E 31/1439
Register summary
- Holder
- Solstice Minerals Limited
- Local government
- Shire of Menzies
- Application received
- 24 July 2025
- Commenced
- 11 May 2026
- Expiry
- 10 May 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153917 | 2026 | Kalgoorlie Gold Mining Limited | Kirgella Project | <1% | Final Report on Diamond Drilling at the Kirgella Gift & Providence Gold Deposits (R30) |
| A154672 | 2026 | Solstice Minerals Limited | Horse Rock Bore | 22% | Annual Report for Combined Reporting Group C173/2021 Horse Rock Bore for the period ending 31/03/2026 |
| A149037 | 2025 | Solstice Minerals Limited | Horse Rock Bore | 22% | Annual Report for Horse Rock Bore C173/2021 for the period ending 31/3/2025 |
| A148905 | 2025 | Solstice Minerals Limited | Horse Rock Bore (E31/1121) | 35% | Partial Surrender Report for E31/1121 Horse Rock Bore for the period ending 14/04/2025. |
| A143429 | 2024 | Solstice Minerals Limited | Horse Rock Bore | 22% | Annual Report for Horse Rock Bore C173/2021 for the period ending 31/03/2024 |
216 more reports
| A139299 | 2024 | Gibb River Diamonds Limited | Edjudina Gold | 60% | E31/1179 Partial Surrender Report Edjudina Gold Project , for the period ending 06/03/2024. |
| A135759 | 2023 | Solstice Minerals Limited | Horse Rock Bore | 22% | Annual Technical Report for Horse Rock Bore C173/2021 for the period ending 31/03/2023 |
| A135945 | 2023 | Anglogold Ashanti Australia | Otway | <1% | Otway Project (E31/1234) Final Surrender Report to the Department of Mines, Industry Regulation and Safety for |
| A131575 | 2022 | Fmg Resources Pty Ltd | E31/1192 | <1% | E31/1192 (Edjudina) Final Surrender Report for the period ending 30/06/2022. |
| A129197 | 2022 | Solstice Minerals Ltd | Walsh Rock | <1% | Annual Report E31/1134 Walsh Rock Project for the period 8 November 2020 to 7 November 2021 |
| A131235 | 2022 | Solstice Minerals Ltd | Horse Rock Bore | 22% | Annual Technical Report for the Horse Rock Bore C173/2021 for the period ending 31/03/2022 |
| A127944 | 2021 | Fortescue Metals Group Ltd | Edjudina | <1% | E31/1192 Edjudina Annual Mineral Report for the period 3 July 2020 to 2 July 2021 |
| A122219 | 2020 | Gateway Projects Wa Pty Ltd | Edjudina | <1% | E 31/1134 - Edjudina Project Annual Report, 8 November 2018 to 7 November 2019 |
| A123205 | 2020 | Nexus Minerals Limited | Triumph | 60% | Annual Tenement Report for Triumph Project, Tenement E31/1179 for the period ending 06/03/2020 |
| A123855 | 2020 | Global Fortune Holdings Investments Pty Ltd | Horse Rock Bore | 35% | Annual Exploration Report E 31/1121 Horse Rock Bore Project for the period ending 14/4/2020 |
| A125718 | 2020 | Discovex Resources Limited; Gateway Mining Limited | Edjudina | <1% | E 31/1134 Edjudina Project Annual Report for the period ending 09/11/2020 |
| A118772 | 2019 | Omni Projects Pty Ltd | Edjudina | <1% | Edjudina Project E31/01134 Annual Report for the period 8 November 2017 to 7 November 2018 |
| A115572 | 2018 | Nexus Minerals Limited | Edjudina Triumph | 33% | Report for Final Surrender Report for Edjudina Triumph Project – Tenement Group C57/2011 for the period 04/12/ |
| A115574 | 2018 | Nexus Minerals Limited | Edjudina Triumph | 41% | Final Surrender Report for Edjudina Triumph Project – Tenement Group C86/2015 for the period 5 January 2018 to |
| A116811 | 2018 | Global Fortune Investment Limited | Horse Rock Bore | <1% | Combined Annual Report_C122-2016 Horse Rock Bore Project for the period 01/03/2017 - 28/02/2018, E31/00859, E3 |
| A111924 | 2017 | Nexus Minerals Limited | Edjudina Triumph | 33% | Combined Annual Report for Edjudina Triumph Project – Tenement Group C57/2011 1 February 2016 to 31 January 20 |
| A112162 | 2017 | Global Fortune Investment Limited | Horse Rock | <1% | Horse Rock Project C122/2016 Annual Report for the period 01/03/2016 to 28/02/2017, E31/00859, E31/00887 |
| A114193 | 2017 | Nexus Minerals Limited | Edjudina Triumph | 41% | Combined Annual Report for Edjudina Triumph Project – Tenement Group C86/2015 For the Period 5 May 2016 to 4 M |
| A108554 | 2016 | Global Fortune Investment Limited | Horse Rock Bore | <1% | HORSE ROCK BORE PROJECT E31/00887 Annual Report for the period 15 February 2015 to 14 April 2016 |
