E 38/2873
Register summary
- Holder
- Laverton Gold Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 31 July 2013
- Commenced
- 23 Mar 2016
- Expiry
- 22 Mar 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | <1% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | 1.5% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
80 more reports
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | 83% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | 76% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | 1.5% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | <1% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A121151 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Final Surrender Report for E38/2872 for the period 20 March 2014 to 25 July 2019 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | 76% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | 1.6% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | 76% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | 1.6% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | 1.6% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | 76% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | 1.6% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 1.9% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 1.6% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | 1.6% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | 30% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | 1.6% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A90714 | 2011 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211 Partial Surrender Report, Period 30 October 2007 – 4 March 2011 techn |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | 1.6% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | 30% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | 1.9% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | 3.1% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | <1% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 1.9% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 1.7% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A76087 | 2007 | Barrick Gold Of Australia Ltd | Lake Carey | <1% | Lake Carey Project E38/448, M38/675 & M38/677 Annual Report Period 1 July 2006 - 30 June 2007 TECHNICAL REPORT |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72952 | 2006 | Crescent Gold Ltd | Jubilee Well | 50% | Surrender Report, Jubilee Well JV E38/523, Period 19 July 2005 to 18 July 2006, Surrendered 27 January 2006, ( |
| A72953 | 2006 | Crescent Gold Ltd | Jubilee Well | 93% | Surrender Report, Jubilee Well JV E38/524, Period 5 August 2005 to 4 August 2006, Surrendered 27 January 2006, |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | 15% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | 8.8% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | 3.9% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | 23% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | 21% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | 23% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | 23% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | 23% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | 23% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56808 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, Partial Surrender Report for theperiod 09/08/1992 to 11/11/1998, E38/448. |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | 23% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | 23% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | 23% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | 23% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | <1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | 23% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | <1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A39256 | 1993 | Placer Exploration Ltd | Island | <1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | 14% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | 14% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | 14% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | 14% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | 14% | Mt Weld Project, Annual report, 1988. E38/163 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 19 months · 22 Mar 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/2873 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/2873? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.