NextMaps›WA Tenements›E 45/4177

E 45/4177

LiveExploration LicenceShire of East PilbaraMarble Bar District

E 45/4177 is a live exploration licence in the Shire of East Pilbara, Western Australia, held by Haoma Mining Nl. Granted on 4 Nov 2013 for 5 years (extended), it expires on 3 Nov 2027. The ground is covered by 71 historical WAMEX reports.

Area
638.394ha
Expires
Nov 2027
in 13 months
WAMEX reports
71
WA median is 53
Report drilling
17
of 71 reports
Free Tenure Pack for E 45/4177
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For E 45/4177 that covers 71 WAMEX reports · 45 earlier titles on the ground since 1958 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
East Pilbara Explore on the live map

Register summary

Holder
Haoma Mining Nl
Local government
Shire of East Pilbara
Application received
15 Mar 2013
Commenced
4 Nov 2013
Expiry
3 Nov 2027
Term
5 Years (Extended)

The full record on E 45/4177

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares, and the one change of holder on record
  • The full record: 13 years of expenditure, 6 conditions and 18 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (7 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

71 historical WAMEX exploration reports intersect E 45/4177: 51 report geochemistry or sampling, 47 include a digital data package.
Work on record: Rock chip sampling 43 · Geological mapping 18 · Stream sediment sampling 14 · RC drilling 13 · Surface geochemistry 12 · Geological reconnaissance 9. Resource declared in A102085 (2014), A97509 (2013), A93517 (2012), A89779 (2011) and 1 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on E 45/4177, free for new accounts.
When this ground was worked · 69 of 71 reports dated
11960s
11970s
31980s
111990s
122000s
322010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A137307 2023 Historic Gold Mines Pty Ltd E45/5717 Lithium <1% E45/5717 Lithium Project the period ending 12/10/2023
A129293 2022 Haoma Mining Nl E45/4477 <1% Partial Surrender E45/4477 for the period 16 November 2015 to 15 November 2021
A132966 2022 Atlas Iron Pty Ltd Mt Webber - E45/4952 <1% Final Surrender Report for E45/4952 Mt Webber for the period of 8/02/2018 to 11/11/2022.
A133030 2022 Historic Gold Mines Pty Ltd Marble Bar Lithium <1% Marble Bar Lithium Project E45/5717 for the period ending 12/10/2022.
A122720 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Hillside - Soansville 2% Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019
66 more reports
A123522 2020 Fmg Pilbara Pty Ltd Glacier Extended <1% Glacier Extended Annual Mineral Exploration Report, C5/2012, 1 April 2019 to 31 March 2020
A124033 2020 Atlas Iron Pty Ltd Mount Webber <1% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2020
A124328 2020 Fortescue Metals Group Ltd Glacier Extended <1% C5/2012 Glacier Extended Combined Final Surrender Report for the period ending 06/06/2020, E45/03641, E45/0446
A124831 2020 Minrex Resources Limited Daltons <1% Annual Report for Daltons Project E45/4681 for the period 13 July 2019 to 12 July 2020
A120900 2019 Minrex Resources Limited Daltons <1% 2019 Annual Report on the Daltons Project E45/04681 for the period 13 July 2018 to 12 July 2019
A121311 2019 Fmg Pilbara Pty Ltd Glacier Extended 51% P45/2932 Glacier Extended Final Surrender for the period 22 September 2015 to 13 September 2019
A119187 2019 Haoma Mining Nl; Elazac Mining Pty Ltd Soansville 2% Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018
A120318 2019 Atlas Iron Pty Ltd Mount Webber <1% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2019, E 45/02922, M45/01197, E45/04
A115566 2018 Fortescue Metals Group Ltd Glacier Extended <1% C5/2012 Glacier Extended Final Surrender Report, E45/2945 for the period 13/03/2012-12/03/2017
