E 47/5110
E 47/5110 is a pending exploration licence in the Shire of Ashburton, Western Australia, applied for by Fmg Pilbara Pty Ltd (part of Fortescue Ltd). The application was received on 10 Jan 2024 and is awaiting a decision. The ground is covered by 102 historical WAMEX reports.
Register summary
- Holder
- Fmg Pilbara Pty Ltd
- Part of
- Fortescue Ltd (ASX:FMG) as at 2026-06-30
- Local government
- Shire of Ashburton
- Application received
- 10 Jan 2024
The full record on E 47/5110
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (5 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125376 | 2020 | Fortescue Metals Group Ltd | Mount MacLeod | 8.9% | C184/2007 Mount MacLeod Project Annual Report for the period ending 31 August 2020 |
| A119830 | 2019 | Fortescue Metals Group Ltd | Mount Brockman | <1% | P47/1269 Mount Brockman Final Surrender Report |
| A120564 | 2019 | Fortescue Metals Group Ltd | Mount Brockman | <1% | E47/1762 Mount Brockman Partial Surrender (125/2011) for the period 13 April 2012 to 28 June 2019 |
| A116998 | 2018 | Fortescue Metals Group Ltd | Mount Brockman | <1% | E47/1762 (Mount Brockman) Partial Surrender Report for the period 13/04/2012 - 12/04/2018 |
| A114111 | 2017 | Fortescue Metals Group Ltd | Mount MacLeod | <1% | C184/2007 Mount MacLeod Final Surrender Report For the Period 23 May 2006 to 2 May 2017, E47/01479, E47/01685 |
97 more reports
| A112210 | 2017 | Robe River Mining Co Pty Ltd | Kangeenarina Well | <1% | Kangeenarina Well Annual Report Exploration Licence 47/1781 (GDSR 6556) for the period 02/02/2016 to 01/02/201 |
| A109336 | 2016 | Fortescue Metals Group Ltd | Mount MacLeod | <1% | C184/2007 Mount MacLeod Final Surrender Report For the Period 15 August 2011 to 29 April 2016, E47/02475, E47/ |
| A108872 | 2016 | Fortescue Metals Group Ltd | Mount MacLeod | <1% | C184/2007 Mount MacLeod Final Surrender Report For the Period 15 February 2013 to 5 April 2016, E47/02546, P47 |
| A109507 | 2016 | Fortescue Metals Group Ltd | C184/2007 Mount MacLeod Partial Surrende | <1% | C184/2007 Mount MacLeod Partial Surrender Report, for the period 23 May 2006 to 16 May 2016 |
| A105452 | 2015 | Fortescue Metals Group Ltd | Solomon East | 4.4% | Combined Annual Mineral Exploration Report: C225/2008 Solomon East for the period 1 January 2014 to 31 Decembe |
| A107203 | 2015 | Hamersley Exploration Pty Ltd; Hamersley Iron Pty Ltd | Brockman Valley | 7.6% | Brockman Valley Project Area Combined Annual Report Exploration Licences 47/47, 47/661, and 47/1054 (C17/2004) |
| A105067 | 2015 | Fortescue Metals Group Ltd | Mount Brockman | <1% | Combined Annual Mineral Exploration Report: C125/2011 “Mount Brockman” for the period 01st January 2014 to 31s |
| A105735 | 2015 | Robe River Mining Co Pty Ltd | Kangeenarina | <1% | Kangeenarina Project Area Combined Annual Report Exploration Licence 47/1781 and Prospecting Licences 47/1337, |
| A107581 | 2015 | Fortescue Metals Group Ltd | Mount MacLeod | 4.8% | C184/2007 Mount MacLeod Annual Report for the period 1 September 2014 to 31 August 2015, E47/01390, E47/01391, |
| A101305 | 2014 | Fortescue Metals Group Ltd | Mount Brockman | <1% | Combined Annual Mineral Exploration Report: C125/2011 “Mount Brockman” 01st January for the period 01st Januar |
| A102010 | 2014 | Fortescue Metals Group Ltd | Walkalina 1 | <1% | Annual Mineral Exploration Report: E47/2546 Walkalina 1 for the period 15 February 2013 to 14 February 2014 |
| A102239 | 2014 | Robe River Mining Co Pty Ltd | Kangeenarina | <1% | Kangeenarina Project Area Combined Annual Report Exploration Licence 47/1781 and Prospecting Licences 47/1337 |