| A108565 | 2016 | Nexus Minerals Ltd | Edjudina Triumph | 33% | Combined Annual Report for Edjudina Triumph Project [Tenement Group C57/2011, E31/819, E31/820, P31/1960, P31/ |
| A109324 | 2016 | Nexus Minerals Limited | Edjudina Triumph | 41% | Combined Annual Report for Edjudina Triumph Project C86/2015 for the period 05/05/2015 to 04/05/2016 |
| A109396 | 2016 | Global Fortune Investment Limited | Horse Rock Bore | <1% | Horse Rock Bore E31/859 Partial Relinquishment Report for the period 15/07/2010 - 14/07/2016 |
| A109778 | 2016 | Global Fortune Investment Limited | Edjudina | <1% | Annual Report For the Period 15 July 2015 to 14 July 2016 EDJUDINA PROJECT E31/00859 |
| A105301 | 2015 | China Mining Pty Ltd | Horse Rock Bore | <1% | Annual Report for the Period 15 Feb 2014 to 14 Fe b 2015, Horse Rock Bore Project, E31/887 |
| A106664 | 2015 | Global Fortune Investment Limited | Yarri South | <1% | Annual Mineral Exploration Report - Yarri South Project E 31/859 in the reporting period 15/7/2014 to 14/7/201 |
| A104975 | 2015 | Nexus Minerals Ltd | Edjudina Triumph | 33% | Combined Annual Report for Edjudina Triumph Project – Tenement Group C57/2011 for the period 4th December 2013 |
| A105465 | 2015 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 12% | Wallbrook Hill C57/2008 Annual Report for the period 01/01/2014 - 31/12/2014, E31/793, E31/946, M31/172, M31/ |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A101685 | 2014 | China Mining Pty Ltd | Horse Rock Bore | <1% | Horse Rock Bore Project E31/887 Annual Report for the period 15 Feb 2013 to 14 Feb 2014 |
| A101318 | 2014 | Coxsrocks Pty Ltd | Edjudina - Triumph | 33% | Combined Annual Report C57/2011 Edjudina Triump Project E31/819, E31/820, P31/1960, P31/1961, P31/1962, P31/1 |
| A101324 | 2014 | Hawthorn Resources Limited | Edjudina - Triumph | <1% | EDJUDINA - TRIUMPH PROJECT E31/788 - Patricia ANNUAL REPORT FOR THE PERIOD 5 November 2012 TO 4 November 2013 |
| A101343 | 2014 | Hawthorn Resources Limited | Edjudina - Patricia NW | <1% | Edjudina - Patricia NW Project E31/790 Annual Report for the period 18 November 2012 - 17 November 2013 |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101802 | 2014 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 12% | Wallbrook Hill Project, Annual Report for the period 01/01/2013 to 31st December 2013, E31/793, 946; M31/172, |
| A103269 | 2014 | China Mining Pty Ltd | Yarri South | <1% | Yarri South Project E31/859 Annual Report for the period 15 July 2013 to 14 July 2014 |
| A96681 | 2013 | Hawthorn Resources Limited | Edjudina - Savannah - Clymies Well | <1% | EDJUDINA - SAVANNAH PROJECT E31/787 – Clymies Well, Annual Report for the period 17 September 2011 to 16 Septe |
| A96717 | 2013 | Hawthorn Resources Limited | Edjudina - Triump - Patricia | <1% | Edjudina - Triump Project E31/788 - Patricia Annual Report for the period 5 November 2011 to 4 November 2012 |
| A97065 | 2013 | Yarri Battery And Resources Pty Ltd | Horse Rock Bore | <1% | HORSE ROCK BORE PROJECT E31/887 ANNUAL REPORT 15 February 2012 to 14 February 2013 |
| A97082 | 2013 | Hawthorn Resources Limited | Triumph - Patricia NW | <1% | EDJUDINA – PATRICIA NW E31/790 Annual Report for the period 18 November 2011 to 17 November 201 2 |
| A97115 | 2013 | Coxsrocks Pty Ltd | Edjudina | 33% | Combined Annual Report for the Edjudina Triumph Project E31/819, E31/820, P31/1960, P31/1961, P31/1962, P31/19 |
| A97182 | 2013 | Legacy Iron Ore Ltd | Kingsley | <1% | Final Surrender Report, Kingsley Project (Deenya Hill) E31/717, For the Period 7th February 2008 to 6th Februa |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A97489 | 2013 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 12% | Wallbrook Hill Project Annual Report 1 January 2012 to 31 December 2012, CR Group: C57/2008, Tenements: E31/7 |
| A98074 | 2013 | Hawthorn Resources Limited | Savannah | 3.2% | Savannah Project, Annual Report for the period 6th February 2012 to 5th February 2013, E31/454. |
| A98136 | 2013 | Legacy Iron Ore Ltd | Byer Well | 47% | Annual Mineral Exploration Report South Laverton Area Byer Well Project E 31/928 For the Period 10 May 2012 to |
