M 53/796
Register summary
- Holder
- So4 Pty Ltd
- Local government
- Shire of Wiluna
- Application received
- 28 Apr 1998
- Commenced
- 21 Nov 2001
- Expiry
- 20 Nov 2043
- Term
- 21 Years (Renewed)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123068 | 2020 | Blackham Resources Limited | Lake Way | 7.9% | Lake Way C73/2017 Annual Report for the period ending 31/12/2019 |
| A123461 | 2020 | Toro Energy Limited | Wiluna | <1% | Wiluna Uranium Project Annual Technical Report C170/2010 For the Period 1 January 2019 to 31 December 2019, E |
| A124145 | 2020 | Salt Lake Potash Limited | Lake Way | <1% | Lake Way Shoreline Paleochannel Drilling (R20) |
| A124423 | 2020 | Piper Preston Pty. Ltd. | Lake Way | <1% | Lake Way Annual Technical Report C30/2019 for the period ending 30/04/2020 |
| A119315 | 2019 | Blackham Resources Limited | Lake Way | 7.9% | Lake Way C73/2017 Annual Report for the period 1 January 2018 to 31 December 2018 |
115 more reports
| A119643 | 2019 | Toro Energy Ltd | Wiluna | <1% | Wiluna Uranium Project C170/2010 Annual Technical Report for the period 1 January 2018 to 31 December 2018, E5 |
| A116220 | 2018 | Blackham Resources Limited | Lake Way | 7.2% | Lake Way C73/2017 Annual Report For the Period 1 January 2017 to 31 December 2017 |
| A116578 | 2018 | Toro Energy Ltd | Wiluna Uranium | <1% | Wiluna Uranium Project Annual Technical Report, C170/2010, 01 January 2017 to 31 December 2017 |
| A118500 | 2018 | Salt Lake Potash Limited | Lake Way | 1.6% | Annual Technical Report E53/1787 for the period 12 October 2017 to 11 October 2018 Lake Way Project |
| A112028 | 2017 | Blackham Resources Limited | Wiluna | <1% | Combined Annual Report Wiluna Project C14/2012 for the period 01/01/2016 to 31/12/2016 |
| A112005 | 2017 | Toro Energy Ltd | Wiluna | 3.2% | Wiluna Uranium Project C170/2010 Annual Technical Report For the Period 1 January 2016 to 31 December 2016 |
| A108745 | 2016 | Toro Energy Ltd | Wiluna | 1.4% | Wiluna Uranium Project Annual Technical Report |
| A108455 | 2016 | Blackham Resources Ltd | Wiluna | <1% | C14/2012 Combined Annual Report WILUNA PROJECT 1 January 2015 to 31 December 2015 |
| A107291 | 2015 | Metals X Limited | Wiluna South | 1.2% | Final Surrender Report, E53/1232 |
| A105185 | 2015 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report Wiluna Project for the period 1 January 2014 to 31 December 2014 (C14/2012), E53/1290.. |
| A105506 | 2015 | Metals X Limited | Wiluna South | 1.2% | Annual Mineral Exploration Report, E53/1232 Wiluna South for the period 09 March 2014 to 08 March 2015 |
| A106427 | 2015 | Toro Energy Limited | Wiluna | 1.1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Report 170/2010 for the period January 1st t |
| A100948 | 2014 | Blackham Resources Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 01/01/2012 to 31/12/2013, E53// 1290,1297; M53/24-25, 34, 41, 52- |
| A101925 | 2014 | Metals X Limited | Wiluna South | 1.2% | Annual Mineral Exploration Report, E53/1232 Wiluna South Project for the period 09 March 2013 to 08 March 2014 |
| A101990 | 2014 | Toro Energy Ltd | Wiluna | 1.1% | Annual Mineral Exploration Report Wiluna Uranium Project Combined Reporting 170/2010 January 1st to December 3 |
