M 53/113
M 53/113 is a live mining lease in the Shire of Wiluna, Western Australia, held by Nova Energy Pty Ltd. Granted on 26 Jan 1989 for 21 years (renewed), it expires on 25 Jan 2031. The ground is covered by 108 historical WAMEX reports.
Register summary
- Holder
- Nova Energy Pty Ltd
- Local government
- Shire of Wiluna
- Application received
- 14 July 1988
- Commenced
- 26 Jan 1989
- Expiry
- 25 Jan 2031
- Term
- 21 Years (Renewed)
The full record on M 53/113
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 8 changes of holder
- The full record: 39 years of expenditure and 14 conditions
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (35 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123068 | 2020 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report for the period ending 31/12/2019 |
| A123461 | 2020 | Toro Energy Limited | Wiluna | 4.6% | Wiluna Uranium Project Annual Technical Report C170/2010 For the Period 1 January 2019 to 31 December 2019, E |
| A119315 | 2019 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119643 | 2019 | Toro Energy Ltd | Wiluna | 4.6% | Wiluna Uranium Project C170/2010 Annual Technical Report for the period 1 January 2018 to 31 December 2018, E5 |
| A116220 | 2018 | Blackham Resources Limited | Lake Way | <1% | Lake Way C73/2017 Annual Report For the Period 1 January 2017 to 31 December 2017 |
103 more reports
| A117401 | 2018 | Toro Energy Ltd | Wiluna | 1.3% | Wiluna Uranium Project E53/1287 Final Surrender for the period 7 January 2008 to 6 January 2018 |
| A116578 | 2018 | Toro Energy Ltd | Wiluna Uranium | 3.1% | Wiluna Uranium Project Annual Technical Report, C170/2010, 01 January 2017 to 31 December 2017 |
| A112005 | 2017 | Toro Energy Ltd | Wiluna | 1.6% | Wiluna Uranium Project C170/2010 Annual Technical Report For the Period 1 January 2016 to 31 December 2016 |
| A108745 | 2016 | Toro Energy Ltd | Wiluna | <1% | Wiluna Uranium Project Annual Technical Report |
| A109461 | 2016 | Toro Energy Ltd | Wiluna | <1% | Final Surrender Report Wiluna Project C170/2010 for the period 27/12/2012 to 31/05/2016, E53/1296, P53/1371, P |
| A109550 | 2016 | Toro Energy Ltd | Wiluna Uranium Project | <1% | E53/1132 & P53/1372 Final Surrender |
| A106427 | 2015 | Toro Energy Limited | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Report 170/2010 for the period January 1st t |
| A101162 | 2014 | Toro Energy Ltd | Wiluna | 1.3% | Wiluna Uranium Project Partial Surrender Report E53/1287 for the period ended 06/01/2014 |
| A101990 | 2014 | Toro Energy Ltd | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Reporting 170/2010 January 1st to December 3 |
| A97621 | 2013 | Toro Energy Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 1st January 2012 to 31st December 2012, E53/1132............E53/1 |
| A92721 | 2012 | Mpi Nickel Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project, Annual Report for the period 1st January 2011 to 31st December 2011, E53/1243-1244; |
| A93539 | 2012 | Toro Energy Ltd | Wiluna | <1% | Annual Mineral Exploration Report Wiluna Uranium Project January 1st to December 31st 2011, Combined Reporting |
| A89493 | 2011 | Norilsk Nickel Australia Ltd | THE HONEYMOON WELL | <1% | ANNUAL REPORT ON EXPLORATION, THE HONEYMOON WELL PROJECT FOR THE PERIOD 1 JANUARY 2010 TO 31 DECEMBER 2010 W |
| A89783 | 2011 | Toro Energy Ltd | Wiluna | 1.1% | Annual Mineral Exploration Report, Wiluna Uranium Project January 1st to December 31st 2010 Combined Reporting |