A117470 2018 Minrex Resources Limited Daltons <1% Annual Report on Daltons Gold Project E45/4681 For the Period 12 July 2017 to 11 July 2018
A116690 2018 Haoma Mining Nl Soansville 2% C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/
A112488 2017 Haoma Mining Nl Tambourah - Soansville - Mercury Hill - 2% C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/
A108317 2016 Haoma Mining Nl Tambourah/Soansville/Mercury Hill/Tank H 3% Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015
A104665 2015 Haoma Mining Nl Soansville - Tambourah - Jeff’s Hill - T 5.5% Soansville / Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual report for the period 1st December 20
A105712 2015 Fortescue Metals Group Ltd Glacier Extended <1% C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945
A101670 2014 Mallina Exploration Pty Ltd Dalton <1% Annual Report for the Period 1st March 2013 to the 29th February 2014, Dalton, E45/3580
A104194 2014 Mallina Exploration Pty Ltd Dalton <1% Final Surrender Report for the Period 1st March 2011 to the 26th September 2014, Dalton project, E45/3580
A101206 2014 Haoma Mining Nl Soansville - Tambourah - Jeff’s 5.5% Soansville / Tambourah / Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2012 to 30th Nov
A102007 2014 Fortescue Metals Group Ltd Glacier Extended <1% Combined Mineral Exploration Report: C5/2012 Glacier Extended for the period 01 April 2013 to 31 March 2014, E
A102085 2014 Atlas Iron Ltd Mount Webber 1.2% Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I
A103943 2014 Atlas Iron Ltd Mount Webber <1% Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014
A97553 2013 Mallina Exploration Pty Ltd Dalton <1% Annual Report E45/3580-I Dalton Project for the period 1st March 2012 to 29th February 2013
A97703 2013 Atlas Iron Ltd Mount Webber 1.4% Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2
A97509 2013 Atlas Iron Ltd Mount Webber 1.2% Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298
A97835 2013 Fortescue Metals Group Ltd Glacier Extended <1% Annual Report for C5/2012 - Glacier Extended for the period 1/4/2012 to 31/3/2013, E
A100051 2013 Atlas Iron Ltd Mount Webber <1% Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29
A93517 2012 Atlas Iron Ltd Mount Webber 1.2% MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/
A94133 2012 Acm Pty Ltd Dalton <1% Annual Report for the period 1st March 2011 to 29th February 2012, Dalton Project E45/3580
A94905 2012 Atlas Iron Ltd Mount Webber 51% Mount webber Project P45/2708, Annual Report for the period ending 29 August 2012.
A89779 2011 Giralia Resources Nl Daltons 1.3% Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011
A90079 2011 Atlas Iron Ltd Mount Webber <1% MT WEBBER PROJECT E45/2496, ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 30 APRIL 2011
A87508 2010 Atlas Iron Ltd Mount Webber <1% Partial Surrender to the Department of Mines and Petroleum for the period 01/05/06 to 30/4/2010
A86300 2010 Acm Pty Ltd Dalton Creek <1% Final Surrender Report for the period 15 April 2005 to 9 December 2009, Dalton Creek Project E45/2544
A86548 2010 Giralia Resources Nl Daltons 1.3% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010
A86819 2010 Atlas Iron Ltd Mount Webber <1% Partial Surrender to the Department of Mines and Petroleum for the period 01/05/06 to 28/3/2010
A87516 2010 Atlas Iron Ltd Mount Webber <1% Mount Webber E45/2496 Annual Report to the Department of Mines and Petroleum for the period 01/05/09 to 30/04/
A84086 2009 Acm Pty Ltd DALTON CREEK <1% ANNUAL REPORT FOR THE PERIOD 15 May 2008 TO 14 MAY 2009, DALTON CREEK PROJECT, E45/2544 and P45/2550, EAST PIL
A81669 2009 Giralia Resources Nl Daltons 1.3% Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009
