M 45/1254
M 45/1254 is a live mining lease in the Shire of East Pilbara, Western Australia, held by Venturex Sulphur Springs Pty Ltd (part of Develop Global Limited). Granted on 11 Oct 2017 for 21 years, it expires on 10 Oct 2038. The ground is covered by 90 historical WAMEX reports.
Register summary
- Holder
- Venturex Sulphur Springs Pty Ltd
- Part of
- Develop Global Limited (ASX:DVP) as at 2025-06-30
- Local government
- Shire of East Pilbara
- Application received
- 29 Apr 2015
- Commenced
- 11 Oct 2017
- Expiry
- 10 Oct 2038
- Term
- 21 Years
The full record on M 45/1254
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and the one change of holder on record
- The full record: 9 years of expenditure, 11 conditions and 19 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (9 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146070 | 2025 | Atlas Iron Pty Ltd | Abydos | 7.8% | Final Surrender Report for E45/4386 for the period 17/11/2014 to 16/11/2024 |
| A138221 | 2024 | Infinity Mining Limited | Panorama | <1% | Partial Surrender E45/4732 Panorama for the period ending 17/11/2023. |
| A144918 | 2024 | Atlas Iron Pty Ltd | Abydos | 14% | Final Surrender Report for E45/5114 Abydos Project for the period 13/08/2018 to 12/08/2024 |
| A123057 | 2020 | Venturex Resources Limited | Sulphur Springs | 18% | Annual Technical Report: Sulphur Springs C139/2005 for the period 1 January 2019 to 31 December 2019 |
| A123029 | 2020 | Baracus Pty Ltd | Honeyeater Creek | 15% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2019 to 16 January 20 |
85 more reports
| A123898 | 2020 | Fe Limited; Macarthur Lithium Pty Ltd | Panorama | <1% | Annual Technical Report Panorama C73/2019 for the period ending 31/12/2020 |
| A124012 | 2020 | Atlas Iron Pty Ltd | Abydos | 2.4% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2020 |
| A119478 | 2019 | Venturex Resources Limited | Sulphur Springs | 18% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2018 to 31 December 2018 |
| A120372 | 2019 | Atlas Iron Pty Ltd | Abydos | 2.4% | Abydos Project Annual report C40/2007 for the period ending 30 April 2019, E45/03298, E45/03619, M45/01179, M4 |
| A119399 | 2019 | Baracus Pty Ltd | Honeyeater Creek | 15% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2018 to 16 January 20 |
| A116250 | 2018 | Venturex Resources Limited | Sulphur Springs | 20% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2017 to 31 December 2017, M45/0049 |
| A117215 | 2018 | Atlas Iron Limited | Abydos | 2.2% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2018, E45/02728, E45/03298, E45/03619, E4 |
| A119170 | 2018 | Gswa | Panorama / Strelley | 100% | Core Library Sampling Results for EIS Drillholes BKD1, BKD2 (P913) |
| A118605 | 2018 | Macarthur Lithium Pty Ltd; Artemis Resources Limited | Marble Bar | <1% | E45/4732 Annual Report for the period 21 November 2017 to 20 November 2018 |
| A110790 | 2017 | Venturex Resources Ltd | Sulphur Springs | 22% | Venturex Resources Ltd ANNUAL REPORT For the Period 1 January 2016 to 31 December 2016 Sulphur Springs C139/20 |
| A112824 | 2017 | State Resources Pty Ltd | Strelley | 2.9% | Combined Annual Technical Report - Strelley Report C51/2013 for the period 07/03/2016 to 06/03/2017, E45/03828 |
| A114462 | 2017 | Atlas Iron Limited | Abydos | 1.7% | ABYDOS PROJECT C40/2007 Annual Technical Report to the DMP for the Period Ending 30 April 2017, E45/02308, E45 |
| A108062 | 2016 | Venturex Resources Limited | Sulphur Springs | 22% | SULPHUR SPRINGS PROJECT ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015, M 45/00494, M 45/0058 |
| A108699 | 2016 | State Resources Pty Ltd | Strelley | 2.9% | Combined Annual Technical Report Strelley Project C51/2013 For the Period 7 March 2015 to 6 March 2016, E45/03 |
