NextMapsWA TenementsM 52/1093

M 52/1093

PendingMining LeaseShire of East PilbaraPeak Hill M.F. District
Area
130ha
Applied
Aug 2024
2 years ago
WAMEX reports
78
WA median is 53
Report drilling
38
of 78 reports
East Pilbara Explore on the live map

Register summary

Holder
Fmg Pilbara Pty Ltd
Local government
Shire of East Pilbara
Application received
19 Aug 2024

Exploration history on this ground

78 historical WAMEX exploration reports intersect M 52/1093: 27 report geochemistry or sampling, 50 include a digital data package.
When this ground was worked · 75 of 78 reports dated
11980s
131990s
332000s
262010s
22020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A122480 2020 Atlas Iron Pty Ltd Jimblebar <1% Jimblebar Combined Annual Report (C121/2007) for the period ending 31 December 2019, E52/01772, E52/02303, M52
A125617 2020 Fortescue Metals Group Ltd Skeleton Creek <1% C130/2011 Skeleton Creek Annual Report for the period 1 November 2019 to 31 October 2020, E52/01937, E52/03441
A118775 2019 Fortescue Metals Group Ltd Skeleton Creek <1% C130/2011 Skeleton Creek Annual Mineral Exploration Report for the period 1 November 2017 to 31 October 2018,
A119480 2019 Atlas Iron Limited Jimblebar <1% Jimblebar Combined Annual Report (C121/2007) for the period ending 31 December 2018, E52/01772, E52/02303, M52
A116189 2018 Fortescue Metals Group Ltd Windaroo <1% C144/2011 Windaroo Annual Report For the Period 1 January 2017 to 31 December 2017, E46/00980, E46/00989, E52/
73 more reports
A116296 2018 Atlas Iron Limited Jimblebar <1% Jimblebar Combined Annual Report (C121/2007) for the period 01 January 2017 to 31 December 2017, E52/01772, E5
A118270 2018 Bhp Iron Ore Pty Ltd Jimblebar South <1% Combined Annual Report for Jimblebar South C21/2017 for the period 22 September 2017 to 21 September 2018, E52
A110821 2017 Bhp Billiton Iron Ore Pty Ltd North Flank, Packsaddle, Western Ridge <1% Donated Drill Core – GE2403DG, GE2455DG, PSB0454DG, PSD1204DG, PSB0451DG, PSB0453DG, WSR1302RD
A108442 2016 Atlas Iron Ltd Jimblebar <1% Jimblebar Project E52/1772-I, E52/2303-I, M52/211, M52/790, M52/799 Annual Technical Report To the Department
A108118 2016 Pilbara Chromite Pty Ltd Coobina 71% P52/1264 Coobina Surrender Report for the period 20 January 2010 to 18 January 2016
A104629 2015 Atlas Iron Ltd Jimblebar <1% Jimblebar Project C121/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period En
A106228 2015 Atlas Iron Limited Jimblebar 3.9% Jimblebar Project P52/1326-I Final Surrender Report to the Department of Mines and Petroleum for the Period 14
A107212 2015 Atlas Iron Ltd Jimblebar <1% Jimblebar Project Partial Surrender Report to the Department of Mines and Petroleum for the Period 17 Septembe
A105352 2015 Atlas Iron Ltd Jimblebar <1% Jimblebar Project E52/1823-I Final Surrender Report to the Department of Mines and Petroleum for the Period fr
A100794 2014 Atlas Iron Ltd Jimblebar <1% Jimblebar Project Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 31 De
A103704 2014 Atlas Iron Ltd Jimblebar <1% Jimblebar Project Partial Surrender Report to the Department of Mines and Petroleum for the Period 29 Septembe
