NextMapsWA TenementsE 38/2888

E 38/2888

LiveExploration LicenceShire of LavertonMt. Margaret District
Area
3,100ha
Expires
Jan 2027
in 5 months
WAMEX reports
124
WA median is 53
Report drilling
80
of 124 reports
Laverton Explore on the live map

Register summary

Holder
Gsm Mining Company Pty Ltd
Local government
Shire of Laverton
Application received
4 Oct 2013
Commenced
23 Jan 2015
Expiry
22 Jan 2027
Term
5 Years (Extended)

Exploration history on this ground

124 historical WAMEX exploration reports intersect E 38/2888: 46 report geochemistry or sampling, 83 include a digital data package.
When this ground was worked · 122 of 124 reports dated
11970s
21980s
301990s
342000s
462010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A145852 2024 Mt Weld Mining Pty Ltd Mount Weld 4.8% Completion of EIS round 28 supported exploration drilling 2024, Mt Weld REE project - Final Report
A129997 2022 Matsa Gold Pty Ltd Hacks Well <1% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A132799 2022 Lodestar Minerals Ltd Jubilee Well <1% Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022
A126029 2021 Gsm Mining Company Pty Ltd E38/2888 41% Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar
A128857 2021 Lodestar Minerals Ltd Jubilee Well <1% Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021
119 more reports
A122827 2020 Matsa Resources Limited Red October <1% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
A123791 2020 Gsm Mining Company Pty Ltd Central Laverton 4.6% Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020
A124132 2020 Focus Minerals (Laverton) Pty Limited Carey <1% Carey C88/2014 Annual Technical Report for the period ending 31/03/2020
A122902 2020 Mt Weld Mining Pty Limited Mount Weld 4.6% Mt Weld Rare Earths Project Annual Report on Exploration on tenements M38/58, M38/59, M38/326, M38/327, E38/22
A120662 2019 Focus Minerals (Laverton) Pty Limited Carey <1% Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0
A119370 2019 Mt Weld Mining Pty Ltd Mount Weld 4.6% Mount Weld Rare Earths Project Combined Report C56/1999 Exploration on tenements M38/58, M38/59, M38/326, M38/
A118830 2019 Matsa Gold Pty Ltd Hack Well <1% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119510 2019 Matsa Resources Limited Red October <1% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A119796 2019 Oro Del Sur Pty Ltd Laverton <1% E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018
A120095 2019 Gsm Mining Company Pty Ltd Central Laverton 4.6% Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201
A115637 2018 Australian Potash Limited Hack Well <1% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A116142 2018 Mt Weld Mining Pty Ltd Mount Weld 4.5% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016,
A116780 2018 Gsm Mining Company Pty Ltd Central Laverton 4.3% Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018
A117034 2018 Focus Minerals (Laverton) Pty Limited Carey <1% Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100
A114051 2017 Gsm Mining Company Pty Ltd Central Laverton 4.1% CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2
A114106 2017 Focus Minerals (Laverton) Pty Limited CAREY <1% Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028
A111860 2017 Lynas Corporation Limited Mount Weld 4.5% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2015 to 24 November 2016,
A112076 2017 Australian Potash Limited Hack Well <1% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A107882 2016 Mt Weld Mining Pty Ltd Mount Weld 4.5% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2014 to 24 November 2015,
A108971 2016 Gsm Mining Company Pty Ltd Central Laverton 6.2% C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016
A109072 2016 Focus Minerals (Laverton) Pty Limited Carey <1% Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P
A109831 2016 Lynas Corporation Limited Mount Weld 7.1% Mount Weld E38/2224 Partial Surrender Report for the period 17 August 2010 to 12 August 2016
A105693 2015 Gsm Mining Company Pty Ltd Central Laverton 7.2% Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38
A100696 2014 Mt Weld Mining Pty Ltd Mount Weld 4.5% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2012 to 24 November 2013,
A104205 2014 Mt Weld Mining Pty Ltd Mount Weld 4.5% Mt Weld Rare Earths Project Annual Report on Exploration for the period 25 November 2013 to 24 November 2014,
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A102477 2014 Focus Minerals Ltd Mount Weld 21% Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A99227 2013 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise 10% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A98692 2013 Focus Minerals (Laverton) Pty Ltd Mount Weld 2.2% Mount Weld Project, C321/2011, Combined Annual Report, 01/04/2012 to 31/03/2013, E38/0812....P38/3766
