E 29/1328
Register summary
- Holder
- Javelin Minerals Limited
- Local government
- Shire of Menzies
- Application received
- 24 Mar 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150367 | 2025 | Toucan Gold Pty Ltd | Perrinvale | <1% | Perrinvale Project E29/987 Final Surrender Report for the period ending 26/06/2025 |
| A146273 | 2025 | Cygnus Metals Limited; Deneb Resources Pty Ltd | Panhandle | <1% | Final Surrender Panhandle E29/01075 for the period ending 10/02/2025 |
| A152906 | 2025 | Toucan Gold Pty Ltd | Perrinvale | 62% | Perrinvale Project E29/929 Final Surrender Report for the period ending 30/07/2025 |
| A152999 | 2025 | Toucan Gold Pty Ltd | Perrinvale | 100% | Perrinvale Project E29/946 Final Surrender Report for the period ending 30/07/2025. |
| A138201 | 2024 | St George Mining Limited | Bulga Project (E29/1126) | <1% | Final Surrender Report for Bulga Project (E29/1126) for the period ending 15/11/2023. |
126 more reports
| A139292 | 2024 | Cygnus Metals Limited; Deneb Resources Pty Ltd | Panhandle | <1% | Annual Report E29/1075 - Panhandle Project for the period ending 10/02/2024 |
| A143534 | 2024 | Mining Equities Pty Ltd | Mount Forrest | <1% | Annual Report for the Mt Forrest Project (E29/1194) from 04/07/2023 to 03/07/2024 |
| A144264 | 2024 | Della-Costa M R | Ranford Peak | <1% | Annual Technical Report – Ranford Peak Project (E 29/1162) for the period ending 30/06/2024 |
| A144437 | 2024 | Cygnus Metals Limited; Deneb Resources Pty Ltd | Panhandle | <1% | Partial Surrender E29/1075 Panhandle Project for the period ending 17/06/2024 |
| A133604 | 2023 | St George Mining Limited | Bulga | <1% | Annual Report for Bulga Project (E29/1126) for the period ending 15/11/2022 |
| A134645 | 2023 | Cygnus Metals Limited; Deneb Resources Pty Ltd | Panhandle | <1% | Annual Report E29/1075 - Panhandle for the period ending 10/02/2023. |
| A135067 | 2023 | Venture Minerals Limited | Perrinvale South | <1% | Perrinvale South, E29/1076 2023 Annual Report for the period ending 11/02/2023. |
| A136341 | 2023 | Dalla-Costa M R | Ranford Peak | <1% | Annual Technical Report – Ranford Peak Project (E 29/1162) for the period ending 30/06/2023. |
| A137801 | 2023 | Venture Minerals Limited | Perrinvale South | <1% | Final Surrender Report E29/1076 Perrinvale South for the period ending 12/10/2023 |
| A133111 | 2022 | Toucan Gold Pty Ltd | Perrinvale | 44% | Partial Surrender Report for tenements E29/987 and E29/990 Perrinvale for the period ending 15/09/2022. |
| A133115 | 2022 | Toucan Gold Pty Ltd | Perrinvale | <1% | Final Surrender Report for E29/988 Perrinvale for the period 19/9/2017 to 15/09/2022 |
| A130320 | 2022 | Venture Minerals Limited | Perrinvale South | <1% | Perrinvale South, E29/1076 Annual Report for the period ending 11/02/2022. |
| A130862 | 2022 | Cygnus Gold Limited; Deneb Resources Pty Ltd | Panhandle | <1% | Annual Report E29/1075 - Panhandle for the period ending 10/02/2022. |
| A127091 | 2021 | Venture Minerals Limited | Perrinvale | <1% | Annual Report for the period 12 February 2020 to 11 February 2021 |