A101008 2014 Pilbara Chromite Pty Ltd Coobina <1% COOBINA PROJECT E52/2047 Surrender Report FOR THE PERIOD 26 Feb 2008 TO 31 DECEMBER 2013
A98056 2013 Pilbara Chromite Pty Ltd Coobina 1.7% Coobina Project, Annual Report for the period 1st January 2012 to 31st December 2012, M52/10,791, 798 & 803-8
A96701 2013 Atlas Iron Ltd Jimblebar <1% JIMBLEBAR PROJECT E52/1595-I, 1750-I,1772-I, 1823-I, 2303-I, M52/21, 790- 799, P52/1124-I ,1125-I,1238-I, 132
A100613 2013 Bhp Billiton Iron Ore Pty Ltd Jimblebar East - West Jimblebar - Jimble <1% COMBINED ANNUAL REPORT C36/2013 JIMBLEBAR EAST, WEST JIMBLEBAR, JIMBLEBAR SOUTH and DONGARDOO Reporting Period
A92923 2012 Atlas Iron Ltd Jimblebar <1% Jimblebar Project C121/2007 Annual Report to DMP Period Ending 31 December 2011, E52/1595, 1750, 1772, 1823, 2
A93184 2012 Pilbara Chromite Pty Ltd Coobina 1.7% Combined Annual Report Coobina 1 January 2011 to 31 December 2011, C42/2006, M52/10, 791, 798, 803, 804, E52/2
A94893 2012 Bhp Billiton Iron Ore Pty Ltd Jimblebar East <1% Combined Annual Report for the period 20 August 2011 to 19 August 2012, Jimblebar East, E52/18 & E52/172
A89840 2011 Atlas Iron Ltd Jimblebar <1% Annual Report to the Department of Mines and Petroleum for the period 01/01/10 to 31/12/10, Jimblebar, E52/159
A90461 2011 Atlas Iron Ltd Jimblebar 3.9% Jimblebar Project P52/1326 Annual Report for the period ending 14th May 2011
A91303 2011 Bhp Coal Pty Ltd Jimblebar East <1% Combined Annual Report C52/1997 Jimblebar East E52/172 and E52/18 Reporting Period 20 August 2010 to 19 August
A89668 2011 Pilbara Chromite Pty Ltd Coobina <1% Combined Annual Report C42/2006 Coobina Project, 1 January 2010 to 31 December 2010
A86038 2010 Warwick Resources Ltd Jimbelbar <1% Jimbelbar Project Annual Report for the period 01/01/2009 –31/12/2009, C121/2007, M52/211, M52/790, E52/1772,
A81601 2009 Warwick Resources Ltd JIMBLEBAR <1% ANNUAL REPORT C121/2007 For the Tenements M52/211, M52/790, E52/1772, E52/1750, E52/1823, E52/1595, P52/869, P
A86143 2009 Pilbara Chromite Pty Ltd Coobina <1% Coobina Project, C42/200, Annual Report For The Period 1 January 2009 to 31 December 2009, M52/10, M52/791, M5
A87286 2009 Bhp Coal Pty Ltd Jimblebar East <1% Annual Report, Jimblebar East, E52/172 and E52/18, Reporting Period 20 August 2009 to 19 August 2010. (C52/1
A83077 2009 Bhp Coal Pty Ltd Jimblebar East <1% Annual report for the period 20 August 2008 to 19 August 2009, Jimblebar East, E52/18 & E52/172
A84485 2009 Warwick Resources Ltd JIMBLEBAR/OAKOVER RIVER <1% Partial Surrender Report for the tenement E52/1772, Jimblebar/Oakover River, for the period 29/09/2005 TO 24/6
A79251 2008 Bhp Coal Pty Ltd Jimblebar East <1% BHP COAL PTY LTD ANNUAL REPORT JIMBLEBAR EAST E52/172 AND E52/18 REPORTING PERIOD 20 AUGUST 2007 TO 19 AUGUST
A77779 2008 Warwick Resources Ltd Jimblebar <1% Annual Report for the period 1st January 2007 to 31st December 2007 for the Jimblebar Project, C121/2007 (M52/
A80588 2008 Pilbara Chromite Pty Ltd COOBINA <1% COOBINA PROJECT COMBINED REPORTING GROUP C42/2006, ANNUAL REPORT FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER
A75984 2007 Bhp Coal Pty Ltd Jimblebar East <1% Annual Report Jimblebar East E52/172 and E52/18 Reporting Period 20 August 2006 to 19 August 2007 DIR Ref No.
