 |
| A87123 | 2010 | St Barbara Ltd | Leonora | 1.4% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A77285 | 2008 | Crucible Resources Pty Ltd | Kookynie | 6% | ANNUAL REPORT KOOKYNIE EXPLORATION LICENCE 40/056 PERIOD 28 December 2006 to 27 December 2007 |
| A78842 | 2008 | St Barbara Ltd | Leonora | 2% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E |
| A81963 | 2008 | Kookynie Partnership Nl | TAMPA | <1% | TAMPA PROJECT, Annual Report, period: 1 January, 2008 to 31st December, 2008 (C49/2001) |
| A77970 | 2008 | Norilsk Nickel Australia Ltd | Kookynie | 45% | Kookynie Project, Final Surrender Report for the period 10/10/2006 to 28/11/2007, E40/131. |
| A78150 | 2008 | Kookynie Resources Nl | Tampa | <1% | TAMPA PROJECT Annual Report GSWA C049/2001, M3820/1 Reporting period: 1 January, 2007 to 31st December, 2007 |
| A81642 | 2008 | Crucible Resources Pty Ltd | KOOKYNIE | 6% | ANNUAL REPORT KOOKYNIE EXPLORATION LICENCE 40/056, WESTERN AUSTRALIA, PERIOD 29 October 2007 to 28 October 200 |
| A74401 | 2007 | Kookynie Resources Nl | Tampa | <1% | Tampa Project C49/2001 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 (Menzies) |
| A76140 | 2007 | Norilsk Nickel Australia Ltd | Kookynie-Melita | 5.3% | Surrender Report E40/46 for the period to 17 August 2007 (Kookynie - Melita Project) |
| A74307 | 2007 | Kookynie Resources Nl | Coronation Well | 6% | Coronation Well Project E40/56, Annual Report, Period 28 October 2005 to 27 October 2006, (Menzies). |
| A75283 | 2007 | St Barbara Ltd | Leonora | 2.5% | Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02) |
| A76642 | 2007 | Dalrymple Resources Nl | Melita | 5.3% | Extension of Term Report for Melita E40/46 Menzies SH51-5, WA Year 8 - 1999 |
| A72278 | 2006 | Kookynie Resources Nl | Tampa | <1% | Tampa Project, Annual Report C49/2001, Period 1 January 2005 to 31 December 2005, (Menzies). |
| A70486 | 2005 | Dalrymple Resources Nl | Kookynie - Melita | 5.3% | Annual report on the Kookynie - Melita project for the period 6 May 2004 to 5 May 2005, E40/46, East Murchison |
| A69721 | 2005 | Barminco Pty Ltd | Coronation Well | 6% | Annual report for the period 13/05/03 - 27/10/04 Coronation Well Project, Kookynie Partnership, C150/1994, E40 |
| A70097 | 2005 | Kookynie Resources Nl | Tampa | <1% | Annual report for the period 01/01/04 - 31/12/04 Tampa Project, C49/2001, M40/03, M40/20, M40/50, M40/99, M40/ |
| A70253 | 2005 | Sons Of Gwalia Ltd | Dalrymple-Melita | 99% | Annual report for the period 29/01/04 - 28/01/05 Dalrymple-Melita joint venture project, M40/166, Leonora, Rep |
| A68781 | 2004 | Dalrymple Resources Nl | Niagra-George Bore | 5.3% | Annual report on the Niagara - George Bore Project for the period 6th May 2003 to 5th May 2004, E40/0046 |
| A67935 | 2004 | Sons Of Gwalia Ltd | Dalrymple/ Melita | 99% | Annual Report for the period 29/01/2003- 28/01/2004 Dalrymple-Melita JV Project M40/166 |
| A68012 | 2004 | Kookynie Resources Nl | Tampa | <1% | Annual report for the period 01/01/2003-31/12/2003 Tampa Project(C49/2001), M40/20, M40/50, M40/99, M40/101 M4 |
| A66518 | 2003 | Diamond Ventures Exploration Pty Ltd | Tampa | <1% | Annual Report 1st January 2002 to 31st December 2002 Tampa Project C49/2001: M40/20, 50, 99, 101, 107, 110, 12 |