| A98963 | 2013 | China Mining Pty Ltd | Yarri South | <1% | Yarri South Project, Annual Report for the period 15th July 2012 to 14th July 2013, E31/859. |
| A99309 | 2013 | Renaissance Minerals Ltd | Eastern Goldfields | 63% | Eastern Goldfields Project,E31/900 Final Surrender Report for the period 25 June 2010 to 07 June 2013 |
| A99425 | 2013 | Hawthorn Resources Limited | Triumph | 31% | Triumph Project, Annual Report for the period 11/06/2012 to 10/06/2013,E31/766 [Edjudina Prospect]. |
| A100222 | 2013 | Legacy Iron Ore Ltd | South Laverton | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/912 For the Period 7th Septe |
| A121325 | 2012 | Coxrocks Pty Ltd | Edjudina Triumph | 33% | Edjudina Triumph Project, Final Co-Funded Drilling Report for the period 4th December 2010 to 3rd December 201 |
| A92623 | 2012 | Hawthorn Resources Limited | Savannah | <1% | Savannah Project, Annual Report for the period 17th September 2010 to 16th September 2011, E31/787. |
| A92624 | 2012 | Hawthorn Resources Limited | Triumph | <1% | Triumph Project, Annual Report for the period 5th November 2010 to 4th November 2011, E31/788. |
| A92949 | 2012 | Heron Resources Ltd | Horse Rock Bore | <1% | Annual report for the period 15 February 2011 to 14 February 2012, Horse Rock Bore Project, E31/887 |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A93376 | 2012 | Coxrocks Pty Ltd | Edjudina Triumph | 33% | Edjudina Triumph Project, Annual Report for the period 4th December 2010 to 3rd December 2011, E31/819-820; P3 |
| A93413 | 2012 | Hawthorn Resources Limited | Edjudina - Patricia NW | <1% | Edjudina – Patricia NW E31/790 Annual Report for the period 18 November 2010 to 17 November 2011 |
| A93615 | 2012 | Saracen Gold Mines Pty Ltd | Wallbrook Hill | 12% | Wallbrook Hill Project C57/2008 annual report for the period 1 January 2011 to 31 December 2011, E31/793, 946, |
| A93738 | 2012 | Legacy Iron Ore Ltd | Kingsley | <1% | Annual Mineral Exploration Report – Kingsley Project E31/717, Report Period: 7th February 2011 – 6th February |
| A93906 | 2012 | Hawthorn Resources Limited | Savannah | 3.2% | Savannah Project E31/454 annual report for the period 6 February 2011 to 5 February 2012 |
| A94620 | 2012 | Renaissance Minerals Ltd | Eastern Goldfields | 63% | Eastern Goldfields Project, Annual Report for the period 25th June 2011 to 24th June 2012, E31/900. |
| A94697 | 2012 | Legacy Iron Ore Ltd | Byer Well | 47% | Annual Mineral Exploration Report South Laverton Area Byer Well Project E 31/928 For the Period 10 May 2011 to |
| A95449 | 2012 | Hawthorn Resources Limited | Triumph | 31% | Triumph Project, Annual Report for the period 11th June 2011 to 10th June 2012, E31/766. |
| A95502 | 2012 | Legacy Iron Ore Ltd | South Laverton - Stophanis Well | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E31/912 For the Period 7th Septem |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A89115 | 2011 | Hawthorn Resources Limited | Triumph | <1% | Triumph Project, Annual Report for the period 5th November 2009 to 4th November 2010, E31/788. |
| A89152 | 2011 | Hawthorn Resources Limited | Edjudina - Savannah | <1% | Edjudina - Savannah Project, Annual Report for the period 17th September 2009 to 16th September 2010, E31/787. |
| A89505 | 2011 | Wayne Blitterswyk | EDJIDINA TRIUMPH | 33% | Combined Annual Report for the Edjidina Triumph Project, Report Period: 4th December 2010—3rd December 2011, E |
| A89826 | 2011 | Legacy Iron Ore Ltd | Jungle Dam | 100% | Final Mineral Exploration Report Jungle Dam Project E31/633 For the Period 23th December 2005 to 22th December |
| A89963 | 2011 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report, Wallbrook Project, E 31/717, For the Period 7th February 2010 to 6th Februa |
| A90384 | 2011 | Hawthorn Resources Limited | Savannah | 3.2% | Savannah Project, Annual Report for the period 6th February 2010 to 5th February 2011, E31/454. |
| A91626 | 2011 | Renaissance Minerals Ltd | E31/900 | 63% | E31/900 Annual Report, 25 June 2010 to 24 June 2011 |
| A91860 | 2011 | Legacy Iron Ore Ltd | Stophanis Well | <1% | Annual Mineral Exploration Report South Laverton Area Stophanis Well Project E 31/912 For the Period 7th Septe |
