M 45/1323
M 45/1323 is a pending mining lease in the Town of Port Hedland, Western Australia, applied for by Atlas Iron Pty Ltd (part of Hancock Prospecting). The application was received on 28 June 2024 and is awaiting a decision. The ground is covered by 82 historical WAMEX reports.
Register summary
- Holder
- Atlas Iron Pty Ltd
- Part of
- Hancock Prospecting
- Local government
- Town of Port Hedland
- Application received
- 28 June 2024
The full record on M 45/1323
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (1 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146156 | 2025 | Peregrine Gold Ltd | Mallina | <1% | Mallina E45/5424 Final Surrender Report For the Period 9 June 2020 to 26 November 2024 |
| A127012 | 2021 | Kimberley Quarry Pty Ltd | Strelley Quarry | <1% | Final Surrender Report for the Strelley Project Area C85/2017 for the period 1 April 2020 to 12 March 2021 |
| A127765 | 2021 | East Pilbara Supreme Pty Ltd | De Grey | <1% | Annual Report E45/5424 De Grey project for the period 9 June 2020 to 8 June 2021 |
| A122463 | 2020 | Atlas Iron Pty Ltd | Pardoo | 20% | Annual Technical Report for C170/2008 Pardoo Project for the period 2 October 2018 to 1 October 2019 |
| A124146 | 2020 | Kimberley Quarry Pty Ltd | Strelley Quarry | <1% | Annual Mineral Exploration Report for the Strelley Quarry Project Area (C85/2017) for the period ending 31/03/ |
77 more reports
| A125450 | 2020 | Atlas Iron Pty Ltd | Pardoo | 20% | Annual Technical Report for C170/2008 Pardoo Project for the period ending 01/10/2020 |
| A120367 | 2019 | Kimberley Quarry Pty Ltd | Strelley Quarry | <1% | Annual Mineral Exploration Report for the Strelley Quarry Project Area (C85/2017) for the period 1 April 2018 |
| A115800 | 2018 | Atlas Iron Limited | Pardoo | 67% | Pardoo C170/2008 Annual Technical Report to the DMIRS for the Period Ending 1 October 2017, E45/02330, M45/011 |
| A118600 | 2018 | Atlas Iron Limited | Pardoo | 20% | Annual Technical Report for C170/2008 Pardoo Project for the Period Ending 01 October 2018 |
| A116769 | 2018 | Atlas Iron Limited | Pardoo | 67% | Final Surrender Report for E45/2330-I Pardoo Project for the period 01 June 2006 to 23 March 2018 |
| A117288 | 2018 | Kimberley Quarry Pty Ltd | Strelley Quarry | <1% | Annual Mineral Exploration Report for the Strelley Quarry Project Area (C85/2017) for the period 1 April 2017 |
| A111873 | 2017 | Atlas Iron Limited | Pardoo | 67% | Annual Technical Report to the DMP for the Period Ending 1 October 2016 |
| A114421 | 2017 | Kimberley Quarry Pty Ltd | Strelley Quarry | <1% | Annual Mineral Exploration Report - C85/2017 - Strelley Quarry - 1 April 2016 to 31 March 2017, E45/04550, E45 |
| A107718 | 2015 | Atlas Iron Limited | Pardoo - Goldsworthy | <1% | Pardoo - Goldsworthy Project C170/2008, E45/2380, 2667, 3015 FInal Surrender Report for the period 24/10/2003 |
| A107720 | 2015 | Atlas Iron Limited | Pardoo - Goldsworthy | 15% | Pardoo - Goldsworthy Project C170/2008 Annual Report for the period 2 October 2014 to 1 October 2015, E45/2330 |
| A104867 | 2015 | Polaris Metals Pty Ltd | Poondano | <1% | Poondano Project (C148/2007) E45/3114-I and E45/3115-I Combined Surrender Report for the period 1 December 200 |
| A106962 | 2015 | Atlas Iron Limited | Pardoo | 67% | Pardoo E45/2330 Partial Surrender Report for the period 01 June 2005 to 29 May 2015 |
| A103727 | 2014 | Atlas Iron Ltd | Pardoo - Goldsworthy | 15% | Pardoo - Goldsworthy Project C170/2008 Annual Technical Report to the Department of Mines and Petroleum for |
