NextMaps›WA Tenements›P 37/9638

P 37/9638

LiveProspecting LicenceShire of LeonoraMt. Malcolm District

P 37/9638 is a live prospecting licence in the Shire of Leonora, Western Australia, held by Bhasin, Neelesh and Crew, Ross Frederick. Granted on 18 Oct 2022 for 4 years (extended), it expires on 17 Oct 2030. The ground is covered by 91 historical WAMEX reports.

Area
51.414ha
Expires
Oct 2030
in 4 years
WAMEX reports
91
WA median is 53
Report drilling
70
of 91 reports
Free Tenure Pack for P 37/9638
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For P 37/9638 that covers 91 WAMEX reports · 66 open-file drillholes (952 m drilled) · 27 earlier titles on the ground since 1951 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Leonora Explore on the live map

Register summary

Holders
Bhasin, Neelesh, Crew, Ross Frederick
Local government
Shire of Leonora
Application received
24 Mar 2022
Commenced
18 Oct 2022
Expiry
17 Oct 2030
Term
4 Years (Extended)

The full record on P 37/9638

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 4 years of expenditure, 6 conditions and 12 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (1 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

91 historical WAMEX exploration reports intersect P 37/9638: 42 report geochemistry or sampling, 64 include a digital data package.
Work on record: Diamond drilling 36 · RC drilling 32 · Geological mapping 30 · Soil sampling 30 · Rotary drilling 27 · Rock chip sampling 25. Resource declared in A123220 (2020), A115994 (2018), A112037 (2017), A107603 (2015) and 15 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on P 37/9638, free for new accounts.
When this ground was worked · 89 of 91 reports dated
41970s
11980s
291990s
242000s
282010s
32020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A123220 2020 Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd Teutonic Bore Project <1% Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019
A124222 2020 Nu-Fortune Gold Ltd Mount Clifford <1% Annual Technical Report for Mt Clifford Project Area C3/2020 for the period ending 13 March 2020
A125691 2020 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2019 to 30 September
A119556 2019 Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd Teutonic Bore <1% C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018
A122153 2019 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2018 to 30 September
86 more reports
A120181 2019 Roxbury Trading Pty Ltd Mount Clifford <1% 2018-2019 Combined Annual Exploration Report for the Mt Clifford Project C139/2015 for the period 14 March 201
A115994 2018 Independence Group Nl Teutonic Bore <1% Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2
A118601 2018 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2017 to 30 September
A110680 2017 St Barbara Limited Cambrian <1% Cambrian Project P37/07407 FINAL SURRENDER REPORT For the Period 27 November 2008 to 26 November 2016 for P37
A112037 2017 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016
A115512 2017 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2016 to 30 September
A110551 2016 St Barbara Limited Gwalia <1% Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2015 to 30 September
A107737 2016 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015
A105028 2015 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014,
A105577 2015 St Barbara Ltd Leonora <1% Partial Surrender Report Tenement: E37/916 (Leonora) Reporting Period 17 March 2009 to 16 March 2015
A105578 2015 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP, E37/916 (Leonora) Reporting Period 17 March 2014 – 16 March 2015