| A104154 | 2014 | Fortescue Metals Group Ltd | Mount MacLeod | 4.9% | Mount MacLeod Project (C184/2007) Annual Report for the Period 01 September 2013 to 31 August 2014, E47/1390-1 |
| A101034 | 2014 | Rio Tinto Iron Ore | Kangeenarina Well | <1% | Kangeenarina Well Project, Partial Surrender Report for the period 02/02/2008 to 14/01/2014, E47/1781. [C21/20 |
| A101548 | 2014 | Fortescue Metals Group Ltd | Solomon East | 4.4% | Annual Report for the Period 1 January 2013 to 31 December 2013, C225/2008 Solomon East |
| A101809 | 2014 | Fortescue Metals Group Ltd | Ridge Bore 2 | 41% | Partial Surrender Exploration Report: E47/1763 Ridge Bore 2 for the period 18th December 2007 to 17th December |
| A103741 | 2014 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project Area Combined Annual Report Exploration Licences 47/47, 47/661, and 47/1054 (C17/2004) |
| A97386 | 2013 | Fortescue Metals Group Ltd | Solomon East | 4.9% | Annual Report for the period 1 January 2012 to 31 December 2012, Solomon East Project C225/2008, E47/1011, 131 |
| A96861 | 2013 | Fortescue Metals Group Ltd | Mount Brockman | <1% | Mount Brockman Project, Annual Report for the period 1st January 2012 to 31st December 2012, E47/1533, 1679, 1 |
| A97997 | 2013 | Robe River Mining Co Pty Ltd | Kangeenarina | <1% | Kangeenarina Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E47/1781; P47/1337 & 13 |
| A99707 | 2013 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project Area Combined Annual Report for E47/661, E47/1054, E47/47 for the period 2 October 201 |
| A100146 | 2013 | Fortescue Metals Group Ltd | Mount MacLeod | 5.2% | Annual Report for the Period 01 September 2012 to 31 August 2013, C184/2007 Mount MacLeod, E47/1390.....P47/16 |
| A93275 | 2012 | Fortescue Metals Group Ltd | Solomon East | 5.2% | Solomon East Project, Annual Report for the period 01/01/2011 to 31/12/2011, E47/1011, 1333, 1334, 1398, 1399, |
| A93815 | 2012 | Rio Tinto Iron Ore | Kangeenarina Well | <1% | Annual Technical Report for Kangeenarina E47/1781, P47/1337 & P47/1353-1359 C21/2008 for the period 24 April 2 |
| A95533 | 2012 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Annual Technical Report for Brockman Valley Project Area E47/661, E47/1054, E47/47 for the period 2 October 20 |
| A95685 | 2012 | Fortescue Metals Group Ltd | Mount MacLeod | 5.2% | Combined Annual Report for the period 1 September 2011 to 31 August 2012, Mt MacLeod Project, E47/1390-1, 1419 |
| A89651 | 2011 | Fortescue Metals Group Ltd | Solomon East | 7.8% | Annual report for the period 1 January 2010 to 31 December 2010, Solomon East Project, C225/2008 Tenement Num |
| A90040 | 2011 | Rio Tinto Iron Ore | Kangeenarina Well | <1% | Kangeenarina Well Project, Annual Report for the period 24th April 2010 to 23rd April 2011, E47/1781; P47/1337 |
| A91637 | 2011 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project C17/2004 Annual Technical Report for the Period 2/10/2010 to 1/10/2011, E47/1054, E47/ |
| A92246 | 2011 | Fortescue Metals Group Ltd | Mount MacLeod | 7.4% | Mt MacLeod Project, Annual Report for the period 1st September 2010 to 31st August 2011, E47/1390-1391, 1455, |
| A88265 | 2010 | Rio Tinto Iron Ore | BROCKMAN BORROW PITS | 40% | Brockman Borrow Pits, Mining Leases M47/369, M47/370, M47/371 and M47/372 – Combined Annual Technical Report f |
| A85927 | 2010 | Fortescue Metals Group Ltd | Solomon East | 7.8% | Annual report for the period 1 January 2009 to 31 December 2009, Solomon East Project |
| A86608 | 2010 | Rio Tinto Iron Ore | Kangeenarina Well | <1% | Kangeenarina Well Project Area, Combined Annual Technical Report for Exploration and Prospect Licences E47/178 |