| A104135 | 2014 | Atlas Iron Ltd | Pardoo - Goldsworthy | <1% | Pardoo - Goldsworthy Project E45/3015‐I Partial Surrender Report to the Department of Mines and Petroleum for |
| A104144 | 2014 | Atlas Iron Ltd | Pardoo - Goldsworthy | <1% | Pardoo - Goldsworthy Project E45/2380‐I Partial Surrender Report to the Department of Mines and Petroleum for |
| A101695 | 2014 | Fortescue Metals Group Ltd | Yegan Pool | <1% | Final Surrender Report: E45/3386 Yegan Pool Project for the period 27 April 2010 to 27 November 2013 |
| A102081 | 2014 | Atlas Iron Ltd | Pardoo - Goldsworthy | <1% | Pardoo - Goldsworthy Project, E45/3015, Partial Surrender Report for the period 22 April 2008 to 4 April 2014. |
| A103606 | 2014 | Process Minerals International Pty Ltd | Poondano | <1% | Poondano Project C148/2007 Annual Report - 01 July 2013 to 30 June 2014, E45/2723 – I, E 45/3114 – I, E 45/311 |
| A99126 | 2013 | Polaris Metals Pty Ltd | Poondano | 21% | Poondano Project E45/2736 Final Surrender Report for the Period 30 June 2012 to 28 June 2013 |
| A99127 | 2013 | Polaris Metals Pty Ltd | Poondano | 29% | Final Surrender Report for the Period 4 July 2012 to 28 June 2013 for E45/3787 Poondano Project |
| A98212 | 2013 | Atlas Iron Ltd | Pardoo - Goldsworthy | <1% | Pardoo - Goldsworthy Project, Partial Surrender Report for the period 22nd April 2012 to 7th June 2013, E45/30 |
| A98370 | 2013 | Fortescue Metals Group Ltd | Midgee Well/Yegan Pool | <1% | Annual Report for the Period 27 April 2012 to 26 April 2013, E45/3386 Midgee Well/Yegan Pool |
| A99125 | 2013 | Polaris Metals Pty Ltd | Poondano | <1% | Partial Surrender Report for the Period 1 December 2012 to 28 June 2013 for E45/3115 Poondano Project |
| A99646 | 2013 | Process Minerals International | Poondano | <1% | Poondano Project 2013, Annual Report - 01 July 2012 to 30 June 2013, E45/2723 – I, E 45/3114 – I, E 45/3115 – |
| A100177 | 2013 | Atlas Iron Ltd | Pardoo-Goldsworthy | 18% | Pardoo-Goldsworthy Project Annual Technical Report to the Department of Mines and Petroleum for the Period End |
| A92410 | 2012 | Brumby Resources Ltd | De Grey | <1% | De Grey Project, E45/2539-I and E45/3137-I. Annual Report for the Period 24 November 2009 to 23 November 2010 |
| A94306 | 2012 | Fortescue Metals Group Ltd | Midgee Well | <1% | Annual report for the period 27th April 2011 to 26th April 2012, E45/3386 Midgee Well |
| A95539 | 2012 | Polaris Metals Pty Ltd | Poondano | 5.4% | Poondano Project 2011, Annual Report - 1 July 2011 to 30 June 2012, E45/2723 – I, E45/2736 – I, E45/3114 – I, |
| A95867 | 2012 | Atlas Iron Ltd | Pardoo- Goldsworthy | 18% | Pardoo- Goldsworthy Project, Annual Report for the period ending 1st October 2012, E45/2330, 2380, 2667, 3015- |
| A91226 | 2011 | Process Minerals International | Poondano | 5.4% | Poondano Project 2011, Annual Report - 01 July 2010 to 30 June 2011 |
| A91991 | 2011 | Atlas Iron Ltd | Pardoo - Goldsworthy | 18% | Pardoo-Goldsworthy Project C170/2008 Annual Technical Report to DMP Period Ending 1 October 2011 |
| A88893 | 2011 | Brumby Resources Ltd | De Grey | <1% | Annual Report On E45/2538 I, E45/2539 I And De Grey Project For the Period 24 November 2009 to 23 November 201 |
| A90412 | 2011 | Fortescue Metals Group Ltd | Midgee Well | <1% | Midgee Well Project, Annual Report for the period 27th April 2010 to 26th April 2011, E45/3386. |