| A109653 | 2016 | Atlas Iron Limited | Abydos | 1.1% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A104488 | 2015 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 21% | Sulphur Springs Project C139/2005 Annual Report for the period 1 Jan 2014 to 31 Dec 2014, M45/494, M45/653, M4 |
| A105712 | 2015 | Fortescue Metals Group Ltd | Glacier Extended | <1% | C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945 |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | <1% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A105595 | 2015 | State Resources Pty Ltd | Strelley Project | 2.2% | Combined Annual Technical Report - Strelley Project |
| A101203 | 2014 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1st December 2012 – 30th November 2013, M45/302 M45/328, M4 |
| A101446 | 2014 | Haoma Mining Nl | North Pole | <1% | E45/3219 - North Pole Surrender Report for the period 5th February 2009 – 4th February 2014 |
| A101577 | 2014 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 23% | Sulphur Springs Project, Annual Report for the period 01/01/2013 to 31/12/2013, M45/494,587 & 653;P45/2607, 2 |
| A101947 | 2014 | State Resources Pty Ltd | Strelley | 2.2% | Strelley Project Combined Annual Technical Report for Exploration Licences 45/3687-I, 45/3828 I, 45/3829-I & 4 |
| A102166 | 2014 | Zenith Minerals Limited | Cleland Rock | 7.6% | Cleland Rock Project, E45/3449, Final Surrender Report for the period 15 November 2010 to 17 April 2014 |
| A96314 | 2013 | Haoma Mining Nl | North Pole | <1% | North Pole Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/302, 328-329, 39 |
| A100225 | 2013 | Zenith Minerals Limited | Cleland Rock | 7.6% | Annual Report for the period 15 November 2012 to 14 November 2013 , Cleland Rock Project, E45/3449. |
| A97715 | 2013 | State Resources Pty Ltd | Strelley | 2.2% | Strelley Project Combined Annual Technical Report E 45/3687-I, E 45/3828-I, E 45/3829-I & E 45/3830-I for the |
| A95653 | 2012 | Zenith Minerals Limited | Cleland Rock | 7.6% | Cleland Rock Project, Annual Report for the period 15 November 2011 to 14 November 2012, E45/3449. |
| A93901 | 2012 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1st December 2010 – 30th November 2011 |
| A89861 | 2011 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1 December 2009 – 30 November 2010, C282/1997 |
| A92530 | 2011 | Zenith Minerals Limited | Cleland Rock | 7.6% | ANNUAL REPORT FOR PERIOD 15 November 2010 to 14 November 2011 CLELAND ROCK PROJECT E45/3449 |
| A86584 | 2010 | Haoma Mining Nl | North Shaw | <1% | North Shaw E45/3219 - Annual Report for the Period 5 February 2009 to 4 February 2010 |
| A86752 | 2010 | Sipa Resources Ltd | Panorama | 1.9% | Panorama Project: E45/2474, Partial Surrender Report for the Period 17 January 2006 to 16 January 2010 |
| A88938 | 2010 | Sipa Resources Ltd | Panorama | 4.2% | Panorama Project Annual Report for the Period 1 January 2010 to 31 December 2010, C137/1993, M45/587, E45/2300 |
| A81699 | 2009 | Sipa Resources Ltd | PANORAMA | 4.2% | Panorama Project Annual Report for the Period 1 January 2008 to 31 December 2009 |
| A85491 | 2009 | Sipa Resources Ltd | Panorama | 4.2% | Panorama Project C137/1993 M45/587, E45/2300, E45/2393, E45/2601,E45/2474, E45/2556, P45/2600-2617 Annual Repo |
| A77713 | 2008 | Sipa Resources Ltd | Panorama (Strelley) | 4.2% | Panorama Project Annual Report for the Period 1 January 2007 to 31 December 2007 |
| A74134 | 2007 | Sipa Resources Ltd | Panorama Project | 1.9% | Panorama Project C137/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 (Marble Bar) |