A92958 2012 Rubicon Resources Ltd Laverton 2.3% Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to
A95100 2012 Torridon Exploration Sunrise Dam 20% Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements:
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A94269 2012 Crescent Gold Ltd Mount Weld 2.2% Combined Annual Report on Exploration for the period 01/04/2011 to 31/03/2012; Mount Weld Project; C321/2011
A95588 2012 Rubicon Resources Ltd Laverton 7.1% E38/2224 Annual Technical Report 1st Jan 2012 to 16th August 2012
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise 10% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A89526 2011 Rubicon Resources Ltd Laverton 2.3% Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A90565 2011 Crescent Gold Ltd Childe Harold 21% Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200
A91983 2011 Cove Resources Limited Sunrise Dam 20% Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 &
A90167 2011 Crescent Gold Ltd Central Laverton 13% Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010, Central Laverton Project C133/2
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat <1% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A86734 2010 Crescent Gold Ltd Central Laverton 1.3% Central Laverton Combined AnnualL Report C133/2006, E38/0812, M38/0376, P38/3609, P38/3710, E38/1349, M38/0377
A87437 2010 Crescent Gold Ltd Childe Harold 21% Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010
A88423 2010 Cazaly Resources Ltd Sunrise Dam 43% Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP 1.2% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A81707 2009 Crescent Gold Ltd Central Laverton 1.5% Central Laverton Combined Annual report C133/2006, 1st January 2008 to 31st December 2008
A82274 2009 Carbon Energy Ltd CHILDE HAROLD 21% Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75
A82441 2009 Carbon Energy Ltd CHILDE HAROLD 21% CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam 1.2% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A78425 2008 Metex Resources Ltd Childe Harold 21% CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o
A78902 2008 Jindalee Resources Ltd Jubilee Well 25% Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam 1.2% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A75232 2007 Metex Resources Ltd Childe Harold 15% Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157
A76288 2007 Metex Resources Ltd Childe Harold 29% Childe Harold Project, Surrender Report E38/1658, P38/3293 -3295, Group Reporting No. C157/2005, Mount Marga
A76156 2007 Jindalee Resources Ltd Burtville 25% Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730
A72825 2006 Metex Resources Ltd Childe Harold 14% W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to
A72935 2006 Crescent Gold Ltd Brumby Well 27% Surrender Report, Brumby Well E38/399, Period 27 October 2005 to 26 October 2006, Surrendered 4 January 2006,
A72416 2006 Placer (Granny Smith) Pty Ltd Mikado <1% Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R
A72951 2006 Crescent Gold Ltd Jubilee Well 19% Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam 1.2% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70514 2005 Placer Dome Asia Pacific Ltd Mikado <1% Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205,
A70566 2005 Anglogold Ashanti Australia Ltd Laverton 6.9% Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38
A68436 2004 Placer Dome Asia Pacific Ltd Mikado <1% Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam 1.2% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A68313 2004 Anglogold Australia Ltd Laverton 3.1% Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066,
A69921 2004 Placer Dome Asia Pacific Ltd Mikado <1% Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996
A66147 2003 Anglogold Australia Ltd Brumby Well 27% Annual Report for the period 1 January 2002 to 31 December 2002 Brumby Well [C346/1996]: E38/399, M38/430 & M3
A66171 2003 Placer (Granny Smith) Pty Ltd Mt Lebanon <1% Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3
A66180 2003 Anglogold Australia Ltd Jubilee Well 16% Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462,
A67737 2003 Anglogold Australia Ltd Jubilee Well 16% Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003.
A64064 2002 Placer (Granny Smith) Pty Ltd Mt Lebanon P <1% Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and
A64307 2002 Anglogold Australia Ltd Jubilee Well 16% Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524.