| A92015 | 2011 | Renaissance Minerals Ltd | Eastern Goldfields | 100% | E31/899 Annual Report 18 August 2010 to 17 August 2011. |
| A92025 | 2011 | Hawthorn Resources Limited | Edjudina - Triumph | 31% | Edjudina - Triumph Project E31/766 - Edjudina Annual Report for the period 11 June 2010 to 10 June 2011 |
| A91634 | 2011 | Heron Resources Ltd | Yarri South | <1% | Annual report for the period 15 July 2010 to 14 July 2011, Yarri South Project, E31/859 |
| A85445 | 2010 | Saracen Gold Mines Pty Ltd | Edjudina | 86% | M31/206 - Edjudina Project Final Report - 2 May 2008 to 30 April 2009 |
| A85446 | 2010 | Saracen Gold Mines Pty Ltd | Edjudina | 14% | M31/140 - Edjudina Project Final Report – 04 March 2008 to 16 April 2009 |
| A86247 | 2010 | Legacy Iron Ore Ltd | Wallbrook | 24% | Surrender Report Wallbrook Project E 31/719 For the Period 7th February 2008 to 11th December 2009 |
| A86310 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report Wallbrook Project E 31/717 For the Period 7th February 2009 to 6th February |
| A87722 | 2010 | Hawthorn Resources Limited | Triumph | 46% | Exploration Licence E31/414 Triumph Partial Surrender Report for the period 17 May 2006 to 16 May 2010 |
| A85722 | 2010 | Legacy Iron Ore Ltd | Jungle Dam | 100% | Annual Technical Report, Jungle Dam Project E31/633 for the period 23 December 2008 to 22 December 2009 |
| A86391 | 2010 | Hawthorn Resources Limited | Savannah | 3.2% | Exploration Licence E31/454, Savannah, Partial Surrender Report for the period 6 February 2006 to 15 December |
| A86974 | 2010 | Hawthorn Resources Limited | Savannah | 3.2% | Exploration Licence E31/454 Savannah Partial Surrender Report for the period 6 February 2006 to 5 February 201 |
| A87903 | 2010 | Hawthorn Resources Limited | Edjudina - Triumph | 31% | Edjudina - Triumph Project E31/766 – Annual Report for the period 11 June 2009 to 10 June 2010 |
| A80799 | 2009 | Jackson Minerals Ltd | Wallbrook | <1% | E31/717 Partial Surrender Report, 7 February 2008 – 21 November 2008 |
| A81798 | 2009 | Legacy Iron Ore Ltd | Wallbrook | <1% | Wallbrook Project E31/717 Annual Report, 7 February 2008 – 6 February 2009 |
| A80827 | 2009 | Jackson Minerals Ltd | Jungle Dam | 100% | E31/633 - Jungle Dam Project 2008 Annual Report, 23 December 2007 – 22 December 2008 |
| A81777 | 2009 | Legacy Iron Ore Ltd | Wallbrook | 24% | E31/719 Annual Report, 7 February 2008 – 6 February 2009 |
| A80460 | 2008 | Jindalee Resources Limited | EDJUDINA | <1% | EDJUDINA PROJECT E31/689, EDJUNDINA SURRENDER REPORT 2008 |
| A77066 | 2008 | Jackson Gold Ltd | Wallbrook Hill 2 | 25% | Wallbrook Hill 2 Project 2007 Annual Report 1 January 2007 - 31 December 2007 E31/174, E31/478, E31/496, E31/6 |
| A77365 | 2008 | Jackson Gold Ltd | Jungle Dam | 100% | Jungle Dam Project 2007 Annual Report from 23 December 2006 - 22 December 2007 E31/633 |
| A77555 | 2008 | Jindalee Resources Ltd | Edjudina | <1% | EDJUDINA PROJECT E31/689 EDJUNDINA ANNUAL REPORT 2008 North Coolgardie Mineral Field |
| A77923 | 2008 | Great Gold Mines Nl | Mount Celia | <1% | Savannah C66/2002 Combined Group Reporting Annual Report for the period 31 December 2006 to 30 December 2007 |
| A78568 | 2008 | Hawthorn Resources Limited | Savannah | 3.2% | SAVANNAH PROJECT E31/454 ANNUAL REPORT FOR THE PERIOD 6 February 2007 TO 5 February 2008 |
| A80434 | 2008 | Jackson Minerals Ltd | Wallbrook | 24% | E31/719 Partial Surrender Report, Report Period: 7 February 2008 – 25 November 2008 |
| A75166 | 2007 | Great Gold Mines Nl | Savannah | 3.2% | E31/454, Savannah Project, Annual Report, for the Period 6 February 2006 to 5 February 2007. |
| A75169 | 2007 | Great Gold Mines Nl | Savannah | <1% | Savannah Project, Annual Report for the period 31st December 2005 to 30th December 2006, E31/352-353, P31/157 |
| A75469 | 2007 | Great Gold Mines Nl | Triumph | 46% | Triumph Project, Annual Report for the period 15 April 2006 TO 14 April 2007, E31/443, E31/457, E31/458, E31/ |
| A74333 | 2007 | Jackson Gold Ltd | Jungle Dam | 100% | E31/633 - Jungle Dam Project 2006 Annual Report, 23 December 2005 – 22 December 2006 |