| A88324 | 2010 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project C17/2004 ANNUAL TECHNICAL REPORT EXPLORATION LICENCES E47/1054, E47/661 & E47/47 |
| A88768 | 2010 | Fortescue Metals Group Ltd | Mount MacLeod | 9.7% | Combined Annual report for the period 1 September 2009 to 31 August 2010, Mt MacLeod Project, E47/1390-1, E47/ |
| A81239 | 2009 | Fortescue Metals Group Ltd | Solomon East | 8% | Annual report for the period 1 January 2008 to 31 December 2008, Solomon East Project, E47/1011, E47/1333, E47 |
| A82133 | 2009 | Rio Tinto Iron Ore | Kangeenarina Well | <1% | Kangeenarina Well Project Area Combined Annual Technical Report for Exploration and Prospect Licences E47/1781 |
| A84594 | 2009 | Rio Tinto Iron Ore | BROCKMAN BORROW PITS | 40% | ANNUAL REPORT 2009 MINING LEASES 47/369, 47/370, 47/371, 47/372, COMBINED REPORTING GROUP C2/2009, BROCKMAN BO |
| A84724 | 2009 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project, C17/2004, Annual Technical Report for the Period 2/10/2008 to 1/10/2009 |
| A84803 | 2009 | Fortescue Metals Group Ltd | Mount Macleod | 9.8% | Annual Report for the period 1 September 2008 to 31 August 2009, Mt MacLeod Project, E47/1479-1480, E47/1455, |
| A78473 | 2008 | Rio Tinto Exploration Pty Ltd | Kangeenarina Well | <1% | Kangeenarina Well Project Combined Annual Report for E47/1781, P47/1337, 1353, 1354, 1355, 1356, 1357, 1358 Re |
| A79818 | 2008 | Rio Tinto Iron Ore | Brockman Borrow Pits | 40% | Annual Report 2008, Mining Leases 47/369-372, Brockman Borrow Pits |
| A79920 | 2008 | Rio Tinto Iron Ore | Brockman Valley | 7.6% | Brockman Valley Project C17/2004. Annual Technical Report for the Period 2/10/2007 to 1/10/08 |
| A80340 | 2008 | Fortescue Metals Group Ltd | Mount MacLeod | 9.8% | Annual report for the period 1 September 2007 to 31 August 2008, Mount MacLeod Project, E47/1479-1480, E47/145 |
| A75165 | 2007 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 6.5% | Kangeenarina Well Project, Annual Report for the period 24th April 2006 to 23th April 2007, E47/731. |
| A75563 | 2007 | Poondano Exploration Pty Ltd | Poondano | <1% | Exploration Report for the Year Ending 22 May 2007 E47/1479 |
| A76416 | 2007 | Hamersley Iron Pty Ltd | Brockman Valley | 7.6% | BROCKMAN VALLEY EXPLORATION LICENCES E47/1054, E47/661, E47/47 ANNUAL REPORT FOR THE PERIOD 02/10/2006 TO 01/1 |
| A72458 | 2006 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 6.5% | Kangeenarina Well, Annual Report for E47/731, 24 April 2005 to 23 April 2006. |
| A73611 | 2006 | Pilbara Iron Pty Ltd | Brockman Valley | 7.6% | Brockman Valley E47/47,661,1054, Annual Report for the Period 04/10/2005 to 03/10/2006, (Hamersley Iron Report |
| A70857 | 2005 | Robe River Mining Co Pty Ltd | Kangeenarina Well iron ore exploration | 6.5% | Kangeenarina Well, Annual report for E47/731, 10 June 2004 - 09 June 2005 (C264/1996, Ref 2118). |
| A71335 | 2005 | Hamersley Iron Pty Ltd | Brockman Valley | 7.6% | Brockman Valley, Exploration Licences E47/1054,E47/661 & E47/47, West Pilbara Mineral Field Western Australia, |
| A67986 | 2004 | Hamersley Iron Pty Ltd | Mount Brockman | 29% | Annual Report for the period 18/12/2002- 17/12/2003 Walkalina Project E47/47 |
| A68951 | 2004 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 6.5% | Kangeenarina Well, Annual Report E47/731 for the period 10/06/2003-09/06/2004. |
| A69443 | 2004 | Hamersley Iron Pty Ltd | Brockman Valley | 7.6% | Annual report for the period 03/12/03 - 02/12/04 Brockman Valley Project, C17/2004,West Pilbara Mineral Field |