| A90771 | 2011 | Atlas Iron Ltd | Pardoo | <1% | Pardoo Project M45/1194 Annual Technical Report to DMP Period Ending 8 July 2011 |
| A85566 | 2010 | Brumby Resources Ltd | De Grey | <1% | Annual report on E45/2538 I, E45/2539 I and De Grey Project for the period 24 November 2008 to 23 November 200 |
| A87854 | 2010 | Polaris Metals Nl | Poondano | 5.4% | Poondano Project C148/2007, 2010 Annual Report, Period: 30/06/2009 – 29/06/10, E45/2723, E45/2736, E 45/3114, |
| A88672 | 2010 | Atlas Iron Ltd | Pardoo-Goldsworthy | 21% | Pardoo-Goldsworthy Project Annual Report to the Department of Mines and Petroleum for the Period 02/10/09 to 0 |
| A87856 | 2010 | Polaris Metals Nl | Poondano | 21% | Poondano Project 2010 Partial Surrender Report Exploration Licences E45/2736-I |
| A87122 | 2010 | Brumby Resources Ltd | De Grey | <1% | Relinquishment Report on E45/25381, E45/25391 and De Grey Project for the Period 24 November 2005 to 23 Novemb |
| A82286 | 2009 | Rio Tinto Exploration Pty Ltd | Delta | <1% | First and Final Annual Report For the period 6 March 2008 to 25 February 2009 E45/3034 Delta |
| A84985 | 2009 | Polaris Metals Nl | Poondano | 11% | Partial Surrender Report for Exploration Licences E45/2723-I & E45/2736-I |
| A81256 | 2009 | Brumby Resources Ltd | De Grey - Goldsworthy | <1% | De Grey Project E45/2538 and E45/2539 Relinquishment Report 24 Nov 2005 to 23 Nov 2008, C210/2006 |
| A80795 | 2009 | Brumby Resources Ltd | De Grey - Goldsworthy | <1% | ANNUAL REPORT On E45/2538, E45/2539 And DE GREY PROJECT For the Period 24 November 2007 to 23 November 2008, C |
| A84756 | 2009 | Polaris Metals Nl | Poondano | 11% | Annual Report for the Period 29th June 2008 to 29th June 2009, Poondano Project, E45/2723 – I and E45/2736 – I |
| A85193 | 2009 | Atlas Iron Ltd | Pardoo | 15% | Pardoo C170/2008, E45/2330, E45/2380, E45/2381, E45/2667, E45/3015, E45/3018, M45/1157, M45/1158, M45/1159 and |
| A77179 | 2008 | Atlas Iron Ltd | Goldsworthy | <1% | Annual Report to the Department of Industry and Resources Goldsworthy Project for the period 24/10/06 to 23/10 |
| A77400 | 2008 | Brumby Resources Ltd | De Grey- Goldsworthy | <1% | ANNUAL REPORT On E45/2538 I, E45/2539 I And DE GREY PROJECT For the Period 24 November 2006 to 23 November 200 |
| A80089 | 2008 | Polaris Metals Nl | Poondano | 11% | Poondano Project 2007 ANNAUL REPORT Exploration Licences E45/2723-I & E45/2736-I. Polaris Report No. 2008-42 |
| A80562 | 2008 | Atlas Iron Ltd | Pardoo | 15% | Annual Report for the period 02/10/2007 – 01/10/2008, Pardoo C170/2008, E45/2330, E45/2380, E45/2381, E45/2667 |
| A76638 | 2007 | Polaris Metals Nl | Poondano | 11% | POONDANO PROJECT 2007 ANNUAL REPORT EXPLORATION LICENCES E45/2723-I & E45/2736-I |
| A74450 | 2007 | Atlas Iron Ltd | Goldsworthy | <1% | Goldsworthy Project, Partial Surrender Report, February 2007, E45/2380. [C66/2004] |
| A75873 | 2007 | Atlas Iron Ltd | Pardoo | 13% | Annual Report to the Department of Industry and Resources for the Period 01/06/06 to 31/05/07 Tenements E45/23 |
| A74200 | 2006 | Atlas Iron Ltd | Goldsworthy | <1% | Annual Report for the Period 24/10/05 to 23/10/06, E45/2285-2286,2380-2381, Combined Reporting No. C66/2004, ( |
| A72880 | 2006 | Atlas Iron Ltd | Pardoo | 67% | Annual Report for the Period 01/06/05 to 31/05/06, E45/2330, (Pardoo Project, Port Hedland). |
| A74104 | 2006 | Independence Group Nl | De Grey - Goldsworthy | <1% | Goldsworthy (De Grey) Project C210/2006 Annual Report for the Period 24/11/2005 to 23/11/2006 (Port Headland) |