| A128728 | 2021 | Toucan Gold Pty Ltd | Perrinvale | 62% | Perrinvale Project E 29/929 Partial Surrender Report for the period 25 August 2015 to 1 September 2021. |
| A128886 | 2021 | Dreadnought Resources Ltd | Illaara | <1% | Partial Surrender Report E29/0957 Illaara Project for the period ending 24/09/2021 |
| A124070 | 2020 | Dreadnought (Yilgarn) Pty Ltd | Illaara | <1% | C159/2018 Illaara Annual Technical Report for the period ending 23/03/2020 |
| A122474 | 2020 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson - Koolyanobbing | 11% | Mount Richardson - Koolyanobbing Annual Report E29/571 for the period 1/12/2018 to 30/11/2019 |
| A125498 | 2020 | Toucan Gold Pty Ltd | Perrinvale | 28% | Combined Annual Report Perrinvale Project C116/2017 for the period ending 31/08/2020 |
| A121955 | 2019 | Toucan Gold Pty Ltd | Perrinvale | 28% | Combined Annual Report Perrinvale Project C116/2017 for the period 1 September 2018 to 31 August 2019, E29/009 |
| A118890 | 2019 | Yilgarn Iron Pty Ltd | Cliffs - Mount Richardson | 11% | Annual Report E29/571 Mt Richardson for the Period 1/12/2019 to 30/11/2019 |
| A119084 | 2019 | Toucan Gold Pty Ltd | Perrinvale | 28% | Perrinvale Project C116/2017 Annual Report for the period 01/09/2017 - 31/08/2018, E29/00929, E29/00938, E29/0 |
| A116247 | 2018 | Matlock Geological Services Pty Ltd | Perrinvale | 43% | ANNUAL REPORT FOR THE PERIOD 1 SEPTEMBER 2016 to 31 AUGUST 2017, PERRINVALE PROJECT E29/00929, E29/00938, E29/ |
| A117875 | 2018 | Parkway Minerals Nl | Lake Barlee | <1% | Final Surrender Report Lake Barlee Project for the period 3 May 2017 to 4 September 2018, E77/02409, E57/01051 |
| A115598 | 2018 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson | 11% | E29/571 Mount Richardson Project for the period 1 December 2016 to 30 November 2017 |
| A116789 | 2018 | Newmont Exploration Pty Ltd | Illaara | <1% | Annual Report for E29/957 Illaara Project for the period 24th March 2017 to 23rd March 2018 |
| A110771 | 2017 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson | 11% | Annual Report E29/571 Mt Richardson 1 December 2015 to 30 November 2016 |
| A112809 | 2017 | Newmont Exploration Pty Ltd | Illaara | <1% | Annual Report E29/957 Illara Project for the period 24/03/2016 - 23 March 2017 |
| A109636 | 2016 | West Coast Geoscience Pty Ltd | Lake Barlee | 4.2% | Final Surrender Report - Lake Barlee Project C47/2015 for the period 08/05/2015 to 13/05/2016, E29/00816, E29/ |
| A104478 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | <1% | Final Report E29/565-I Perrinvale For the period 11 August 2005 to 2 December 2014 |
| A105036 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | 92% | C95/2007 Perrinvale Project Final Report for E29/655, P29/1926 and P29/1927 for the period 19 December 2007 to |
| A106618 | 2015 | Westcoast Geoscience Trust | Lake Barlee | 4.2% | Lake Barlee Project C47/2015, E29/816, E29/0878 Annual Report for the Period 8th May 2014 to 7th May 2015 |
| A106637 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson | 11% | Partial Surrender Report for E29/571-I Mt Richardson for the period 01 December 2005 to 22 July 2015 |