| A97621 | 2013 | Toro Energy Ltd | Wiluna | 1.2% | Wiluna Project, Annual Report for the period 1st January 2012 to 31st December 2012, E53/1132............E53/1 |
| A97361 | 2013 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report WILUNA PROJECT For the Period 1 January 2012 to 31 December 2012, E53/1290, E53/1297, M |
| A98348 | 2013 | Alacer Gold Corporation | Wiluna South | 1.2% | Wiluna South Project Combined Annual Technical Report C143/2002, E53/1232, for the Period 1 May 2012 to 30 Apr |
| A94119 | 2012 | Alacer Gold Corporation | Wiluna South | 1.2% | WILUNA SOUTH PROJECT Combined Annual Technical Report C143/2002 E53/1232 for the Period 1 May 2011 to 30 April |
| A92721 | 2012 | Mpi Nickel Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project, Annual Report for the period 1st January 2011 to 31st December 2011, E53/1243-1244; |
| A92922 | 2012 | Avoca Resources Ltd | Wiluna South | 1.2% | WILUNA SOUTH PROJECT Exploration Licence 53/1232 Partial Surrender Report for the Period 9th March 2007 to 29t |
| A93240 | 2012 | Blackham Resources Ltd | Wiluna | <1% | Combined Annual Report Wiluna Project C14/2012 for the period 1 January 2011 to 31 December 2011 |
| A93539 | 2012 | Toro Energy Ltd | Wiluna | 1.3% | Annual Mineral Exploration Report Wiluna Uranium Project January 1st to December 31st 2011, Combined Reporting |
| A89493 | 2011 | Norilsk Nickel Australia Ltd | THE HONEYMOON WELL | <1% | ANNUAL REPORT ON EXPLORATION, THE HONEYMOON WELL PROJECT FOR THE PERIOD 1 JANUARY 2010 TO 31 DECEMBER 2010 W |
| A89756 | 2011 | Minerals And Metals Group Ltd | Wiluna | <1% | Combined Annual Report for Period 01/01/2010 to 31/12/2010 Project Wiluna C169/2001 |
| A89783 | 2011 | Toro Energy Ltd | Wiluna | 2.1% | Annual Mineral Exploration Report, Wiluna Uranium Project January 1st to December 31st 2010 Combined Reporting |
| A90931 | 2011 | Avoca Resources Ltd | Wiluna South | 1.2% | Wiluna South Project Combined Annual Technical Report C143/2002, E53/1232, for the Period 1 May 2010 to 30 Apr |
| A85989 | 2010 | Minerals And Metals Group Ltd | Wiluna | 1% | Combined Annual Report for the period 01/01/2009 to 31/12/2009, Project Wiluna C169/2001, E 53/845, E 53/854, |
| A86166 | 2010 | Norilsk Nickel Australia Ltd | Honeymoon Well | <1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2009 TO 31 DECEMBER 2009, WI |
| A87310 | 2010 | Avoca Resources Ltd | Wiluna South | 1.2% | Wiluna South Project Combined Annual Technical Report C143/2002 (E53/1232 and P53/1270) for the Period 1 May 2 |
| A81676 | 2009 | Norilsk Nickel Australia Ltd | HONEYMOON WELL | <1% | ANNUAL REPORT ON EXPLORATION THE HONEYMOON WELL PROJECT, FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008, WI |
| A82690 | 2009 | Avoca Resources Ltd | WILUNA SOUTH | 2.4% | WILUNA SOUTH PROJECT EXPLORATION LICENCES 53/1010, E53/1232 and PROSPECTING LICENCE 53/1270, COMBINED TECHNICA |
| A77857 | 2008 | Norilsk Nickel Australia Ltd | East Honeymoon Well | 2.6% | Annual Report on Exploration The Honeymoon Well Project For the period 1 January 2007 to 31 December 2007 Comb |
| A77398 | 2008 | Oxiana Ltd | Wiluna | <1% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2007 TO 31/12/2007 PROJECT WILUNA C169/2001 |
| A79129 | 2008 | Avoca Resources Ltd | WILUNA SOUTH | 2.4% | WILUNA SOUTH PROJECT EXPLORATION LICENCES 53/1010, E53/1232 and PROSPECTING LICENCE 53/1270 Combined Technica |
