E 45/4979
E 45/4979 is a pending exploration licence in the Shire of East Pilbara, Western Australia, applied for by Atlas Iron Pty Ltd (part of Hancock Prospecting). The application was received on 22 Aug 2017 and is awaiting a decision. The ground is covered by 91 historical WAMEX reports.
Register summary
- Holder
- Atlas Iron Pty Ltd
- Part of
- Hancock Prospecting
- Local government
- Shire of East Pilbara
- Application received
- 22 Aug 2017
The full record on E 45/4979
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares, and the one change of holder on record
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (4 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138816 | 2024 | Valorem Resources Pty Ltd | SPEAR HILL | <1% | Partial Surrender Report E 45/4713 Spear Hill For the period ending 23/10/2023 |
| A143698 | 2024 | Atlas Iron Pty Ltd | Mt Webber | <1% | Surrender Report for E45/5340 Mt Webber for the period of 6/06/2019 to 31/05/2024 |
| A144146 | 2024 | Askari Metals Limited | Hillside | <1% | Annual Report for C81/20239 Hillside Project for the period ending 13/4/2024 |
| A135828 | 2023 | Askari Metals Limited | Hill Side | <1% | E45/6224 and E45/5966 Hill SIde Project Annual Report (C81/2023) for the period ending 13/4/2023 |
| A122392 | 2020 | Sayona Lithium Pty Ltd | Cooglegong | <1% | Annual Report, Cooglegong Project E45/4738 for the period 30 October 2018 to 29 October 2019 |
86 more reports
| A122711 | 2020 | Rear M | Smith Bore | <1% | Annual Report for Smith Bore Project E45/04713 for the period 24 October 2018 to 23 October 2019 |
| A124034 | 2020 | Atlas Iron Pty Ltd | Mount Webber | 8.2% | Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2020 |
| A124265 | 2020 | Lithium Australia Nl | Hillside | <1% | Hillside Project Final Surrender Report E45/4660 for the period ending 6/7/2020 |
| A125088 | 2020 | Haoma Mining Nl | Spear Hill | <1% | C145/2016 Spear Hill Annual Report for the period ending 21/09/2020 |
| A125698 | 2020 | Rear M | Smith Bore | <1% | Annual Report for Smith Bore Project E 45/04713 for the period 24 October 2019 to 23 October 2020 |
| A122720 | 2020 | Haoma Mining Nl; Elazac Mining Pty Ltd | Hillside - Soansville | <1% | Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019 |
| A124033 | 2020 | Atlas Iron Pty Ltd | Mount Webber | 8.6% | Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2020 |
| A121196 | 2019 | Lithium Australia Nl | Hillside | <1% | Combined Annual Report on Hillside E45/04660 [CRG #: 20/2018] for the period 11 July 2018 to 10 July 2019 |
| A119040 | 2019 | Sayona Mining Limited | Cooglegong | <1% | Cooglegong Lithium Project E45/04738 Annual Technical Report for the period 30 October 2017 to 29 October 2018 |
| A119187 | 2019 | Haoma Mining Nl; Elazac Mining Pty Ltd | Soansville | <1% | Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018 |
| A120318 | 2019 | Atlas Iron Pty Ltd | Mount Webber | 8.6% | Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2019, E 45/02922, M45/01197, E45/04 |
| A120321 | 2019 | Atlas Iron Pty Ltd | Mount Webber | 8.2% | Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2019, M45/01209, P45/02822, E45/04 |
| A121649 | 2019 | Haoma Mining Nl | Spear Hill | <1% | Annual Report For C145/2016 (Spear Hill) for the period 22 September 2018 to 21 September 2019, P45/02973, E45 |
| A117091 | 2018 | Atlas Iron Limited | Mount Webber | 8% | Mt Webber Combined Annual Report (C187/2012) for the Period 30 March 2017 to 29 March 2018, E45/04269, E45/045 |