| A85989 | 2010 | Minerals And Metals Group Ltd | Wiluna | <1% | Combined Annual Report for the period 01/01/2009 to 31/12/2009, Project Wiluna C169/2001, E 53/845, E 53/854, |
| A86166 | 2010 | Norilsk Nickel Australia Ltd | Honeymoon Well | <1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2009 TO 31 DECEMBER 2009, WI |
| A81676 | 2009 | Norilsk Nickel Australia Ltd | HONEYMOON WELL | <1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008, WI |
| A77857 | 2008 | Norilsk Nickel Australia Ltd | East Honeymoon Well | 2.8% | Annual Report on Exploration The Honeymoon Well Project For the period 1 January 2007 to 31 December 2007 Comb |
| A77398 | 2008 | Oxiana Ltd | Wiluna | <1% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2007 TO 31/12/2007 PROJECT WILUNA C169/2001 |
| A81118 | 2008 | Oz Minerals Ltd | WILUNA | <1% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2008 TO 31/12/2008 PROJECT WILUNA C169/2001, E 53/1003, E 53/1120, E 5 |
| A74391 | 2007 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for Period 01/01/2006 to 31/12/2007, Wiluna Project C169/2001, (Glengarry). |
| A74667 | 2007 | Mpi Mines Ltd | East Honeymoon Well | 2.8% | Annual Report on Exploration The Honeymoon Well Project for the period 1 January 2006 to 31 December 2006 Comb |
| A71900 | 2006 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for period 01/01/2005 to 31/12/2005, Project Wiluna C169/2001, (Glengarry). |
| A72017 | 2006 | Mpi Mines Ltd | East Honeymoon Well | 2.8% | First Report - Annual Report on the Honeymoon Well Project, For the period 1 January 2005 to 31 December 2005, |
| A70195 | 2005 | Mpi Mines Pty Ltd | East Honeymoon Well | 2.8% | Annual Report on the Honeymoon Well project for the period 1 January 2004 to 31 December 2004 Combined Reporti |
| A70415 | 2005 | Agincourt Resources Ltd | Wiluna | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Wiluna Project, C169/2001, E53/259, 399, 536, 609, 6 |
| A68297 | 2004 | Agincourt Resources Ltd | Wiluna | <1% | Annual report for the period 01/01/2003-31/12/2003 Wiluna Project (C169/2001), E53/259, E53/399, E53/536, E53/ |
| A68552 | 2004 | Mining Project Investors Pty Ltd | East Honeymoon Well | 2.8% | Annual Combined Technical Report Honeymoon Well Project Wilu na District Period: 1st January 2003 to 31st Dece |
| A66362 | 2003 | Newmont Australia Ltd | Wiluna | <1% | Combined Annual Report for period 01/01/2002 to 31/12/2002 Project Wiluna C169/2001: E53/232, 259, 399, 443, 5 |
| A67013 | 2003 | Newmont Yandal Operations Ltd | Wiluna | <1% | Surrender Report for the period ending 04/06/2003 ,Wiluna Project. C169/2001 E53/443,232 P53/873. |
| A64419 | 2002 | Outokumpu Exp Aust Pty Ltd | East Honeymoon Well | 6.2% | Annual Exploration Report For Year Ending 31st December 2001 Mining Leases 53/35, 53/36, 53/55, 53/100 Explora |
| A64797 | 2002 | Newmont Yandal Operations Ltd | Wiluna | <1% | Combined Annual Report For Period 01/01/2001 To 31/12/2001 Project Wiluna C169/2001 E53/232, E53/259, 399, 443 |
| A62437 | 2001 | Normandy Yandal Operations Ltd | Wiluna nickel | <1% | Annual Report on Exploration for period 01/01/2000 to 31/12/2000 |
| A62490 | 2001 | Normandy Yandal Operations Ltd | Wiluna | <1% | Combined Annual Report On Exploration For Period 1/01/2000 To 31/12/2000 Project Wiluna C118-1993 E53/232, 240 |
| A63894 | 2001 | Outokumpu Mining Australia Pty Ltd | Abercromby | 20% | Abercromby Project, Annual Report for the year ending 30th April 2001,E53/447;P53/759. |
| A60013 | 2000 | Acclaim Uranium Nl | Abercromby Well | 20% | Annual Report on Group Reporting Area C169/1999 E53/447 & P53/759 Abercromby Well For the period 23/05/1999 to |