| A66689 | 2003 | Diamond Ventures Exploration Pty Ltd | Coronation Well | 6% | Annual Report 13th May 2002 to 12th May 2003, Coronation Well Project, E40/56. [C150/1994] |
| A66841 | 2003 | Kookynie Resources Nl | Coronation Well | 6% | Annual Report for the period 13 May 2001 to 12 May 2002 ,Coronation Well Project, E40/56. [C150/1994] |
| A67034 | 2003 | Dalrymple Resources Nl | Melita | 5.3% | Annual Report 2003, Melita Project, E40/46 ,for the period 6 May 2002 to 5 May 2003. |
| A64037 | 2002 | Sons Of Gwalia Ltd | Melita | 3.1% | Annual Report for the period 5 Nov 2000 - 4 Nov 2001 Melita JV tenements E40/046, E40/065, E40/066, E40/111, E |
| A64599 | 2002 | Kookynie Resources Nl | Tampa | <1% | Tampa Project. Combined Reporting Group All Tenements Annual Report GSWA Report C49/2001 Reporting Period: 1 J |
| A64745 | 2002 | Sons Of Gwalia Ltd | Melita | <1% | Melita Project, Partial Surrender Report for the period 10th September 1993 to 2nd April 2002, E40/65 & E40/ |
| A65772 | 2002 | Sons Of Gwalia Ltd | Ulysses | 99% | Ulysses Project. Dalrymple - Melita JV. Annual Report For The Period 5 November 2001 - 4 November 2002. Teneme |
| A62191 | 2001 | Kookynie Resources Nl | Kookynie | <1% | Annual Report Butterfly Project reporting period: 1 January 2000 to 31 December 2000 combined reporting group, |
| A62530 | 2001 | Sons Of Gwalia Ltd | Melita | 3.1% | Melita Project, Annual Report For The Period 1 January 1997 - 4 November 2000 Tenements: E40/46, E40/65-66 E40 |
| A63190 | 2001 | Kookynie Resources Nl | Coronation Well | 6% | Coronation Well Project, E40/56 [ C150/1994] Annual Report for the period: 13 May 2000 to 12 May 2001, E40/5 |
| A59833 | 2000 | Kookynie Resources Nl | Coronation Well | 6% | Coronation Well Project , Annual Report for the period 13/05/1998 to 12/05/1999, E40/56 & M40/134.[C150/1994] |
| A59864 | 2000 | Kookynie Resources Nl | Butterfly | <1% | Butterfly project, Annual Report, Butterfly, 31/01/2000, Tenement M40/99,101,110, GML 40/1074, P40/989,1054,95 |
| A61089 | 2000 | Kookynie Resources Nl | Coronation Well | 6% | Coronation Well Project Annual Technical Report due on 12 July 2000, Reporting Period 13 May 1999 to 12 May 20 |
| A61418 | 2000 | Sons Of Gwalia Ltd | Melita | 1.4% | Melita Project, Annual Report for the Period 15/09/1997 to 14/09/2000, E40/65. |
| A57431 | 1999 | Kookynie Resources Nl | Butterfly | <1% | Butterfly Project Annual Report for 31/01/1999 |
| A56707 | 1998 | Dalrymple Resources Nl | Snowy Melita | 5.3% | Snowy Melita Project, Partial Surrender Report, November 1998,E40/46. |
| A53805 | 1998 | Dalrymple Resources Nl | Kennedy Bore | 1.4% | Kennedy Bore Project, Annual Report for the period 01/09/1996 to 01/09/1997, E40/65. |
| A55620 | 1998 | Consolidated Gold Nl | Butterfly | <1% | Butterfly Project - Annual Technical Report M40/50, 99, 101, 110, GML40/1074, P40/989, 954 01/01/97 - 31/12/97 |
| A56021 | 1998 | Kookynie Resources Nl | Coronation Well | 6% | Coronation Well Project, Annual Report for the period 13/05/97 to - 12/05/98, E40/56; M40/134.[C150/1994] |
| A50593 | 1997 | Dalrymple Resources Nl | Kennedy Bore | 1.4% | Kennedy Bore Project, Annual Report for the period 15/09/1995 to 14/09/1996, E40/65. |
| A52279 | 1997 | Dalrymple Resources Nl | Snowy Melita | 5.2% | Snowy Melita Project,,E40/46 P40/1014 , M40/166 Annual report 1996-1997 |