| A107814 | 2015 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson | 11% | Mt Richardson E29/571 For the period 01 December 2014 to 30 November 2015 |
| A102543 | 2014 | West Coast Geoscience Pty Ltd | Barlee South | <1% | Barlee South Project E29/816 Annual Report for the Period 8th May 2013 to 7th May 2014 |
| A102917 | 2014 | Jupiter Mines Ltd | Mount Alfred | 29% | Mount Alfred Project, Final Surrender Report for the period 08/03/2006 to 05/05/2014, E29/581. |
| A102918 | 2014 | Jupiter Mines Ltd | Mount Alfred | <1% | Mount Alfred Project, Final Surrender Report for the period 19/01/2010 to 05/05/2014, E29/726. |
| A103545 | 2014 | Cliffs Asia Pacific Iron Ore Pty Ltd | Maynard - Mount Richardson - Perrinvale | 2.8% | Combined Annual Report C95/2007 (Maynard, Mt. Richardson, Perrinvale and Barlee) E29/564, E29/565, E29/571, E2 |
| A96463 | 2013 | Mithril Resources Ltd | Edale Bore | <1% | E57/827 – Edale Bore Year 2 Annual Report for the period 21/12/2011 – 20/12/2012 |
| A97669 | 2013 | Jupiter Mines Ltd | Mount Alfred | 29% | Mt Alfred Project, Annual Report for the period 08/03/2012 to 07/03/2013, E29/581 & E29/726. [C33/2010] |
| A98535 | 2013 | Mithril Resources Ltd | Edale Bore | <1% | E57/827 Edale Bore Project Surrender Report for the period 21/12/2010 – 31/05/2013 |
| A99597 | 2013 | Mithril Resources Ltd | Lane Bore | <1% | E29/836 – Lane Bore Final Report for the period 05/09/2012 – 04/09/2013 |
| A99654 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | <1% | Final Report E29/682-I (Perrinvale) For the period 26 August 2008 to 25 August 2013 |
| A99710 | 2013 | Cliffs Asia Pacific Iron Ore Pty Ltd | Maynard - Mt. Richardson - Perrinvale - | 2.6% | Combined Annual Report C95/2007 (Maynard, Mt. Richardson, Perrinvale and Barlee) E29/564, E29/565, E29/571, E2 |
| A92794 | 2012 | Mithril Resources Ltd | Edale Bore | <1% | E57/827 – Edale Bore Year 1 Annual Report for the period 21/12/2010 - 20/12/2011 |
| A93490 | 2012 | Jupiter Mines Ltd | Mount Alfred | 29% | Mount Alfred Project Annual Report E29/581 & E29/726 Period 30/04/11 to 01/05/12 (C33/2010) |
| A95231 | 2012 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson - Perrinvale - Barlee | 2.6% | Combined Annual Report for the period 11 August 2011 to 10 August 2012, Mt. Richardson ,Perrinvale and Barlee |
| A96005 | 2012 | Vale Exploration Pty Ltd | Ranford | <1% | Ranford Project, Final Surrender Report for the period 3rd September 2010 to 29th October 2012, E29/759-760; E |
| A89822 | 2011 | Jupiter Mines Ltd | Mount Alfred | 29% | Mount Alfred Project , Annual Report E29/581 & E29/726 for the period 30/04/10 to 01/05/11. |
| A91671 | 2011 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson - Perrinvale | 2.6% | Combined Annual Report C95/2007 (Mt. Richardson and Perrinvale) For the period 11 August 2010 to 10 August 201 |
| A92128 | 2011 | Vale Exploration Pty Ltd | Ranford | <1% | Ranford Project C163/2010, E29/759, E29/760, E30/422 first combined report for the period 3 September 2010 – 2 |
| A91425 | 2011 | Alamar Resources Ltd | Lake Barlee | 8.3% | Lake Barlee Project E29/734 Annual Report for the Period 22nd June 2010 to 21st June 2011 |