| A74133 | 2007 | Sipa Resources Ltd | Panorama | 1.9% | Panorama Project E45/2474 Annual Report for the Period 17th Jan 2006 to 16th Jan 2007 (Marble Bar) |
| A74605 | 2007 | Sipa Resources Ltd | Panorama | 14% | E45/2393 Annual Report for the Period 22 March 2006 to 21 March 2007, Panorama Project |
| A76165 | 2007 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2189 Surrender Report Period 24/01/2002 to 23/01/2007 REPORT NO: 05-01-2007-03 |
| A72539 | 2006 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2189, Partial Surrender Report, (Period 2006, Haoma Mining Report No. 05-02-2006-02, Ma |
| A73912 | 2006 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2188-2189, Annual Report for the Period 31 July 2005 to 1 August 2006, Combined Reporti |
| A70474 | 2005 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project, E45/2189, Partial surrender report (for the period ended 20/05/05 Marble Bar), Report num |
| A70940 | 2005 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2189, Annual report for the period ending April 2005 (Report No. 05-02-2005-05, Marble |
| A71565 | 2005 | Sipa Resources Ltd | Panorama Exploration Project | 1.9% | Panorama Exploration Project, 2005 Annual report (Covering the period 1 January 2005 to 31 December 2005, C137 |
| A68293 | 2004 | Sipa Resources Ltd | Panorama (Strelley) | 1.3% | Annual Report for the period 01/01/2003-31/12/2003 Panorama JV Project(c137/1993), E45/1852, E45/2029, M45/494 |
| A68809 | 2004 | Haoma Mining Nl | North Shaw | <1% | E45/2189, Annual Report for the period 24/01/2003-23/01/2004 (North ShawProject). |
| A69467 | 2004 | Sipa Resources Ltd | Panorama / Strelley | 2.7% | Panorama Project, Strelley Exploration Area, Surrender report Panorama Project, C137/1993, E45/1291, E45/1478 |
| A67029 | 2003 | Haoma Mining Nl | North Shaw | <1% | Annual Report for the period ending 25 March 2003 North Shaw East Pilbara District E45/2189 |
| A64887 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 2.6% | 2001 Annual Report On The Strelley Exploration Area Panorama Project (Covering The Period 1 January 2001 To 31 |
| A65354 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama - Strelley | 4% | Panorama - Strelley Project, Partial Surrender Report for the period 10th September 1992 to 9th September 2001 |
| A65355 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama - Strelley | 32% | Panorama - Strelley Project, Partial Surrender Report for the period 7th September 1993 to 24th August 2001, M |
| A66373 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 2.3% | Annual Report on the Strelley Exploration Area Panorama Project covering the period 1 January 2002 to 31 Decem |
| A62548 | 2001 | Outokumpu Exp Aust Pty Ltd | Panorama - Strelley | 2.7% | Panorama - Strelley Project, Annual Report (Parts 1 & 2) for the period 1st January 2000 to 31st December 2000 |
| A59696 | 2000 | Sipa Resources Ltd | Panorama | 2.7% | Department of Minerals and Energy, 1999 Annual Report on the Strelley Exploration Area, Panorama Project, cove |
| A60184 | 2000 | Haoma Mining Nl | North Shaw | <1% | Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1 |
| A60185 | 2000 | Haoma Mining Nl | North Pole,Lalla Rookh,Callina Creek,Nor | <1% | North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M |
| A57502 | 1999 | Haoma Mining Nl | North Pole, Lalla Rookh, Callina Creek, | <1% | North Pole, Lalla Rookh, Callina Creek, Normay, and Mickeys Find. Annual Report for the period ending 11/98. |
| A57799 | 1999 | Sipa Resources Ltd | Panorama (Strelley) | 1.6% | Department of Minerals and Energy 1998 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | <1% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A54106 | 1998 | Haoma Mining Nl | North Pole, Lala Rookh, Callina Creek, N | <1% | Group3 - North Pole, Lala Rookh, Callina Creek, Normay, & Mickeys Find. Annual report for the period ending 11 |