| A46780 | 1996 | Dalrymple Resources Nl | Kennedy Bore | 1.4% | Kennedy Bore Project, Annual Report for the period 01/01/1994 to 01/01/1995, E40/65. |
| A48272 | 1996 | Aberfoyle Resources Ltd | Coronation Well | 6% | Coronation Well Project, E40/56, M40/134, P40/1005 , Annual Report 12 May 1995 to 11 May 1996. |
| A45400 | 1995 | Dalrymple Resources Nl | Snowy Melita | 5.3% | Snowy Melita Project, E40/46 Annual report 1994-1995 |
| A44923 | 1995 | Aberfoyle Resources Ltd | Coronation Well | 6% | Coronation Well Project, E40/56,P40/1005,M40/134 Annual Report on Exploration for the period 12th May 1994 to |
| A45342 | 1995 | Melita Mining Nl | Butterfly | <1% | Butterfly Project Area M40/101 M40/110 M40/99 July 1995 01/07/94 to 30/06/95 |
| A46287 | 1995 | Aberfoyle Resources Ltd | Coronation Well | 6% | Partial Surrender Report for the period ending 18/12/1995, Coronation Well Project, E40/56 |
| A41707 | 1994 | Dalrymple Resources Nl | Melita | 5.3% | Annual Report for the period 05/93-05/94, Snowy Melita Project, E40/46. |
| A43345 | 1994 | Melita Mining Nl | Butterfly | <1% | Butterfly Project Area M40/101 M40/110 M40/99 December 1994 |
| A49401 | 1994 | Melita Mining Nl | Butterfly | <1% | Field Mapping Programme Butterfly Project Kookynie Western Australia M40/99 M40/101 M40/110 and P40/989 (01/19 |
| A43016 | 1994 | Dalrymple Resources Nl | Kennedy Bore | 1.4% | Annual Report,E40/65, Kennedy Bore Project, for the period 01/09/1993 to 01/01/1994. |
| A41292 | 1994 | Wilga Mines Nl | Coronation Well | 6% | Annual Report for the period ending 12/05/94 Coronation Well Project E40/56 & P40/1005 |
| A41656 | 1993 | Melita Mining Nl | Butterfly | <1% | Annual Report for the period 09/92-12/93 Admiral/Butterfly Mining Centre Project M40/99,101,110 |
| A38827 | 1993 | Dalrymple Resources Nl | Snowy Melita | 5.3% | Annual Report for the period 06/05/92-05/05/93 Snowy Melita Project E40/46 |
| A37538 | 1992 | Dominion Mining Ltd | Butterfly | <1% | Annual Report Butterfly M40/99, M40,101, M40/110 from July 1990 to August 1992 |
| A31312 | 1990 | Dominion Mining Ltd | Butterfly | <1% | Annual Report on Butterfly Project Area GML40/1052, GML40/1207, M40/5, M40/28, M40/71, M40/72, M40/99, M40/101 |
| A20097 | 1981 | Amalgamated Industries Ltd | Golden Butterfly | 6.8% | Progress Report on The Gold Bond Prospect Leonora Area (GML40/1053, 1981) Bond Resources, R Kean, Amalgamated |
| A5992 | 1975 | Esso Australia Ltd | Kennedy Bore | 1.5% | Kennedy Bore Project, Non-statutory Report: Flnal Report, September 1975, TR70/5961H. |
| A48445 | 1753 | Melita Mining Nl | Butterfly | <1% | Butterfly Project Area M40/101 M40/110 and M40/99 1st January 1995 to the 31st December 1995 Technical Report |
| A50825 | 1753 | Consolidated Gold Nl | Butterfly | <1% | Butterfly Project M40/50 M40/99 M40/101 M40/110 GML40/1074 P40/989 P40/1054 P40/1025 and P40/954. Combined Rep |
| A82836 | 1753 | St Barbara Ltd | Leonora | 1.8% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235, |
| A48223 | 1753 | Dalrymple Resources Nl | Snowy Melita | 5.2% | Snowy Melita Project, E40/46 P40/1014 Annual report 1995 to 1996. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 40/166 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.