| A86870 | 2010 | Jupiter Mines Ltd | Mount Alfred | 29% | Mount Alfred Project - Annual Report E29/581 & E29/726, Period 30/04/09 to 01/05/10 (C33/2010) |
| A85525 | 2010 | Cliffs Asia Pacific Iron Ore Pty Ltd | Mount Richardson | 11% | Annual Report E29/571 Mount Richardson, for the period 1st December 2008 to 30th November 2009 |
| A86457 | 2010 | Mindax Ltd | Bulga Downs | <1% | BULGA DOWNS PROJECT - Annual Report for Exploration License, E29/533 (Victory Bore), For the Period 21st Febr |
| A88305 | 2010 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | 2.8% | Combined Annual Report C95/2007 (Perrinvale) for the period 11 August 2009 to 10 August 2010 |
| A88633 | 2010 | Mindax Ltd | Bulga Downs | <1% | BULGA DOWNS PROJECT, Surrender Report for Exploration License E29/533 (Booylgoo Springs). For the Period of 7t |
| A81364 | 2009 | Portman Iron Ore Ltd | Perrinvale | 23% | COMBINED ANNUAL REPORT C95/2007 (Perrinvale) E29/653, E29/654, E29/655, E30/331, P30/1011, P29/1922, P29/1923, |
| A81652 | 2009 | Mindax Ltd | BULGA DOWNS (Victory Bore) | <1% | BULGA DOWNS PROJECT Annual Report for Exploration License, E29/533 (Victory Bore), Menzies District, North Coo |
| A84454 | 2009 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | <1% | PARTIAL SURRENDER REPORT E29/565 (Part of the Perrinvale Project Area) for the period 11th Aug 2005 to 10th Au |
| A80956 | 2009 | Mindax Ltd | Bulga Downs (Victory Bore) | <1% | BULGA DOWNS PROJECT Partial Relinquishment Report for Exploration License E29/533 (Victory Bore) Menzies Distr |
| A81495 | 2009 | Red Rock Resources Pl | Mt Alfred | 29% | Annual Report for E29/581 Mt Alfred, For the Period 8th March 2008 to 7th March 2009 |
| A81591 | 2009 | Red Rock Resources Pl | Mt Alfred | 29% | Partial Surrender Report for E29/581 Mt Alfred |
| A84646 | 2009 | Uranium Equities Ltd | Lake Barlee | 7% | Final Surrender Report, E29/588, Lake Barlee Project, 11 May 2006 – 12 May 2009 |
| A84796 | 2009 | Cliffs Asia Pacific Iron Ore Pty Ltd | Perrinvale | 1.3% | COMBINED ANNUAL REPORT C95/2007 (Perrinvale) for the period 11 August 2008 to 10 August 2009 E29/565, E29/653, |
| A76936 | 2008 | Iron Mountain Mining Ltd | Mount Richardson | 11% | Mount Richardson Project, Annual Report for the period 01/12/2006 to 30/11/2007, E29/571. |
| A78025 | 2008 | Red Rock Resources Pty Ltd | Mount Alfred | 29% | Annual Report for E29/581 Mt Alfred For the Period 8th March 2007 to 7th March 2008 |
| A78424 | 2008 | Mindax Ltd | Bulga Downs (Victory Bore) | <1% | Bulga Downs Project: Annual Report for Exploration License E29/533 (Victory Bore) 21st February 2007 to 20th F |
| A78502 | 2008 | Mindax Ltd | Bulga Downs (Victory Bore) | <1% | Bulga Downs Project: Partial Relinquishment Report for Exploration License E29/533 (Victory Bore) 21st Februar |
| A79377 | 2008 | Uranium Equities Ltd | Lake Barlee | 7% | Annual Technical Report, E29/588, Lake Barlee Project, for the period 11 May 2007 to 11 May 2008, |
| A75331 | 2007 | Red Rock Resources Pty Ltd | Mount Alfred | 29% | Annual Report for E29/581 Mount Alfred For the period 7th March 2006 to 6th March 2007 |