| A56516 | 1998 | Sipa Resources Ltd | Panorama (Strelley) | 1.7% | Department of Minerals and Energy 1997 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A50969 | 1997 | Sipa Resources Ltd | Panorama / Strelley | <1% | Panorama / Strelley Project, Surrender Report E45/1477, 1540 & 1579 for the period ending December 1996. |
| A51765 | 1997 | Sipa Resources Ltd | Panorama (Strelley) | 1.6% | Department of Minerals and Energy 1996 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A52152 | 1997 | Haoma Mining Nl | North Pole, Lalla Rookh, Callina Creek, | <1% | Annual report for period ending 30/11/96 Group 3 : North Pole, Lalla Rookh, Callina Creek, Normay & Mickey's F |
| A53198 | 1997 | Sipa Resources Ltd | Panorama | 6.1% | E45/1478-1479 Partial Surrender Report Strelley Exploration Area , Panorama Project (for the period 23 Februar |
| A48458 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 1.7% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A48457 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 1.7% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A46318 | 1995 | Sipa Resources Ltd | Panorama (Strelley) | 1.8% | Department of Mineral and Energy 1994 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A40986 | 1994 | Sipa Resources Ltd | Panorama - Strelley | 1.7% | Panorama - Strelley Project , Annual Report for the period 27th November 1992 to 31st December 1993, E45/715 |
| A39115 | 1993 | Sipa Resources Ltd | Panorama - Strelley | 1.7% | Panorama - Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/825, |
| A39174 | 1993 | Sipa Resources Ltd | Panorama- Strelley | 1.5% | Panorama- Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992. E45/581, 71 |
| A32544 | 1991 | Sipa Resources Ltd | Panorama -Strelly | 7.6% | Sipa-Ashling JV; Panorama Project E45/825 - 'Camel Flats'; Annual Technical Report -1990 |
| A32548 | 1991 | Sipa Resources Ltd | Panorama | 1% | Sipa-Ashling Joint Venture Panorama Project M45/494, E45/581 , 957, 971 Annual Technical Report - 1990 |
| A34908 | 1991 | Sipa Resources Ltd | Panorama | <1% | Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9 |
| A31203 | 1990 | Miralga Mining Nl | Panorama | 1.7% | Panorama Project, Partial Surrender Report for the period 27/11/1988 to 26/11/1989 E45/581 (Strelley Gorge), E |
| A30016 | 1990 | Mr Maynard Aj | Leilira Creek | 7.6% | Leilira Creek Project, Annual Report for the period 10/07/1988 to 09/07/1989, E45/825 |
| A27601 | 1989 | Homestake Australia Ltd | SULPHUR SPRINGS | 1.7% | Sulphur Springs JV Report for period 01/05/88 to 30/12/88 Tenements E45/419 E45/532 E45/535 E45/581 Miralga Mi |
| A25326 | 1988 | Homestake Australia Ltd | SULPHUR SPRINGS | 1.7% | Sulphur Springs Joint Venture Annual Report as at 30 April 1988. E45/419, E45/532, E45/535, and E45/581. Homes |
| A15949 | 1985 | Duval Mining Australia Ltd | Strelley | 1.8% | Strelley Project, Annual Report for the period ending 11th March 1985, E45/101 & 102. |
| A16363 | 1985 | Duval Mining Australia Ltd | Strelley | 1.8% | Strelley Project, Final Surrender Report for the period ending 09/10/1985, E45/101 & 102. |
| A12464 | 1983 | Pancontinental Mining Ltd | Soanesville | 3% | Soanesville Project, Final Surrender Report for the period ending 26/07/1983, TR70/8811H & 8812H |
| A531 | 1970 | Project Development Corp | Shaw River | 1.7% | Shaw River Project, Non-statutory Report: Completion Report , November 1970, TR70/4221H. |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 45/1254 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.