| A76053 | 2007 | Heron Resources Ltd | Jungle Dam Project | 100% | Jungle Dam Project E31/675 North Coolgardie (Yerilla) Mineral Field Annual Report 21 June 2006 to 20 June 2007 |
| A72119 | 2006 | Jackson Gold Ltd | Wallbrook Hill | 26% | E31/89,117,174,477,P31/1406,1407, Wallbrook Project 2005 Annual Report, Period 1 January 2005 to 31 December 2 |
| A73252 | 2006 | Heron Resources Ltd | Jungle Dam Project | 100% | Jungle Dam Project E31/675, Annual Report, 21 June 2005 to 20 June 2006, (Edjudina). |
| A73922 | 2006 | Jackson Gold Ltd | Wallbrook | 24% | Wallbrook Project 2006 Annual Report, Reporting Period: 1st January 2006 to 31st December 2006, Tenements: E3 |
| A72361 | 2006 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project - E31/478, 2005 Annual Report, 17 February 2005 to 16 February 2006, (Edjudina). |
| A70136 | 2005 | Jackson Gold Ltd | Wallbrook Hill | 26% | Annual report for the period 01/01/04 - 31/12/04 Wallbrook Project, C305/1992, E31/89, E31/117, E31/174, E31/4 |
| A70540 | 2005 | Jackson Gold Ltd | Wallbrook | <1% | Wallbrook Project, E31/478, Annual report, reporting period107/02/04 - 16/02/05 Kurnalpi |
| A71276 | 2005 | Great Gold Mines Nl | Savannah | <1% | Savannah C66/2002, Combined Group Reporting Annual Report, For the period 31 December 2003 to 30 December 2004 |
| A68499 | 2004 | Jackson Gold Ltd | Wallbrook | 26% | Annual report for the period 01/01/2003-31/12/2003 Wallbrook Project (C305/1992), E31/117, E31/174, E31/89, P3 |
| A68860 | 2004 | Gutnick Resources Nl | Savannah | <1% | Exploration Licences:E31/313, E31/315, E31/352 E31/353, E31/433, E31/434, E31/453, E39/714, E39/728, E39/743, |
| A69062 | 2004 | Jindalee Resources Ltd | Edjudina | 6.6% | Annual Report for the period ending 30/03/2004 Edjudina Project E31/418 |
| A69368 | 2004 | Great Gold Mines Nl | Triumph | 31% | Exploration licences: E31/419, E31/440 and E31/481, C63/2002 - Triumph, Joint partial surrender report for the |
| A68662 | 2004 | Sons Of Gwalia Ltd | Jungle Dam | 22% | Surrender Report for the period 07/04/1991-21/04/2004 Jungle Dam Project (C227/1995), E31/93 |
| A68707 | 2004 | Gutnick Resources Nl | Triumph | 27% | Exploration Licences: E31/244, E31/317, E31/419, E31/440,... P31/1621 to P31/1624, C63/2002 - Triumph,Joint An |
| A68849 | 2004 | Gutnick Resources Nl | Triumph | 27% | E31/317, E31/417, E31/440 E31/443, E31/457, E31/458, E31/481 Triumph Project (C63/2002) - Triumph, Joint Annua |
| A66214 | 2003 | Jackson Gold Ltd | Wallbrook Hill | 26% | Wallbrook Project, 2002 Annual Report, Reporting period 1st January 2002 to 31st December 2002 C305/1992, E31/ |
| A66693 | 2003 | Sons Of Gwalia Ltd | Kurnalpi East | 22% | Kurnalpi East Project, Partial Surrender Report for the period 7th April 1991 to 24th January 2003, E31/93. [C |
| A66696 | 2003 | Sons Of Gwalia Ltd | Kurnalpi East | 22% | Annual Report for the period 18 February 2001 - 6 December 2002, Kurnalpi East Project, C227/1995: E31/93. |
| A66955 | 2003 | Jindalee Resources Ltd | Edjudina | 6.6% | Annual Report for the period ending 30 March 2003 E31/418 Edjudina Project North Coolgardie Mineral Field |
| A66972 | 2003 | Gutnick Resources Nl | Savannah | <1% | Joint Annual Report for the period 31 December 2001 to 30 December 2002 Savannah Project C66/2002: E31/313,315 |
| A67665 | 2003 | Avoca Resources Ltd | Edjudina | 23% | Exploration Licence E31/312 Annual Technical Report for the period 15/08/2002-14/08/2003, Edjudina. |
| A67743 | 2003 | Sons Of Gwalia Ltd | Jungle Dam | 22% | Annual Report for the period 07/12/2002 to 06/12/2003,Jungle Dam Project, C227/1995, E31/93. |
| A64173 | 2002 | Croesus Mining Nl | Wallbrook | 27% | Annual Report 1st January 2001 to 31st December 2001 Wallbrook Joint Venture Project E31/117, C305/1992. |
| A64246 | 2002 | Gutnick Resources Nl | Pinjin | 27% | Annual Report for the period 1 February 2000 to 31 January 2001 'Pinjin' exploration licence: E31/317. |
| A64354 | 2002 | Sons Of Gwalia Ltd | Yarri | <1% | Annual Report. Combined Report For Period 23/12/00 to 22/12/01. Yarri Project ,E31/140, M31/119, P31/1446, P31 |