| A81118 | 2008 | Oz Minerals Ltd | WILUNA | 1.2% | COMBINED ANNUAL REPORT FOR PERIOD 01/01/2008 TO 31/12/2008 PROJECT WILUNA C169/2001, E 53/1003, E 53/1120, E 5 |
| A74391 | 2007 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for Period 01/01/2006 to 31/12/2007, Wiluna Project C169/2001, (Glengarry). |
| A74667 | 2007 | Mpi Mines Ltd | East Honeymoon Well | 2.6% | Annual Report on Exploration The Honeymoon Well Project for the period 1 January 2006 to 31 December 2006 Comb |
| A75617 | 2007 | Avoca Resources Ltd | Wiluna South | 2.4% | Wiluna South Project Exploration Licences 53/1010 and Prospecting Licence 53/1113, Combined Technical Report ( |
| A71900 | 2006 | Agincourt Resources Ltd | Wiluna | <1% | Combined Annual Report for period 01/01/2005 to 31/12/2005, Project Wiluna C169/2001, (Glengarry). |
| A72017 | 2006 | Mpi Mines Ltd | East Honeymoon Well | 2.6% | First Report - Annual Report on the Honeymoon Well Project, For the period 1 January 2005 to 31 December 2005, |
| A73039 | 2006 | Avoca Resources Ltd | Wiluna | 2.4% | Wiluna South Project Exploration Licences E53/1010,1012, Prospecting Licence P53/1113, Combined Technical Repo |
| A70195 | 2005 | Mpi Mines Pty Ltd | East Honeymoon Well | 2.6% | Annual Report on the Honeymoon Well project for the period 1 January 2004 to 31 December 2004 Combined Reporti |
| A70415 | 2005 | Agincourt Resources Ltd | Wiluna | 1% | Combined annual report for the period 01/01/04 - 31/12/04 Wiluna Project, C169/2001, E53/259, 399, 536, 609, 6 |
| A71051 | 2005 | Avoca Resources Ltd | Wiluna South Gold | 2.4% | Wiluna South Gold Project, Exploration licences 53/1010, 1012 and Prospecting licence 53/1113. Combined techni |
| A68552 | 2004 | Mining Project Investors Pty Ltd | East Honeymoon Well | 2.6% | Annual Combined Technical Report Honeymoon Well Project Wilu na District Period: 1st January 2003 to 31st Dece |
| A68297 | 2004 | Agincourt Resources Ltd | Wiluna | 1% | Annual report for the period 01/01/2003-31/12/2003 Wiluna Project (C169/2001), E53/259, E53/399, E53/536, E53/ |
| A69573 | 2004 | Avoca Resources Ltd | Wiluna South | 2.4% | Wiluna South Gold Project, Exploration Licences E53/1010, E53/1012 and Prospecting Licence P53/1113, Combined |
| A66769 | 2003 | Avoca Resources Ltd | Wiluna South | 2.4% | Wiluna South Gold Project, E53/1010, 1012 and P53/1113, Combined Technical Report (C143/2002)for the period |
| A66362 | 2003 | Newmont Australia Ltd | Wiluna | 1% | Combined Annual Report for period 01/01/2002 to 31/12/2002 Project Wiluna C169/2001: E53/232, 259, 399, 443, 5 |
| A67013 | 2003 | Newmont Yandal Operations Ltd | Wiluna | 20% | Surrender Report for the period ending 04/06/2003 ,Wiluna Project. C169/2001 E53/443,232 P53/873. |
| A64419 | 2002 | Outokumpu Exp Aust Pty Ltd | East Honeymoon Well | 5.6% | Annual Exploration Report For Year Ending 31st December 2001 Mining Leases 53/35, 53/36, 53/55, 53/100 Explora |
| A64797 | 2002 | Newmont Yandal Operations Ltd | Wiluna | 1% | Combined Annual Report For Period 01/01/2001 To 31/12/2001 Project Wiluna C169/2001 E53/232, E53/259, 399, 443 |
| A61998 | 2001 | Wmc Resources Ltd | Lake Way | <1% | Exploration license: E53/408 Annual Report for the period 8 December 1999 to 7 December 2000 (Sir Samuel SG 51 |