| A118013 | 2018 | Lithium Australia Nl | Hillside | <1% | Hillside C20/2018 Combined Annual Report for the period 31 August 2017 to 1 September 2018, E45/04654, E45/046 |
| A118150 | 2018 | Haoma Mining Nl | Speak Hill | <1% | C145/2016 Speak Hill Project Annual Report for the period 22 September 2017 to 21 September 2018, P45/02973, P |
| A116120 | 2018 | Atlas Iron Limited | Mount Webber | 100% | Final Surrender Report for P45/2739-I Mt Webber Project for the period 29 January 2010 to 10 January 2018 |
| A116690 | 2018 | Haoma Mining Nl | Soansville | <1% | C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/ |
| A117094 | 2018 | Atlas Iron Limited | Mount Webber | 9% | Mt Webber Combined Annual Report (C71/2003) for the Period 30 March 2017 to 29 March 2018, E45/02922, M45/0119 |
| A118042 | 2018 | Lithium Australia Nl | Hillside | <1% | Surrender Report of E45/4655 Hillside Project for the period 03/07/2017 - 02/08/2018 |
| A112488 | 2017 | Haoma Mining Nl | Tambourah - Soansville - Mercury Hill - | <1% | C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/ |
| A114409 | 2017 | Atlas Iron Limited | Mount Webber | 8.2% | C71/2003 Annual Tenement Report for the Period 30th March 2016 to 29th March 2017, E45/02922, M45/01197, P45/0 |
| A114400 | 2017 | Atlas Iron Limited | Mount Webber | 8% | Annual Technical Report to the Department of Mines and Petroleum for Combined Reporting Group C187/2012 (Mt We |
| A115237 | 2017 | Haoma Mining Nl | Spear Hill | <1% | C145/2016 Spear Hill Project Annual Report for the period 22 September 2016 to 21 September 2017, E45/04586, E |
| A107806 | 2016 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project E45/3437 Surrender Report to the Department of Mines and Petroleum For the Period 21 Jan |
| A108317 | 2016 | Haoma Mining Nl | Tambourah/Soansville/Mercury Hill/Tank H | <1% | Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015 |
| A109218 | 2016 | Atlas Iron Limited | Mount Webber | 8.2% | MT WEBBER PROJECT E45/2922, E45/3822, E45/4029, M45/1197, P45/2739, P45/2901, P45/2902, P45/2903, P45/2904, P4 |
| A104665 | 2015 | Haoma Mining Nl | Soansville - Tambourah - Jeff’s Hill - T | <1% | Soansville / Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual report for the period 1st December 20 |
| A105323 | 2015 | Fortescue Metals Group Ltd | White Quartz Hill | 48% | Final Surrender Mineral Exploration Report: P45/2721 White Quartz Hill Project for the period 30 August 2011 t |
| A105489 | 2015 | Atlas Iron Ltd | Mount Webber | 11% | Mt Webber Project E45/2922‐I P45/2702‐I 2705‐I 2706‐I 2739‐I P45/2901‐I to P45/ 2904‐I & M45/1197‐I Annual Tec |
| A105490 | 2015 | Atlas Iron Ltd | Mount Webber | 8.5% | Mt Webber Project E45/2312‐I E45/2268‐I E45/3437‐I E45/4269‐I M45/1209‐I P45/2822 Annual Technical Report To t |
| A107121 | 2015 | Fortescue Metals Group Ltd | Hillside | <1% | C129/2011 Hillside Final Surrender Report For the Period 1 March 2011 to 17 July 2015, E45/03445, E45/02861, E |
| A101206 | 2014 | Haoma Mining Nl | Soansville - Tambourah - Jeff’s | <1% | Soansville / Tambourah / Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2012 to 30th Nov |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A102085 | 2014 | Atlas Iron Ltd | Mount Webber | 3% | Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I |
| A102086 | 2014 | Atlas Iron Ltd | Mount Webber | 8.5% | Mount Webber Project E45/2312-I E45/2268-I E45/3437-I M45/1209-I P45/2822 to the Department of Mines and Petro |
