E 39/1279
E 39/1279 is a live exploration licence in the Shire of Leonora, Western Australia, held by Anglogold Ashanti Australia Limited and Northern Star (Carosue Dam) Pty Ltd (part of AngloGold Ashanti). Granted on 18 Sept 2008 for 5 years (extended), it passed its expiry date on 17 Sept 2026. The ground is covered by 141 historical WAMEX reports.
Register summary
- Holders
- Anglogold Ashanti Australia Limited, Northern Star (Carosue Dam) Pty Ltd
- Part of
- AngloGold Ashanti, Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
- Local government
- Shire of Leonora, Shire of Laverton
- Application received
- 3 Jan 2007
- Commenced
- 18 Sept 2008
- Expiry
- 17 Sept 2026
- Term
- 5 Years (Extended)
The full record on E 39/1279
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 4 changes of holder
- The full record: 19 years of expenditure, 9 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (28 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137208 | 2023 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken Project (E39/1416) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A137621 | 2023 | Anglogold Ashanti Australia Limited | Otway Project (E39/1973) | <1% | Otway Project (E39/1973) 40% Partial Surrender Tenement Relinquishment Report to the Department of Mines, Indu |
| A126493 | 2021 | Gswa | 15% | Core Library Sampling K1127 | |
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | 8% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
136 more reports
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
| A122822 | 2020 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken C146/2018 Annual Report to the Department of Mines, Industry Regulation and Safety for the period 01/01 |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | 8% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A119207 | 2019 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken (C146/2018) Annual Report for the period 1 January 2018 to 31 December 2018, E39/01416, E39/01738, E39/ |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115551 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | 48% | Wallaby Project Final Surrender Report for P39/4976 for the period 24/07/2009-23/07/2017 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | 8% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A118036 | 2018 | Matsa Resources Limited | Sunrise West | <1% | Sunrise West E39/1840 Annual Report for the period 1 September 2017 to 31 August 2018 |
| A115990 | 2018 | Saracen Gold Mines Pty Limited | Red October | <1% | Red October Project (C173/2017) Annual Report for the Period 1 January to 31 December 2017, M 39/00411, M39/00 |
| A112356 | 2017 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume II Annual Report for the Period 1 January to 31 December 2016, E39/014 |
| A114918 | 2017 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey E39/1840 Annual Mineral Exploration Report For the Period 1 September 2016 to 31 August 2017 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A110763 | 2017 | Matsa Gold Pty Ltd | Lake Carey | <1% | MATSA GOLD PTY LTD ANNUAL REPORT For the Period 1 September 2015 to 31 August 2016 E39/1840 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | 8.2% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A112650 | 2017 | Sammy Resources Pty Ltd | Mount Weld | <1% | Mt Weld E39/1837 Annual Report for the period 5 February 2016 to 4 February 2017 |
| A108911 | 2016 | Saracen Mineral Holdings Limited | Butcher Well | <1% | BUTCHER WELL Exploration License 39/1489 Partial Surrender Report for the Period 25 March 2010 to 24 March 201 |
| A108266 | 2016 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | 17% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 15% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A104859 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 56% | Butcher Well Partial Surrender Report E39/1279 for the period 18/09/2008 to 17/09/2014 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | 15% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 1% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | 15% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A99225 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Partial Surrender Report for E39/1416 for the period 12/08/2009 to 24/07/2013 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | <1% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | 14% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | 14% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | 1.6% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | 11% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | 1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | 5% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | 5% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | 4.8% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | 4.6% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A67535 | 2003 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Annual Report for the period 12 October 2002 to 11 October 2003 Wilga Well West JV Project E39/378 Report No. |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A65497 | 2002 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Wilga Well West JV Annual Report For The Period 12/10/01 - 11/10/02 Tenement: E39/378. Report No. 0451-2002-01 |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | <1% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A63625 | 2001 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Wilga Well West JV Annual Report for the period 12/10/00-11/ 10/01 tenement E39/378. |
| A60349 | 2000 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Wilga Well West JV, Annual Report for the Period 12/10/1998 to 11/10/1999, E39/378. |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A57548 | 1999 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Wilga Well West JV Annual Report For 12/10/97 - 11/10/98 E39/378 |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A46521 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well West | 55% | Wilga Well West Joint Venture E39/378 Annual report for the year ending 11 October 1995 |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | <1% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A43353 | 1995 | Gasgoyne Gold Mines Nl | Sunrise-Wilga | 55% | Sunrise-Wilga projects Wilga West - E39/378 Annual report for the year to 11th October 1994 |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | <1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | <1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | <1% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A39256 | 1993 | Placer Exploration Ltd | Island | 1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A36331 | 1992 | Billiton Australia Pty Ltd | Soak Well | <1% | Soak Well Project,Partial Surrender Report,May 1992, E39/174 & E39/227. |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A35174 | 1991 | Newcrest Mining Ltd | Sunrise Dam | <1% | Final Report from Soak Well Joint Venture from February 1991 to May 1991. E39/174 and E39/227. Billeton Austr |
| A33196 | 1991 | Billiton Australia Pty Ltd | Freshwater Swamp | <1% | Freshwater Swamp Project,Partial Surrender Report, 21st March 1991, E39/174. |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A50044 | 1753 | Sons Of Gwalia Ltd | Wilga Well West | 55% | Wilga Well West Joint Venture Annual report for the year ending 11th October 1996 Tenement E39/378 Report No.0 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | 5.4% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A94604 | 1753 | Saracen Gold Mines Pty Ltd | Lake Carey | 37% | Lake Carey Project. Royalties for Regions - Exploration Incentive Scheme. Report for the period 01/02/2011 to |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 39/1279 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 39/1279? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.