| A64385 | 2002 | Gutnick Resources Nl | Horse Rock Bore | 83% | Annual Report For The Period 28 April 2000 To 27 April 2001 Exploration Licence: E31/481. |
| A65669 | 2002 | Jindalee Resources Ltd | Edjudina | 6.6% | Edjudina Project E31/418 Annual Report For The Period Ending 30 March 2002. |
| A62079 | 2001 | Pacmin Mining Corporation Ltd | Yarri | <1% | 1999/2000 Annual Report Yarri Project Area E31/140, M31/119, P31/1446, P31/1447 Combined Report for period 23/ |
| A62235 | 2001 | Pacmin Mining Corporation Ltd | Edjudina | <1% | Edjudina Project, 2001 Final Report E31/140 for the Period 16/03/93-09/02/01. [ C208/1995] |
| A62336 | 2001 | Pacmin Mining Corporation Ltd | Jungle Dam | 22% | 2001 Final Report Annual Report for period 07/04/2000 to 17/02/01, Jungle Dam Project, E31/93. |
| A64248 | 2001 | Gutnick Resources Nl | Horse Rock Bore | 100% | Annual Report for the period 31 March 2000 to 30 March 2001 'Horse Rock Bore' exploration licence E31/419. |
| A59874 | 2000 | Pacmin Mining Corporation Ltd | Yarri | <1% | 1998/1999 Annual Report, Yarri Project , E31/140,342, M31/119, P31/1446,1447 Combined Report for the Period 2 |
| A60510 | 2000 | Pacmin Mining Corporation Ltd | Jungle Dam | 22% | 1999/2000 Annual Report Jungle Dam E31/93 Report for period 07/04/1999 to 06/04/2000. |
| A60050 | 2000 | Croesus Mining Nl | Wallbrook Hill | 27% | Annual Report, Wallbrook Joint Venture Project, 01/01/1999 to 31/12/1999, Combined Reporting No. C305/1992, Te |
| A57299 | 1999 | Talon Resources Nl | Kingsley | 34% | Kingsley Project E31/174 Annual Exploration Report for the year ending 10/02/99 Report No:ST010802R1 |
| A58151 | 1999 | Pacmin Mining Corporation Ltd | Yarri | 4.7% | Annual Report Yarri Project, Combined Reporting Area E31/98/140,181,3 42,117,M31/117,119,P31/1426,1446,1447,1 |
| A57164 | 1999 | Talon Resources Nl | Kingsley | 34% | Kingsley Project, Partial Surrender Report for the period ending 01/01/1999, E31/174. |
| A53939 | 1998 | Cove Mining Nl | Edjudina -Hobble Gap | 2.7% | Edjudina -Hobble Gap Project, Final Report for the period 8 April 1997 to 28 October 1997, E31/171. |
| A54208 | 1998 | Talon Resources Nl | Kingsley | 34% | Kingsley Project. E31/174. Annual report for the year ending 10/02/98. |
| A54348 | 1998 | Goldfields Exploration Pty Ltd | Claypan Creek | 25% | Final Report, Keith Kilkenny Joint Venture, E31/194 Claypan Creek for period 25th March 1997 to 6th April 1998 |
| A55046 | 1998 | Golden Valley Mines Nl | Edjudina | 2.7% | Edjudina Project , Western Australia (Comprising Exploration Licences E31/171 and E31/107) Partial Relinquishm |
| A55187 | 1998 | Pacific Mining Corporation Ltd | Edjudina | 5% | Yarri Combined Reporting Area - 23/12/96 - 22/12/97 Yerilla District, North Coolgardie Mineral Field E31/98, 1 |
| A56242 | 1998 | Goldfields Exploration Pty Ltd | Edjudina | 9.7% | Edjudina Project E31/147 Hobble Gap Final Surrender Report 31 May, 1993 to 21 May, 1998. |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 4.6% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A55071 | 1998 | Talon Resources Nl | Kingsley | 34% | Kingsley Project, Partial Surrender Report E31/174, Edjudina, North Coolgardie Mineral Field 06/1998 |
| A56350 | 1998 | Abador Gold Nl | Chloe gold exploration | <1% | First Annual Report Chloe Project Exploration Licences 31/335, North Coolgardie Mineral Field, WA. Edjudina (S |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 5.9% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A57163 | 1998 | Abador Gold Nl | Chloe | <1% | Partial Surrender Report Chloe Project Exploration Licence 31/335, North Coolgardie Mineral Field, WA, For the |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | 4.6% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A50316 | 1997 | Sons Of Gwalia Ltd | Hobble Gap | 2.7% | Hobble Gap Project, Annual Report for the Period 01 Feburary 1996 to 31 January 1997 E31/171. |
| A50181 | 1997 | Western Mining Corporation Ltd | Kingsley | 34% | Annual report for the period 11 February 1996 to 10 February 1997 The Kingsley Project Exploration Licence E31 |
| A50632 | 1997 | Goldfields Exploration Pty Ltd | Keith Kilkenny- Claypan Creek | 25% | Keith Kilkenny- Claypan Creek Project, Annual Report for the period 24/03/1996 to 23/03/1997, E31/194. |