A105579 2015 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A107603 2015 St Barbara Limited Gwalia <1% Gwalia Project C55/2004 Combined Annual Report for the Period 1 October 2014 to 30 September 2015
A101281 2014 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013,
A102142 2014 St Barbara Mines Ltd Leonora <1% Leonora Project, Final Surrender Report, E37/915, for the period 3rd March 2009 to 2nd March 2014. [C162/2006]
A102258 2014 St Barbara Ltd Leonora <1% Annual Mineral Exploration Report - DMP Combined Reporting Group C162/2006 (Leonora) Reporting Period 1 April
A97747 2013 Independence Group Nl Teutonic Bore <1% Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012,
A98017 2013 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the period 1st April 2012 to 31st March 2013, E37/670.......E37/964; M36/41
A98608 2013 Independence Group Nl Teutonic Bore <1% Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37
A93519 2012 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011
A93822 2012 St Barbara Ltd Leonora <1% Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012
A89792 2011 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2010 to 31st December 2010
A90352 2011 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep
A85496 2010 St Barbara Ltd McEast <1% McEast C162/2006 E37/496, Partial Surrender Report for the Period 22 September 2005 to 21 September 2009
A86577 2010 Jabiru Metals Ltd Teutonic Bore <1% Teutonic Bore Project Combined Annual Report C157/2002, For the period 1st January 2009 to 31st December 2009,
A87123 2010 St Barbara Ltd Leonora <1% Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37
A81243 2009 Jabiru Metals Ltd TEUTONIC BORE <1% TEUTONIC BORE PROJECT COMBINED ANNUAL REPORT C157/2002 For the period 1st January 2008 to 31st December 2008
A78149 2008 Jabiru Metals Ltd Teutonic Bore <1% COMBINED ANNUAL REPORT, E37/512, E37/258, E37/319, M37/44, M37/515, M37/1132, M37/1153, P37/4326, P37/6794-P37
A78842 2008 St Barbara Ltd Leonora <1% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E
A80228 2008 Montezuma Mining Company Ltd WEEBO <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2007 to 22 November 2008
A74695 2007 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report Teutonic Bore Project C157/2002 From 18 January 2006 to 17 January 2007
A74019 2007 St Barbara Ltd Cambrian 1.4% Cambrian Project E37/281, Surrender Report for the Period 29 January 1993 to 28 September 2006, (St Barbara Re
A75283 2007 St Barbara Ltd Leonora <1% Leonora Project, Annual Report for the Period 1 April 2006 - 31 March 2007, C162/2006.(Report No.0051-2007-02)
A77253 2007 Montezuma Mining Company Ltd Weebo <1% Annual Report on E37/802, WEEBO PROJECT, For the Period 23 November 2006 to 22 November 2007
A72388 2006 Jabiru Metals Ltd Teutonic Bore <1% Combined Annual Report E37/258, 512, M37/44,515, 1132, 1153, P37/4326, Teutonic Bore Project, Combined Reporti
A72988 2006 St Barbara Mines Ltd McEast - Robinsons <1% McEast / Robinsons Project, Annual Report for the Period 1 July 2005 to 30 June 2006, Combined Reporting No. C
A70505 2005 Jabiru Metals Ltd Teutonic Bore <1% Combined annual report, E37/258, 501, 512, 691, M37/44, P37/4326, and 6235, Teutonic Bore Project, C157/2002,
A68874 2004 Pilbara Mines Ltd Teutonic Bore <1% Exploration Licences E37/258, M37/44, E37/501, E37/691, E37/512, P37/6235, Teutonic Bore Project Combined Annu
A68976 2004 Sons Of Gwalia Ltd McEast-Robinsons <1% McEast/Robinsons project, annual report for the period 5 June 2003 - 30 June 2004