| A61999 | 2001 | Wmc Resources Ltd | Lake Way | <1% | Exploration license: E53/409 Annual Report for the period 8 December 1999 to 7 December 2000 (Sir Samuel, SG 5 |
| A62490 | 2001 | Normandy Yandal Operations Ltd | Wiluna | 4.5% | Combined Annual Report On Exploration For Period 1/01/2000 To 31/12/2000 Project Wiluna C118-1993 E53/232, 240 |
| A63855 | 2001 | Wmc Resources Ltd | LAKE WAY | <1% | Exploration licenses E53/408 and E53/409 Final Surrender Report for the period 8.12.1992 to 17.08.2001, Wiluna |
| A63894 | 2001 | Outokumpu Mining Australia Pty Ltd | Abercromby | 18% | Abercromby Project, Annual Report for the year ending 30th April 2001,E53/447;P53/759. |
| A62437 | 2001 | Normandy Yandal Operations Ltd | Wiluna nickel | <1% | Annual Report on Exploration for period 01/01/2000 to 31/12/2000 |
| A60013 | 2000 | Acclaim Uranium Nl | Abercromby Well | 18% | Annual Report on Group Reporting Area C169/1999 E53/447 & P53/759 Abercromby Well For the period 23/05/1999 to |
| A60250 | 2000 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Mining Leases 53/35,53/36,53/55,53/100,53/380,53/381 and Exploration Licences 53/397,53/471,53/474,53/608,53/6 |
| A60487 | 2000 | Great Central Mines Ltd | Wiluna | <1% | Joint Annual Report: Wiluna C132/1994 for the Period 01/01/1999 to 31/12/1999. |
| A61063 | 2000 | Outokumpu Exp Aust Pty Ltd | Tullock Well | <1% | Tullock Well Project, E53/608 Surrender Report for Period 1st December 1995 to 28th March 2000. |
| A57782 | 1999 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project 31/12/98 Mining Lease:53/35-36, 55. 100, 380, 397 etc |
| A58545 | 1999 | Acclaim Uranium Nl | Abercromby Well | 18% | Abercromby Well 23/05/98 - 22/05/99 E53/447, 759 |
| A58579 | 1999 | Wmc Resources Ltd | Mount Keith | <1% | Mount Keith Operations, Partial Relinquishement report to for E53/408 and E53/409, for period 8/12/1992 to 8/0 |
| A58606 | 1999 | Wiluna Mines Ltd | Wiluna | <1% | Joint Annual Report For the Period 1/01/1998 to 31/12/1998 E53/259,399,414,443,459,504,506,536,559,609,624,674 |
| A57725 | 1999 | Wmc Resources Ltd | Mount Keith | <1% | Mount Keith Operations Annual Report 30/03/1999 E53/408-412, 545 |
| A59054 | 1999 | Eagle Mining Corp Nl | Wiluna | 4.5% | Annual Report for C118/1993, Wiluna Project , E53/232,240, 277,286,405,735, P53/833-840 for the period 1 Janua |
| A54063 | 1998 | Wmc Resources Ltd | Mount Keith | <1% | Mount Keith Operations - Annual Report (Wobbly Bore Area) E53/408-412, 436, 438-440, 545, 01/01/1997 - 31/12/1 |
| A54267 | 1998 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 01/01/97-31/12/97. |
| A55227 | 1998 | Outokumpu Exp Aust Pty Ltd | Abercromby tion | 18% | Abercromby (JV) Project, Annual Report for the year ending 30/04/1998 ,E53/447; P53/759. |
| A53648 | 1998 | Eagle Mining Corp Nl | Wiluna | 3.7% | Annual Report - Wiluna Project Area, 01/01/1997 - 31/12/1997 E53/232, 240, 277, 286, 339, 405, P53/833-840 |
| A59307 | 1997 | Wiluna Mines Ltd | Lake Way- Centipede | 7.3% | Lake Way and Centipede Project[s], Non-statutory Report: Summary Geological Report on Uranium Deposits, M53/38 |
| A50912 | 1997 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the year ending 31/12/1996, M53/6............M53/384;E53/399..........E53/62 |