| A65985 | 2003 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mount Sylvia Project, Annual Report for the period 24/11/2001 to 23/11/2002 , E47/661. |
| A65987 | 2003 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina Exploration Licence E47/47,Annual Report for the period 18/12/2001 to 17/12/2002 . |
| A66929 | 2003 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 3.5% | Kangeenarina Well/Stevenson Bore, Combined Annual Report for E47/731,E47/803 10 June 2001 to 9 Jun2002. Robe R |
| A67454 | 2003 | Hamersley Iron Pty Ltd | WALKALINA NORTH 01 | 60% | Final Surrender Report from the period 21 September 2002 to 2003 Walkalina North 01 E47/937 |
| A67479 | 2003 | Hamersley Iron Pty Ltd | Walkalina West 01 | 1.2% | Annual Report for the period 22/09/2002 to 21/09/2003 Walkalina West 01 Project E47/936 Report GDSR 4414 |
| A67702 | 2003 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project, Exploration Licence E47/661, West Pilbara Mineral Field, WA. Annual Report for the period 2 |
| A67858 | 2003 | Hamersley Iron Pty Ltd | Walkalina West (01) | 1.2% | Final Surrender Report for the period ending 2003 Walkalina West (01) Project E47/936 |
| A64122 | 2002 | Hamersley Iron Pty Ltd | Walkalina | 29% | Annual Report for the period 18/12/2000 to 17/12/2001 Walkalina exploration licence E47/47, West Pilbara Miner |
| A65582 | 2002 | Hamersley Iron Pty Ltd | Walkalina West | 1.2% | Annual Report E47/936 ( Walkalina West Project) covering period 21/9/2001 To 20/9/2002. |
| A65584 | 2002 | Hamersley Iron Pty Ltd | Walkalina North | 60% | Annual Report E47/937 covering period 21/9/2001 to 20/9/2002 (Walkalina NorthProject). |
| A65116 | 2002 | Robe River Mining Co Pty Ltd | Kangeenarina Well/Stevenson | 3.5% | Combined Annual Report For E47/731 and E47/803 10 June 2001 - 9 June 2002. Our Ref: 1752 DMPR Ref: C264/1996 |
| A61627 | 2001 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project, Exploration Licence E47/661, West Pilbara Mineral Field, Western Australia, Annual Report f |
| A61757 | 2001 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina exploration licence E47/47 West Pilbara Mineral Field, Western Australia Annual Report for the perio |
| A62950 | 2001 | Robe River Mining Co Pty Ltd | Kangeenarina Wel | 3.5% | Kangeenarina Well/Stevenson Bore, Combined Annual Report for E47/731,803, 10 June 2000 - 9 June 2001. |
| A63642 | 2001 | Hamersley Iron Pty Ltd | Walkalina North | 60% | Walkalina North exploration licence E47/937, West Pilbara Mineral Field, Western Australia. Annual Report for |
| A63644 | 2001 | Hamersley Iron Pty Ltd | Walkalina | 1.2% | Walkalina West exploration licence E47/936, West Pilbara Mineral Field, Western Australia. Annual Report for |
| A63736 | 2001 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 6.5% | Kangeenarina Well E47/731 Partial Surrender Report. |
| A64002 | 2001 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Annual Report for the period 24/11/2000 to 23/11/2001 Mt Sylvia Project exploration licence E47/661, West Pilb |
| A59734 | 2000 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina Exploration Licence E47/47 West Pilbara Mineral Field Western Australia Annual Report for 1999 Repor |
| A60875 | 2000 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 3.5% | Kangeenarina Well/Stevenson Bore Combined Annual Report for E47/731 and E47/803 10 June 1999 to 9 June 2000.Re |
| A57025 | 1999 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project - Exploration Licence: E47/661 West Pilbara Mineral Field W.A. 24/11/97 - 23/11/98 |
| A57326 | 1999 | Hamersley Iron Pty Ltd | Silvergrass | 10% | Silvergrass Project Exploration Licence: E47/43-45, 47, 50, 904 West Pilbara Mineral Field W.A. 18/12/97 - 17/ |