| A76091 | 2007 | Polaris Metals Nl | Perrinvale | 30% | Final Surrender Reporfor E29/434 for period 27 April 2000 - 26 April 2007 (tPerrinvale Project). |
| A76331 | 2007 | Portman Iron Ore Ltd | Perrinvale | <1% | Annual Report Perrinvale Project Exploration Licence E29/565 For the period 11 August 2006 to 10 August 2007 |
| A74298 | 2007 | Mindax Ltd | Bulga Downs | 2.4% | Bulga Downs Project E29/117, E29/138, E29/279, E29/370, Combined Annual Report C327/1996, For the Period 01 Ja |
| A74842 | 2007 | Mindax Ltd | Bulga Downs (Victory Bore) | <1% | Bulga Downs Project, Annual Report for Exploration License E29/533 (Victory Bore), Menzies District, North Coo |
| A75477 | 2007 | Polaris Metals Nl | Perrinvale | 4.7% | Combined Annual Report for the Period 27th April 2006 to 26 th April 2007 for E29/564-1,E30/226-1,E29/434-1, E |
| A76111 | 2007 | Uranium Equities Ltd | Lake Barlee | 7% | Annual Technical Report E29/588 Lake Barlee Project For the Period 11 May 2006 to 10 May 2007 North Kalgoorlie |
| A71819 | 2006 | Mindax Ltd | Bulga Downs | 2.4% | Bulga Downs Project, Combined Annual Report for Exploration Licence E29/117,E29/138,E29/279 & E29/370 (Cabaret |
| A72148 | 2006 | Mindax Ltd | Bulga Downs (Victory Bore) | <1% | Bulga Downs Project, Annual Report for E29/533(Victory Bore) , Menzies District North Coolgardie Goldfield, Fo |
| A73077 | 2006 | Heron Resources Ltd | Perrinvale | 5.8% | Perrinvale Project C76/2001 E29/434,E29/435,E30/226 and E30/ 254 Annual Report, 27 April 2004 to 26 April 2006 |
| A74162 | 2006 | Iron Mountain Ltd | Mount Richardson | 11% | Mt Richardson Project E29/571, Annual Report 2006, Period 1 December 2005 to 30 November 2006, (Youanmi). |
| A73340 | 2006 | Portman Iron Ore Ltd | Perrinvale | <1% | Annual Report, Perrinvale Project E29/565, For the Period 11 August 2005 to 10 August 2006, (Menzies). |
| A69800 | 2005 | Mount Burgess Mining Nl | Mount Elvire | 7.1% | Combined annual report for the period 01/11/03 - 31/10/04 Mount Elvire Project, E30/258, E29/498, E30/256, E77 |
| A70001 | 2005 | Mindax Ltd | Bulga Downs | 2.4% | Bulga Downs Project, E29/117, E29/138, E29/279, E29/370, 2004 Annual Report, January 1 to December 31 2004, Sh |
| A71505 | 2005 | Mount Burgess Mining Nl | Mount Elvire | 28% | E29/496 (Mt Elvire), Surrender Report, Period 22 March 2004 to 23 February 2005, (Youanmi). |
| A70057 | 2005 | Mount Burgess Mining Nl | Mount Elvire | 7.1% | Mount Elvire Project, E77/1044, E29/496, E29/498, E30/256, E30/258, Open file review and Data evaluation, Augu |
| A68191 | 2004 | Sipa Exploration Nl | Bulga Downs | 2.4% | Bulga Downs Project, 2003 Annual Report E29/117, E29/138, E29/279, E29/370 for the period January 1st 2003 to |
| A68713 | 2004 | Mount Burgess Mining Nl | Perrinvale | 6.6% | Perrinvale (JV) Project, Partial Surrender Report for the period 27th April 2000 to 26th April 2003, E29/434- |
| A68842 | 2004 | Mount Burgess Mining Nl | Perrinvale | 5.1% | Combined Annual Technical Report Period 27 April 2003 to 26 April 2004 Perrinvale Project JV E29/434, E29/435, |