| A50791 | 1997 | Voyager Gold Nl | Edjudina | 11% | Edjudina Project, Annual & Surrender Report P31/1505-1511(inc) & P31/1521-1524 (inc) for the year ending 25/02 |
| A50990 | 1997 | Mt Edon Gold Mines Aust Ltd | Yarri | 4.9% | Annual Report on the Exploration of the Yarri Project Area M31/11 M31/117 M31/119 E31/98 E31/140 E31/181 E31/2 |
| A51753 | 1997 | Goldfields Exploration Pty Ltd | Edjudina | 3.8% | Edjudina Project, Annual Report for the period 31/05/1996 to 30/05/1997, E31/147,148, 149 & 225. |
| A52371 | 1997 | Goldfields Exploration Pty Ltd | Edjudina | 9.7% | Edjudina Project, Partial Surrender Report for the period 31/05/1993 to 30/05/1997, E31/147 ( Hobble Gap). |
| A48618 | 1996 | Goldfields Exploration Pty Ltd | Edjudina | 3.8% | Edjudina Project, Annual Report for period 31/05/1995 to 30/05/1996, E31/147-149, E31/225. |
| A48716 | 1996 | Goldfields Exploration Pty Ltd | Triumph Line | 21% | Triumph Line Project, Final Surrender Report for the period 11/06/1992 to 10/06/1996, E31/124. |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | 3.9% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A47528 | 1996 | Sons Of Gwalia Ltd | Hobble Gap | 2.7% | Hobble Gap Project, Annual Report for the period 1st February 1995 to 31st January 1996, E31/171, P31/1499-150 |
| A47683 | 1996 | Western Mining Corporation Ltd | Kingsley | 34% | Annual report for the period 1 February 1995 to 31 January 1996 The Kingsley Project Exploration Licence E31/1 |
| A48620 | 1996 | Goldfields Exploration Pty Ltd | Edjudina | 9.7% | Edjudina Project, Partial Surrender Report for period 31/05/1993 ro 30/05/1996, E31/147( Hobble Gap). |
| A49170 | 1996 | Mining Corporation Of Australia Ltd | Edjudina | <1% | Annual Report Edjudine Project P31/1478-1471 for the year Ending 01/09/1996 |
| A45120 | 1995 | Rgc Exploration Pty Ltd | Edjudina /Hobble Gao | 9.7% | Edjudina/ Hobble Gap Project, Annual Report E31/147 for period 31/05/19994 to 30/05/1995. |
| A45693 | 1995 | Goldfields Exploration Pty Ltd | Triumph Line | 21% | Triumph Line Project, Annual Report June 1994 to June 1995 , E31/124. |
| A43419 | 1995 | Consolidated Resources Nl | Edjudina | 39% | Partial Surrender Report E31/98, Edjudina Project,for the period 08/11/1990 to 07/1/1994. |
| A43693 | 1995 | Consolidated Resources Nl | Clymies Well | 62% | Clymies Well Project, Annual Report Prospecting Licences P31/1461 & 1462 for year ending 4th November 1994. |
| A44207 | 1995 | Western Mining Corporation Ltd | Kingsley | 34% | Annual report for the period 1 February 1994 to 31 January 1995, The Kingsley Project,Exploration Licence 31/1 |
| A44329 | 1995 | Consolidated Resources Nl | Yarri | <1% | Yarri Project, Annual Report E31/140 for the period 16/03/1994 to 15/03/1995. |
| A44706 | 1995 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap Project, Annual Report Exploration Licence E31/85 for period ending 28th February 1995. |
| A47584 | 1995 | Mt Edon Gold Mines Nl | Edjudina | 2.6% | Edjudina Gold Project Report on Interpretation of Airborne Magnetometer Survey Edjudina, Western Australia Jun |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 3.5% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41599 | 1994 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap (JV)Project, E31/85, Relinquishment Report for relinquishment made on 28 February 1994. |
| A40149 | 1994 | Consolidated Resources Nl | Edjudina | 39% | Partial surrender report for the period ending 07/11/1993, Edjudina Project, E31/98. |
| A41004 | 1994 | Consolidated Resources Nl | Yarri | <1% | Yarri (JV) Project, Annual Report E31/140 Yerilla District North Coolgardie Goldfield for the period 16/03/19 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 4.1% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 3.5% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A41472 | 1994 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap (JV) Project, Annual Report for the period ending 28th February 1994, E31/85. |
| A41792 | 1994 | Rgc Exploration Pty Ltd | Edjudina - Hobble Gap | 9.7% | Edjudina - Hobble Gap Project, Annual Report for the period 31/05/1993 to 30/05/1994, E31/147. |