| A50676 | 1997 | Eagle Mining Corp Nl | Wiluna | 3.7% | Annual report on the Wiluna Project Area E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 in |
| A50857 | 1997 | Cra Exploration Pty Ltd | Honeymoon Well | <1% | Annual report for 1996 on M53/35 M53/36 M53/55 M53/100 M53/380 and M53/381 E53/471 E53/474 E53/608 E53/615 E53 |
| A51728 | 1997 | Rio Tinto Exploration Pty Ltd | Abercromby Well | 18% | Annual Technical Report for the period ending 30/04/97 on E53/447 and P53/759, Abercromby Well Project. |
| A47867 | 1996 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project Annual Report for the period 1st January 1995 to 31st December 1995 M53/6..........M53/ 384; P5 |
| A48625 | 1996 | Cra Exploration Pty Ltd | Abercromby Well | 18% | Annual Report for the period ending 30/04/96, E53/447 & P53/759, Abercromby Well Project. |
| A47410 | 1996 | Eagle Mining Corp Nl | Wiluna | 3.7% | Annual Report , Wiluna Project , E53/232 E53/240 E53/277 E53/286 E53/339 E53/405 P53/833 to P53/840 inclusive |
| A48586 | 1996 | Wmc Resources Ltd | Mount Keith | <1% | Mount Keith Project, (Lake Way Exploration Area), Partial Surrender Report for the period 8th December 1992 to |
| A45041 | 1995 | Western Mining Corporation Ltd | Mount Keith | <1% | Mt Keith Nickel Project Annual report 01/01/94 to 31/12/94 |
| A46667 | 1995 | Eagle Mining Corp Nl | Lake Way | 32% | Partial Surrender Report for the period 26/05/91-06/02/95 Lake Way Project E53/232 |
| A45804 | 1995 | Cra Exploration Pty Ltd | Abercromby Well | 20% | Annual Report for the period ending 30/04/95 , E53/447, Abercromby Well Project. |
| A43762 | 1994 | Wiluna Mines Ltd | Wiluna | <1% | Wiluna Project ,Annual Report for the period January 1st 1994 to 31st December 1994, GML53/703 & 752; P53/873; |
| A44275 | 1994 | Eagle Mining Corp Nl | Wiluna | 2.1% | Wiluna Joint Venture,Annual Report on Wiluna ProjectArea (E53/232,E53/240,E53/277,E53/286,E53/317,E53/339,E53/ |
| A38700 | 1993 | Western Mining Corporation Ltd | Mount Keith | <1% | Annual Report for the period 01/01/92-31/12/92 Mt Keith Project |
| A40801 | 1993 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project Annual report for 1993 |
| A35709 | 1992 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project 1991 Annual report to Department of Mines |
| A36606 | 1992 | Hunter Resources Ltd | Lake Way | 32% | Lake Way Project, E53/232 Annual Report for the Period to 26/05/92. |
| A32857 | 1991 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the year ending 31/12/1990, E53/53,71, 108, 118, 122 & 245; M53/24........M5 |
| A30112 | 1990 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project 1989 Annual Report to Mines Department. Asarco Australia Ltd. January 1990. (53 tenements). |
| A20272 | 1987 | Asarco Australia Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Cross Section Ore Reserve, Wiluna Project, Western Australia (1986). |
| A8776 | 1980 | Esso Exploration Aust Inc | Abercromby Well | 14% | Abercromby Well Project, Annual Report for the period ending 31/12/1979 , MC53/4806........MC53/5387. |
| A8123 | 1979 | Esso Exploration Aust Inc | Abercromby Well | 14% | Annual Report for the period 1978 Abercromby Well Project MC53/4806-4828 |