A63177 2001 Pan Palladium Ltd Sunset Strip 82% Annual Report on Exploration, Sunset Strip project, P38/2828 2829,2830, Ref C2/2001, Mt Margaret Mineral Field
A64280 2001 Anglogold Australia Ltd Brumby Well 27% Annual Report for the period 1 January 2001 to 31 December 2001 Brumby Well E38/399, M38/430 & M38/431 .[C348/
A61200 2000 Abador Gold Nl Sunset Strip 81% Sunset Strip P38/2829, 38/2830. Mt Morgan Mineral Field Laverton 1:250,000 (SH51-2) Annual Report for 12 month
A59993 2000 Acacia Resources Ltd Brumby Well 27% Brumby Well Project E38/399,M38/430 & 431 Annual Report for the Period 01/01/1999 to 31/12/1999 Report No.08.1
A60182 2000 Acacia Resources Ltd Jubilee Well 16% Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000
A62054 2000 Anglogold Australasia Ltd Jubilee Well 16% Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January
A57593 1999 Acacia Resources Ltd Jubilee Well 16% Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1
A59519 1999 Abador Gold Nl Sunset Strip 85% 2nd Annual Report on P38/2828, Sunset Strip, Mt Morgan Mineral Field WA, Laverton 1:250,000 for the Period 28
A57721 1998 Acacia Resources Ltd Brumby Well 27% Brumby Well - E38/399, M38/430-431 01/01/98 -31/12/98
A56457 1998 Abador Gold Nl Sunset Strip 85% Sunset Strip Project First Annual Report on Prospecting Licence 38/2828, Mt Morgan Mineral Field, W.A, Laverto
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A56251 1998 Placer (Granny Smith) Pty Ltd Barnicoat/Keringal <1% Hack Well/ Ophir Bore (E38/437) Surrender Report October 1998.
A53144 1997 Acacia Resources Ltd Brumby Well 27% Brumby Well, Annual Report 01/01/97 - 31/12/97 E38/399, M38/430, 431
A53166 1997 Acacia Resources Ltd Brumby Well 16% Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97
A50186 1997 Acacia Resources Ltd Brumby Well 16% Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A51717 1997 Placer (Granny Smith) Pty Ltd Ophir Bore/ Barnicoat 79% Ophir Bore/ Barnicoat Project,Surrender Report P38/2426, July 1997.
A51718 1997 Placer (Granny Smith) Pty Ltd Ophir Bore / Barnicoat 85% Ophir Bore / Barnicoat Project, Surrender Report P38/2427, July 1997.
A51719 1997 Placer (Granny Smith) Pty Ltd Ophir Bore / Barnicoat 78% Ophir Bore / Barnicoat Project, Surrender Report P38/2428, July 1997.
A47027 1996 Placer Exploration Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47216 1996 Aurora Gold Ltd Brumby Well 16% H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar
A50357 1996 Acacia Resources Ltd Brumby Well 27% Brumby Well E38/399 M38/430 and M38/431 Annual report for the period 01/01/96 to 31/12/96 Acacia Resources Lim
A44189 1995 Aurora Gold Ltd Brumby Well 16% Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For
A44535 1995 Acacia Resources Ltd Brumby Well 27% Brumby Well Project, E38/399, Annual Report for the period 1/01/1994 to 1/01/1995 (February 1995)
A45544 1995 Placer Exploration Ltd Barnicoat <1% Partial Surrender Report for the period 07/09/92-18/08/95 ,Barnicoat Project ,E38/437.
A43702 1995 Placer Exploration Ltd Barnicoat 1.6% Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429
A47826 1995 Acacia Resources Ltd Brumby Well 27% Brumby Well Project, E38/399, Annual Report for the period 01/01/95 to 31/12/95.
A40432 1994 Billiton Australia Pty Ltd Brumby Well 27% Annual report for the period 01/01/93-31/12/93 Brumby Well Project, E38/399.
A40522 1994 Placer Exploration Ltd Mount Weld 1.8% Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project
A41227 1994 Aurora Gold Ltd Brumby Well 16% Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524
A38898 1993 Billiton Australia Pty Ltd Brumby Well 27% Annual Report for the period 01/01/92-31/12/92 Brumby Well Project E38/399
A35400 1992 Poseidon Exploration Ltd Mount Weld 9.6% Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163.
A32915 1991 Poseidon Ltd Mount Weld 9.6% Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163.
A33396 1991 Poseidon Ltd Mount Weld 9.6% Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163.
A30632 1990 Poseidon Ltd Mount Weld 9.6% Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2
A30847 1990 Freeport Of Australia Inc Mount Weld 9.6% Mt Weld Project, Annual report, 1988. E38/163
A14703 1985 Golconda Minerals Nl Hack Well 25% Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24.
A12968 1983 Golconda Minerals Nl Davis Well - Hack Well 19% Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72-
A6945 1973 Kennecott Exp Aust Pty Ltd Erlistoun <1% Aeromag- Raw Data
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
5 months · 22 Jan 2027
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 38/2888 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 38/2888? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.