A65854 2003 Sons Of Gwalia Ltd Mount Newman <1% 2001/02 Annual Report for period 01/07/01 to 30/06/02 Group Reporting No C121/1999 Mount Newman/Royal Arthur B
A65855 2003 Sons Of Gwalia Ltd Cambrian <1% Annual Report for period 05/06/01 to 04/06/02, C327/1995, Cambrian JV Project , E37/236, E37/281, E37/294, M3
A66780 2003 Sons Of Gwalia Ltd Royal Arthur Bore <1% Royal Arthur Bore Project, Surrender Report for C121/1999 Tenements Surrendered between 28 November 2002 and
A66925 2003 Sons Of Gwalia Ltd Cambrian <1% CAMBRIAN PROJECT ANNUAL REPORT FOR THE PERIOD 5 JUNE 2002 – 4 JUNE 2003 C327/1995, M37/479, E37/236,281,294,
A66964 2003 Pilbara Mines Ltd Teutonic Bore <1% Combined Annual Report for the period ending 17 January 2003 C157/2002 (formerly C417/1994): E37/258, M37/44,
A67076 2003 Sons Of Gwalia Ltd MOUNT NEWMAN <1% MOUNT NEWMAN, Annual report for the period 1 July 2002 to 30 June 2003 C121/1999: M37/459-460,478 E37/235,284,
A67765 2003 Pacmin Mining Corporation Ltd Cambrian <1% Annual Report for the period 05/06/1999- 04/06/2000 Cambrian Project C327/1995, E37/236, E37/281, E37/294, E37
A63877 2002 Sons Of Gwalia Ltd Royal Arthur Bore <1% 2000/01 Annual Report Royal Arthur Bore Project Area E37/235, E37/284, E37/345, M37/459, M37/460, M37/478, P37
A61673 2001 Pilbara Mines Ltd Teutonic Bore <1% Digital Data at November 2000 on P37/4326, E37/258,501,512, M37/44,636,705, Teutonic Bore.
A63376 2001 Pacmin Mining Corporation Ltd Cambrian <1% 2000/2001 Annual Report Cambrian Project Area - E37/236, E37 /281, E37/294, E37/492, M37/479, P37/4402, P37/44
A62612 2000 Pacmin Mining Corporation Ltd Royal Arthur Bore <1% 1999/2000 Annual Report Royal Arthur Bore Project Area E37/235, E37/284, E37/345, M37/459, M37/460, M37/478 P3
A57477 1999 Pacific Mining Corporation Ltd Cambrian <1% Annual Report for Cambrian Project for the period ending 04/06/98. E37/236,281,294,409. M37/479. P37/4402,4434
A58460 1999 Pacmin Mining Corporation Ltd Royal Arthur Bore <1% Royal Arthur Bore Project - Mt Margaret Mineral Field W.A. 01/02/98 - 31/01/99 E37/284, M37/478, P37/4681-4682
A57072 1999 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore JV 18/01/97 - 17/01/98 E37/258, 282, 353, 373-375, 501, P37/4326, M37/44, MLA37/515, 636, 705
A59344 1999 Pacmin Mining Corporation Ltd Cambrian <1% Cambrian Project, Annual Report for the period 05/06/1998 to 04/06/1999, E37/236,E37/281,E37/294,E37/409,M37/
A54022 1998 Tarmoola Australia Pty Ltd Royal Arthur Bore <1% Compulsory Partial Surrender Report for Tenement E37/284 (part of the Royal Arthur Bore Project Group).
A55251 1998 Tarmoola Australia Pty Ltd Royal Arthur Bore <1% Royal Arthur Bore Project, Annual Technical Report 01/02/97 - 31/01/98 E37/284, M37/478, P37/4681-4682, 4883-4
A50583 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Final Report Exploration Licence E37/247 for the period 18th December 1991 to 17th Dece
A50936 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual Report Teutonic Bore JV E37/247 E37/258 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Technical
A51326 1997 Mt Edon Gold Mines Aust Ltd Royal Arthur <1% Annual report on the Exploration of the Royal Arthur Bore Prospect Area E37/284 M37/478 P37/4681 P37/4682 P37/
A51653 1997 Goldfields Exploration Pty Ltd Wendy's Bore <1% Partial Surrender Report, Wendy's Bore JV E37/282 , Technical Report for the period 29/01/1993 to 28/01/1997.
A52599 1997 Goldfields Exploration Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Final Surrender Report for the period 9th November 1994 to 1st September 1997, E37/353,