| A58755 | 1999 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 3.5% | Kangeenarina Well / Stevenson Bore Combined Annual Report E47/731, E47/803 10/06/1998 - 09/06/1999 |
| A59527 | 1999 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project, Exploration Licence E47/661, West Pilbara Mineral Field, Western Australia, Annual Report f |
| A53381 | 1998 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project Exploration Licence E47/661 West Pilbara Mineral Field WA Annual report for 1997 |
| A53616 | 1998 | Hamersley Iron Pty Ltd | Silvergrass | 13% | Silvergrass Project. West Pilbara Mineral Field W.A. Annual Report 1997, 18/12/1996 - 17/12/1997 Explor |
| A55356 | 1998 | Robe River Mining Co Pty Ltd | Kangeenarina Well | 3.5% | Kangeenarina Well/Stevenson Bore Combined Annual Report for E47/731 and E47/803 10/06/97-09/06/98 |
| A49826 | 1997 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project Exploration Licence E47/661 West Pilbara Mineral Field Western Australia Annual report for t |
| A50060 | 1997 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina Exploration Licence E47/47 West Pilbara Mineral Field Western Australia Annual report for the period |
| A51876 | 1997 | Robe River Mining Co Pty Ltd | Kangeenarina Well - Stevenson Bore | 3.5% | Kangeenarina Well/Stevenson Bore Annual report for E47/731 and E47/803 10 June 1996 to 9 June 1997 C264/1996 |
| A46645 | 1996 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project Exploration Licence E47/661 West Pilbara Mineral Field Western Australia Annual report for t |
| A43465 | 1995 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina Exploration Licence E47/47 West Pilbara Mineral Field Western Australia Annual report for the period |
| A46909 | 1995 | Hamersley Iron Pty Ltd | Walkalina | 29% | Exploration Licence E47/47 Walkalina Annual report for the period 18/12/94 to 17/12/95 West Pilbara Mineral Fi |
| A42928 | 1994 | Kilkenny Gold Nl | Mount Brockman | 2.1% | Mt Brockman Project, Final Surrender Report for the period 14th October 1993 to 13 October 1994, E47/594. |
| A40195 | 1994 | Hamersley Iron Pty Ltd | Walkalina | 29% | Annual report for the period 18/12/92-17/12/93 Walkalina Project E47/47 |
| A43211 | 1994 | Hamersley Iron Pty Ltd | Mount Sylvia | <1% | Mt Sylvia Project Exploration Licence E47/661 West Pilbara Mineral Field Western Australia Annual report for t |
| A37654 | 1993 | Hamersley Iron Pty Ltd | Walkalina | 29% | Annual report for the period 18/12/91-17/12/92 Walkalina Project E47/47 |
| A39885 | 1993 | Kilkenny Gold Nl | Mount Brockman | 2.1% | Mount Brockman Project, Annual Report for the period 13/10/1992 to 12/10/1993, E47/594. |
| A35017 | 1992 | Hamersley Iron Pty Ltd | Walkalina | 29% | Annual Report for the period 18/12/90-17/12/91 Walkalina Project E47/47 |
| A32459 | 1991 | Hamersley Iron Pty Ltd | Walkalina | 29% | Walkalina Project E47/47. Annual Report 18/12/89-17/12/90. West Pilbara Mineral Field, WA. |
| A29716 | 1990 | Hamersley Iron Pty Ltd | Mount Tom Price | 29% | Annual report 18/12/88 - 17/12/89 Exploration licence E47/47 |
| A23242 | 1988 | Cra Exploration Pty Ltd | Silvergrass | 1.6% | Silvergrass Project[s], Final Surrender Report , March 1987,E47/226 - 230 & ELA 47/241 - 242. |
| A4505 | 1973 | Australian Steel & Mining Corp | Marra Mamba | 3.8% | Marra Mamba Project, Non-statutory Report: Report on Testing Marra Mamba Formations, February 1973, TR70/5674- |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 47/5110 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.