| A41852 | 1994 | Pancontinental Mining Ltd | Keith Kilkenny - Triumph Line | 21% | Keith Kilkenny -Triumph Line Project, Annual Report for the period June 1993 to June 1994, E31/124. |
| A37773 | 1993 | Avon Management Co Pty Ltd | Edjudina | 39% | (1992-1993 Annual report for Paget Prospect E31/98, M31/106) |
| A38440 | 1993 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap Project, Annual Report for period ending 28th February 1993, E31/85. |
| A38441 | 1993 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap (JV) Project, . E31/85, Partial Relinquishment Report. February 1993. |
| A39063 | 1993 | Pancontinental Mining Ltd | Keith Kilkenny - Triumph Line | 21% | Keith Kilkenny Project, E31/124 [Triumph Line] ,Annual Report period ending 30/06/1993. |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.4% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.4% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A35317 | 1992 | Avon Management Co Pty Ltd | Edjudina | 39% | Annual report on EL31/98 (Edjudina Gold Project 11/90-11/91). |
| A35398 | 1992 | Pancontinental Mining Ltd | Hobble Gap | <1% | Hobble Gap Project, Annual Report for the period ending 28th February 1992, E31/85. |
| A37173 | 1992 | Avon Management Co Pty Ltd | Edjudina | 39% | Annual Report for the period 08/11/90-07/11/91 Edjudina Project E31/98 |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | 3% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A14597 | 1984 | Paget Gold Mining Co Nl | Edjudina | 3.8% | Edjudina Project, Non-statutory Report: Chairman's Address to the Shareholders, 23/10/1984. |
| A10935 | 1982 | Duval Mining Australia Ltd | Q | 7.1% | 'Q' Project Edjudina W.A final report December 31st 1981 |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | 3.2% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A61689 | 1753 | Croesus Mining Nl | Wallbrook JV | 27% | Annual Report 1st January 2000 to 31st December 2000 Wallbrook Joint Venture Project tenements E31/117, E31/17 |
| A82477 | 1753 | Hawthorn Resources Limited | SAVANNAH | 3.2% | Exploration Licence E31/454 SAVANNAH ANNUAL REPORT FOR THE PERIOD 6 FEBRUARY 2008 TO 5 FEBRUARY 2009 |
| A84166 | 1753 | Hawthorn Resources Limited | Triumph | 46% | Exploration Licence E31/414 TRIUMPH, PARTIAL SURRENDER REPORT FOR THE PERIOD 17 MAY 2006 TO MAY 2009 |
| A89596 | 1753 | Hawthorn Resources Limited | Triumph - Edjudina - Patricia | <1% | EDJUDINA – PATRICIA NW, E31/790 ANNUAL REPORT FOR THE PERIOD 18 November 2009 TO 17 November 2010 |
| A81859 | 1753 | Saracen Gold Mines Pty Ltd | EDJUDINA | 1.7% | EDJUDINA PROJECT ANNUAL REPORT 23 DECEMBER 2007 TO 22 DECEMBER 2008 CR GROUP: C206/1995 TENEMENTS: E31/113, E3 |
| A85717 | 1753 | Hawthorn Resources Limited | EDJUDINA - SAVANNAH | <1% | EDJUDINA - SAVANNAH PROJECT E31/787 – Clymies Well ANNUAL REPORT FOR THE PERIOD 17 September 2009 TO 16 Septem |
| A86419 | 1753 | Saracen Gold Mines Pty Ltd | Edjudina | 2% | Edjudina Project Annual Report, 23rd December 2008 to 22 December 2009, C206/1995, E31/573, E31/621, E31/645, |
| A88256 | 1753 | Hawthorn Resources Limited | Savannah | 3.2% | SAVANNAH PROJECT E31/454 ANNUAL REPORT FOR THE PERIOD 6 February 2009 TO 5 February 2010 |
| A37199 | 1753 | Golden Valley Mines Nl | Clymies Well | 62% | 1992 Annual Report. Clymies Well. PL31/1388 and 1389 |
| A40259 | 1753 | Consolidated Resources Nl | Edjudina | 6.6% | Annual Report Edjudina Project E31/91, E31/98, E31/113, E31/125, E31/142, M31/30, M31/76, M31/106, P31/1417, P |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43715 | 1753 | Consolidated Resources Nl | Edjudina | 6% | Annual Report Edjudina Project E31/91,E31/98,E31/113,E31/125 ,E31/142,M31/30,M31/76,M31/117,M31/119,M31/120,M3 |
| A46997 | 1753 | Mt Edon Gold Mines Aust Ltd | Edjudina | 4.9% | Annual report Yarri Combined Reporting Area for Tenements M31/11 M31/117 M31/119 E31/98 E31/140 E31/181 E31/21 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 10 May 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 31/1439 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 31/1439? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.