| A72696 | 2006 | Atlas Iron Ltd | Goldsworthy | <1% | Annual Report for the Period 24/10/04 to 23/10/05, E45/2285-286,2380-2381, (Goldsworthy Prospect, Port Hedland |
| A69647 | 2004 | Independence Group Nl | Goldsworthy | <1% | Annual report for the period 24/10/03 - 23/10/04 Goldsworthy Project, C66/2004, E45/2380, E45/2381, E45/2285, |
| A55081 | 1998 | Mr O'Meara Dw | Pardoo Creek Well | 89% | Annual Report of Activities (for) 12 months ended 14th February 1998, Exploration Licence E45/1638 at Pardoo C |
| A50369 | 1997 | Domain Mining Nl | Pardoo Creek Well | 89% | Pardoo Creek Well Project, Annual Report of Activities 12 Months Ended 14th february 1997 Exploration Licence |
| A43288 | 1995 | Bhp Iron Ore Pty Ltd | Mount St George | 47% | Annual report October 1993 to September 1994. Mt. St. George, EL45/1077 |
| A40246 | 1994 | Bhp Iron Ore Pty Ltd | Mount St George | 47% | Annual report October 1992 to September 1993 Mt St George EL 45/1077 |
| A39646 | 1993 | Cra Exploration Pty Ltd | Worthy | 1.6% | Worthy Project, Partial Surrender Report for the period ending July 1993, E45/691,698, 699, & 1025. |
| A36855 | 1992 | Cra Exploration Pty Ltd | Worthy | 1.9% | Worthy Project ,(2nd) Partial Surrender Report for the period ending 16th July 1992 , E45/691, 698 & 699. |
| A36906 | 1992 | Cra Exploration Pty Ltd | Worthy | 1.6% | Worthy Project, Annual Report for the year ending 1st July 1992, E45/691, E45/698, E45/699 & E45/1025. |
| A37796 | 1992 | Bhp Minerals Pty Ltd | Mount St. George | 47% | Annual report. October 1991 to September 1992. Mt. St. George project,. ELA45/1077 |
| A34487 | 1991 | Cra Exploration Pty Ltd | Worthy | 1.4% | Worthy Project, Partial Surrender Report for period to July 1991, E45/691, 692, 697,698 & 699. |
| A34890 | 1991 | Cra Exploration Pty Ltd | Worthy | 1.2% | Worthy Project, Annual Report for the year ending July 1991, E45/691,692,697,698,699, & 1025. |
| A31540 | 1990 | Cra Exploration Pty Ltd | Worthy | 1.4% | Worthy Project, Annual Report for the period July 1989 to July 1990, E45/691,692, 697- 699. |
| A29149 | 1989 | Cra Exploration Pty Ltd | Worthy | 1.4% | Annual report to July 1989, Worthy, E45/691-692, E45/697-699 |
| A19444 | 1986 | Mitchell Exploration Co | Pardoo Creek Well | 100% | Annual Report for 1985-1986 on P 45/1086. |
| A9472 | 1981 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Non-statutory Report:Final Report for the period 3rd August 1980 to 29th November 1980, TR70/ |
| A10433 | 1981 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Non-statutory Report: Final Report for the period 03/08/1980 to 16/08/1981, November 1981, TR |
| A10441 | 1981 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Non-statutory Report: Bore Hole Logs, Final Report for 03/08/1980 to 16/08/1981,November 1981 |
| A9321 | 1980 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Annual Report for the period 3rd August 1979 to 2nd August 1980, TR70/7128-7132H. |
| A16762 | 1979 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Non-statutory Report: Alluvial Potential of the De Grey Area, May 1979, TR70/7128-7132H. |
| A16769 | 1979 | Australian Anglo American Ltd | De Grey | <1% | De Grey Project, Non-statutory Report: Landsat Image Interpretation of the De Grey River Delta Area & Coongan- |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 45/1323 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 45/1323? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.