A82625 2009 Atlas Iron Ltd Mt Webber <1% Mt Webber E45/2496 Annual Report for the period 01/05/08 to 30/04/09
A78891 2008 Clara Resources Pty Ltd Dalton Creek <1% ANNUAL REPORT FOR THE PERIOD 15 May 2007 TO 14 MAY 2008 DALTON CREEK PROJECT E45/2544 and P45/2550 COMBINED RE
A80593 2008 Giralia Resources Nl Daltons 1.3% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003
A75540 2007 Clara Resources Pty Ltd Dalton Creek <1% 2007 Annual Report Dalton Creek Report Project Exploration Licence 45/2544 and Prospecting Licence 45/2550 For
A75860 2007 Giralia Resources Nl Daltons 1.4% E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29
A75374 2007 Atlas Iron Ltd Abydos <1% Annual Report For the period 01/05/06 to 30/04/07 Tenement:E45/2496
A72610 2006 Giralia Resources Nl Daltons 1.4% E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20
A71128 2005 Giralia Resources Nl Daltons 1.4% E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin
A68997 2004 Giralia Resources Nl Daltons 1.4% Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187
A67049 2003 Giralia Resources Nl Daltons 2.7% Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187
A57790 1999 Sipa Resources Ltd Panorama 1.2% 1998 Annual Report on the Daltons Exploration Area, Panorama Project( covering the period 1 January 1998 to 31
A57173 1999 Sipa Resources Ltd Panorama <1% E45/1048, 1065, 1066, 1851, (& 1151) Surrender Report Daltons Exploration Area Panorma Project (Covering the P
A54819 1998 Sipa Resources Ltd Panorama 1.2% 1997 Annual Report on the Daltons Exploration Area, Panorama Project, (covering the period 1st January 1997 to
A51154 1997 Sipa Resources Ltd Panorama / Daltons 1.1% Panorama / Daltons Project, 1996 Annual Report E45/1048, 1062, 1151 & 1286 covering the period 1st January 199
A47307 1996 Cra Exploration Pty Ltd Daltons 1.1% Dalton's Project, Annual Report, E45/1048, 1062, 1151, 1286 For Period ending 31 December 1995.
A46188 1995 Sipa Resources Ltd Daltons / Panorama 4.8% Daltons / Panorama Project, Partial Surrender Report E45/1048 covering period 14th June 1991 to 15th February
A45111 1995 Sipa Resources Ltd Panorama 1.1% Panorama Project, 1994 Annual Report E45/1048, 1062, 1133, 1151, 1286, 1355 covering the period 1st January 19
A42000 1994 Sipa Resources Ltd Panorama-Daltons 4.3% E45/113 SURRENDER REPORT
A40876 1994 Sipa Resources Ltd Panorama - Daltons 1.1% Panorama - Daltons Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/1048,
A39175 1993 Sipa Resources Ltd Panorama - Daltons 1.3% Panorama - Daltons Project, Annual Report for the period 27th Novembre 1991 to 26th November 1992, E45/1048, 1
A34908 1991 Sipa Resources Ltd Panorama <1% Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9
A23463 1988 Altus Corporation Pty Ltd Daltons <1% Daltons Tenements, Annual report for 1988, P45/820-822, P45/1198-1200
A25091 1988 Gold Partners Nl Daltons 9.7% Daltons Tenements, Annual report, 1988, P45/1232-1234, P45/820-822, P45/1198-1200, P45/1205-1225
A15044 1985 Terrex Resources Nl Soanesville <1% Annual Report on prospecting licences 45/65 and 45/464-467 and exploration licence 45/96 Soansville and Soansv
A531 1970 Project Development Corp Shaw River 3.4% Shaw River Project, Non-statutory Report: Completion Report , November 1970, TR70/4221H.
A13076 1968 Us Steel International Inc Pilbara <1% Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4
A78773 1753 Atlas Iron Ltd Abydos <1% ANNUAL REPORT to the Department of Industry and Resources for the Period 01/05/07 to 30/04/08 TENEMENT: E45/24
A79126 1753 Giralia Resources Nl Daltons 1.4% E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over E 45/4177 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold E 45/4177? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.