A49707 1996 Mt Edon Gold Mines Aust Ltd Leonora <1% Leonora Project ( Cambrian JV Tenements) Annual Report for the period ending June 30th 1996, E37/236, 281, 294
A47244 1996 Goldfields Exploration Pty Ltd Teutonic Bore <1% Annual report Teutonic Bore JV E37/247 E37/258 E37/282 E37/353 E37/373 to E37/375 P37/4326 M37/44 MLA37/515 Te
A48470 1996 Mt Edon Gold Mines Aust Ltd Royal Arthur <1% Royal Arthur E37/284 M37/478 P37/4681 P37/4682 P37/4883 P37/4884 P37/4885 P37/4886 P37/4887 P37/4888 P37/4889
A48976 1995 Mt Edon Gold Mines Aust Ltd Cambrian <1% Cambrian (JV) Project, E37/236 E37/281 E37/294 M37/479 P37/4402 P37/4434 and P37/4988, for the period ending J
A43995 1995 Mt Edon Gold Mines Aust Ltd Leonora 1.4% Leonora Project, Annual Report for the period ending January 28, 1995, E37/281.
A44162 1995 Pancontinental Gold Operations Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Annual Report for the period ending 17th January 1995, E37/247 E37/258 & E37/282; M37/
A44932 1995 Stockdale Prospecting Ltd Leonora <1% Annual Combined Report Exploration Licences 37/220-221 & 37/226 Leonora project, for the period 02/1994-02/199
A46410 1995 Mt Edon Gold Mines Aust Ltd Royal Arthur Bore <1% Annual Report ,Royal Arthur Bore Project, for the period ending November 9th, 1995, P37/4883 P37/4884 P37/4885
A46411 1995 Mt Edon Gold Mines Aust Ltd Royal Arthur Bore <1% Annual Report on the exploration of the Royal Arthur Bore Project, for the period ending May 4, 1995 E37/284.
A40806 1994 Mim Exploration Pty Ltd Wendy's Bore <1% Annual Report Year ending January 1994 Exploration Licence E37/282 Wendy's Bore
A41263 1994 Mt Edon Gold Mines Nl Cambrian 1.4% Annual Reprt for the period 28/01/94 - 28/01/95 Tenements E37/281 Mt Margaret Mineral Field WA (Cambrian Proje
A41817 1994 Mt Edon Gold Mines Nl Royal Arthur Bore <1% Annual Report for the period 05/05/93-04/05/94, Royal Arthur Bore Project, E37/284.
A40253 1993 Mim Exploration Pty Ltd Junior Hill <1% Junior Hill Project, Annual Report for the year ending 17th December 1993, E37/247.
A36359 1992 Mim Exploration Pty Ltd Royal Arthur <1% Royal Arthur Project, Final Surrender Report for the period ending 03/03/1992, E37/226.
A37540 1992 Mim Exploration Pty Ltd Junior Hill <1% Junior Hill Project, Annual Report for the year ending December 17th 1992, E37/247.
A34972 1991 Mim Exploration Pty Ltd Wilson Creek <1% Wilson Creek Project, Annual Report for the period ending 23rd August 1991, P37/2375 -2390 & P37/2399-2400.
A31255 1990 Sons Of Gwalia Nl Wilson Creek <1% Wilson Creek Project, Non-statutory Report: Progress Report on Exploration, January 1990, P37/2375-2390 & P37/
A31256 1990 Summit Gold Pty Ltd Wilson Creek <1% Wilson Creek Project, Non-statutory Report: Exploration Report on Wilson Creek Prospcting Licences, WA , Augus
A10299 1981 Seltrust Mining Corp Pty Ltd Teutonic Bore <1% Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3
A21875 1978 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648-
A7295 1977 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4
A8321 1977 Australian Selection Pty Ltd Teutonic Bore <1% Teutonic Bore Claim Group Progress Report 1st October, 1977 to 31st December 1978
A6164 1975 Carpentaria Exp Co Pty Ltd Teutonic Bore <1% Teutonic Bore (JV) Project, Non-statutory Report: Progress Report , March 1975, MC37/4648-4659.
A82836 1753 St Barbara Ltd Leonora <1% LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2008 – 31 MARCH 2009 GROUP: C162/2006 TENEMENTS: E37/235,
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over P 37/9638 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold P 37/9638? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.