NextMaps›WA Tenements›E 39/1729

E 39/1729

LiveExploration LicenceShire of LavertonMt. Morgans District

E 39/1729 is a live exploration licence in the Shire of Laverton, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 6 Feb 2014 for 5 years (extended), it expires on 5 Feb 2028. The ground is covered by 84 historical WAMEX reports.

Area
599.765ha
Expires
Feb 2028
in 16 months
WAMEX reports
84
WA median is 53
Report drilling
62
of 84 reports
Free Tenure Pack for E 39/1729
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 39/1729 that covers 84 WAMEX reports · 24 open-file drillholes (2,093 m drilled) · 17 earlier titles on the ground since 1968 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Laverton Explore on the live map

Register summary

Holder
Anglogold Ashanti Australia Limited
Part of
AngloGold Ashanti
Local government
Shire of Laverton
Application received
15 Jan 2013
Commenced
6 Feb 2014
Expiry
5 Feb 2028
Term
5 Years (Extended)

The full record on E 39/1729

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 13 years of expenditure, 12 conditions and 13 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (13 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

84 historical WAMEX exploration reports intersect E 39/1729: 41 report geochemistry or sampling, 60 include a digital data package.
Work on record: Diamond drilling 43 · RC drilling 39 · Soil sampling 24 · Rotary drilling 15 · Geological mapping 12 · Mineral resource estimate 12. Resource declared in A122815 (2020), A119211 (2019), A104898 (2015), A66542 (2003) and 8 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 39/1729, free for new accounts.
When this ground was worked · 82 of 84 reports dated
11960s
21970s
11980s
221990s
252000s
262010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A129997 2022 Matsa Gold Pty Ltd Hacks Well <1% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam 1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
A122827 2020 Matsa Resources Limited Red October <1% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
79 more reports
A118830 2019 Matsa Gold Pty Ltd Hack Well <1% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group 1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A119510 2019 Matsa Resources Limited Red October <1% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
A115637 2018 Australian Potash Limited Hack Well <1% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A112076 2017 Australian Potash Limited Hack Well <1% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat <1% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A97044 2013 Barrick (Granny Smith) Pty Ltd Barnicoat 100% Barnicoat Project, Final Surrender Report for the 16th January 2009 to 14th January 2013, P39/4806. [C388/199
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat 1.1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A92690 2012 Crescent Gold Ltd Sunrise <1% Interim Combined Annual Report on Exploration for the period 01/09/2010 to 31/08/2011; Sunrise Project; C320/2
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat 1.1% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A90051 2011 Crescent Gold Ltd Wilga Dam <1% Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Wilga Dam Project; C118/2009
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat 1.1% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat 1.1% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A86622 2010 Barrick (Australia Pacific) Ltd Wilga Dam <1% Wilga Dam Project P39/4797, M39/664, M39/742, M39/743, M39/862, M39/904, M39/951, Annual Report Period 1 Janua
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP <1% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam <1% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A72814 2006 Barrick (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam Project E39/786, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, C314/1995, (
A72164 2006 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70688 2005 Placer Dome Asia Pacific Ltd Barnicoat 2.6% Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret
A71360 2005 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam Project, E39/347 & E39/786, Mount Margaret Mineral Field Western Australia, Annual Exploration Repor
A68170 2004 Anglogold Australasia Ltd Sunrise Dam <1% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A68271 2004 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the
A69923 2004 Placer Dome Asia Pacific Ltd Wilga Dam <1% Wilga Dam Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 X32, C314/1995, E3
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A65899 2003 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A66976 2003 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam Project, E39/786, Mount Margaret Mineral Field,Western Australia, Partial Surrender Report for the
A67211 2003 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam Project, E39/347,786, Mount Margaret Mineral Field, Western Australia Annual Exploration Report for
A64258 2002 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A65544 2002 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Project E39/347, E39/786 Annual Report On Exploration For The Period 1st July 2001 To 30th June 2002 Group Rep
A62105 2001 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar
A63421 2001 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam Project Mount Margaret Mineral Field Western Australia Annual Report On Exploration For The Period 1
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A60543 2000 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go
A61260 2000 Placer (Granny Smith) Pty Ltd Wilga Dam <1% Wilga Dam E39/347 Annual Report on Exploration for the Period 1 July 1999 to 30 June 2000. C314/1995 Grid Ref:
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A57772 1999 Placer (Granny Smith) Pty Ltd Barnicoat 2.6% Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98
A59071 1999 Exodus Minerals Ltd Wilga Dam <1% Annual report Wilga Dam Exploration Licence 39/347 Prospecting Licences 39/2985 &39/2986 for the period 01/07/
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A56033 1998 Exodus Minerals Ltd Wilga Dam <1% Annual Report - Wilga Dam Exploration Licence:39/347, Prospecting Licence:39/2985-2986 01/07/97 - 30/06/98
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A52374 1997 Wmc Resources Ltd Wilga Dam <1% Annual Report 01/07/96-30/06/97 Wilga Dam E39/347 P39/2985 P39/2986 P39/3396 (Edjudina SH51-6 1:250 000)
A47027 1996 Placer Exploration Ltd Barnicoat <1% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A48993 1996 Wmc Resources Ltd Wilga Dam <1% Annual report for the period 1 July 1995 to 30 June 1996 Wilga Dam Project Exploration Licence E39/347 Prospec
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A45239 1995 Western Mining Corporation Ltd Wilga Dam <1% Annual report for the period 1 July 1994 to 30 June 1995 The Wilga Dam Project Exploration Licence E39/347 Pro
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A42285 1994 Western Mining Corporation Ltd Wilga Dam <1% Annual Report for the period 28/10/92-30/06/94 The Wilga Dam Project E39/347 P39/2985-2986 (Edjudina, SH51-6,
A42103 1994 Placer Exploration Ltd Sunset 11% Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A40012 1993 Billiton Australia Pty Ltd Sunrise Central <1% Partial surrender report, Sunrise Central, E39/229.
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A2691 1972 Australian Selection Pty Ltd Wilga <1% Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9
A1366 1970 Australian Selection Pty Ltd Wilga <1% Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 &
A1365 1968 Australian Selection Pty Ltd Wilga <1% Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747,
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 39/1729 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 39/1729? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.