| A66043 | 2003 | Sipa Exploration Nl | Bulga Downs | 2.4% | Bulga Downs Project E29/117, E29/138, E29/279 & E29/370, 2002 Annual Report, January 1 to December 31 2002, Sh |
| A66717 | 2003 | Mount Burgess Mining Nl | Perrinvale | 6.6% | Combined Annual Technical Report period 27 April 2002 to 26 April 2003 Perrinvale Project JV C76/2001: E29/434 |
| A64262 | 2002 | Sipa Exploration Nl | Bulga Downs | 2.4% | 2001 Annual Report January 1 to December 31 2001 Bulga Downs Project E29/117, E29/138, E29/279 & E29/370. She |
| A64908 | 2002 | Mount Burgess Mining Nl | Perrinvale | 6.6% | Combined Annual Technical Reprot Period 27 April 2001 To 26 April 2002 Perrinvale Project JV Perrinvale Teneme |
| A62008 | 2001 | Anglo Australian Resources Nl | Bulga Downs | 2.4% | Bulga Downs Project 2000 Annual Report E29/117, 138, 279, 370 & 436, MLA 29/257 & 258 (1 January 2000 - 31 Dec |
| A62641 | 2001 | Mount Burgess Mining Nl | Perrinvale | 6.6% | Combined Annual Technical Report Period 27 April 2000 to 26 April 2001. Perrinvale Project JV. Perrinvale Tene |
| A57881 | 1999 | Anglo Australian Resources Nl | Bulga Downs | 3.2% | Bulga Downs Project E29/117, 138, 279 01/01/98 - 31/12/98 |
| A57268 | 1998 | Navigator Pty Ltd | Bulga Downs | 8.1% | Annual Report for period 14/10/1997 to 14/10/1998 by Navigator Pty Ltd Exploration Licence E29/343 Bulga Downs |
| A53736 | 1998 | Astro Mining Nl | West Leonora | <1% | Exploration Licences : E29/211-226,271-272 ;E36/262-269 Joint Annual Report for the Period 06 December1996 to |
| A54211 | 1998 | Sipa Exploration Nl | Bulga Downs | 3.2% | Bulga Downs Project. 1997 Annual Report E29/117,138,279. 01/01/97-31/12/97. |
| A50122 | 1997 | Astro Mining Nl | West Leonora | <1% | West Leonora Project, Annual Report for the period 6th December 1995 to 5th December 1996, |
| A50618 | 1997 | Sipa Exploration Nl | Bulga Downs | 12% | Bulga Downs Project E29/117 E29/279 1996 Annual report 19 December 1995 to 31 December 1996 Sheet SH50-04-2840 |
| A52700 | 1997 | Anglo Australian Resources Nl | Perrinvale | 18% | Perrinvale Project, Annual Report for the period 12th September 1996 to 11th September 1997, E29/194 & 197. |
| A46762 | 1996 | Astro Mining Nl | West Leonora | <1% | West Leonora Project, Reporting Period 6/12/1994 - 5/12/1995, Exploration Licences E29/211-233, E29/2226 and E |
| A47055 | 1996 | Sipa Exploration Nl | Bulga Downs | 7.3% | Bulga Downs Project Bulga Downs North Prospects E39/117 and E29/114 1995 Annual report (covering the period 19 |
| A43384 | 1995 | Sipa Exploration Nl | Bulga Downs | 7.3% | Bulga Downs Project, Bulga Downs Prospect E29/117 and E29/114 Annual Report 19 December 1993-18 December 1994. |
| A43385 | 1995 | Sipa Exploration Nl | Bulga Downs | 12% | Bulga Downs Project, Partial Surrender Report E29/117 for period 19th December 1990 to 18th September 1994. |
| A44747 | 1995 | Sipa Exploration Nl | Bulga Downs | <1% | E29/114, Final Report, Bulga Downs Project for the period. 6/9/90 - 20/4/95 |
| A45512 | 1995 | Anglo Australian Resources Nl | Perrinvale | 35% | Perrinvale Project, Annual Report Exploration Licence E29/194 for period 7th July 1994 to 6th July 1995. |