| A102849 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project, E45/2922, Partial Surrender Report for the period 10 July 2008 to 8 July 2014. |
| A103943 | 2014 | Atlas Iron Ltd | Mount Webber | 4.6% | Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014 |
| A104367 | 2014 | Fortescue Metals Group Ltd | Hillside | <1% | Hillside Project, Annual Report for the period 01/11/2013 to 31/10/2014, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A97500 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Annual Report for the period ending 20th January 2013, E45/3437. |
| A97703 | 2013 | Atlas Iron Ltd | Mount Webber | 3.4% | Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2 |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A97509 | 2013 | Atlas Iron Ltd | Mount Webber | 3% | Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298 |
| A97510 | 2013 | Atlas Iron Ltd | Mount Webber | 11% | Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2312 & 2268; M45/1209. [C187/20 |
| A100572 | 2013 | Fortescue Metals Group Ltd | Hillside | <1% | Annual Report for the Period 1 November 2012 to 31 October 2013, C129/2011 Hillside Project E45/2861, E45/2862 |
| A92895 | 2012 | Atlas Iron Ltd | Mount Webber | 32% | Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2012 |
| A93102 | 2012 | Gondwana Resources Ltd | Trigg Hill | <1% | Annual Report E45/3437 Trigg Hill Project 2011, period covered to 21st January 2011 to 2oth January 2012 |
| A93517 | 2012 | Atlas Iron Ltd | Mount Webber | 3% | MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/ |
| A96143 | 2012 | Fortescue Metals Group Ltd | Hillside | <1% | Hillside Project, Annual Report for the period 01/11/2011 to 31/10/2012, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A89779 | 2011 | Giralia Resources Nl | Daltons | 3.2% | Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011 |
| A89929 | 2011 | Atlas Iron Ltd | Mount Webber | 32% | Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2011 |
| A89736 | 2011 | Atlas Iron Ltd | Mount Webber | 100% | Mt Webber Project P45/2739 Annual Report to DMP Period Ending 29 January, 2011 |
| A86431 | 2010 | Atlas Iron Ltd | Mount Webber | 32% | Mount Webber E45/2268, Annual Report for the period 30/01/2009 – 29/01/2010 |
| A86548 | 2010 | Giralia Resources Nl | Daltons | 3.2% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010 |
| A81669 | 2009 | Giralia Resources Nl | Daltons | 3.2% | Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009 |
| A77584 | 2008 | Montezuma Mining Company Ltd | Curlew | <1% | Annual Report on E45/2548 Curlew Project, for the Period January 7 2007 to January 6 2008 |
| A78788 | 2008 | Montezuma Mining Company Ltd | Curlew | <1% | Annual Report on E45/2769, Curlew Project, for the Period 16 May 2007 to 15 May 2008 |
| A80593 | 2008 | Giralia Resources Nl | Daltons | 3.2% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003 |
| A74451 | 2007 | Montezuma Mining Company Ltd | Curlew | <1% | Annual Report on E45/2548 Curlew Project, For the Period 7 January 2006 to 6 January 2007, (Marble Bar). |
| A75225 | 2007 | Montezuma Mining Company Ltd | Curlew | <1% | Curlew Project, Annual Report for the period 16th May 2006 to 15th May 2007, E45/2769. |
| A75860 | 2007 | Giralia Resources Nl | Daltons | 3.4% | E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29 |
| A72610 | 2006 | Giralia Resources Nl | Daltons | 3.4% | E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20 |
| A71128 | 2005 | Giralia Resources Nl | Daltons | 3.4% | E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin |
| A68997 | 2004 | Giralia Resources Nl | Daltons | 3.4% | Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187 |
| A66961 | 2003 | Giralia Resources Nl | Daltons | 6.8% | E45/2186, Daltons Project, Annual Technical Report for 12 months ending 4 March 2003. |
| A64441 | 2002 | Mr North De | Curlew | 8.1% | Curlew Project, Annual Report for the period 02/12/2000 to 01/12/2001, E45/1724. |
| A61722 | 2001 | Stockdale Prospecting Ltd | Hillside | 30% | 2000 Final Report for Exploration Licence 45/2137 February 2001 |
| A62174 | 2001 | Mr North De | Beryl Emerald | 8.1% | Annual Report on exploration licence 45/1724 'Curlew' Beryl/ Emerald Project for the period 2.12.99 to 1.12.00 |
| A59703 | 2000 | Haoma Mining Nl | Lalla Rookh - North Pole | 9% | Group 3, Lalla Rookh -North Pole, Tenements E45/1453 and E45/1513, Partial Surrender Report for the period end |
| A60184 | 2000 | Haoma Mining Nl | North Shaw | 6.9% | Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1 |
| A60185 | 2000 | Haoma Mining Nl | North Pole,Lalla Rookh,Callina Creek,Nor | 6% | North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M |
| A57391 | 1999 | Mr Johnston Lg | North Pole | 17% | North Pole - Surrender Report 1998 Exploration Licence: E45/1882 |
| A58642 | 1999 | Haoma Mining Nl | North Shaw | 9% | Surrender Report E45/1453,1513 for period ending July 1999 ( North Shaw Project). |
| A54106 | 1998 | Haoma Mining Nl | North Pole, Lala Rookh, Callina Creek, N | 1.5% | Group3 - North Pole, Lala Rookh, Callina Creek, Normay, & Mickeys Find. Annual report for the period ending 11 |
| A54603 | 1998 | Stockdale Prospecting Ltd | Exposed Pilbara | 1.7% | Exposed Pilbara Project, Final Report on Exploration Licence E45/1827, March 1998. |
| A54804 | 1998 | Gold Partners Nl | Market Creek/ North Shaw | 15% | North Shaw Project, Market Creek,Partial Surrender Report for the period 15th September 1994 to 27th March1998 |
| A53072 | 1997 | Geographe Resources Ltd | North Shaw | 6.6% | North Shaw Project, Annual Report for year ending 18th August 1997, E45/1453, 1513, & 1600. |
| A49396 | 1996 | Gold Partners Nl | North Shaw | 15% | Market Creek Project Annual Report E45/1513 for Period 15/09/1995 to 14/09/1996, Soil Sampling, Geological Map |
| A46198 | 1995 | Gold Partners Nl | Market Creek | 15% | Market Creek Project, Annual Report E45/1513 for the year ending September 14th 1995. |
| A40371 | 1994 | Mt Edon Gold Mines Nl | Shaw River | 1.4% | Shaw River Project, Annual Report for the period 01/09/1993 to 01/09/1994, E45/1219 -1221. |
| A43234 | 1994 | Mt Edon Gold Mines Nl | Shaw River | 1.4% | Annual report for the period 09/93-09/94 Shaw River Project E45/1219 E45/1220 E45/1221 |
| A28619 | 1989 | Hooker Mining Pty Ltd | White Quartz Hill | 51% | White Quartz Hill Project, Non-statutory Report: Mineralogical Analysis of Beryllium Rich Permatite Samples f |
| A25091 | 1988 | Gold Partners Nl | Daltons | 14% | Daltons Tenements, Annual report, 1988, P45/1232-1234, P45/820-822, P45/1198-1200, P45/1205-1225 |
| A12625 | 1970 | Hull Mining Aust Pty Ltd | Daltons | 34% | Daltons Project, Non-statutory Report: Reconnaissance Report, MC45/ 4713-4720, 4748-4762, 4980, 4966-4971,& 49 |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
| A79126 | 1753 | Giralia Resources Nl | Daltons | 3.4% | E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 45/4979 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 45/4979? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.