| A60487 | 2000 | Great Central Mines Ltd | Wiluna | <1% | Joint Annual Report: Wiluna C132/1994 for the Period 01/01/1999 to 31/12/1999. |
| A60250 | 2000 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Mining Leases 53/35,53/36,53/55,53/100,53/380,53/381 and Exploration Licences 53/397,53/471,53/474,53/608,53/6 |
| A61063 | 2000 | Outokumpu Exp Aust Pty Ltd | Tullock Well | 2.9% | Tullock Well Project, E53/608 Surrender Report for Period 1st December 1995 to 28th March 2000. |
| A57782 | 1999 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project 31/12/98 Mining Lease:53/35-36, 55. 100, 380, 397 etc |
| A58544 | 1999 | Acclaim Uranium Nl | Kingston | <1% | Annual Report On Group Reporting Area M53/336 Millipede For the Period 23/5/1998 to 22/5/1999 |
| A58545 | 1999 | Acclaim Uranium Nl | Abercromby Well | 20% | Abercromby Well 23/05/98 - 22/05/99 E53/447, 759 |
| A58606 | 1999 | Wiluna Mines Ltd | Wiluna | <1% | Joint Annual Report For the Period 1/01/1998 to 31/12/1998 E53/259,399,414,443,459,504,506,536,559,609,624,674 |
| A59054 | 1999 | Eagle Mining Corp Nl | Wiluna | <1% | Annual Report for C118/1993, Wiluna Project , E53/232,240, 277,286,405,735, P53/833-840 for the period 1 Janua |
| A59269 | 1999 | Acclaim Uranium Nl | Centipede | <1% | Acclaim Uranium NL, Centipede Uranium Deposit, WA, Ore Resource Estimate, April, 1999 M53/224, 336, 447, P53/7 |
| A53648 | 1998 | Eagle Mining Corp Nl | Wiluna | <1% | Annual Report - Wiluna Project Area, 01/01/1997 - 31/12/1997 E53/232, 240, 277, 286, 339, 405, P53/833-840 |
| A54267 | 1998 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 01/01/97-31/12/97. |
| A55286 | 1998 | Acclaim Uranium Nl | Millipede | <1% | Millipede, Annual Report M53/336 23/05/97 - 22/05/98 |
| A55227 | 1998 | Outokumpu Exp Aust Pty Ltd | Abercromby tion | 20% | Abercromby (JV) Project, Annual Report for the year ending 30/04/1998 ,E53/447; P53/759. |
| A50676 | 1997 | Eagle Mining Corp Nl | Wiluna | <1% | Annual report on the Wiluna Project Area E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 in |
| A50857 | 1997 | Cra Exploration Pty Ltd | Honeymoon Well | <1% | Annual report for 1996 on M53/35 M53/36 M53/55 M53/100 M53/380 and M53/381 E53/471 E53/474 E53/608 E53/615 E53 |
| A51728 | 1997 | Rio Tinto Exploration Pty Ltd | Abercromby Well | 20% | Annual Technical Report for the period ending 30/04/97 on E53/447 and P53/759, Abercromby Well Project. |
| A51729 | 1997 | Rio Tinto Exploration Pty Ltd | Barrack | <1% | Annual technical report for the period ending 22/05/97 on M53/336 Barrack JV Project. |
| A59307 | 1997 | Wiluna Mines Ltd | Lake Way- Centipede | 8% | Lake Way and Centipede Project[s], Non-statutory Report: Summary Geological Report on Uranium Deposits, M53/38 |
| A50912 | 1997 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the year ending 31/12/1996, M53/6............M53/384;E53/399..........E53/62 |
| A51135 | 1997 | Cra Exploration Pty Ltd | Wiluna | 3.9% | Wiluna (JV) Project, Annual Report for the period ending 31/12/1996 , M53/24, M53/26, M53/42, M53/49, M53/70, |
| A45142 | 1996 | Cra Exploration Pty Ltd | Honeymoon Well - Albion | <1% | Honeymoon Well - Albion Project, - Surrender Report to 15 July 1996 , E53/278. |
| A47747 | 1996 | Cra Exploration Pty Ltd | Wiluna | 3.9% | Wiluna Project, Annual Report for the period ending 31/12/1995 , M53/24, 26, 42, 49, 70, 71, 74, 78, 92, 113, |
| A48066 | 1996 | Cra Exploration Pty Ltd | Albion | <1% | Partial Surrender Report to 15 July 1995 on E53/278, Albion , SG51-09 Wiluna, SG51-13 Sir Samuel, WA |