A74145 2007 Allarrow Pty Ltd Sylvania <1% Sylvania Project C109/2006 Combined Annual report for the Period 17/11/2005-16/11/2006 (Robertson)
A74687 2007 Pilbara Chromite Pty Ltd Coobina <1% Coobina Project Annual report C42_2006_2006A For leases E52/1595, M52/10, M52/791, M52/798, M52/803, M52/804,
A74244 2007 Mr Flint Wj Copper Range <1% Annual Technical Report on E52/1772 Copper Range, For the Year Ending 28 September 2006, (Robertson).
A71930 2006 Pilbara Chromite Pty Ltd Coobina 2% Coobina Project, Annual report C102/2003, For the Leases E52/1083,1329,1595,1686,P52/1025,1065, For the period
A73425 2006 Bhp Coal Pty Ltd Carramulla <1% Annual Report, Carramulla E52/18,172, Period 20 August 2005 to 19 August 2006, Combined Reporting No. C72/1997
A73824 2006 Pilbara Chromite Pty Ltd Coobina 2.7% Surrender Report, For the lease E52/1083 Coobina Project for the Period 25 September 1996 to 7 July 2006, (Rob
A70997 2005 Bhp Coal Pty Ltd Jimblebar <1% Annual report, Carramulla E52/172 and E52/18, Reporting period 20 August 2004 to 19 August 2005 (East Jimbleba
A70079 2005 Pilbara Chromite Pty Ltd Coobina <1% Coobina Project, Annual report C102/2003, For the leases E52/1083, E52/1215, E52/1329, E52/1354, E52/1595, E52
A68890 2004 Bhp Billiton Iron Ore Pty Ltd East Jimblebar <1% Annual report, East Jimblebar, E52/172, Reporting period 20/08/2003-19/08/2004.
A67954 2004 Pilbara Chromite Pty Ltd Coobina <1% Annual report C102/2003 for the leases E52/951, E52/1083, E52/1215, E52/1329, E52/1354, E52/1595, P52/1065 Coo
A69020 2004 Pilbara Chromite Pty Ltd Coobina <1% Partial Surrender Report Exploration Licence E52/1215 Coobina Project Surrendered 8th April 2004.
A66176 2003 Sylvania Resources Ltd Jimblebar <1% Combined Annual Mineral Exploration Report for the period ending 31st December 2002 Jimblebar Project C153/200
A67199 2003 Bhp Coal Pty Ltd Jimblebar <1% Annual Report, East Jumblebar, E52/172, Reporting period 20 August 2002 - 19 August 2003, (E52/18 not worked
A64445 2002 Sylvania Resources Ltd Jimblebar <1% Partial Surrender Report E52/1328 Jimblebar GSWA Ref No. M9739/1.
A64836 2002 Pilbara Chromite Pty Ltd Murramunda <1% Annual Report for the period 9TH April 2001 To 8th April 2002 Robertson 1:250,000 Sheet SF51-13 Peak Hill Mine
A63276 2001 Mr Flint Wj Garden Well <1% Annual Report for the Year ending 30/8/2001, E52/1328, E52/1329 and E52/1346, Garden Well Project.
A63805 2001 Sylvania Resources Ltd Coobina 2.7% Annual Report for the year ending September 2001 E52/1083 Coobina Project.
A63186 2001 Sylvania Resources Ltd Jimblebar <1% Jimblebar Project E52/132B M52/211 Transient Electromagnetic Survey P. Mutton & W.S. Peters March 2001.
A63802 2001 Sylvania Resources Ltd Jimblebar <1% Annual Report for the year ending June 2000 E52/1328 Jimblebar Project.