| A41596 | 1994 | Sipa Resources Ltd | Bulga Downs | 12% | Bulga Downs Project, E29/117. Partial Surrender Report, 19 December 1990- 18 September 1993 |
| A42787 | 1994 | Sipa Resources Ltd | Bulga Downs | <1% | Bulga Downs Project, Partial Surrender Report for the period 6th September 1990 to 5th September 1994, E29/114 |
| A38156 | 1993 | Sipa Resources Ltd | Bulga Downs | 7.3% | Bulga Downs Project, Annual Report for the period 19th December 1991 to 18th December 1992, E29/114 & 117. |
| A39739 | 1993 | Sipa Resources International | Bulga Downs | <1% | Bulga Downs Project, Partial Surrender Report for the period 6th September 1992 to 5th September 1993, E29/114 |
| A39879 | 1993 | Sipa Resources Ltd | Bulga Downs | 7.3% | Bulga Downs Project; Bulga Downs & Cabaret Bore Prospects E29/114 & E29/117; 19/12/92 to 18/12/93 |
| A34066 | 1991 | Anglo Australian Resources Nl | Bulga Downs | 7.3% | Bulga Downs Prospect , Non-statutory Report, E29/114 and E29/117 Progress Report to 31/12/90 |
| A34067 | 1991 | Sipa Resources Ltd | Bulga Downs - Cabaret Bore | 12% | Bulga Downs -Cabaret Bore Project [s],Non-statutory Report : Report on T.E.M. Survey , Mapping & Sampling, Feb |
| A40517 | 1991 | Sipa Resources Ltd | Bulga Downs | 12% | Bulga Downs Prospect, Non-statutory Report:Transient Electromagnetic Surveys April 1991. Sipa Resources Int. N |
| A10554 | 1982 | Dechow & Co Pty Ltd | Lake Barlee | 60% | Lake Barlee Project, Non-statutory Report: The Potential of the Lake Barlee Area, March 1982, MC29/626-630. |
| A8452 | 1979 | Uranerz Australia Pty Ltd | Lake Barlee | 14% | Lake Barlee Project, Non-statutory Report: Final Report for the period 23rd July 1978 to 22nd July 1979, TR70/ |
| A7968 | 1978 | Uranerz Australia Pty Ltd | Lake Barlee | 14% | Lake Barlee Project, Annual Report for the period 23rd July 1977 to 22nd July 1978, TR70/6338H. |
| A6833 | 1977 | Uranerz Australia Pty Ltd | Mount Alfred | 16% | Mount Alfred Project, Annual Report for the year ending 31/12/1976, MC29/3067-3069 & 3086-3094. |
| A6864 | 1977 | International Nickel Aust Ltd | Stock Well | 97% | Stock Well Project, Non-statutory Report: Final Report for the period ending 14/02/1977, MC29/2984-2987. |
| A7249 | 1977 | Uranerz Australia Pty Ltd | Lake Barlee | 14% | Lake Barlee Project, Annual Report for the period 23/07/1976 to 22/07/1977, TR70/6338H. |
| A79672 | 1753 | Portman Iron Ore Ltd | Perrinvale | <1% | ANNUAL REPORT FOR EXPLORATION LICENCE E29/565 Perrinvale YILGARN MINERAL FIELD WESTERN AUSTRALIA FOR THE PERIO |
| A80687 | 1753 | Portman Iron Ore Ltd | Mt. Richardson | 11% | ANNUAL REPORT MT. RICHARDSON PROJECT EXPLORATION LICENCE E29/571 YILGARN MINERAL FIELD WESTERN AUSTRALIA, FOR |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A49797 | 1753 | Battle Mountain Australia Inc | Perrinvale | 18% | Perrinvale Project, E29/194 & 197, Annual Report for the period 12th September 1995 to 11th September 1996. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 29/1328 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 29/1328 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 29/1328? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.