| A48625 | 1996 | Cra Exploration Pty Ltd | Abercromby Well | 20% | Annual Report for the period ending 30/04/96, E53/447 & P53/759, Abercromby Well Project. |
| A47410 | 1996 | Eagle Mining Corp Nl | Wiluna | <1% | Annual Report , Wiluna Project , E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 inclusive |
| A47714 | 1996 | Cra Exploration Pty Ltd | Honeymoon Well | <1% | Annual report for 1995 on M53/35 M53/36 M53/55 M53/100 M53/380 and M53/381 Honeymoon Well, E53/278 Albion, E53 |
| A47867 | 1996 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 1st January 1995 to 31st December 1995 M53/6..........M53/ 384; P5 |
| A48570 | 1996 | Cra Exploration Pty Ltd | Barrack | <1% | Annual report to 22/05/96 on M53/336 Barrack Joint Venture SG51-09 Wiluna Western Australia Report No. 22021 |
| A45620 | 1995 | Cra Exploration Pty Ltd | Barrack | <1% | ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 30/4/1995 ON M53/336, BARRACK JV SG51-09 WILUNA, WESTERN AUSTRAL |
| A43969 | 1995 | Cra Exploration Pty Ltd | Honeymoon Well | <1% | Annual report for 1994 on M53/35 M53/36 M53/55 M53/100 M53/380 and M53/381 Honeymoon Well E53/278 Albion E53/4 |
| A45804 | 1995 | Cra Exploration Pty Ltd | Abercromby Well | 22% | Annual Report for the period ending 30/04/95 , E53/447, Abercromby Well Project. |
| A46667 | 1995 | Eagle Mining Corp Nl | Lake Way | <1% | Partial Surrender Report for the period 26/05/91-06/02/95 Lake Way Project E53/232 |
| A40929 | 1994 | Cra Exploration Pty Ltd | East Honeymoon Well | <1% | Annual report for 1993 on M53/35, 36, 55 and 100 Honeymoon Well E53/278 Albion, E53/471-474 Mystery Bore SG51- |
| A42550 | 1994 | Cra Exploration Pty Ltd | Albion | <1% | PARTIAL RELINQUISHMENT TO 16 JULY 1994 ON E53/278 ALBION SG51-09 WILUNA, WESTERN AUSTRALIA |
| A43762 | 1994 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project ,Annual Report for the period January 1st 1994 to 31st December 1994, GML53/703 & 752; P53/873; |
| A44275 | 1994 | Eagle Mining Corp Nl | Wiluna | <1% | Wiluna Joint Venture,Annual Report on Wiluna ProjectArea (E53/232,E53/240,E53/277,E53/286,E53/317,E53/339,E53/ |
| A40801 | 1993 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project Annual report for 1993 |
| A36605 | 1992 | Mr Trengove Bp | Kingston | <1% | Non-statutory Report : 1988 Report on Expenditure Mininig Lease M53/85. Kingston Project . |
| A36606 | 1992 | Hunter Resources Ltd | Lake Way | <1% | Lake Way Project, E53/232 Annual Report for the Period to 26/05/92. |
| A35709 | 1992 | Asarco Australia Ltd | Wiluna | 1.9% | Wiluna Project 1991 Annual report to Department of Mines |
| A32857 | 1991 | Asarco Australia Ltd | Wiluna | 1.9% | Wiluna Project, Annual Report for the year ending 31/12/1990, E53/53,71, 108, 118, 122 & 245; M53/24........M5 |
| A30112 | 1990 | Asarco Australia Ltd | Wiluna | 2.2% | Wiluna Project 1989 Annual Report to Mines Department. Asarco Australia Ltd. January 1990. (53 tenements). |
| A39372 | 1989 | Barrack Exploration Pty Ltd | Abercromby Well | <1% | Non-statutory ReportR Report for the period 1989 ,Abercromby Well Project, M53/85 Interpretation of Airborne G |
| A20272 | 1987 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Cross Section Ore Reserve, Wiluna Project, Western Australia (1986). |
| A20558 | 1987 | Bp Minerals Aust Pty Ltd | Millipede/ Lake Way | <1% | Agnew Joint Venture, Mining Lease 53/37, Final report for period 29th April 1986 to 9th March 1987 |