| A8224 | 1979 | Esso Exploration Aust Inc | Centipede | <1% | Centipede Project, Annual Report for the period ending 31/12/1978, MC53/4890-4897, 5255-5281, 5229-5249, 5322- |
| A8734 | 1979 | Esso Exploration Aust Inc | Centipede | <1% | Centipede Project, Annual Report for the year ending 31/12/1979, MC53/4890-4897, 5153-5140, 5147-5149, 5152, 5 |
| A7539 | 1978 | Esso Exploration Aust Inc | Centipede | <1% | Centipede Project, Annual Report for the year ending 31/12/1977, MC53/4890-4897. |
| A6524 | 1976 | International Nickel Aust Ltd | Abercromby Well | 14% | Annual Report for the period 07/07/75 to 31/12/75, Abercromby Well Project MC53/4806-4828. |
| A5937 | 1975 | Asarco Australia Ltd | Wiluna South | 2.9% | Wiluna South Project, Annual Report for the period ending 1st August 1975, MC53/221-231,4671-4689,4706-4707, 4 |
| A5806 | 1975 | Kennecott Exp Aust Pty Ltd | Duketon One - Laverton Three - Wiluna Tw | 2.6% | Final report [non-statutory] on the Shell Minerals Explorations (Australia) Pty Ltd joint venture agreement on |
| A5808 | 1974 | Kennecott Exp Aust Pty Ltd | Wiluna | 12% | Wiluna Claim Block, Annual report on work completed from March 1973 to March 1974, MC53/205-231 |
| A5807 | 1973 | Kennecott Exp Aust Pty Ltd | Wiluna | 12% | Wiluna Claim Block, Preliminary report - Phase 1 [Non-statutory report], March 1973, MC53/205-231 |
| A2563 | 1971 | Kennecott Exp Aust Pty Ltd | Wiluna Two Block- Boolygoo | 12% | Wiluna Two Block - Boolygloo Project, Annual Report (s) for 1970 & 1971, MC53/205-231. |
| A2731 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report: Quarterly Report for the period 01/07/1970-30/09/1970 & Summary 1966-1970 Expl |
| A960 | 1970 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Quarterly Report(s) for the period 1st April 1969 to 30th June 1969,!st |
| A2770 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period ending 1st January 1968 to 31st December 1968, TR70/3702H; ML53/7 |
| A959 | 1968 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Quarterly Reports covering periods:- 01/01/1968 to 31/03/1968, 01/04/196 |
| A957 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Non-statutory Report: Annual Report for the period 29th June 1966 to 28th June 1967, TR70/3702 |
| A958 | 1967 | Delhi Aust Petroleum Ltd | Wiluna | <1% | Wiluna Project, Annual Report for the period 1st January 1967 to 31st December 1967, TR70/3702H. |
| A41130 | 1753 | Western Mining Corporation Ltd | Mount Keith | <1% | Annual Report for the Period 01/01/93 - 31/12/93 Mt Keith Nickel Project |
| A41328 | 1753 | Orpheus Geoscience Pty Ltd | Wiluna | 3.7% | Annual report for the period 01/01/93- 31/12/93 Wiluna JV Project E53/232 E53/240 E53/277 E53/286 E53/317 E53/ |
| A48724 | 1753 | Wmc Resources Ltd | Mount Keith | <1% | Mt Keith Nickel Project Various Tenements (Refer Table 1) C467/1996 Annual report 01/01/95 to 31/12/95 |
| A54820 | 1753 | Outokumpu Exp Aust Pty Ltd | Honeymoon Well | <1% | Honeymoon Well Project, Annual Report Year Ending: 31/12/97 Mining Lease: 53/35, 36, 55, 100, 380, 381, |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 17 years · 20 Nov 2043
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over M 53/796 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold M 53/796? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.