A61651 2001 Sylvania Resources Ltd Coobina 2.7% Annual Report for the year ending September 2000, E52/1083 Coobina Project Ref. No M973/2.
A63160 2001 Sylvania Resources Ltd Jimblebar <1% Annual Report For The Year Ending June 2001. E52/1328 Jimblebar Project.
A61119 2000 Renison Ltd Jimblebar <1% Annual Report East Jimblebar E52/18 Period 20 August 1999 to 19 August 2000, E52/172 Period 4 July 1999 to 3 J
A59590 2000 Murilla Exploration Pty Ltd Jimblebar 2.7% Annual Report for the Year Ending September 1999, E52/1083, Jimblebar Project.
A63171 2000 Renison Ltd Jimblebar <1% Annual Report East Jimblebar Project E52/172 Period 4 July 2000 to 3 July 2001 E52/18 Period 20 August 2000 to
A59000 1999 Bhp Iron Ore Pty Ltd Jimblebar <1% Annual report East Jimblebar E52/18 Period 20/08/98-19/08/99 E52/172 period 04/07/98-03/07/99 C72/1997
A57063 1999 Murilla Exploration Pty Ltd Jimblebar 2.7% Jimblebar Project, E52/1083for the year ending 01/09/1998.
A58809 1999 Mr Flint Wj Garden Well <1% Annual report for the year ending 24 June 1999, Combined mineral exploration report (project) Garden Well C68/
A52690 1997 Murilla Exploration Pty Ltd Jimblebar 2.7% Annual Report for the year ending 09/97, Jimblebar Project, E52/1083
A52804 1997 Bhp Iron Ore Pty Ltd Jimblebar <1% East Jimblebar Project. Annual Report E52/172. 04/07/96 - 03/07/97 E52/18. 20/08/96 - 19/08/97
A48178 1996 Mining Project Investors Pty Ltd Cubana Well <1% Cubana Well Project, Partial Surrender Report, July 1996, E52/694.
A45782 1995 Bhp Iron Ore Pty Ltd Jimblebar 1.3% Annual report East Jimblebar E52/18 period 21 August 1994 to 20 August 1995
A48109 1995 Mining Project Investors Pty Ltd Cubana Well <1% Cubana Well Project, Annual Report , December 1995, E52/694.
A42498 1994 Fodina Minerals Pty Ltd Cubana Well <1% Cubana Well Project, Annual Report for the year ending 11th October 1994, E52/694.
A39603 1993 Sovereign Resources Aust Nl Cubana Well <1% Cubana Well Project, Annual Report for the period 12th October 1992 to 11th October 1993, E52/694.
A36841 1992 Bhp Minerals Pty Ltd Jimblebar <1% Report on E52/18 and E52/172 East Jimblebar 1991/92 Programme (for the period 07/91-07/92)
A29741 1990 Bhp-Utah Minerals International Jimblebar <1% Report on E52/18 & E52/172. 'East Jimblebar' 1989-90 Programme
A32831 1990 Bhp Minerals Pty Ltd Jimblebar <1% Report on E52/18 and E52/172 East Jimblebar 1990/91 Programme (Annual Report)
A29395 1989 Pennant Resources Ltd McCamey's Monster <1% Annual report for ML70/266SA McCamey's Monster for the period 11/10/88-10/10/89
A25172 1753 Bhp Minerals Pty Ltd Jimblebar <1% Report on East Jimblebar E52/18, E52/172 1987-1988 Programme Renison Ltd / Bhp-Utah Coal Joint Venture June 1
A26683 1753 Bhp-Utah Minerals International Jimblebar <1% Report on E52/18 E52/172 East Jimblebar 1988-1989 Programme
A104146 Atlas Iron Ltd Jimblebar <1% Jimblebar Project E52/1823‐I Partial Surrender Report to the Department of Mines and Petroleum for the Period
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. M 52/1093 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over M 52/1093 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold M 52/1093? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.