| A11225 | 1982 | Seltrust Mining Corp Pty Ltd | Lake Way | <1% | Lake Way Project, Non-statutory Report: Progress Report, March 1982, MC53/4783-4787. |
| A8776 | 1980 | Esso Exploration Aust Inc | Abercromby Well | 17% | Abercromby Well Project, Annual Report for the period ending 31/12/1979 , MC53/4806........MC53/5387. |
| A8123 | 1979 | Esso Exploration Aust Inc | Abercromby Well | 17% | Annual Report for the period 1978 Abercromby Well Project MC53/4806-4828 |
| A8224 | 1979 | Esso Exploration Aust Inc | Centipede | <1% | Centipede Project, Annual Report for the period ending 31/12/1978, MC53/4890-4897, 5255-5281, 5229-5249, 5322- |
| A8814 | 1979 | Esso Exploration Aust Inc | Millipede | <1% | Millipede Project, Annual Report for the year ending 31/12/1979, MC53/4783-4787. |
| A8734 | 1979 | Esso Exploration Aust Inc | Centipede | <1% | Centipede Project, Annual Report for the year ending 31/12/1979, MC53/4890-4897, 5153-5140, 5147-5149, 5152, 5 |
| A6524 | 1976 | International Nickel Aust Ltd | Abercromby Well | 17% | Annual Report for the period 07/07/75 to 31/12/75, Abercromby Well Project MC53/4806-4828. |
| A5937 | 1975 | Asarco Australia Ltd | Wiluna South | <1% | Wiluna South Project, Annual Report for the period ending 1st August 1975, MC53/221-231,4671-4689,4706-4707, 4 |
| A5806 | 1975 | Kennecott Exp Aust Pty Ltd | Duketon One - Laverton Three - Wiluna Tw | 3.3% | Final report [non-statutory] on the Shell Minerals Explorations (Australia) Pty Ltd joint venture agreement on |
| A5808 | 1974 | Kennecott Exp Aust Pty Ltd | Wiluna | 15% | Wiluna Claim Block, Annual report on work completed from March 1973 to March 1974, MC53/205-231 |
| A5807 | 1973 | Kennecott Exp Aust Pty Ltd | Wiluna | 15% | Wiluna Claim Block, Preliminary report - Phase 1 [Non-statutory report], March 1973, MC53/205-231 |
| A2563 | 1971 | Kennecott Exp Aust Pty Ltd | Wiluna Two Block- Boolygoo | 15% | Wiluna Two Block - Boolygloo Project, Annual Report (s) for 1970 & 1971, MC53/205-231. |
| A2731 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report: Quarterly Report for the period 01/07/1970-30/09/1970 & Summary 1966-1970 Expl |
| A960 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Quarterly Report(s) for the period 1st April 1969 to 30th June 1969,!st |
| A2770 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period ending 1st January 1968 to 31st December 1968, TR70/3702H; ML53/7 |
| A959 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Quarterly Reports covering periods:- 01/01/1968 to 31/03/1968, 01/04/196 |
| A957 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Annual Report for the period 29th June 1966 to 28th June 1967, TR70/3702 |
| A958 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 1st January 1967 to 31st December 1967, TR70/3702H. |
| A37266 | 1753 | Hunter Resources Ltd | Albion | <1% | Annual Report for the Period 17/07/91 - 16/07/92 ,Albion Project, E53/278 |
| A41328 | 1753 | Orpheus Geoscience Pty Ltd | Wiluna | <1% | Annual report for the period 01/01/93- 31/12/93 Wiluna JV Project E53/232 E53/240 E53/277 E53/286 E53/317 E53/ |
| A54820 | 1753 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project, Annual Report Year Ending: 31/12/97 Mining Lease: 53/35, 36, 55, 100, 380, 381, |
| A26359 | 1753 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project. 1988 Annual Report. AsarcoAustralia Ltd. E53/35, 108, 118, 120 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 53/113 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 53/113? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.